The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed Casteel Dam Safety Rehabilitation Project

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed Casteel Dam Safety Rehabilitation Project at Farm Kasteel 231-KU, south of Acornhoek, Bushbuckridge Local Municipality, Ehlanzeni District Municipality, Mpumalanga Province

Expanded_Motivation: 

The Department of Water and Sanitation, Directorate: Strategic Infrastructure Asset Management (SIAM) proposes to conduct scheduled rehabilitation works at Casteel Dam, locally known as Ga-Josefa Dam. Casteel Dam is located on a tributary of the Tlulandziteka River North of Bushbuckridge within the jurisdiction of Bushbuckridge Local Municipality in the Ehlanzeni District of Mpumalanga Province. The DWS, Directorate: SIAM conducts Dam Safety Evaluations (DSE) every five (5) years in terms of the Dam Safety Regulation (GN R 139, 24 February 2012) at all departmental dams. Any safety risks identified at these dams are placed on the Dam Safety Rehabilitation Programme (DSRP) for repair. The latest DSE conducted at the dam identified several safety risks and have been placed on the DSRP for scheduled rehabilitation i.e.  The slope on the downstream embankment is unstable;  There is an eroded gully downstream in the spillway channel;  The outlet works are non-functional;  The dam is freely discharging from the spillway to the river;  The spillway capacity is inadequate and requires the dam embankment to be raised. The DWS Chief Directorate: Construction Management proposes to undertake the necessary rehabilitation works at the original dam embankment over a twenty-four (24) month construction period. No expansion of the dam or construction of a new facility is proposed. The project scope of works would include three components i.e. 1) 28 500m2 (2.85 Ha) rehabilitation works at the main dam embankment, spillway section and outlet works. 2) 0.9 Ha Site establishment area northeast of the dam. 3) Upgrading and realignment of the existing gravel access road from the R40 to the dam embankment. An existing access road through Casteel will be used to access the spillway section during the rehabilitation works. The DWS will remove all reeds and vegetation on the spill approach channel and upstream slope along the dam embankment as part of the rehabilitation works. It will promote the free flow of water, prevent spillway blockages and allow for the placement of slope protection material. The site establishment area comprises degraded shrubland that will also need to be cleared to accommodate the site offices.

ApplicationDate: 

Monday, October 17, 2022 - 20:52

CaseID: 

19843

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateContactPerson
Pending
31/07/2023

ReferenceList: 

AdditionalDocuments
  1. PDF icon Stakeholder Notification Letter (Project Announcement)
  2. PDF icon Background Information Document
  3. PDF icon Stakeholder Notification letter - DBAR availability
  4. PDF icon Draft Basic Assessment Report
  5. PDF icon Appendix A DWS Directive
  6. PDF icon Appendix B Qualifications of EAP & Scientist
  7. PDF icon Appendix B CV of EAP
  8. PDF icon Appendix B CV of Scientist
  9. Image icon Appendix C 1 Locality Plan
  10. PDF icon Appendix C2 Landowner Consent
  11. PDF icon Appendix D1 DWS Addendum Design Report July 2015
  12. PDF icon Appendix D2 Casteel Dam Inundation map
  13. PDF icon Appendix D1 Donga erosion plan
  14. PDF icon Appendix D3 Coordinates of Listed Activities
  15. PDF icon Appendix E1 Specialist Declarations
  16. PDF icon Appendix E2 Screening Tool Report
  17. PDF icon Appendix E2 Site Sensitivity Verification (SSV) Report
  18. PDF icon Appendix E2 SSV Report Appendix B Photo Evidence
  19. PDF icon Appendix E3 Terrestrial Biodiversity Report
  20. PDF icon Appendix E4 Aquatic Biodiversity Report
  21. PDF icon Appendix E5 Traffic Study
  22. PDF icon Appendix F1 DFFE pre-application meeting minutes
  23. PDF icon Appendix F2 DWS Introductory Meetings Attendance Register
  24. PDF icon Appendix F3 I&AP Database
  25. PDF icon Appendix F4 Newspaper Tear Sheet
  26. PDF icon Appendix F5 Site notice photos
  27. PDF icon Appendix F6 Copies of BID
  28. PDF icon Appendix F7 Proof of Direct Notification
  29. PDF icon Appendix F8 First Round of PPP meeting minutes (BLM Site inspection)
  30. PDF icon Appendix F8 First Round of PPP meeting minutes (Casteel Public Meeting)
  31. PDF icon Appendix F8 First Round of PPP meeting minutes (Dingley Dale Meeting)
  32. PDF icon Appendix F9 Comments and Response Report
  33. PDF icon Appendix G EMPR
  34. PDF icon Casteel Community Meeting Minutes (12 July 2023)
  35. PDF icon 12 July 2023 Community meeting attendance Register
  36. PDF icon 12 July 2023 Community Meeting Presentation
  37. PDF icon Dingley Dale Community Meeting Minutes (13 July 2023)
  38. PDF icon Dingley Dale Community Meeting Attendance Register (13 July 2023)
  39. PDF icon Dingley Dale Community Meeting Presentation
 
 