Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Sediba Solar Power Plant

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The activity entails the development of a photovoltaic solar facility and associated infrastructure on the Remaining Extent of the Farm Kliprug No. 344, Registration Division Parys, Free State Province situated within the Ngwathe Local Municipality area of jurisdiction. The proposed development is located in the Free State province in the central interior of South-Africa. The town of Parys is located approximately 2km north of the proposed development. The project entails the generation of up to 150MW electrical power through photovoltaic (PV) panels. The total footprint of the project will approximately be 270 hectares (including supporting infrastructure on site).

ApplicationDate: 

Tuesday, June 8, 2021 - 11:00

CaseID: 

16593

OtherReferences: 

ReferenceList: 

AdditionalDocuments
  1. PDF icon 2021-04 Sediba SPP BID.pdf
  2. PDF icon 2021-04 Sediba Draft Scoping (Final).pdf
  3. Image icon Figure A Locality Map.jpg
  4. Image icon Figure B Regional Map.jpg
  5. Image icon Figure C Footprint Map.jpg
  6. Image icon Figure D Land capability Map.jpg
  7. Image icon Figure E Vegetation Map.jpg
  8. Image icon Figure F Cumulative Impact Map.jpg
  9. Image icon Figure I2 - Option 1 Layout and Sensitivity Map.jpg
  10. PDF icon Sediba Final Scoping Report (1).pdf
  11. Image icon Figure I5 - Option 2 Layout and Sensitivity Map.jpg
  12. PDF icon Figure G Facility Layout.pdf
  13. Image icon Figure G2 -Option 1 Layout Map.jpg
  14. Image icon Figure G3 - Option 2 Layout Map.jpg
  15. Image icon Figure H Location within 10km of a World Heritage Site.jpg
  16. Image icon Figure I1 - Sensitivity Map.jpg
  17. PDF icon Appendix I1 - Sediba Solar Power Plant EMPr.pdf
  18. PDF icon Appendix I2 - Sediba Power Line Generic EMPr.pdf
  19. PDF icon Appendix I3 - Sediba Substation Generic EMPR.pdf
  20. PDF icon Sediba Draft EIR.pdf
  21. PDF icon Sediba SPP Final EIA Report.pdf
  22. PDF icon Appendix I1 - Sediba Solar Power Plant EMPr.pdf
  23. PDF icon Appendix I2 - Sediba Power Line Generic EMPr.pdf
  24. PDF icon Appendix I3 - Sediba Substation Generic EMPR.pdf
  25. PDF icon Appendix I4 - Alien Invasive Species Management and Rehabilitation Plan.pdf
  26. PDF icon EA - 14-12-16-3-3-2-2086 - Sediba.pdf
  27. PDF icon 05 Appendix D - Detailed Engineering Layout Map.pdf
  28. PDF icon 07 Appendix E2 - Generic EMPr - IPP Substation.pdf
  29. PDF icon 07 Appendix E2 - Signed Declaration.pdf
  30. PDF icon 08 Appendix F1 - Generic EMPr - Power Line.pdf
  31. PDF icon 08 Appendix F1 - Signed Declaration.pdf
  32. PDF icon 09 Appendix F2 - Generic EMPr - Eskom Switching Station.pdf
  33. PDF icon 09 Appendix F2 - Signed Declaration.pdf
  34. PDF icon 11 Appendix H - Environmental Authorisation.pdf
  35. PDF icon 01 Amendments and Final Approvals Report.pdf
  36. PDF icon 02 Appendix A - EA Split Matrix.pdf
  37. Image icon 03 Appendix B - Amended PV Facility Layout Map.jpg
  38. Image icon 04 Appendix C - Grid Infrastructure Layout Map.jpg
  39. PDF icon Sediba SPP Split EA - PV.pdf
  40. PDF icon Sediba SPP Final EIA Report.pdf
  41. PDF icon Sediba SPP Split EA - Grid Connection.pdf
 
 