Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

PROPOSED VISSERSPAN SOLAR PV FACILITY ON THE FARM VISSERSPAN NO. 40 NEAR DEALESVILLE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Four, solar PV projects are proposed on the Farm Visserspan No. 40 near Dealesville (Figure 4). Each stand-alone facility will have a maximum generating capacity of 100MW and include the following infrastructure: Solar panels covering an area of about 200ha. The solar arrays will be raised approximately 500mm above ground level and will have single axis tracking systems. Transmission and distribution lines for connection to the Eskom Perseus substation; Invertor-transformer stations on concrete beds. Offices, workshops, stores, maintenance sheds, ablution facilities, and Security/fencing

Expanded_Motivation: 

The proposed development is primarily a linear development and includes the construction of two new substations located at each end of the grid connection line. A combined switching station and high voltage substation on the Farm Visserspan 40 will serve as the collection point for electricity generated from the proposed Visserspan Solar PV Facility (Kaplan 2020). From the switching station, electricity will be fed via overhead powerlines to the east, turning north east to trace the northern boundary of the Farms Mooihoek No. 1547 and Vasteveld No. 1548, before turning north east and running along the southern boundary of the Farm Kinderdam No. 1685, finally connecting to the proposed new Kinderdam main transmission substation (MTS). From the Kinderdam MTS, electricity will feed into the existing Eskom Perseus/Theseus 400kV overhead powerline that runs adjacent the site. The estimated total length of the grid connection line is about 6km and will be either via 132kV steel monopole, or 400kV pylon overhead powerlines. The servitude for the proposed grid connection will be ± 55m wide. Existing farm roads and farm maintenance roads will be used, and no new roads will need to be constructed.

ApplicationDate: 

Tuesday, March 24, 2020 - 15:20

CaseID: 

15046

OtherReferences: 

ContactPerson