Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Phase 1 HIA for the Seriti Arnot Water Treatment Plant Project

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Large open cast mining operations at Seriti Arnot ceased in 1992. The area is currently undergoing mine closure rehabilitation as part of the fulfilment of the mine closure obligations. Since the ceasing of mine operations, mine impacted water emanating from Seriti’s mining area is conveyed through a water reservoir network to the final void dam. From the dam, water is pumped to evaporators which are used to dissipate decant water for irrigation purposes. The high energy and maintenance requirements of the mechanical evaporation is problematic due to the high costs associated with the system. The Arnot OpCo mining area, recently acquired from Exxaro, consists of an underground and two open cast mining sections which have recently been closed. At Arnot OpCo, decant water from the Schoonoord area is managed through pumping from boreholes and shafts to U3 Dam. At the Mooifontein opencast area, decant water is pumped from the West to the South Pit resulting in a circulatory flow of water. As part of the mine closure requirements, Seriti and Arnot OpCo are responsible for ensuring that mine impacted water is properly managed prior to discharge to either the local catchment or to a nominated and acceptable end user. Management of decant water may necessitate treatment intervention to ensure that the water does not have a detrimental impact on the surrounding environment or downstream water users. Due to the institutional arrangement between the coal miners (Seriti and Arnot OpCo) and the coal consumer (Eskom), the financial liability of mine closure is held by Eskom. A pre-feasibility study conducted in May 2018 investigated various treatment options and proposed a treatment train consisting of a centralised Lime Softening, Ultrafiltration and Nanofiltration as the go-forward water treatment solution. The CWTP was to be situated near the previous Seriti mine area and required to be designed for a capacity of approximately 12.3 Mℓ/d, abstracted from both Seriti and Arnot OpCo. The water treatment and conveyance systems include the following major units: • A decant water abstraction system • A decant water conveyance system • A Combined Water Treatment Plant (CWTP) • A treated water conveyance system • A waste and solids handling system • Requisite access roads and associated security infrastructure • Requisite electrical and commercial and industrial (C&I) infrastructure The development will also require road, stream and railway line crossings. Eskom power lines are also found within the pipeline route and will be negotiated with Eskom prior to construction.

Expanded_Motivation: 

Large open cast mining operations at Seriti Arnot ceased in 1992. The area is currently undergoing mine closure rehabilitation as part of the fulfilment of the mine closure obligations. Since the ceasing of mine operations, mine impacted water emanating from Seriti’s mining area is conveyed through a water reservoir network to the final void dam. From the dam, water is pumped to evaporators which are used to dissipate decant water for irrigation purposes. The high energy and maintenance requirements of the mechanical evaporation is problematic due to the high costs associated with the system. The Arnot OpCo mining area, recently acquired from Exxaro, consists of an underground and two open cast mining sections which have recently been closed. At Arnot OpCo, decant water from the Schoonoord area is managed through pumping from boreholes and shafts to U3 Dam. At the Mooifontein opencast area, decant water is pumped from the West to the South Pit resulting in a circulatory flow of water. As part of the mine closure requirements, Seriti and Arnot OpCo are responsible for ensuring that mine impacted water is properly managed prior to discharge to either the local catchment or to a nominated and acceptable end user. Management of decant water may necessitate treatment intervention to ensure that the water does not have a detrimental impact on the surrounding environment or downstream water users. Due to the institutional arrangement between the coal miners (Seriti and Arnot OpCo) and the coal consumer (Eskom), the financial liability of mine closure is held by Eskom. A pre-feasibility study conducted in May 2018 investigated various treatment options and proposed a treatment train consisting of a centralised Lime Softening, Ultrafiltration and Nanofiltration as the go-forward water treatment solution. The CWTP was to be situated near the previous Seriti mine area and required to be designed for a capacity of approximately 12.3 Mℓ/d, abstracted from both Seriti and Arnot OpCo. The water treatment and conveyance systems include the following major units: • A decant water abstraction system • A decant water conveyance system • A Combined Water Treatment Plant (CWTP) • A treated water conveyance system • A waste and solids handling system • Requisite access roads and associated security infrastructure • Requisite electrical and commercial and industrial (C&I) infrastructure The development will also require road, stream and railway line crossings. Eskom power lines are also found within the pipeline route and will be negotiated with Eskom prior to construction.

ApplicationDate: 

Monday, March 7, 2022 - 09:29

CaseID: 

18063

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateContactPerson
TBC
04/04/2022