THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14701 - 14750 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Ga Maila HIA Proposed demarcation of Sites in Ga-Maila Village | Heritage Impact Assessment Report. Proposed Demarcation of Sites In Ga-Maila Village within Makhuduthamaga Local Municipality of the Sekhukhune District, Limpopo Province | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:22 | |
HIA report Proposed development of a shopping centre and filling station in Namakgale | Heritage Impact Assessment Report. Proposed development of a Shopping Centre and a Filling Station in Namakgale on the Portion Of The Remaining Extent of the farm Makushane Location 28-Lu within Ba-Phalaborwa Local Municipality of Mopani District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:37 | |
HIA report Proposed Establishment of a Township at Siyandani in Giyani | Heritage Impact Assessment Report. Proposed Demarcation of Sites and Township Development in Siyandani Village on the Portion of The Remaining Extent of Farm Greater Giyani 891 LT within Greater Giyani Local Municipality of Mopani District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | Phaki Phakanani | 20/10/2020 - 06:46 | |
HIA Melkspruit Rouxville | THE PROPOSED DEVELOPMENT OF THE ESKOM MELKSPRUIT TO ROUXVILLE 132 KV OVERHEADPOWERLINE, FREE STATE PROVINCE Heritage Impact Assessment PGS Heritage, 2020 | HIA Phase 1 | 30/09/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | GA Environment (Pty) Ltd | 20/10/2020 - 08:13 |
Melkspruit Rouxville Palaeontological Report | PALAEONTOLOGICAL IMPACT ASSESSMENT FOR PART 2 AMENDMENT OF THE ENVIRONMENTAL AUTHORISATION FOR THE MELKSPRUIT TO ROUXVILLE LINE Banzai Environmental, 2020 | Palaeontological Specialist Reports | 06/09/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | GA Environment (Pty) Ltd | 20/10/2020 - 08:16 |
HIA DA2S WEF Substation and BESS | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION AND OPERATION OF A 132KV SUBSTATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/08/2020 | John Gribble | 20/10/2020 - 10:29 | ||
Heritage Impact Assessment | 20/10/2020 - 11:00 | ||||||
HIA for Nkomati Anthracite Mine, Mpumalanga | Heritage Impact Assessment for the Nkomati Anthracite Mine, Nkomazi Local Municipality, in the Ehlanzeni District Municipality, Mpumalanga Province | HIA Phase 1 | 06/10/2020 | Henk Steyn, Jennifer Kitto | PGS Heritage (Pty) Ltd | Nkomati Anthracite(Pty)Ltd | 20/10/2020 - 12:58 |
Motlhoeng 22kV PIA | Palaeontological Impact Study: Erection of a 22kV power line in Motlhoeng area in the Northern Cape. | PIA Phase 1 | 04/10/2020 | JF Durand | 20/10/2020 - 13:31 | ||
Farm Blesboklaagte 296 JS | Coal Mining Permit Application on portion of portion 23 of the Farm Blesboklaagte 296 JS | Visual Impact Assessment | 05/11/2020 | SINGO CONSULTING (PTY) LTD | Department of Mineral Resources - Mpumalanga | 21/10/2020 - 01:21 | |
Stormill Ext 2Sewer Pipe Replacement | The Proposed Stormill Ext. 2 Sewer Pipe Replacement, City of Johannesburg, Gauteng Province | HIA Phase 1 | 31/03/2020 | Johnny van Schalkwyk | J A van Schalkwyk | J A van Schalkwyk | 21/10/2020 - 10:53 |
Stormill Ext 2 Sewer Pipe Replacement | The Proposed Stormill Ext 2 Sewer Pipe Replacement, City of Johannesburg, Gauteng Province | HIA Phase 1 | 31/03/2020 | Johnny van Schalkwyk | J A van Schalkwyk | J A van Schalkwyk | 21/10/2020 - 11:05 |
Africanos Architectural Heritage Assessment | BE & CL Phase 1 | 01/03/2020 | Theresa Hardman | Public Process Consultants | 21/10/2020 - 15:42 | ||
The Vreede 4317/HS farm | Phase 1 Heritage Impact Assessment for the proposed Vreede 4317/HS Farm Project in Newcastle, KwaZulu Natal Province | HIA Phase 1 | 20/03/2020 | Makhosazana Mngomezulu | Vungandze Projects | 22/10/2020 - 05:23 | |
The Vreede 4317/HS farm | PIA Desktop | 20/03/2020 | JF Durand | Skarab CC | 22/10/2020 - 05:28 | ||
The Vreede 4317/HS farm | THE PROPOSED DEVELOPMENT OF FARM VREEDE 4317/HS; KWAZULU-NATAL PROVINCE. PALAEONTOLOGICAL IMPACT ASSESSMENT | PIA Desktop | 20/03/2020 | JF Durand | Skarab CC | 22/10/2020 - 06:13 | |
The proposed Kalahari Secondary School PIA | Palaeontological Impact Assessment for the proposed Kalahari Secondary School, north of Kuruman, Northern Cape Province | PIA Desktop | 31/07/2020 | Marion Bamford | 22/10/2020 - 06:37 | ||
