Displaying 551 - 600 of 17953
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Letter of Exemption for the Mhlungwini Rural Housing Development | HIA Letter of Exemption | 20/02/2017 - 11:16 | |||||
Mthonjaneni Bulk Water Supply | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED, GREATER MTHONJANENI SSA 2 BULK WATER SUPPLY PROJECT WITHIN THE MTHONJANENI LOCAL MUNICIPALITY | HIA Phase 1 | 06/06/2014 | Frans Prins | Active Heritage CC | ACER (Africa) Environmental Management Consultants | 06/06/2014 - 08:18 |
Saldanha ADZ HIA | Underwater Heritage Impact Assessment for the Development of an Aquaculture Development Zone (ADZ) at Saldanha Bay | Heritage Impact Assessment Specialist Reports | African Centre for Heritage Activities | Department of Agriculture, Forestry and Fisheries | 05/04/2017 - 11:19 | ||
Ventersdorp Palaeontological Studies | ventersdorp Palaeontological Studies | Palaeontological Specialist Reports | 13/04/2018 | Adriaan Johannes Hendrikus Lamprecht | Museum Africa | Bobo Productions | 13/04/2018 - 09:11 |
HIA for In-situ Rural Subsidised Housing Project , Qadi Ward 8, Maphumulo | Cultural Heritage Impact Assessment of the Proposed Rural Subsidised Housing Project , Qadi Traditional Authority (Ward 8), Maphumulo. | HIA Phase 1 | 08/08/2014 | Frans Prins | Active Heritage CC | Simon Vines TRP (SA) | 02/09/2014 - 05:04 |
Heritage Impact Assessment Report Samin Prospecting Right Application | Heritage Impact Assessment Report for Samin Prospecting Right Application at Gumbu, Madimbo Area, Musina Local Municipality, Vhembe District Municipality of Limpopo Province, South Africa | HIA Phase 1 | 15/05/2018 | Eric Ndivhuho Mathoho | SAMIN Group Pty Ltd | Naledzi Environmental Consultants | 06/06/2018 - 16:40 |
Integrated Heritage Impact Assessment for Humansrus Solar PV Energy Facility 1 | Integrated Heritage Impact Assessment in terms of Section 38(8) of the National Heritage Resources Act, 1999 (ACT 25 of 1999): Proposed Development of Humansrus Solar PV Energy Facility 1 (previously named RE Capital 13 Solar Development) on a portion of the Farm Humansrus 147/ Remainder, Prieska District, Northern Cape. | HIA Phase 1 | 30/11/2014 | Stefan de Kock | Perception Heritage Planning | Humansrus Solar PV Energy Facility 1 (Pty) Ltd. | 03/02/2015 - 14:00 |
Heritage Impact Assessment Report (Desktop report) | Heritage Impact Assessment Report and Paleontological Report (Desktop Reports) | Heritage Impact Assessment Specialist Reports | 18/11/2019 | Jaco van der Walt | Greenmined Environmental | Lengana Health SA (Pty) Ltd | 18/11/2019 - 08:43 |
14_App C5 Palaeontological Screening Report | PALAEONTOLOGICAL HERITAGE SCREENING INPUT: PROPOSED KHAUTA SOLAR PV CLUSTER NEAR WELKOM, FREE STATE PROVINCE | PIA Desktop | 01/07/2021 | John E. Almond | Natura Viva CC | Enviroworks | 19/08/2022 - 11:48 |
Senekal Boerdery- Application for HIA Exemption | Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed agricultural development by Senekal Boerdery near Mkuze, uMkhanyakude District Municipality, KwaZulu-Natal | HIA Letter of Exemption | 28/01/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 31/03/2015 - 10:50 |
SAHRIS CaseID 14758-Postponement of Date of Submission of Requested Information to 23 March 2020 | SAHRIS CaseID 14758-Postponement of Date of Submission of Requested Information to 23 March 2020 | 09/03/2020 | Karen Van Ryneveld | 09/03/2020 - 09:34 | |||
CONFIBRITE PTY (LTD) -FS (10323) EM | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON PORTION OF THE REMAINDER OF THE FARM FLORISBAD SOUTWERKE 1241, IN THE MAGISTERIAL DISTRICT OF BRANDFORT FOR CONFIBRITE. | 22/04/2021 | 22/04/2021 - 12:55 | ||||
