Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed Refurbishment and Additions to the eMondlo Bulk Water Supply Scheme located at eMondlo Town in the Abaqulusi Local and Zululand District Municipality, KwaZulu-Natal.

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The Zululand District Municipality has identified the need to undertake the refurbishment and additions to the existing eMondlo Bulk Water Supply Scheme located at eMondlo Town, south of Vryheid, in the Abaqulusi Local and Zululand District Municipality, KwaZulu-Natal.

Expanded_Motivation: 

The following activities will be undertaken as part of the refurbishment of the existing eMondlo Bulk Water Supply Scheme: 1. Dredging of the Mvunyane Dam: The accumulation of silt in the Mvunyane Dam is currently obstructing the intake of water at the abstraction tower. An area of approximately 3000m2 around the abstraction tower requires dredging, with the silt to be disposed of in a disposal lagoon (coffer dam) to be located adjacent to the Mvunyane Dam wall. 2. Refurbishment of the Abstraction Tower and Pump Station: The abstraction tower requires refurbishment with respect to the isolating valve and replacement of the existing suction and scour pipe. Four new pumps need to be installed in the existing pump station and the pump station building requires refurbishment, with the construction of a new office. 3. Installation of a new 4km Section of Rising Main: Approximately 4km of the existing Steel Rising Main linking Mvunyane Dam and the eMondlo Water Treatment Works has numerous leaks and has come to the end of its lifespan. A new 4km section of 450mm/500mm diameter Ductile Iron/PVC-o pipeline needs to be installed to replace the existing section of pipeline, including new air and scour chambers as required. 4. Installation of a new 2.7km Section of Pipeline: Approximately 2.7km of the existing bulk water pipeline linking Mvunyane Dam to Purim has come to the end of its lifespan. A new 2.7km section of 125mm diameter uPVC pipeline needs to be installed to replace the existing section of pipeline, including new air and scour chambers as required. 5. Refurbishment of the eMondlo Water Treatment Works: Several electrical and mechanical components need to be refurbished or replaced at the existing eMondlo Water Treatment Works. Some refurbishment of the building works is required as well as the replacement of the wash water recovery sump.