Heritage Impact Assessment Eskom Aloe Substation and LILO Powerlines | PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE | HIA Phase 1 | 08/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | GA Environment (Pty) Ltd | 22/10/2020 - 10:59 |
Madimbo Mixed Commercial Use and Filling Station project - Amended | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MADIMBO MIXED COMMERCIAL USE AND FILLING STATION PROJECT WITHIN MUSINA LOCAL MUNICIPALITY, VHEMBE DISTRICT IN THE LIMPOPO PROVINCE. | HIA Phase 1 | 31/07/2020 | Makhosazana Mngomezulu | Vungandze Projects | 22/10/2020 - 11:47 | |
Proposed installation of rooftop PV panels, Sexton's House, Evangelical Lutheran Church | 22/10/2020 | Louise van Riet | 22/10/2020 - 12:02 | ||||
PIA Estcourt Hospital, KZN | Palaeontological Impact Assessment for the proposed construction of a private and public Hospital in Estcourt, KwaZulu Natal Province | PIA Phase 1 | Marion Bamford | University of the Witwatersrand - Evolutionary Studies Institute | EnviroPro | 22/10/2020 - 13:09 | |
MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HIA AND PIA | MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE AND PALAEONTOLOGICAL IMPACT ASSESSMENT – GLENCORE OPERATIONS LIMITED, IMPUNZI DISCARD FACILITY EXPANSION PROJECT | HIA Letter of Exemption | 16/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Golder Associates Africa (Pty) Ltd, Impunzi Mining (Pty) Ltd | 23/10/2020 - 08:09 |
Klipspruit Colliery Tombstones | STATUS QUO REPORT FOR SEVERAL TOMBSTONES PILED AT KLIPSPRUIT COLLIERY NEAR ORGIES IN EMALAHLENI LOCAL MUNICIPALITY IN MPUMALANGA PROVINCE | Burial Grounds and Graves Specialist Reports | 14/09/2020 | Trust Mlilo | Sativa Travel and Environmental Consultants | South 32 Coal Holdings PTY Ltd | 23/10/2020 - 10:45 |
Phase 1 Archaelogical & Heritage IA Report | Phase 1 Archaeological and Heritage Impact Assessment on the farm Ngodwana 1030 JT in respect of proposed Remediation work to the Ngodwana Dam, Mpumalanga Province. | AIA Phase 1 | 10/07/2020 | Jean-Pierre Celliers | Kudzala Antiquity | Kudzala Antiquity | 26/10/2020 - 10:38 |
Development of farmland on Farm Skutwater 115 MS, Musina Local Municipality, Vhembe District | Development of farmland on Farm Skutwater 115 MS, Musina Local Municipality, Vhembe District | PIA Phase 1 | 20/06/2020 | JF Durand | Tua Conserva Environmental | 26/10/2020 - 10:42 | |
Skutwater HIA | Heritage Impact Assessment for the proposed Skutwater Development, Limpopo Province. | HIA Phase 1 | 01/09/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tua Conserva Environmental | 26/10/2020 - 10:48 |
Phase 1 Desktop PIA | Palaeontological Impact Assessment for the proposed remediation project for Ngodwana Dam, Mpumalanga Province | PIA Phase 1 | 01/06/2020 | Marion Bamford | Kudzala Antiquity | Kudzala Antiquity | 26/10/2020 - 10:57 |
HERITAGE IMPACT ASSESSMENT:f McTaggarts PV1, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452, near Upington in the Northern Cape Province. | Proposed development of McTaggarts PV1, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452, near Upington in the Northern Cape Province. | HIA Phase 1 | 01/09/2019 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 26/10/2020 - 12:48 |
Ptn 100 Nooitgedacht | REPORT ON A PHASE 1 HIA FOR THE PROPOSED TOWNSHIP DEVELOPMENTS OF JOUBERTON EXTENSION 34 & KANANA EXTENSION 16 ON A PORTION OF PORTION 100 OF THE FARM NOOITGEDACHT 434IP CITY OF MATLOSANA LOCAL MUNICIPALITY, NORTHWEST PROVINCE | AIA Phase 1 | 15/09/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Maxim Planning Solutions | 26/10/2020 - 13:36 |
Tigane | REPORT ON A PHASE 1 HIA FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF TIGANE EXTENSIONS 7 & 8 ON A PORTION OF THE REMAINING EXTENT OF THE FARM URAAN 295IP & A PORTION OF REMAINING EXTENT OF THE FARM VOGELSTRUISFONTEIN 273IP CITY OF MATLOSANA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 15/09/2020 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 26/10/2020 - 13:57 |
Vyfhoek | PHASE 1 HIA REPORT FOR A PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 51 OF THE FARM VYFHOEK 428IQ IN POTCHEFSTROOM, NORTHWEST PROVINCE | AIA Phase 1 | 15/07/2020 | Anton Pelser | A Pelser Archaeological Consulting | AB Enviro Consult CC | 26/10/2020 - 14:14 |
