Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

THE PROPOSED MINING OF QUARRY 6A ASSOCIATED WITH THE UPGRADE OF NATIONAL ROAD R573 (MOLOTO ROAD), GAUTENG PROVINCE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

It is the intention of the South African National Roads Agency Soc Ltd to establish various Quarries to provide the necessary construction materials for the proposed upgrading of national road R573-1 (K139) from Stormvoël Road in Tshwane (km 0,00) to the Gauteng / Mpumalanga Provincial Border (± 48.00 km). The proposed Quarry 6A is located approximately 2.5km to the northwest of the R573 (Moloto Road) roadway, immediately to the northeast of the N1/N4 highway intersection and bordering the N1 highway to the east. The site centre geographic coordinates are 25°37’35.67” S, 28°17’08.25” E.

Expanded_Motivation: 

The proposed Quarry 6A will supply construction material for the proposed upgrading of national road R573-1 (K139) from Stormvoël Road in Tshwane (km 0,00) to the Gauteng / Mpumalanga Provincial Border (± 48.00 km). The rational for the proposed upgrade is provided below: • The R573 Moloto Road is one of South Africa’s busiest and most important economic routes connecting Gauteng, Mpumalanga, and Limpopo provinces with an extremely high number of buses and light motor vehicles. The road links small towns and rural settlements with Pretoria and carries inter-district traffic between these locations, hence the road is an important regional mobility function but has an equally significant accessibility function (KBK Engineers, 2020). • The road has been dubbed the “road of death” due to the high number of accidents that has happened on it over the years. According to the media release issued on the 31st July 2018 by Pretoria News, the Moloto road has not been upgraded for many years and has been exposed to increasing traffic over the years. Statistics taken from a period of 29 months, January 2012 to May 2014, show that there were 489 crashes on Moloto Road, resulting in 158 fatalities and 594 serious injuries (iol, 2018). • In order to address safety, mobility functions and ensure that reasonable access is provided to adjacent properties and areas to enable the future land use development, SANRAL is proposing the upgrade of the R573 Moloto Road. Large volumes of construction material would be required for the proposed project, hence the development of a local source of material would be highly beneficial. Obtaining the required quality and quantity of material from commercial sources would not be financially viable. Substantial cost savings would result by eliminating the cost of procurement and transportation of large volumes of material from existing commercial sources. Material investigations have also revealed that the proposed study area holds material reserves to meet the project requirements in conjunction with various other sites as provided in Section 2d (ii) of the report. In addition, the study area was previously mined for the purpose of road materials for the N1 and the proposed site falls within close proximity of the proposed road upgrades. Such will avoid potential risks associated with road safety on the surrounding road networks and carbon emissions as the distance travelled by the haul vehicles will be reduced

ApplicationDate: 

Thursday, November 26, 2020 - 14:28

CaseID: 

15854

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateFinalDecision
GP 30/5/1/1/2/ (00002) BP
28/06/2021

Heritage Reports: 