Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed Nku Solar PV Facility to be developed as part of the Great Karoo Renewable Energy Development near Richmond in the Northern Cape

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Great Karoo Renewable Energy (Pty) Ltd is proposing the construction and operation of a photovoltaic (PV) solar energy facility and associated infrastructure on Portion 1 of Farm Rondavel 85, located approximately 35km south-west of Richmond and 80km south-east of Victoria West, within the Ubuntu Local Municipality and the Pixley Ka Seme District Municipality in the Northern Cape Province. A preferred project site with an extent of ~29 909ha and a development area of ~571ha within the project site has been identified by Great Karoo Renewable Energy (Pty) Ltd as a technically suitable area for the development of the Nku Solar PV Facility with a contracted capacity of up to 100MW. The Nku Solar PV Facility project site is proposed to accommodate the following infrastructure, which will enable the facility to supply a contracted capacity of up to 100MW: Solar PV array comprising PV modules and mounting structures. Inverters and transformers. Cabling between the panels. 33/132kV onsite facility substation. Cabling from the onsite substation to the collector substation (either underground or overhead). Electrical and auxiliary equipment required at the collector substation that serves that solar energy facility, including switchyard/bay, control building, fences, etc. Battery Energy Storage System (BESS). Site offices and maintenance buildings, including workshop areas for maintenance and storage. Laydown areas. Access roads and internal distribution roads. The solar PV facility is proposed in response to the identified objectives of the national and provincial government and local and district municipalities to develop renewable energy facilities for power generation purposes. It is the developer’s intention to bid for the Nku Solar PV Facility under the Department of Mineral Resources and Energy’s (DMRE’s) Renewable Energy Independent Power Producer Procurement (REIPPP) Programme, with the aim of evacuating the generated power into the national grid. This will aid in the diversification and stabilisation of the country’s electricity supply, in line with the objectives of the Integrated Resource Plan (IRP) with the Nku Solar PV Facility set to inject up to 100MW into the national grid. The project is planned as part of a larger cluster of renewable energy projects, which include two (2) 140MW Wind Energy Facilities (known as Merino Wind Farm and Angora Wind Farm) two (2) additional 100MW PV facilities (known as Kwana Solar PV and Moriri Solar PV), as well as the grid connection infrastructure connecting the renewable energy facilities to the existing Eskom Gamma Substation.

ApplicationDate: 

Monday, November 15, 2021 - 17:21

CaseID: 

17543

OtherReferences: 

ReferenceList: 

AdditionalDocuments
  1. PDF icon SE3125 - Nku PV - Appendix A - EIA Project Consulting Team CVs.pdf
  2. PDF icon SE3125 - Nku PV - Appendix B - Authority Consultation.pdf
  3. PDF icon SE3125 - Nku PV - Appendix C1-I&AP Database.pdf
  4. PDF icon SE3125 - Nku PV - Appendix C2-Site Notices & Newspaper Adverts.pdf
  5. PDF icon SE3125 - Nku PV - Appendix C3-Background Information Document.pdf
  6. PDF icon SE3125 - Nku PV - Appendix C4-Organs of State Correspondence.pdf
  7. PDF icon SE3125 - Nku PV - Appendix C5-I&AP Correspondence.pdf
  8. PDF icon SE3125 - Nku PV - Appendix C6-Comments Received.pdf
  9. PDF icon SE3125 - Nku PV - Appendix C7-Meeting Notes.pdf
  10. PDF icon SE3125 - Nku PV - Appendix C8-Comments and Responses Report.pdf
  11. PDF icon SE3125 - Nku PV - Appendix C9-PP Plan&Approval.pdf
  12. PDF icon SE3125 - Nku PV - Appendix D - Ecological Scoping Report.pdf
  13. PDF icon SE3125 - Nku PV - Appendix E - Avifauna Scoping Report.pdf
  14. PDF icon SE3125 - Nku PV - Appendix F - Bat Scoping Report.pdf
  15. PDF icon SE3125 - Nku PV - Appendix G - Soils & Freshwater Report.pdf
  16. PDF icon SE3125 - Nku PV - Appendix I - Visual Scoping Report.pdf
  17. PDF icon SE3125 - Nku PV - Appendix J - Social Scoping Report.pdf
  18. PDF icon SE3125 - Nku PV - Appendix K - Traffic Scoping Study.pdf
  19. PDF icon SE3125 - Nku PV - Appendix L - Maps (A3).pdf
  20. PDF icon SE3125 - Nku PV - Appendix M - Specialist Declarations.pdf
  21. PDF icon SE3125 - Nku PV - Appendix N - Screening Tool Report.pdf
  22. PDF icon SE3125 - Nku PV - Appendix O - EAP Affirmation and Declaration.pdf
  23. PDF icon SE3125 - Nku PV - Nku Scoping Report(Nov21).pdf
  24. PDF icon 0.Nku Scoping Report _FINAL TO DFFE.pdf
  25. PDF icon Appendix A - EIA Project Consulting Team CVs.pdf
  26. PDF icon Appendix B - Authority Consultation.pdf
  27. PDF icon Appendix C1-PP Plan&Approval.pdf
  28. PDF icon Appendix C2-I&AP Database.pdf
  29. PDF icon Appendix C3-Site Notices & Newspaper Adverts.pdf
  30. PDF icon Appendix C4-Background Information Document.pdf
  31. PDF icon Appendix C5-Organs of State Correspondence.pdf
  32. PDF icon Appendix C6-I&AP Correspondence.pdf
  33. PDF icon Appendix C7-Comments Received.pdf
  34. PDF icon Appendix C8 -Meeting Notes.pdf
  35. PDF icon Appendix C9-Comments&Responses Report.pdf
  36. PDF icon Appendix D - Ecological Scoping Report.pdf
  37. PDF icon Appendix E - Avifauna Scoping Report.pdf
  38. PDF icon Appendix F - Bat Scoping Report.pdf
  39. PDF icon Appendix G - Soils & Freshwater Report.pdf
  40. PDF icon Appendix I - Visual Scoping Report.pdf
  41. PDF icon Appendix J - Social Scoping Report.pdf
  42. PDF icon Appendix K - Traffic Scoping Study.pdf
  43. PDF icon Appendix L - Maps (A3).pdf
  44. PDF icon Appendix M - Specialist Declarations.pdf
  45. PDF icon Appendix N - Screening Tool Report.pdf
  46. PDF icon Appendix O - EAP Affirmation and Declaration.pdf
  47. PDF icon Appendix P - Nku Landowner Consent.pdf
  48. PDF icon 01. Nku PV EIAR_compressed & protected.pdf
  49. PDF icon SE3125 - Nku PV - Appendix A - EIA Project Consulting Team CVs.pdf
 
 

Search form