THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 551 - 600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Phase 1 Cultural Heritage Impact Assessment: Mimosa 61 | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT OF DIAMOND ALLUVIAL AND DIAMOND GENERAL ON THE REMAINING EXTENT OF PORTION 23 OF THE FARM MIMOSA, NEAR SCHWEIZER-RENEKE, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 03/04/2018 | Johnny van Schalkwyk | 09/04/2018 - 12:37 | ||
Wolmaransstad X20 HIA | Phase 1 HIA Report for the proposed Wolmaransstad Extension 20 (Unit U) township development on a portion of the Remaining Extent of Portion 2 of the farm Wolmaransstad Town and Townlands 184 HO, Wolmaransstad, North West Province | HIA Phase 1 | 01/07/2018 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 13/05/2019 - 16:54 |
HIA Final Kudu Oranjemund | HIA Final Kudu Oranjemund | HIA Phase 1 | 19/08/2016 | Anton van Vollenhoven | 14/09/2016 - 13:39 | ||
Gold One Heritage Report | PHASE 1 HERITAGE IMPACT ASSESSMENT OF THE PROPOSED GELUKSDAL TAILINGS STORAGE FACILITY AND PIPELINE INFRASTRUCTURE FOR GOLD ONE INTERNATIONAL LIMITED | HIA Phase 1 | 29/05/2012 | Justin du Piesanie | Digby Wells Environmental | 23/07/2013 - 11:38 | |
AIA_Onbekend_54_IT_Hutten_L_Feb11 | Heritage Impact Assessment for the farm Onbekend 54 IT Portion 9, 12 and RE, Mpumalanga | AIA Phase 1 | 01/02/2011 | Louisa Hutten, Marko Hutten | 16/06/2012 - 14:48 | ||
Haarlem shipwreck. Final report on test excavations. | Haarlem shipwreck. Final report on 2017 - 2018 test excavations. | Archaeological Permit Report | 01/08/2019 | Bruno Werz | African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) | African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) | 31/07/2019 - 16:10 |
DPD PV1 & 2 grid connection palaeo | Palaeontological Impact Assessment for the proposed Du Plessis Dam Solar PV1 and Du Plessis Dam Solar PV2 Grid Connections, De Aar, Northern Cape Province | PIA Phase 1 | 15/05/2022 | Marion Bamford | Prof Marion Bamford | ASHA Consulting(Pty) Ltd | 17/06/2022 - 00:17 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:09 |
Heritage Assessment-Mqangqala Access Road | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MQANGQALA ACCESS ROAD, UMZUMBE MUNICIPALITY | Heritage Impact Assessment Specialist Reports | 18/09/2013 | Frans Prins | Active Heritage CC | Active Heritage CC | 20/09/2013 - 10:26 |
AIA_Riverbank_Wind_Energy_Facility_Binneman_J_Oct10 | A Phase 1 Archaeological Impact Assessment (AIA) for the proposed Riverbank Wind Energy Facility between Hamburg and Wesley, Amathole District Municipality, Eastern Cape Province | AIA Phase 1 | 16/10/2010 | Johan Binneman, Celeste Booth, Natasha Higgitt | Albany Museum | 16/06/2012 - 14:49 | |
Weltevreden 386JS | Phase 1 Archaeological/Heritage Impact Assessment for proposed residential township: extention 7 of portion 5 (a portion of portion 2) of the farm Weltevreden 386 JS, Belfast | AIA Phase 1 | 01/02/2012 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 17/10/2012 - 14:51 |
Motivational Report for EA Amendment | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 16:20 |
ESKOM CUPRUM BESS: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/06/2021 | Trust Mlilo | Sativa Travel and Environmental Consultants | AECOM SA - Head Office | 10/08/2022 - 10:14 |