Addendum 10 | 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT | HIA Phase 1 | 01/08/2022 | Siegwalt Udo Kusel | Sidney Miller | Sidney Miller | 13/10/2022 - 10:14 |
Chibide Road Upgrade HIA report | Phase 1 - Heritage Impact Assessment Report - Chibide Road Upgrade, near Greytown, KwaZulu-Natal. | HIA Phase 1 | 02/01/2013 | Stephan Gaigher | G & A Heritage | 18/06/2013 - 14:05 | |
HERITAGE IMPACT ASSESSMENT | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED QHWAYI ROAD UPGRADE NEAR LADYSMITH, KWAZULU-NATAL. | HIA Phase 1 | 08/05/2016 | Frans Prins | Active Heritage CC | Active Heritage CC | 12/05/2016 - 09:13 |
Protea Addition Paleontological Impact Assessment | PROPOSED EXPANSION OF THE AUTHORISED PROTEA SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM HARTSBOOM NO. 734, NALEDI LOCAL MUNICIPALITY, NORTH WEST PROVINCE. | PIA Desktop | 01/04/2021 | John E. Almond | Natura Viva CC | Protea Solar Power Plant (Pty) Ltd | 21/06/2021 - 13:14 |
HERITAGE SURVEY OF THE JOZINI REGIONAL COMMUNITY WATER SUPPLY SCHEME | HERITAGE SURVEY OF THE JOZINI REGIONAL COMMUNITY WATER SUPPLY SCHEME | AIA Phase 1 | 19/08/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions | 21/08/2013 - 09:00 |
Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/06/2011 | eThembeni Cultural Heritage | 19/05/2017 - 14:19 | ||
EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT | APPLICATION FOR EXEMPTION FROM CONDUCTING A PHASE I ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF STORM WATER AND ENVIRONMENTAL SYSTEMS IN THE PORT OF SALDANHA WITHIN SALDANHA BAY LOCAL MUNICIPALITY IN THE WESTERN CAPE PROVINCE | Archaeological Specialist Reports | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 03/08/2018 - 13:28 | |
AIA_Hydropower_station_Neus_Island_Orange_River_Morris_D_Nov10 | Heritage Impact Assessment of the proposed hydropower station on the Orange River at Neus Island on the Farm Zwartbooisberg, east of Kakamas, Northern Cape | AIA Phase 1 | 17/11/2010 | David Morris | McGregor Museum | 16/06/2012 - 14:46 | |
Phase 1 Heritage Impact Assessment | Proposed Drilling Sites and Prospecting Trenches on the Farms De Paarl 246 KP, Goedgedacht 255 KP, Bedford 254 KP & Syferbult 257 KP, Dwaalboom Area, Bojanala District Municipality, North West Province. | HIA Phase 1 | 16/10/2018 | Polke Birkholtz | PGS Heritage (Pty) Ltd | EOH Coastal & Environmental Services (CES) - Port Elizabeth | 24/10/2018 - 12:40 |
Phase 1 Archaelogical Heritage Impact Assessment | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEBUSHING OF NATURAL LAND FOR AGRICULTURAL USE: PORTIONS 7 AND 8 OF THE FARM BOERBOONKRAAL 353KT BURGERSFORT LIMPOPO PROVINCE | HIA Phase 1 | 13/11/2014 | Ralf Kalwa | Adansonia Heritage Consultants | 09/03/2020 - 15:07 | |
PIA Siza | Gary Trower | Gary Trower | University of Johannesburg-Palaeo-Research Institute (P-R I) | 10/11/2021 - 11:44 | |||
Construction of Water Supply Pipeline, Hammarsdale, KwaZulu Natal | Proposed construction of a 500mm steel inlet trunkmain to Hammarsdale High Level Reservoir | HIA Phase 1 | 20/04/2015 | Jean Beater | Nemai Consulting | eThekwini Municipality | 23/06/2015 - 11:54 |
Basic Assessment Report for Maluti Plant and Crushers CC | REVISED BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON PORTION 2 OF THE FARM BOESMANSKOP 115, IN THE MAGISTERIAL DISTRICT OF BLOEMFONTEIN | 24/07/2020 | 24/07/2020 - 09:23 | ||||
