THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14801 - 14850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Desktop Palaeontological Impact Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED EXTENSION OF THE SOUTH AFRICAN NUCLEAR ENERGY CORPORATION (NECSA) PIPE STORAGE FACILITY, MADIBENG LOCAL MUNICIPALITY, NORTH WEST PROVINCE | PIA Desktop | 15/10/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | GA Environment (Pty) Ltd | 13/11/2020 - 10:58 |
Construction of an irrigation dam on the farm Esperado | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LOUWS CREEK DAM PROJECT: CONSTRUCTION OF AN IRRIGATION DAM ON PORTIONS OF THE REMAINING EXTENT OF THE FARM ESPERADO 253JU AND PORTIONS 1 & 2 OF ESPERADO ANNEX 222JU, LOUW’S CREEK-KAAPMUIDEN AREA, MPUMALANGA PROVINCE | AIA Phase 1 | 13/11/2020 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 13/11/2020 - 12:33 |
Kakamas Arendsnes Agricultural PIA LOE 2020 | PALAEONTOLOGICAL ASSESSMENT: Rectification of agricultural developments and associated infrastructure on Farm Arendsnes (Portion 30 of Farm Zeekoesteek No. 09), Kai! Garib Municipality, Northern Cape | PIA Desktop | 20/08/2020 | John E Almond | Natura Viva CC | GroenbergEnviro (Pty) Ltd | 13/11/2020 - 14:55 |
Report GroenbergEnviro Arendnes S24G Application, near Augrabies - AIA | Report GroenbergEnviro Arendnes S24G Application, near Augrabies - AIA | AIA Phase 1 | 20/08/2020 | Jonathan Kaplan | ACRM | GroenbergEnviro (Pty) Ltd | 13/11/2020 - 15:01 |
Kakamas Arendsnes Agricultural PIA LOE 2020 | Rectification of agricultural developments and associated infrastructure on Farm Arendsnes (Portion 30 of Farm Zeekoesteek No. 09), Kai! Garib Municipality, Northern Cape | PIA Desktop | 20/08/2020 | John E Almond | Natura Viva CC | GroenbergEnviro (Pty) Ltd | 13/11/2020 - 15:13 |
Phase 1 Cultural Heritage Impact Assessment:THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS (DIA) NEAR WOLMARANSSTAD ON THE REMAINING EXTENT, PORTION 7 AND PORTION 8 OF THE FARM ROOIBULT 152, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | HIA Phase 1 | 13/10/2020 | Johnny van Schalkwyk | 13/11/2020 - 15:28 | ||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS GENERAL AND DIAMONDS NEAR WOLMARANSSTAD ON THE REMAINING EXTENT, PORTION 7 AND PORTION 8 OF FARM ROOIBULT 152, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE. | PIA Desktop | 15/10/2020 | 13/11/2020 - 15:30 | |||
273 Longmarket Street, Bo Kaap Cape Town | Assessment of deviation from approved plans: 273 Longmarket Street | Vidamemoria Heritage Consultants | 14/11/2020 - 12:58 | ||||
PROPOSED CONSTRUCTION OF A TELECOMMUNCATION MAST NEAR HANVOVER, NORTHERN CAPE PROVINCE | PROPOSED CONSTRUCTION OF A 25M HIGH TELECOMMUNCATION MAST ON REM OF THE FARM ELANDSHEUWEL 146 NEAR HANVOVER, NORTHERN CAPE PROVINCE | AIA Desktop | 03/11/2020 | Jonathan Kaplan, John Almond | ACRM | Enviroafrica CC | 15/11/2020 - 13:46 |
HIA report, Karpower Powership, Coega IDZ, Eastern Cape | Coega to Dedisa Powerline Construction | Heritage Impact Assessment Specialist Reports | 01/10/2020 | Alan Smith | ACRM | Triplo4 Sustainable Solutions | 15/11/2020 - 14:18 |
PROPOSED SOLAR PV PLANT AT ARMOEDE, NEAR MOKOPANE, LIMPOPO PROVINCE Heritage Impact Assessment | PROPOSED SOLAR PV PLANT AT ARMOEDE, NEAR MOKOPANE, LIMPOPO PROVINCE: Heritage Impact Assessment | Heritage Scoping | 13/10/2020 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Aurecon - Head Office | 16/11/2020 - 11:30 |
Phase 1 Cultural Heritage Impact Assessment | THE PROPOSED PARYS ESTATE (RIETPOORT) ESTABLISHMENT ON PORTIONS 95 AND 96 OF THE FARM RIETPOORT 518-IQ, TLOKWE CITY LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 01/07/2020 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | JA van Schalkwyk Heritage Consultant | 16/11/2020 - 12:05 |