Survey Report and Management Plan for heritage sites in Dlinza Forest, Eshowe and Blackburn | Survey Report and Management Plan for heritage sites in Dlinza Forest, Eshowe and Blackburn | Conservation Management Plan | 28/03/2023 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 11/04/2023 - 11:44 |
Basic Heritage Impact Assessment | A BASIC HERITAGE IMPACT ASSESSMENT REPORT FOR THE LAKEVIEW FLOODLINE CONFINEMENT AND WATER USE LICENCE APPLICATION, CONSTANTIA KLOOF, ROODEPOORT | HIA Phase 1 | 31/01/2013 | Anton Pelser | A Pelser Archaeological Consulting | 05/02/2013 - 12:15 | |
Empire-Perth Storm water Conduits HIA Report | Cultural heritage impact assessment for THE PROPOSED INSTALLATION OF EMPIRE-PERTH CORRIDOR CONDUITS AND OUTFALLS STORM WATER MANAGEMENT SYSTEMS, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 30/07/2016 | J.A. van Schalkwyk | Envirolution Consulting (Pty) Ltd | 03/02/2017 - 14:57 | |
Phase 1 HIA report for the proposed Klerksoord filling station | Phase 1 HIA Klerksoord Filling Station | HIA Phase 1 | 22/01/2021 | Anton Pelser | Bokamoso Landscape Architects and Environmental Consultants CC | Bokamoso Landscape Architects and Environmental Consultants CC | 06/04/2021 - 13:41 |
PIA (desktop) Oliphant Estate Township Development | Desktop Study (Phase 1) Paleontology Impact Assessment for the proposed Oliphant Estate residential development, Kimberley, Northern Cape Province | PIA Desktop | 28/11/2021 | Marion Bamford | Prof Marion Bamford | 24/05/2023 - 10:43 | |
HL Hall Graves Mitigation Report | REPORT ON THE RELOCATION OF GRAVES HALL GRAVE RELOCATION PROJECT PLOT 13 OF THE OLD BOSCH STREET CEMETERY NELSPRUIT, MPUMALANGA | BGG Phase 3 | 14/09/2015 | Henk Steyn, Marko Hutten, Lineree de Jager | PGS Heritage and Grave Relocation Consultants | HL Hall & Sons (Pty) Ltd | 15/09/2015 - 08:57 |
Egazini Memorial Garden | Site Inspection Report: Egazini Memorial | Site Inspection Report | 13/03/2017 | 30/03/2017 - 11:30 | |||
HIA; Proposed Borrow Pit, Beaufort West | Heritage Impact Assessment for a Proposed Borrow Pit Located along DR 2308 Approximately 40 km southwest of Beaufort West in the Central Karoo District Municipality, Western Cape. | HIA Phase 1 | 25/04/2012 | Quahnita Samie, Madelon Tusenius | Vidamemoria Heritage Consultants, Natura Viva CC | Aurecon South Africa (Pty) Ltd | 29/05/2018 - 14:08 |
ASR-IlangaSites | Archeological Scoping Report for the Additional CSP Facilities Associated with the Authorized CSP Sites (1.3, 1.4, 3, 4 & 5) within the Karoshoek Solar Valley Development near Upington, ZK Mgcawu Distrcitu, NC Province | Heritage Scoping | 13/11/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/11/2015 - 10:47 |
AIA; Erf 26 Castle Rock, Simon's Town | Archaeological Impact Assessment (AIA) for erf 26, Castle Rock Simon’s Town | AIA Phase 1 | 01/01/2011 | Ute Seemann | Ute A Seemann - Heritage Archaeologist and Heritage Consultant | Khula Environmental Consultants | 18/07/2018 - 11:16 |
STRAWBERRY FARM TOWNSHIP DEVELOPMENT | A REPORT ON A HIA RELATED TO A GRAVE SITE RELOCATION PROJECT FOR THE STRAWBERRY FARM TOWNSHIP DEVELOPMENT LOCATED ON A PORTION (PTN 14) OF THE FARM OLIFANTSFONTEIN 402JR OLIFANTSFONTEIN/IRENE/CLAYVILLE AREA, GAUTENG - APAC018/43 | Heritage Impact Assessment Specialist Reports | 01/06/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | M&T Development (Pty) Ltd | 29/10/2019 - 15:23 |
