Displaying 701 - 750 of 17960
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Farm Aroams 57 HIA | Heritage Impact Assessment Report for Farm Aroams 57 | Heritage Impact Assessment Specialist Reports | Christine Fouche | Greenmined Environmental | ACO Associates CC | 17/01/2020 - 12:31 | |
PHASE 1 HIA DOORNRIVIER SOLAR 2 VIRGINIA | PHASE 1 HIA PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY (DOORNRIVIER SOLAR 2) ON THE FARM, DOORNRIVIER 330 PORTION 5, VIRGINIA, MATJHABENG LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 31/08/2022 | Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 30/09/2022 - 14:08 |
Reiger Park Ext. 16 | Phase 1 Heritage Impact Assessment: Proposed Development of ReigerPark Ext. 16 Boksburg, Ekurhuleni Metropolitan Municipality, Gauteng Province | AIA Phase 1 | 18/05/2011 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Marsh Environmental Services | 04/10/2012 - 10:57 |
HIA of Phase 1F of the Richards Bay Industrial Development Zone | HIA Phase 1 | 13/01/2015 | Frans Prins | 08/08/2016 - 15:41 | |||
Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR | Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 01/09/2013 | Francois P Coetzee | Umhlaba Environmental Consulting CC | 15/02/2018 - 12:33 | |
Desktop Paleontological Papkuilfontein | DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSMENT REPORT ON THE SITE OF A PROPOSED SAND AND CLAY MINE TO BE LOCATED ON PORTIONS 0 OF THE FARM PAPKUILFONTEIN 469 JR, MPUMALANGA PROVINCE | PIA Desktop | 28/10/2013 | Barry Millsteed | 18/02/2014 - 10:26 | ||
Diepsloot Cemetery Eskom Power Cable | THE PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT IS PART OF AN APPLICATION TO ESKOM FOR THE LOCATION OF AN ELECTRICAL CABLE ON ONE OF THEIR SERVITUDES ON CITY OF JOHANNESBURG LAND - DIEPSLOOT CEMETERY PORTION 1 OF THE FARM DIEPSLOOT 388-JR GAUTENG PROVINCE | HIA Phase 1 | 07/04/2020 | Gwen Theron | LEAP -Landscape Architectural and Environmental Planning | LEAP -Landscape Architectural and Environmental Planning | 15/05/2020 - 12:14 |
HIA - NBC Consolidation Project | NBC COLLIERY GLISA AND PAARDEPLAATS MINING PROJECT Phase 1 – Heritage Impact Assessment | HIA Phase 1 | 19/05/2021 | Polke Birkholtz, Cherene de Bruyn, Elize Butler | PGS Heritage (Pty) Ltd, Banzai Environmental (Pty) Ltd | CIGroup Environmental (Pty) Ltd, North Block Complex (Pty) Ltd | 08/06/2021 - 15:46 |
Preliminary Report on Chance Discoveries of Human Remains | Preliminary Report on Chance Discoveries of Human Remains at Two Rivers Platinum Mine, October-November 2022 | Archaeological Permit Report | 16/11/2022 | Edward Matenga | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 16/11/2022 - 11:02 |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 16:29 | ||
HIA Chicken Houses, Middelburg Mpumalanga | A Report on an Archaeological and Built Environment Heritage Impact Assessment for Proposed Chicken Houses on the Farm Kopermyn 435 JS and Kwaggafontein 460 JS, close to Middelburg, Mpumalanga Province. | HIA Phase 1 | 01/04/2015 | Anton van Vollenhoven | Archaetnos CC | Clean Stream Environmental Services | 30/06/2015 - 15:36 |
AIA_Old_Pta_Bowling_Kiᄑsel_U_Nov11 | Exemption of cultural heritage resources impact assessment for the old pretoria circle of friends bowling club Gauteng province | AIA Phase 1 | 11/04/2011 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:48 | |
Phase 1 PIA for Latimer's Landing Jetty Port of East London | Palaeontological Impact Assessment for the Proposed Rehabilitation and Refurbishment of the existing Latimer’s Landing jetty at the Port of East London (Part 1 of HIA) | PIA Phase 1 | 20/07/2015 | Lloyd Rossouw | National Museum Bloemfontein | Transnet Capital Projects | 07/08/2015 - 08:48 |
L Gromer Chicken Facility | Proposed new chicken broiler facilities | HIA Phase 1 | 04/10/2021 | Lloyd Rossouw | Paleo Field Services | 26/10/2021 - 09:42 | |
Phase 1 Archaeological Impact Assessment of proposed new sand mine - Hoffmans Rust 173/RE, Wepener | Phase 1 Archaeological Impact Assessment of proposed new sand mine development on the farm Hoffmans Rust 173 near Wepener, FS Province | AIA Phase 1 | 26/01/2017 | Lloyd Rossouw | Department of Mineral Resources - Free State | Proper Consulting Engineers Pty Ltd | 24/02/2017 - 16:23 |