External Services SRA | MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED STONE RIVER ARCH DEVELOPMENT EXTERNAL SERVICES ON PORTION 112 & THE REMAINING EXTENT OF PORTION 2 OF RIETVLEI 101IR & PORTION 28 AND THE REMAINING EXTENTS OF PORTIONS 1 & 6 OF LIEFDE & VREDE 104IR, RISIPARK AGRICULTURAL HOLDINGS, GAUTENG | HIA Letter of Exemption | 15/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Bokamoso Landscape Architects and Environmental Consultants CC | 16/11/2020 - 12:21 |
Vaalbult Palaeontological Monitoring Report | Annual Palaeontological Monitoring Report (September 2020) on Vaalbult Colliery located on Portion 1,9 and 10 of the Farm Vaalbult 3IT, Mpumalanga Province | Palaeontological Monitoring | 07/11/2022 | 16/11/2020 - 13:45 | |||
HIA phase 1 report prior to core drilling | Phase 1 HIA report for the Marnitzkraal boreholes on portions of the farms Cohcin-China 46LR, Bristol 17LR and Naples 35LR, near Marnitz in the Limpopo Province | HIA Phase 1 | 01/10/2020 | Anton Pelser | De Beers Consolidated Mines (Pty) Ltd | 16/11/2020 - 15:22 | |
Phase 1 HIA report prior to core drilling | PHASE 1 HIA REPORT FOR THE MARNITZ KRAAL BOREHOLES ON PORTIONS OF THE FARMS COCHIN-CHINA 46LR, BRISTOL 17LR & NAPLES 35LR NEAR MARNITZ IN THE LIMPOPO PROVINCE | HIA Phase 1 | 01/10/2020 | Anton Pelser | De Beers Consolidated Mines (Pty) Ltd | 16/11/2020 - 16:03 | |
Phase 1 HIA report prior to core drilling | Heritage Impact Assessment for proposed drilling site at Mariaspan 223, near Wesselsbron, Free State Province | HIA Phase 1 | 01/10/2020 | David Morris | Archaeology department, McGreggor Museum | De Beers Consolidated Mines (Pty) Ltd | 16/11/2020 - 16:12 |
HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) | PHASE 1 HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) ON THE REMAINING EXTENT OF THE FARM VETLAAGTE 4 WITHIN EMTHANJENI LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 15/10/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Sativa Travel and Environmental Consultants | 17/11/2020 - 00:10 |
Heritage Screening Assessment: Richards Bay Powerline | Heritage Screening Assessment for the Proposed development of a power line to connect a 400MW gas-to-power plant in the Richards Bay area to the electricity grid, Richards Bay | Heritage Scoping | 06/11/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/11/2020 - 09:59 |
Desktop Cultural Heritage Scoping Report and Palaeontological Desktop Study | Desktop Study of Cultural Heritage Resources of Richtersveld, for two prospecting rights with bulk sampling for alluvial diamonds along the Orange River, Richtersveld, Namaqualand, Northern Cape Province of South Africa | Heritage Scoping | 28/10/2020 | Eric Mathoho | Millennium Heritage Group | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 17/11/2020 - 10:13 |
Desktop Cultural Heritage Scoping Report and Palaeontological Desktop Study | Desktop Study of Cultural Heritage Resources of Richtersveld for two prospecting right applications with bulk sampling for alluvial diamonds on the left bank of the Orange River, Richtersveld, Namaqualand, Northern Cape Province of South Africa | Heritage Scoping | 28/10/2020 | Eric Mathoho | Millennium Heritage Group | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 17/11/2020 - 10:53 |
Heritage Impact Assessment for the proposed Montrose N4 Interchange Mpumalanga Province | Heritage Impact Assessment for the proposed Montrose N4 Interchange Mpumalanga Province | HIA Phase 1 | 11/11/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 17/11/2020 - 15:47 |
Scoteville Phase II HIA for Built Environment | Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. | HIA Phase 2 | 17/11/2020 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 17/11/2020 - 16:22 |