PPM updated HIA | An updated Phase I Heritage Impact Assessment (HIA) for Pilanesberg Platinum Mine (PPM) near the Pilanesberg in the North-West Province of South Africa | HIA Phase 1 | 30/08/2013 | SLR Consulting (Africa) | 21/11/2013 - 15:36 | ||
HIA Report Jacaranda Boardroom | Heritage Impact Assessment in accordance to Section 27 (18) of NHRA 25 of 1999 for submission to SAHRA with Special Focus on Jacaranda Boardrooms upgrade of the Portions of the Farm Elandspoort 357- JR, Pretoria | Heritage Impact Assessment Specialist Reports | 21/02/2020 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | National Department of Public Works | 21/02/2020 - 09:56 |
PHASE 1 HIA DOORNRIVIER SOLAR 2 VIRGINIA | PHASE 1 HIA PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY (DOORNRIVIER SOLAR 2) ON THE FARM, DOORNRIVIER 330 PORTION 5, VIRGINIA, MATJHABENG LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 31/08/2022 | Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 30/09/2022 - 14:08 |
Apex Cultural Heritage Study | 20/02/2014 - 11:30 | ||||||
Gxumisa | The proposed Eucalyptus forestry projects by P. W. Gxumisa (24ha) occurring in locations in Kroomdraai 127ES Portion 13, 15, 17 & 18 farms in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 14:50 |
Palaeontological Heritage Assessment: Desktop Study | Palaeontological Heritage Assessment: Desktop Study Proposed Dawid Kruiper Rest Camp and Picnic Sites at the Veertiende and Bedinkt Waterholes, Kalahari Gemsbok National Park / Kgalagadi Transfrontier Park, Northern Cape Province | PIA Desktop | 08/05/2021 | 08/06/2021 - 14:35 | |||
Preliminary Report on Chance Discoveries of Human Remains | Preliminary Report on Chance Discoveries of Human Remains at Two Rivers Platinum Mine, October-November 2022 | Archaeological Permit Report | 16/11/2022 | Edward Matenga | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 16/11/2022 - 11:02 |
PIA | 03/07/2023 - 08:14 | ||||||
RESIDENTIAL DEVELOPMENT AT KURUMAN | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED 222 ERVEN RESIDENTIAL DEVELOPMENT AT 27HA ERF 1, KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 25/11/2014 | Cobus Dreyer | YB Mashalaba & Associates Consultants | YB Mashalaba & Associates Consultants | 09/08/2015 - 20:47 |
Waaihoek HIA | HERITAGE SURVEY OF THE PROPOSED WAAIHOEK WIND ENERGY FACILITY, UTRECHT, KWAZULU-NATAL | AIA Phase 1 | 19/05/2014 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 27/06/2014 - 11:17 |
port st Johns WWTW 2 | HERITAGE SURVEY OF THE PROPOSED PORT ST JOHNS WASTE WATER TREATMENT WORKS | HIA Phase 1 | 05/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 10/05/2017 - 08:34 |
Boitumelo Heritage Impact Assessment | 30/07/2021 - 09:54 | ||||||
Borrow pit D3150 | Proposed new borrow pit (1) on the road d3150, on the remaining extent of the farm Mosterthoek 163 LT, near Morebeng (Soekmekaar), Limpopo Province | Heritage Scoping | 21/07/2017 - 15:33 | ||||
AIA FOR THE EAST 2 AND EAST 3 SOLAR PARKS AND ACCESS ROAD ON THE FARM EAST 270, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR PROPOSED PHOTOVOLTAIC POWER PLANTS (EAST 2 AND EAST 3 SOLAR PARKS AND ACCESS ROAD) ON THE REMAINDER AND PORTION 2 OF THE FARM EAST 270, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 16/04/2016 | Neels Kruger | Exigo Sustainability | Palus Energy (Pty) Ltd. | 12/02/2016 - 10:00 |