EIA 496 PIA_EButler December 2021 Percy | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT WITH BULK SAMPLING FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS GENERAL & DIAMONDS IN KIMBERLITE INCLUDING ASSOCIATED INFRASTRUCTURE, STRUCTURE AND EARTHWORKS ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | Palaeontological Specialist Reports | 01/12/2021 | Elize Butler, Johnny van Schalkwyk | 27/01/2022 - 15:29 | ||
Desktop PIA, Application for Exemption Phase 1 PIA Kendal Power Station | Application letter for exemption from Phase 1 site visit PROPOSED DEVELOPMENT OF A LOW PRESSURE SYSTEM (LPS) PIPELINE AND 11KV POWERLINE IN ASSOCIATION WITH AN EXISTING AUTHORISED (EA DATED 28 JULY 2015) ASH DISPOSAL FACILITY (ADF) AT THE KENDAL POWER STATION, EMALAHLENI AND DELMAS LOCAL MUNICIPALITIES, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | PIA Desktop | 22/11/2022 | Gideon Groenewald | Vungandze Projects | 29/11/2022 - 10:17 | |
Erf 5357 Drostdy Centre Stellenbosch | Permit Application Erf 5357Stellenbosch | Heritage Study | 25/07/2016 | Andre Gideon Pentz | 26/07/2016 - 12:01 | ||
HIA of Hlinzeka Road | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED, HLINZEKA ACCESS ROAD AND CAUSEWAY ON LOCAL ROAD L2717 NEAR NQUTU, KWAZULU-NATAL. | HIA Phase 1 | 27/07/2015 | Frans Prins | 27/07/2015 - 12:44 | ||
Middelburg Dam Precinct Plan | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF MIDDELBURG DAM PRECINCT PLAN, (18Ha) ON A PORTION OF PORTION 87 OF THE FARM RONDEBOSCH 403-JS, MIDDELBURG, MPUMALANGA PROVINCE | HIA Phase 1 | 23/06/2021 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Adansonia Heritage Consultants | 10/08/2021 - 14:06 |
Bojanala HIA | Cultural Heritage Impact Assessment: THE DEVELOPMENT OF THE PROPOSED BOJANALA SEZ AND ASSOCIATED POWER LINE AND WATER PIPELINE IN THE BOJANALA DISTRICT MUNICIPALITY OF NORTH WEST PROVINCE | HIA Phase 1 | 15/12/2022 | J A van Schalkwyk | 06/02/2023 - 15:47 | ||
Proposed Balfour FET College | Phase1 Heritage Impact Assessment for the Proposed Further Education Training (FET) College in Balfour. | Heritage Impact Assessment Specialist Reports | 25/10/2013 | Makhosazana Mngomezulu | 25/10/2013 - 12:37 | ||
GBDBWSS - HIA Phase 2 | Assessment of railway bridge across the Umkomaas River, Ncwadi district, KwaZulu | AIA Phase 2 | 30/08/2016 | Archaic Consulting | 21/09/2016 - 15:16 | ||
Ga-Mothakge | A CULTURAL HERITAGE MANAGEMENT PLAN FOR THE GA-MOTHAKGE RESORT, CITY OF TSHWANE | Conservation Management Plan | 16/09/2013 | Anton van Vollenhoven | Archaetnos CC | City of Tshwane - Environmental Management Department | 06/01/2014 - 10:38 |
AIA: 22kv powerlines in the Eastern Cape | AIA: In terms of Section 38(8) of the NHRA for NEW 22KV POWER LINES IN VARIOUS LOCATIONS IN THE EASTERN CAPE | AIA Phase 1 | 13/10/2017 | Katie Smuts, Jenna Lavin, Guy Thomas | CTS Heritage | JG AFRIKA | 13/10/2017 - 11:14 |
Mahube Valley Storm Water Management Basic Assessment | Cultural Heritage Impact Assessment for the Mahube Valley Storm Water Management Pipes, Mamelodi Township | Heritage Impact Assessment Specialist Reports | 01/10/2014 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 05/11/2014 - 10:12 |
Archaeology Impact Assessment - Hotazel Solar | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE HOTAZEL SOLAR FACILITY (100 MW) ON REMAINDER FARM YORK A 279 AND 132 kV GRID CONNECTION ON REMAINDER OF FARM HOTAZEL 280 AND PORTION 11 OF FARM YORK A 279, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE | AIA Phase 1 | 30/11/2018 | Lita Webley | Cape Environmental Assessment Practitioners | 05/02/2019 - 12:45 | |
Bospoort Pipeline Desktop Study Report | Archaeological and Heritage Desktop Study in respect of the proposed construction of a water pipeline and reservoir, Rustenburg, North West Province. | AIA Desktop | 01/04/2019 | 03/05/2019 - 10:25 | |||
