FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort descending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE SECTION 34 DEMOLITION APPLICATION FOR CERTAIN STRUCTURES AT THE BLACK ROCK KOPPIE, WITHIN THE ASSMANG BLACK ROCK MINING OPERATIONS (BRMO), NORTHERN CAPE PROVINCE BE & CL Phase 1 19/10/2022 Anton van Vollenhoven Archaetnos CC EScience 31/10/2022 - 17:21
A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 05/11/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants EScience Associates (Pty) Ltd 02/12/2019 - 13:45
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) Heritage Impact Assessment Specialist Reports 15/11/2015 Timothy Hart ACO Associates CC Arcus Consulting 17/05/2016 - 13:46
Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION FOR PORTION 35 OF RIETVLEI 150, VRYHEID REGION, ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL HIA Phase 1 01/06/2020 J.A. van Schalkwyk Information Decision Systems 02/07/2020 - 10:16
Phase 2 Study PIA Palaeontological Impact Assessment for the Proposed Prospecting Rights Application on Rietvlei 150 HU, ~20km east of Vryheid, KwaZulu-Natal Province PIA Phase 2 27/08/2019 Marion Bamford 19/03/2020 - 11:39
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP, ZEERUST, NORTH WEST PROVINCE HIA Phase 1 07/07/2021 Leonie Marais Heritage Practitioner Leonie Marais Heritage Practitioner EnviroSynergy Consulting (Pty) Ltd 06/07/2021 - 06:38
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA HIA Phase 1 06/06/2009 Julius CC Pistorius Pilanesberg Platinum Mines (Pty) Ltd SLR Consulting (Africa) 21/11/2013 - 17:18
281 Retief Street Pietermaritzburg Application for Additions to 281 Retief Street Pietermaritzburg Built Environment and Cultural Landscapes 26/09/2023 JOHARA ANANDLAL LEI DESIGN STUDIOS LEI DESIGN STUDIOS 27/09/2023 - 00:28
ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF EXXARO DORSTFONTEIN WEST DISCARD DUMP FACILITY AND TRANSPORTATION OF COAL FROM DCM WEST TO DCM EAST WITHIN EMALAHLENI LOCAL MUNICIPALITY OF NKANGALA DISTRICT IN MPUMALANGA PROVINCE. AIA Phase 1 10/03/2020 Munyadziwa Magoma Nsovo Environmental Consulting 09/09/2020 - 13:03
ARCHAEOLOGICAL SURVEY PHASE 1 ARCHAEOLOGICAL SURVEY ON PORTION 3 OF THE FARM EZAKHENI C 16863 GS IN ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE AIA Phase 1 10/07/2019 Churchill Mpiyesizwe Guduza Nkululeko Environment and Development Agency Nkululeko Environment and Development Agency 06/02/2020 - 18:29
Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. Heritage Impact Walkdown Report for the Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. HIA Phase 1 19/06/2017 Stephan Gaigher G&A Heritage Management Consultants Eskom Distribution Free State Operating Unit 20/07/2017 - 14:28
Croydon/Germiston River Crossings HIA Phase 1 Cultural Heritage Impact Assessment for THE PROPOSED CONSTRUCTION OF RIVER CROSSINGS ALONG UNDERGROUND HV FEEDER CABLES IN GERMISTON AND CROYDON, EKURHULENI DISTRICT MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 15/12/2017 20/02/2018 - 10:51
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 06/03/2018 Johan van Schalkwyk, Cobus Dreyer 16/03/2018 - 16:30
Erf 924, Bo-Kaap Nr. 54 Chiappini Street, Erf 924, Bo-Kaap, Cape Town renovation Heritage Statement 03/10/2013 03/10/2013 - 13:42
ERG6028 - Project Status and Close-out Memo City Dump Burial Ground Mitigation Process - Proposed Way Forward and Proposed Project Close out Non Impact Assessment Related Reports 29/05/2023 Shannon Hardwick Digby Wells Environmental Ergo Mining (Pty) Ltd 29/05/2023 - 11:49
Golden Mole Mall - PTA east - Phase 1 AIA_v1 PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Golden Mole Mall on Farm Portions 218 and 220 of the Farm Tweefontein 372 JR, Pretoria, Gauteng AIA Phase 1 12/11/2021 Tobias Coetzee Tobias Coetzee Eco Elementum (Pty) Ltd 02/12/2021 - 21:06
Heritage Impact Assessment & Palaeontological Desktop Assessment Heritage Impact Assessment and Palaeontological Desktop Assessment Heritage Impact Assessment Specialist Reports 27/05/2021 Wouter Fourie PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 27/05/2021 - 10:10
Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province Heritage Impact Assessment for the for the Proposed New Residential Township Development Of Vanderbijl Park South West No 8 Ext 1, Situated On Holding 23, Lasiandra Ah, Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province HIA Phase 1 09/11/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 20/12/2022 - 13:52
Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality HIA Phase 1 18/11/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 07/02/2023 - 21:49
Heritage Impact Assessment for the Proposed Residential Township Establishment to be known as Erand Gardens Ext 125, Gauteng Province Heritage Impact Assessment for the Proposed Residential Township Establishment to be known as Erand Gardens Ext 125, Gauteng Province HIA Phase 1 21/02/2022 Jaco van der Walt Beyond Heritage Exigent Engineering Consultants 03/03/2022 - 14:43
Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province Heritage Impact Assessment for the proposed Roan 1 PV facility and associated infrastructure near Hartbeesfontein, North-West Province HIA Phase 1 06/04/2022 Jaco van der Walt Beyond Heritage Cape Environmental Assessment Practitioners 11/05/2022 - 08:12
HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA LOCAL MUNICIPALITY, NORTHERN KWAZULU-NATAL. HIA Letter of Exemption 28/01/2015 Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 24/02/2015 - 13:04
Heritage input optimised layout SE2602 Wind Garden App S6 - Heritage input optimised layout Heritage Statement 28/04/2022 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 04/05/2022 - 13:30
Heritage input optimised layout SE2602 Fronteer App S6 - Heritage input optimised layout Heritage Statement 28/04/2022 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 04/05/2022 - 14:47
Heritage Report For Popo Molefe Heritage Report : Popo Molefe HIA Phase 1 25/08/2020 A Stone Bobo Productions Maropeng 'a Afrika 04/09/2020 - 16:02
HIA A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR A MINING RIGHT APPLICATION ON PORTION 1 OF THE FARM KLEINZUIKERBOSCHPLAAT 5IS NEAR OGIES, SITUATED IN THE EMALAHLENI MAGISTERIAL DISTRICT IN THE MPUMALANGA PROVINCE HIA Phase 1 01/05/2018 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Ndlelehle Mining and Consulting 12/02/2019 - 05:40
HIA Borrow Pit 12 Phase 1 Heritage Impact Assessment of a new borrow pit (BP 12) at Dithakong, located northeast of Kuruman, NC Province HIA Phase 1 02/09/2019 Lloyd Rossouw 04/12/2019 - 08:29
HIA Caledon Wind Farm Environmental Impact Assessment for the Establishment of the Caledon Wind Farm, Western Cape Province HIA Phase 1 01/10/2011 Timothy Hart ACO Associates CC Arcus Gibb (Pty) Ltd CTS_329679 08/09/2015 - 12:27
HIA De Kleine Oliphantskop 1481 Remainder Farm De Kleine Oliphantskop 1481 HERITAGE ASSESSMENT In terms of Section 38(1) 0f the NationaI Heritage Resources Act (Act 25 of 1999) HIA Phase 1 01/03/2009 Quahnita Samie Vidamemoria Heritage Consultants VASSIL PANTCHEV CTS_329607 04/09/2015 - 12:03
HIA Exemption for Sugar Cane Agricultural Development by Senekal Boerdery near Mkuze Application for Exemption from a Phase 1 Heritage Impact Assessment for the Proposed agricultural development by Senekal Boerdery near Mkuze,uMkhanyakude District Municipality, KwaZulu-Natal, South Africa HIA Letter of Exemption 28/01/2015 Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 03/03/2015 - 14:02
HIA for In-situ Rural Subsidised Housing Project , Qadi Ward 8, Maphumulo Cultural Heritage Impact Assessment of the Proposed Rural Subsidised Housing Project , Qadi Traditional Authority (Ward 8), Maphumulo. HIA Phase 1 08/08/2014 Frans Prins Active Heritage CC Simon Vines TRP (SA) 02/09/2014 - 05:04
HIA Gonubie Filling Station Heritage Impact Assessment Report: Proposed Gonubie Filling Station, Located On Farm No. 809, Portion 66 (Of Portion 9), Buffalo City Metropolitan Municipality, Eastern Cape Province HIA Phase 1 20/02/2022 Alexander Antonites Kantey & Templer Consulting Engineers 20/02/2022 - 11:31
INGLESBY 580 OLIFANTSHOEK, FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 10/05/2014 Cobus Dreyer RE A Kgona General Services CC RE A Kgona General Services CC 27/09/2014 - 21:35
IXOPO RENEWAL ENERGY PLANT A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED IXOPO RENEWAL ENERGY PLANT, KWAZULU-NATAL PROVINCE HIA Phase 1 23/06/2016 Prof. Anton van Vollenhoven A.C. van Vollenhoven EON Consulting 21/10/2016 - 16:06
Kudu Solar Facility 5 Heritage Scoping Report HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 5) and associated infrastructure, near De Aar, Northern Cape Province Heritage Scoping 18/08/2022 Jayson Orton ASHA Consulting(Pty) Ltd CSIR 11/12/2022 - 21:19
