Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

BASIC ASSESSMENT PROCESS FOR THE GRID CONNECTION INFRASTRUCTURE, INCLUDING 132KV OVERHEAD POWERLINE, SWITCHING STATION AND ANCILLARIES, FOR THE GREAT KAROO WIND FARM, NORTHERN CAPE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Great Karoo Wind Farm (Pty) Ltd, proposes the development of specific grid connection infrastructure required to connect and evacuate the generated power of the authorised Great Karoo Wind Farm (DEA Ref No. 12/12/20/2370/3) to the national electricity grid. Following consultation with Eskom, it has been confirmed that the Great Karoo Wind Farm must connect to the Hidden Valley substation located at the ACED Renewables Hidden Valley (Karusa) Wind Farm, which is currently under construction, to the west of Great Karoo Wind Farm. The project is located ~44km south of Sutherland and ~50km north of Matjiesfontein within the Northern Cape Province and falls within the Namakwa District Municipality and the Karoo Hoogland Local Municipality. The grid connection infrastructure required includes a switching station (up to 100m x 100m which is 2ha) to be developed adjacent to the authorised Great Karoo Wind Farm on-site substation. A 132kV double- or single-circuit overhead powerline, with a length of up to 14km, will connect the proposed switching station to the Eskom Hidden Valley substation. The pylon structures of the power line will be up to 32m high and the power line will be developed within the servitude of up to 40m wide. A grid connection corridor of 300m has been identified for the power line, which widens to ~740m wide for the eastern section of the powerline to allow for consideration of alternatives. A 500m assessment area around the wind farm substation has been considered for the placement of the switching station. Collectively, these assessment areas are referred to as the “development envelope”. The proposed infrastructure will be appropriately placed within the development envelope, outside of identified environmental sensitive areas. Where possible, the switching station will be accessed via the authorised access road to the Great Karoo Wind Farm substation. However, where this is not feasible during construction a service track along the length of the power line servitude, of up to 4m wide, will be required to allow for large crane movement. This track will be rehabilitated following construction to a typical ‘jeep’ track (i.e. off-road track) for use during operation. Other associated infrastructure includes drainage line crossing infrastructure (culverts) and temporary laydown area/s that will be rehabilitated upon completion of the construction phase. Two power line alternatives are being considered for the project which are near the starting point of the power line at the proposed switching station. Both alternatives are assessed equally as part of the Basic Assessment process. The alternative that will be developed will depend on the final placement of turbines at the Great Karoo Wind Farm, since the powerline will need to be routed between the turbines (the final turbine positions will only be confirmed closer to the time of wind farm construction in which Eskom setback requirements will also need to be catered for). It is therefore requested that both alternatives be approved, on condition that only one of the alternatives will be developed. The grid connection infrastructure will be located within three affected properties: » Farm Kentucky No. 206; » Portion 1 of the Farm Orange Fontein No. 203; and » Remaining Extent of the Farm De Hoop No. 202.

ApplicationDate: 

Friday, October 30, 2020 - 15:03

CaseID: 

15700

OtherReferences: 

CaseReferenceDepartmentApplicationTypeContactPersonFinalDecision
12/12/20/2370/3/AM6

ReferenceList: 

 
 

Search form