Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Proposed Square Kilometre Array (SKA) fibre optic cable between Beaufort West and Carnarvon, Northern and Western Cape

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The South African Radio Astronomy Observatory (SARAO) spearheads South Africa’s activities in the SKA Radio Telescope through engineering, science and construction. SARAO is a National Facility, managed by the National Research Foundation, which incorporates radio astronomy instruments and programmes such as the MeerKAT and KAT-7 telescopes in the Karoo, the Hartebeesthoek Radio Astronomy Observatory (HartRAO) in Gauteng, the African Very Long Baseline Interferometry (AVN) programme in nine African countries, as well as the associated human capital development and commercialisation endeavours. Connectivity is required between the SKA core site in the Northern Cape and a data processing facility in Cape Town to transport the science data for the SKA project and its precursor, MeerKAT. Access to dark fibre is required to transport this data due to the expected data throughputs for the SKA project. SARAO has built an overhead fibre route between Carnarvon and the SKA core site. Additionally, the South African National Research Network (SANReN) has procured access to fibre between Beaufort West area and Cape Town. A fibre optic cable connection must, therefore, be built between Carnarvon and Beaufort West. The details of the preferred and selected SKA fibre route (Route A) is as follows: The fibre route starts from Beaufort West Transnet building, to a 3 m x 6 m signal repeater station at Loxton, and then on to the Carnarvon SKA Point of Presence (PoP) site (location where networking equipment may be accessed). The fibre duct and cable will be laid in a 1 m deep and 300 mm wide trench and be buried by backfilling and compacting the trench. The full fibre route will be installed within the road reserves of roads R381 and R63, and 1 m from the fence of the private land. 155 km will be underground and 25 km will be overhead due to it not being technically or financially feasible to trench on the Molteno Pass section. The total pole length is 9 m, buried 1.5 m deep, with a resultant above-ground height of 7.5 m There are several streams / rivers and associated wetlands to cross. Rivers will be crossed using directional drilling 2 m below the riverbed starting 32 m away from river banks. There is only one river with solid bedrock (the Brak River near Loxton) where directional drilling is not technically or financially feasible. Here the fibre cable will be attached to the existing road bridge.

ApplicationDate: 

Friday, October 2, 2020 - 09:38

CaseID: 

15577

OtherReferences: 

CaseReferenceDepartmentApplicationTypeFinalDecision
14/12/16/3/3/1/2419

ReferenceList: 

 
 