Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Botswana-South Africa (BOSA) Transmission Interconnection Project

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed 400kV transmission power line, stretching between the Mahikeng area (North West Province) in South Africa and Gaborone in Botswana. The line will connect the existing Isang substation in Botswana to the proposed Watershed B substation in South Africa.

Expanded_Motivation: 

The Botswana-South Africa (BOSA) Transmission Interconnection Project, is one of the identified and planned initiatives to address the power generation and transmission challenges in the region. The establishment of the BOSA interconnector provides the opportunity for trade in electricity to better balance the supply/demand requirements of the region and thereby stimulate economic activity

ApplicationDate: 

Friday, July 14, 2017 - 15:24

CaseID: 

11363

OtherReferences: 

DepartmentApplicationTypeDeadlineDateContactPersonFinalDecision
31/07/2017

ReferenceList: 

AdditionalDocuments
  1. PDF icon 112581_BOSA DSR 28 June 2017.pdf
  2. PDF icon 2. Locality Map Without Imagery.pdf
  3. PDF icon 3. Sensitivity Map.pdf
  4. PDF icon Environmental and Social Impact Assessment Report (EIA phase)
  5. PDF icon Appendix A - Project Team.pdf
  6. PDF icon Appendix B - EAP Declaration.pdf
  7. PDF icon App C4 Records of Emails.pdf
  8. PDF icon App C1 - DEA Botswana Correspondence.pdf
  9. PDF icon App C2 - DEA SA Correspondence.pdf
  10. PDF icon App C3 MCDM Workshop Register.pdf
  11. PDF icon G_4. Avifauna Report.pdf
  12. PDF icon G_6. Social Impact Assessment Report.pdf
  13. PDF icon G_7 BOSA Draft RAP Report - Rev2.pdf
  14. PDF icon G_7a RAP - Appendix A.pdf
  15. PDF icon G_7b(1) RAP - Appendix B(a).pdf
  16. PDF icon G_7b(2) RAP - Appendix B(b).pdf
  17. PDF icon G_7c RAP - Appendix C.pdf
  18. PDF icon G.1. Climate Change Report.pdf
  19. PDF icon G.2. VIA Report_Draft.pdf
  20. PDF icon G_3. Ecological Report_Draft.pdf
  21. PDF icon Ann F_1. Plan of Study.pdf
  22. PDF icon 112581_BOSA_ESMP_signed.pdf
  23. PDF icon App 2_Air Quality.pdf
  24. PDF icon Appendix D - Maps.pdf
  25. PDF icon App 3_Noise&Vibrations.pdf
  26. PDF icon App 4_Water Resources.pdf
  27. PDF icon App 5_Biodiversity.pdf
  28. PDF icon App 6_Waste.pdf
  29. PDF icon App 7_Sediment&Erosion .pdf
  30. PDF icon App 8_Construction Material.pdf
  31. PDF icon App 9_ Heritage.pdf
  32. PDF icon App 10_Traffic.pdf
  33. PDF icon App 11_Social.pdf
  34. PDF icon App 12_Health and Safety.pdf
  35. PDF icon Ann I_3. MCDM Addendum.pdf
  36. PDF icon Ann I_1. Final Inception Report_Rev2.pdf
  37. PDF icon Ann I_2. MCDM Report.pdf
  38. PDF icon Final Scoping Report - External Review - Aurecon - Aug 2017.pdf
  39. PDF icon App E1 - I&AP Database.pdf
  40. PDF icon App E2 - Stakeholder Plan.pdf
  41. PDF icon FSR_Ann E3.4. Proof of Distribution_Botswana.pdf
  42. PDF icon FSR_Ann E3.1. BIDs (Afr, Engl&Tswana).pdf
  43. PDF icon FSR_Ann E3.2. Proof of Distribution in SA.pdf
  44. PDF icon FSR_Ann E3.3. Recipient Signatures BIDs_SA.pdf
  45. PDF icon BOSA_Newspaper_EIA_Eng_SA_Dec17_vers4.pdf
  46. PDF icon BOSA_Newspaper_EIA_Afr_SA_Dec17_ver4.pdf
  47. PDF icon FSP_Email_I&AP's_21Sept17.pdf
  48. PDF icon E5.1_1. CRR.pdf
  49. PDF icon Mr Ackerman_21Sept 17.pdf
  50. PDF icon 1. Notification Period.pdf
  51. PDF icon 2. ScopingRound1.pdf
  52. PDF icon 3. ScopingRound2.pdf
  53. PDF icon 6. Prof Legotla_meetings.pdf
  54. PDF icon 1. Permission access.pdf
  55. PDF icon 2. Request_Madikwe.pdf
  56. PDF icon 3. MrPienaar_Meetings.pdf
  57. PDF icon 4. Prof Legotla_meetings.pdf
  58. PDF icon 5. Prof Legotla_meetings.pdf
  59. PDF icon Public Meetings_Sept17.pdf
  60. PDF icon 5. Supingstad_Ldrs.pdf
  61. PDF icon 6. Lehuritshe Trad.pdf
  62. PDF icon 7. RamotshereLM.pdf
  63. PDF icon 8. Supingstad.pdf
  64. PDF icon 1. Klippan_Farmers.pdf
  65. PDF icon 2. Lehurutshe.pdf
  66. PDF icon 3. Serake.pdf
  67. PDF icon 4. Serake_Tribal.pdf
  68. PDF icon Letter responding to SAHRA's comments_03.04.18.pdf
  69. PDF icon EA - 14-12-16-3-3-2-1025.pdf
 
 