DU PLESSIS DAM PV1 PRE-CON SURVEY | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY: PROPOSED DU PLESSIS DAM PV1 SOLAR ENERGY FACILITY AND ASSOCIATED POWER LINE, NORTHERN CAPE | Archaeological Specialist Reports | 13/12/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | Landscape Dynamics - Cape Town | 15/01/2022 - 10:06 |
Palaeontology Report for Wonderheuwel Solar Energy Facility 731 | Proposed Wonderheuwel Solar Energy Facility, Noupoort, Northern Cape Province. Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | Skarab CC | 01/02/2013 - 13:12 | |
HIA Report for Solar-Ferrum 400kV Power Line | Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province | HIA Phase 1 | 15/04/2014 | Stephan Gaigher | Department of Environmental Affairs | Zitholele Consulting | 09/04/2014 - 07:48 |
HIA for Proposed Drilling at Greeffputs 169 | Heritage Impact Assessment for proposed drilling site at Greeffputs 169, near Barkley West, Northern Cape | HIA Phase 1 | 27/02/2020 | David Morris | McGregor Museum | De Beers Consolidated Mines (Pty) Ltd | 26/08/2020 - 12:10 |
Kutlwano Paleontological Impact Assessment | 30/07/2021 - 10:04 | ||||||
Soutrivier South WEF PIA | PIA Phase 1 | 31/10/2022 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 25/01/2023 - 10:33 | |
HIA FOR THE PROPOSED COAL MINING ACTIVITIES ON THE FARM VLAKFONTEIN 569JR | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COAL MINING ACTIVITIES ON THE FARM VLAKFONTEIN 569JR, WITBANK MAGISTERIAL DISTRICT, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 18/10/2009 | Johnny Van Schalkwyk | SRK Consulting (Pty) Ltd - Pretoria | 18/04/2013 - 12:08 | |
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE | HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE | HIA Letter of Exemption | 15/09/2016 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/11/2016 - 15:49 |
HIA; Expansion of Existing Borrow Pit, MR00282, Bonnievale | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along MR00282 Approximately 2 km south of Bonnievale in Cape Winelands District Municipality, Western Cape. | HIA Phase 1 | 27/02/2012 | Quahnita Samie, John Almond | Vidamemoria Heritage Consultants | Nadeson Consulting Services | 12/06/2018 - 14:09 |
Phase 1 AIA and HIA for the proposed Siyanqoba residential development | Phase 1 archaeological and Heritage Impact assessment for proposed Siyanqoba residential development on farms Tweedam377JS snd remaining extent of Leeuwpoort 283JS, Emalahleni, Mpumalanga•••••••••• | Archaeological Specialist Reports | 23/06/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 24/06/2014 - 11:44 |
ASR-Buffels1 | Archaeological Scoping Report for the Proposed Buffels Solar 1 SEF, Klerksdorp, North West Province | Archaeological Specialist Reports | 17/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 07/08/2015 - 11:14 |
Ixopo informal settlement upgrading OR Tambo | PHASE 1 HIA REPORT FOR PROPOSED INFORMAL SETTLEMENT UPGRADING AT O.R.TAMBO (IXOPO), UBUHLEBEZWE LOCAL MUNICIPALITY, IXOPO, KWAZULU-NATAL | HIA Phase 1 | 17/06/2020 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 24/03/2023 - 09:50 |
TRUCK STOP PALMIET 585 VREDE | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED TRUCK STOP DEVELOPMENTS AT PORTION 4, PALMIET 585, VREDE, FREE STATE | Heritage Impact Assessment Specialist Reports | 11/10/2015 | Cobus Dreyer | DESTUDIO DESIGN BLOEMFONTEIN | DESTUDIO DESIGN BLOEMFONTEIN | 05/10/2015 - 21:03 |
HIA Mabaso Gravel Road | Proposed construction of 6.9km gravel road in Mabaso Village, Klip River Native Location 4665 Msinga LM, Mzinyathi District DM, KwaZulu-Natal | Heritage Scoping | 10/03/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 11/04/2017 - 11:18 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Surface Infrastructure changes at the UMK Mine on Farm Botha 313, the Remaining Extent (Re) of the Farm Smartt 314, and Portion 1 and Remaining Extent (RE) of the Farm Rissik 330, Northern Cape Province | Palaeontological Specialist Reports | 11/03/2022 | Marion Bamford | Wits Archaeology Consulting (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 25/03/2022 - 11:11 |
249 Avondale Road Durban | 249 Avondale Road Durban - Boundary Wall Application | 19/04/2013 | Barry St Leger Denny | 19/04/2013 - 10:46 | |||