AIA_Fluorspar_Kromdraai_Kusel_U_Sep11 | Cultural Heritage Resources Impact Assessment of the proposed new Fluorspar Mine on the Farms Kromdraai 209JR and Naaupoort 208JR, Nokeng, Gauteng Province | AIA Phase 1 | 05/09/2011 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:45 | |
HIA for Makushane Substation & lilo line 2013 | Archaeological and Heritage Impact Assessment Report for Proposed Makushane Substation and ± 1km 132kv loop in and out powerline in Ba- Phalaborwa Local Municipality (Wards 1 and 2) of the Limpopo Province February 2013 | HIA Phase 1 | McEdward Murimbika | Nzumbululo Heritage Solutions | Shumani SHE Specialists | 08/10/2018 - 13:51 | |
Hendrina Leachate Dam | LETTER FOR HIA EXEMPTION REQUEST: HENDRINA LEACHATE DAM, MPUMALANGA PROVINCE | HIA Letter of Exemption | 08/04/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | WSP Environmental Pty Ltd - Johannesburg | 25/10/2021 - 15:28 |
Phase 1 HIA Sandham 171, Hartfell 172 & Bullsrun 164 | Phase 1 Heritage Impact Assessment of Application for a Prospecting Right on the Remaining Extent of Farm Sandham 171; Remaining Extent and Portion 1 of Farm Hartfell 172 and Remaining Extent, Portions 1 and 2 of Farm Bullsrun 164 in the administrative district of Hay, NC Province. | HIA Phase 1 | 06/04/2016 | Lloyd Rossouw | Paleo Field Services | EndemicVision Environmental Services | 06/04/2016 - 13:27 |
Heritage IAR - Lichtenburg 2 PV_Nov 2018 | Heritage Impact Assessment for the Development of the Lichtenburg 2 PV Solar Energy Facility and Associated Infrastructure on a Site Near Lichtenburg, North West Province. | Heritage Impact Assessment Specialist Reports | 15/11/2018 | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/01/2019 - 10:03 | |
HIA: Equestrian & Country Estate - Meyer's Farm | Cultural Heritage Survey of Proposed Agricultural Museum, Equestrian and Country Estate on a Part of Portion 106 IR of the Farm Klipriviersberg (Meyer's Farm), Gauteng Province | Heritage Impact Assessment Specialist Reports | Francois P Coetzee, Joanna Behrens | 08/07/2020 - 09:49 | |||
PIA FOR THE CONSTRUCTION OF CULVERT 1 AND 2 ON ROAD L1526 | Palaeontological Impact Assessment for the proposed two culverts on Road L1526, Bergville, Okhahlamba Local Municipality, KwaZulu Natal Province | PIA Phase 1 | 20/03/2021 | Marion Bamford | Prof Marion Bamford | Prof Marion Bamford | 14/01/2022 - 13:13 |
Heritage Impact Scoping Assessment for the proposed Delareyville-Kopela Power line development, North West Province. | Heritage Impact Scoping Assessment for the proposed Delareyville-Kopela Power line development, North West Province. | HIA Phase 1 | 03/01/2010 | Johnny Van Schalkwyk | 16/06/2012 - 08:54 | ||
Heritage amendment letter: BESS Hoekplaas PV2 | Heritage amendment letter: BESS Hoekplaas PV2 | Heritage Statement | 27/08/2020 | ACO Associates CC | 17/09/2020 - 14:22 | ||
Kutlwano Heritage Impact Assessment | 30/07/2021 - 10:04 | ||||||
Soutrivier South WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 10:33 | |
Archaeological and Heritage assessment for solid waste site, Keimoes | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE SOLID WASTE DISPOSAL SITE AT KEIMOES NEAR UPINGTON, NORTHERN CAPE Please take note: Also phase 1 heritage assessment. | AIA Phase 1 | 04/09/2012 | Cobus Dreyer | 23/09/2014 - 11:35 |