Scoteville Phase II Built Environment HIA | Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. | HIA Phase 2 | 17/11/2020 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 17/11/2020 - 16:53 |
GOSA GGV Pipeline - Baseline Heritage Report | Phase 1 HIA Report for the Goedgevonden Colliery Joint Venture South Witbank Pipeline Environmental Authorisation Application near Ogies, Mpumalanga. | HIA Phase 1 | 01/09/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Golder Associates Africa (Pty) Ltd | 18/11/2020 - 12:36 |
GOSA GGV Pipeline - Baseline Palaeontology Report | Paleontological Impact Assessment: Phase 1: Field Study South Witbank Pipeline | PIA Phase 1 | 22/09/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | Golder Associates Africa (Pty) Ltd | 18/11/2020 - 12:38 |
Heritage Scoping Report - Zero Waste Recovery Plant | Heritage Impact Assessment for the proposed Zero Waste Recovery Plant is located on Portion 4 of Farm No. 309, eMalahleni LM within the Nkangala District Municipality (DM) in Mpumalanga. | Heritage Scoping | 19/10/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/11/2020 - 14:13 |
S24G Khalinkomo Phase 1 HIA | PHASE 1 HIA REPORT FOR THE PROPOSED KHALINKOMO TOWNSHIP DEVELOPMENT LOCATED ON A PORTION OF ORANJEVLEI 174 IN WESSELSBRON/MONYAKENG, FREE STATE PROVINCE | HIA Phase 1 | 30/09/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | NSVT Consultants | 18/11/2020 - 20:35 |
Oya WEF Amendment Letter | Kudusberg WEF Environmental Authorisation Amendment: Specialist Impact Statement | Heritage Impact Assessment Specialist Reports | 31/10/2020 | Katie Smuts | Rennie Scurr Adendorff | G7 Energies (Pty) Ltd | 19/11/2020 - 11:21 |
Oya WEF Amendment Letter - Palaeontology | Kudusberg WEF Environmental Authorisation Amendment: Specialist Impact Statement for Palaeontology | Palaeontological Specialist Reports | 06/11/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | G7 Energies (Pty) Ltd | 19/11/2020 - 11:26 |
Archeological Impact Assessment Barry Marais Road Upgrade | Archeological Impact Assessment Report for Proposed Barry Marais Road Upgrade and | AIA Phase 1 | 02/09/2019 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | 19/11/2020 - 11:36 | |
HERITAGE IMPACT ASSESSMENT: OF PROPOSED KOKOSI SEWER OUTFALL | HERITAGE IMPACT ASSESSMENT: PROPOSED KOKOSI SEWER OUTFALL, POTCHEFSTROOM MAGISTERIAL DISTRICT, GAUTENG PROVINCE | HIA Phase 1 | 18/09/2020 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 19/11/2020 - 11:57 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Kokosi Outfall 2 project on Elandsfontein 144, about 16km south of Carltonville,Gauteng | PIA Phase 1 | 05/09/2020 | Marion Bamford | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 19/11/2020 - 12:07 |
Phase 1 Cultural Heritage Impact Assessment: | THE PROPOSED PROSPECTING RIGHT AREA AND MINING PERMIT AREA NEAR RITCHIE ON THE REMAINING EXTENT OF THE FARM ZANDHEUVEL 144, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | HIA Phase 1 | Johnny van Schalkwyk | 19/11/2020 - 16:14 | |||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT AREA AND MINING PERMIT AREA NEAR RITCHIE ON THE REMAINING EXTENT OF PORTION 3 (ANNA’S HOOP) OF THE FARM ZANDHEUVEL 144, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | PIA Desktop | Elize Butler | 19/11/2020 - 16:15 | |||
Phase 1 Cultural Heritage Impact Assessment: | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT AREA AND MINING PERMIT AREA NEAR RITCHIE ON THE REMAINING EXTENT OF THE FARM ZANDHEUVEL 144, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | HIA Phase 1 | Johnny van Schalkwyk | 19/11/2020 - 16:17 | |||