Lebone Solar Farm - HIA Phase 1 Archaeological Impact Assessment & Palaeontological Assessment Lebone Solar Farm The Remaining Extent of the Farm Onverwag No. 728 and Portion 2 of the Farm Vaalkranz Np. 220, Welkom, Free State Province Heritage Impact Assessment Specialist Reports 17/10/2013 Karen Van Ryneveld, Gideon Groenewald ArchaeoMaps Archaeological Consultancy Enviroworks 12/11/2013 - 15:08
Lougot Logistics Industrial Park, Cato Ridge Phase 1 Heritage Impact Assessment Report: Proposed Subdivision for Lougot Logistics Industrial Park on Portion of the Remainder of a Portion of Portion 30 of The Farm Uitkomst and Doornrug No. 852, Cato Ridge, eThekwini Metropolitan Municipality, KwaZulu-Natal HIA Phase 1 14/10/2014 Elizabeth Wahl eThembeni Cultural Heritage Lougot Property Investments (Pty) Ltd 15/10/2014 - 12:39
M1562 Oribi Gorge Dams Heritage Screener M1562 Oribi Gorge Dams Heritage Screener (CTS15_005) 28/07/2015 Kyla Bluff, Mariagrazia Galimberti, Peter Kloos, Nicholas Wiltshire CTS Heritage Envirosol - Environmental Solutions 28/07/2015 - 14:20
Moletjie Grave Rescue Project Rescue Exhumation and Relocation of a Human Skeleton at Moletjie, Polokwane, Limpopo Province Archaeological Permit Report 20/07/2015 Stephan Gaigher G&A Heritage Management Consultants Polokwane Local Municipality 24/07/2015 - 12:32
MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. PROPOSED CONSTRUCTION OF THE BONISWA SITE 2021, MURUNWA VODACOM TELEMAST, LIMPOPO PROVINCE. Heritage Impact Assessment Specialist Reports 16/03/2022 Stephan Gaigher Tekplan Environmental 30/03/2022 - 12:30
Nzalo DBAR Heritage Report Phase One Heritage Impact Assessment Of The Proposed Coal-Link, Nzalo (Mqabe) Near Vryheid, Kzn. Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Sivest - Gauteng 22/04/2015 - 10:45
Olievenhoutpoort Evaluation of existing built structures on: Portion 662 of the Farm Olievenhoutpoort 196 IQ Johannesburg, Gauteng In terms of Section 34 of the National Heritage Resources Act HIA Phase 2 01/04/2017 Engela White 31/08/2017 - 11:49
Palmietfontein_Ventersdorp_AIA_Revised+desktop Palmietfontein_Ventersdorp_AIA_Revised+desktop Archaeological Specialist Reports 22/02/2020 Tobias Coetzee 28/02/2020 - 11:05
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 09/12/2021 04/01/2022 - 09:41
PROPOSED KHULU TSF PROJECT ARCHAEOLOGICAL SITE SELECTION REPORT ARCHAEOLOGICAL SITE SELECTION REPORT FOR THE PROPOSED KHULU TSF PROJECT, LIMPOPO PROVINCE Archaeological Specialist Reports 01/06/2021 Jaco van der Walt HCAC Heritage Consultants Envirogistics (Pty) Ltd 27/07/2021 - 20:18
PROPOSED KHULU TSF PROJECT HERITAGE SCOPING REPORT HERITAGE SCOPING REPORT FOR THE PROPOSED NEW KHULU TAILINGS STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE PROJECT, LIMPOPO PROVINCE. Heritage Scoping 18/06/2021 Jaco van der Walt HCAC Heritage Consultants Envirogistics (Pty) Ltd 27/07/2021 - 20:21
Proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid A phase I Heritage Impact Assessment (HIA) study for the proposed KiPower 400kV loop-in and loop-out transmission lines to connect the KiPower IPP to the national grid on the eastern Highveld in the Mpumalanga province HIA Phase 1 12/05/2016 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Jones & Wagener Engineering and Environmental Consultants 19/05/2016 - 15:03
REMAINING EXTENT OF FARM FAIRFIELD 520, HAY DISTRICT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A 4 HA PORTION OF THE REMAINING EXTENT OF FARM FAIRFIELD 520, SITUATED ~30 KM NORTH OF CAMPBELL, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE AIA Phase 1 12/02/2013 Peter Beaumont De Beers Consolidated Mines - Kimberley Mines McGregor Museum 04/04/2013 - 12:25
ROODEPOORT COLLIERY ARCHAEOLOGICAL IMPACT ASSESSMENT A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ROODEPOORT MINING PROJECT, CLOSE TO PULLENS HOPE, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 27/01/2021 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants 14/06/2021 - 15:45
Rustfontein Dam WTW facility HIA Phase 1 Heritage Impact Assessment of the proposed extension of the Rustfontein Dam WTW facility, Free State Province. HIA Phase 1 21/03/2015 Lloyd Rossouw Paleo Field Services Aryx Consulting Limited 08/12/2015 - 12:52