SIB6297 - DBAR Appendix H (Heritage Impact Assessment) | Heritage Impact Assessment: Basic Assessment Process for the Closure of the Cooke Underground Operations | HIA Phase 1 | 26/10/2020 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sibanye Gold Limited | 26/10/2020 - 15:59 |
HIA Remhoogte | Heritage Report Assessment for Remhoogte Vodacom Mast | Heritage Impact Assessment Specialist Reports | Tekplan Environmental | Vodacom | 27/10/2020 - 04:14 | ||
Draft Basic Assessment Report for Sunny Mining (Pty) Ltd | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON THE FARMS MATJESFONTEIN NO. 97, BLAAUWBLOEMETJES KEEP NO. 95, AND DE VREEDE NO. 133 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE | Conservation Management Plan | 27/10/2020 | 27/10/2020 - 11:18 | |||
Ga-Mampa road upgrade | Phase 1 Heritage Impact Assessment Scoping Report for Proposed Ga-Mampa Access Bridge, Limpopo Province. | HIA Phase 1 | 02/12/2019 | Liesl Stegmann | Shasa Heritage Consultants CC | 27/10/2020 - 12:39 | |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed rehabilitation of the R104 road, North West Province | PIA Desktop | 27/10/2020 - 15:30 | ||||
Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 28/10/2020 - 15:39 | |||||
Heritage Impact Assessment Helderwyk Township | Heritage Impact Assessment Helderwyk Township, Gauteng Province | HIA Phase 1 | 24/11/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 28/10/2020 - 15:40 |
Proposed Powership at Port of Saldanha, Saldanha Bay | Proposed Powership at Port of Saldanha, Saldanha Bay | Heritage Impact Assessment Specialist Reports | 01/10/2020 | Jonathan Kaplan | Agency for Cultural Resources Management | Triplo4 Sustainable Solutions (Pty) Ltd | 28/10/2020 - 15:55 |
PIA for Gas to Power Project - Port of Saldanha | Proposed Powerline Routing for Electricity Generation by a Karpowership Port of Saldanha to Eskom Blouwater Substation Saldanha Bay Municipality, Vredenburg Magisterial District, Western Cape | Palaeontological Specialist Reports | 02/10/2020 | John Pether | Agency for Cultural Resources Management | Triplo4 Sustainable Solutions (Pty) Ltd | 28/10/2020 - 16:04 |
R Bay powerline | HIA FOR THE RICHARDS BAY POWERSHIP, RICHARDS BAY , KZN | HIA Phase 1 | 03/09/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 28/10/2020 - 16:54 |
Heritage Impact Assessment Skeerhok Transmission Line | Heritage Impact Assessment Specialist Reports | Jayson Orton | CSIR | 29/10/2020 - 11:31 | |||
Sappi Saiccor flood protection berm | Sappi Saiccor flood protection berm, uMkhomazi, KwaZulu-Natal | HIA Phase 1 | 30/09/2020 | Jean Beater | JLB Consulting | WSP Environmental Pty Ltd - Durban | 29/10/2020 - 11:42 |
PIA for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 | Palaeontological Impact Assessment for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 | PIA Desktop | 29/10/2020 | 29/10/2020 - 14:23 | |||
PIA for Nkomati Anthracite Madadeni Extension, Mpumalannga | Phase 1 Palaeontological Impact Assessment for the Proposed N’komati Anthracite Opencast Mine Northern Extension, in the Barberton Magisterial District, Mpumalanga Province | PIA Phase 1 | 30/08/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 29/10/2020 - 15:06 |
Amended HIA report: RE of Ptn 10 of the farm Newgate 802 MS | Heritage Impact Assessment Report. Accidentally discovered human remains on RE of PTN 10 of the farm Newgate 802 MS. Avoca Vale Country Lodge. Makhado Local Municipality. | Heritage Impact Assessment Specialist Reports | 20/10/2020 | Frans Roodt | 29/10/2020 - 15:40 | ||
CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL | CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL | HIA Phase 1 | 30/11/2008 | Natal Museum | 29/10/2020 - 17:18 | ||
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GARIEP NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON PLOT 113, GARIEP SETTLEMENT, FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 30/10/2020 - 09:22 |
Erf 1852: 2 Lion Street | Section 34 application: Erf 1852: 2 Lion Street | Heritage Statement | 23/10/2020 | Vidamemoria Heritage Consultants | 30/10/2020 - 13:13 | ||
Heritage Screener: Great Karoo OHL | HERITAGE SCREENING ASSESSMENT FOR BASIC ASSESSMENT PROCESS FOR THE GRID CONNECTION INFRASTRUCTURE, INCLUDING 132KV OVERHEAD POWERLINE, SWITCHING STATION AND ANCILLARIES, FOR THE GREAT KAROO WIND FARM, NORTHERN CAPE | Heritage Scoping | 23/10/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/10/2020 - 15:05 |