Proposed establishment of Rooibos Plantations on F arm 587 and Farm 148/0 Vlierfontein, Clanwilliam | HIA:Proposed establishment of Rooibos Plantations on Farm 587 and Farm 148/0 Vlierfontein, Clanwilliam | HIA Phase 1 | 07/10/2019 | Jenna Lavin | CTS Heritage | FOOTPRINT Environmental Services | 28/09/2020 - 10:29 |
HIA: Wolf-Skillpad-Grassridge 132kV Transmission Line | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE NEW WOLF – SKILPAD – GRASSRIDGE 132 KV TRANSMISSION LINE, KARIEGA / KIRKWOOD, EASTERN CAPE PROVINCE | AIA Phase 1 | 31/03/2022 | Kobus Reichert | Eastern Cape Heritage Consultants | Zutari (Pty) Ltd | 08/04/2022 - 09:48 |
jambok Zijn Oude Kraal | Heritage Scoping Report for the Prospecting Right Application on the Farm Sjambok Zijn Oude Kraal 258 JR in the Gauteng Province | Heritage Scoping | 12/06/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Quanto Environmental Solutions | 01/08/2012 - 15:00 |
Proposed Danhauser Subsidised Housing Development | Proposed Danhauser Subsidised Housing Development Application for Exemption from Phase 1 HIA | Heritage Scoping | 30/05/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | SPHE CONSULTING | 28/09/2015 - 05:25 |
Elysium Fuel station | A REPORT ON A HERITAGE IMPACT ASSESSMENT RELATED TO A PROPOSED FILLING STATION ON PORTION 19 OF THE FARM ELYSIUM 15582 ET, UMDONI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 20/11/2020 | Anton van Vollenhoven | Archaetnos CC | MGTD Environmental | 20/11/2020 - 14:01 |
Sterkspruit 33 JT | Phase 1 Archaeological Impact Assessment on portions 60 and 64 of the remainder of the farm Sterkspruit 33 JT in Lydenburg, Mpumalanga Province. | AIA Phase 1 | 01/05/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Tua Conserva Environmental | 05/12/2012 - 15:20 |
Kokerboom 1 Palaeo | Palaeontological heritage assessment: combined desktop and field-based scoping study for the proposed Kokerboom 1 Wind Farm near Loeriesfontein, Namaqua District Municipality, Northern Cape. | Palaeontological Specialist Reports | 18/10/2016 | John Almond | Natura Viva CC | Aurecon - Cape Town | 01/11/2016 - 12:11 |
Ngquza Hill | Site Inspection Report | Site Inspection Report | 30/10/2015 | Themba Monnye | 26/11/2015 - 14:14 | ||
Phase 1 Heritage Impact Assessment: Coza Iron Ore Project | Coza Iron Ore Project: Phase 1 Heritage Impact Assessment in terms of Proposed Mining Activities on Sections of Portion 1 of the farm Doornpan 445, north of Potsmasburg, Northern Cape Province. | HIA Phase 1 | 19/02/2014 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Synergistics Environmental Services | 08/03/2014 - 23:58 |
Werda HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON REMAINING PORTION OF THE FARM JACOBSFONTEIN 503 (WERDA) NEAR POSTMASBURG IN THE NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 29/09/2016 | Edward Matenga | 31/01/2017 - 09:12 | ||
HIA Dundee Piggery, KZN | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXPANSION ON AN EXISTING PIGGERY LOCATED ON REM AND PORTION 1 OF THE FARM DONDOLA 8493, DUNDEE, KWAZULU-NATAL | HIA Phase 1 | Frans Prins | Active Heritage CC | Green Door Environmental | 20/12/2017 - 13:27 | |
Boikarabelo Collection Management Report | Collections Management and Research Report: Mitigation of Boikarabelo Coal Mine, Limpopo Province (SAHRA Permit No. 80/11/07/015/51) | Archaeological Permit Report | 06/05/2014 | Annie R. Antonites | Department of Anthropology & Archaeology, University of Pretoria | Digby Wells Environmental | 15/05/2014 - 15:46 |