KwaMhlanga HIA | ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED INTERGRATED SUSTAINABLE HUMAN SETTLEMENT TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM KWAMHLANGA 617 JR WITHIN THEMBISILE HANI LOCAL MUNICIPALITY, NKANGALA DISTRICT, MPUMALANGA PROVINCE . | HIA Phase 1 | 31/07/2020 | McEdward Murimbika | 19/11/2020 - 20:31 | ||
HIA - Oya OHL | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the 132kV Oya Overhead Power Line near Matjiesfontein, Western and Northern Cape | HIA Phase 1 | 20/11/2020 | Jenna Lavin, Nicholas Wiltshire, Nikki Mann, Dewald Wilken | CTS Heritage | G7 Energies (Pty) Ltd | 20/11/2020 - 11:00 |
Construction of an irrigation dam on the farm Esperado | Phase 1 AIA & HIA for the proposed Louw's Creek Dam Project: construction of an irrigation dam on portions of the remaining extent of the farm Esperado 253JU & portions 1 & 2 of the farm Esperado Annex 222JU, Louw's Creek, Kaapmuiden, Mpumalanga Province | AIA Phase 1 | 20/11/2020 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 20/11/2020 - 11:38 |
Elysium Fuel station | A REPORT ON A HERITAGE IMPACT ASSESSMENT RELATED TO A PROPOSED FILLING STATION ON PORTION 19 OF THE FARM ELYSIUM 15582 ET, UMDONI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 20/11/2020 | Anton van Vollenhoven | Archaetnos CC | MGTD Environmental | 20/11/2020 - 14:01 |
Zebediela Nickel Mine HIA | INTEGRATED HERITAGE IMPACT ASSESSMENT (HIA) ON VARIOUS PORTIONS OF THE FARM UITLOOP 3 KS FOR THE PROPOSED ZEBEDIELA NICKEL MINE PROJECT, MOGALAKWENA LOCAL MUNICIPALITY AND THE WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 05/11/2020 | Exigo Sustainability | Lesego Platinum Uitloop (Pty) Metals | 20/11/2020 - 16:43 | |
Heritage Screener: Vrede PV | Desktop Heritage Screening Assessment for the Proposed development of the Vrede Solar Energy Facilities near Kroonstad, Free State Province | Heritage Scoping | 20/11/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 20/11/2020 - 17:05 |
Heritage Screener: Rondavel PV | Desktop Heritage Screening Assessment for the Proposed development of the Rondavel Solar Energy Facilities near Kroonstad, Free State Province | Heritage Scoping | 20/11/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 20/11/2020 - 17:08 |
MAMFEMTHENI | A LETTER OF EXEMPTION FOR MAMFEMTHENI RURAL SUBSIDISED HOUSING PROJECT, OKUHLAMBA LOCAL MUNCIPALITY, KZN | HIA Letter of Exemption | 22/11/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 23/11/2020 - 08:33 |
PHIWO'S PIGGERY | A LETTER OF EXEMPTION FOR PHIWO'S PIGGERY, KZN | HIA Letter of Exemption | 19/11/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 23/11/2020 - 08:36 |
Motivation for a Full Phase 1 Heritage Impact Assessment Exemption for BMJ Coal | HIA Letter of Exemption | 07/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 23/11/2020 - 09:15 | ||
NTSUKANGIHLALE B | A LETTER OF EXEMPTION FOR THE NTSUKANGIHLALE B HOUSING PROJECT, OKAHLAMBA MUNICIPALITY, KZN | HIA Letter of Exemption | 22/11/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | K2M Environmental | 23/11/2020 - 09:19 |
De Hoop 320 Quarry Phase 1 HIA | Phase 1 Heritage Impact Assessment proposed new quarry on remainder portion of Farm De Hoop 230, Bloemfontein, FS Province | HIA Phase 1 | 19/11/2020 | Lloyd Rossouw | Palaeo Field Services | Eko Environmental | 23/11/2020 - 11:18 |
UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES | UNDERWATER ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MARINE SERVITUDES FOR THE COEGA SEZ, PORT ELIZABETH | AIA Phase 1 | 20/10/2020 | Vanessa Maitland | Coastal & Environmental Services - Port Elizabeth | 23/11/2020 - 12:22 | |
PermitID2804 | Tracing human population history through ancient DNA: Pretoria bone collection | Archaeological Permit Report | 23/11/2020 | Maryna Steyn | University of the Witwatersrand - School of Anatomical Sciences | University of the Witwatersrand - School of Anatomical Sciences | 23/11/2020 - 12:42 |