HIA Report Roof Repair Test Strip Elandspoort 357 JR | Heitage Impact Assessment Report in accordance with Section 27 (18) for the Report Roof Repair Test Strip for Portions of Elandspoort 357 JR, Pretoria, Gauteng | Heritage Impact Assessment Specialist Reports | 12/11/2020 | Judith Muindisi | Tsica Heritage Consultants | National Department of Public Works | 12/11/2020 - 12:19 |
HIA for bulk infrastructure development Musina | Phase 1 Heritage Impact Assessment for Proposed bulk infrastructure development within the Musina-Makhado Special Economic Zone (MMSEZ) North site in Antonvilla, Musina Local Municipality within Vhembe District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 31/01/2022 | Trust Mlilo | Integrated Specialist Services | Sativa Travel and Environmental Consultants | 31/05/2022 - 00:10 |
Impumelelo 132kV OHPL - Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED IMPUMELELO GRID CONNECTION NEAR SECUNDA, MPUMALANGA | HIA Phase 1 | 28/01/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 24/03/2023 - 10:57 |
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED BORDER ROAD | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED BORDER ROAD | HIA Phase 1 | 01/01/2018 | Frans Prins | Active Heritage CC | Royal Haskoning DHV | 16/08/2018 - 11:05 |
KALKLAAGTE 32 JACOBSDAL | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT KALKLAAGTE 32, JACOBSDAL, FREE STATE | Heritage Impact Assessment Specialist Reports | 25/08/2014 | Cobus Dreyer | De Beers Consolidated Mines (Pty) Ltd | De Beers Consolidated Mines (Pty) Ltd | 20/09/2014 - 15:15 |
NAZARETH FILLING STATION HIA Report | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF A FUEL FILLING STATION ON PART OF PORTION 119, MIDDELBURG TOWN AND TOWNLANDS 287JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 31/10/2020 | J.A. van Schalkwyk | Mpumalanga Provincial Heritage Resources Authority | 03/02/2021 - 13:04 | |
Heritage Impact Assessment Al3 Boerdery | Heritage Impact Assessment Al3 Boerdery, Waterpoort, Limpopo | HIA Phase 1 | 18/09/2018 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 05/11/2018 - 14:51 |
Desktop PIA Gemsbok Solar PV1 | PROPOSED GEMSBOK SOLAR PV1 SOLAR ENERGY FACILITY NEAR KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 19/09/2014 | John E Almond | Natura Viva CC | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:50 |
COP3706_HBAR | Heritage Basic Assessment Report for the Basic Assessment Report: Environmental Authorisation Application in support of the Section 102 Amendment for the Copper Sunset Sand Mining Operation, near Sasolburg, Free State | Heritage Impact Assessment Specialist Reports | 27/11/2015 | Natasha Higgitt, Justin du Piesanie, Johan Nel | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 02/12/2015 - 11:16 |
212A Buitengracht St Bo-Kaap | UR_DRAFT II 212A BUITENGRACHT PPP with RESPONSES 22 July 2019 | Heritage Statement | 22/07/2019 | Ursula Rigby | 23/07/2019 - 18:06 | ||
Leeuwfontain 188JR | Proposed construction of a filling Station on the farm Leeuwfontein 188JR along R568 TO Pieterskraal Village within JS Moroka Local Municipality of Nkangala District,Mpumalanga Province. | AIA Phase 1 | 03/08/2017 | Ndivhuho Eric Mathoho | Vhufa Hashu Heritage Consultants | Vhufa Hashu Heritage Consultants | 03/08/2017 - 12:09 |
Two grave sites along the Qunu-Zimbane powerline | The assessment of two grave sites along the Qunu-Zimbane powerline, Mthatha, Eastern Cape, South Africa | Archaeological Specialist Reports | 02/08/2013 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | GIBB Engineering & Science - Port Elizabeth | 04/09/2013 - 10:59 |
SHPM UG1 DEIAR | SMOKEY HILL PLATINUM MINE UG1 DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT. | 02/09/2019 | Prescali Info | Prescali Environmental Consultants (pty) Ltd | Prescali Environmental Consultants (pty) Ltd | 02/09/2019 - 22:03 | |
PIA - Madibeng | Palaeontological Impact Assessment for the proposed electrification of Madibeng-Lenganeng, northeast of Delareyville, Northern Cape Province | PIA Desktop | 23/07/2022 | Marion Bamford | Vhubvo Archaeo-Heritage Consultance Cc | 26/07/2022 - 09:44 | |
Heritage Scoping Report - Skeerhok PV 3 | Heritage Scoping | Jayson Orton | ASHA Consulting(Pty) Ltd | 26/10/2017 - 10:33 | |||
Decommissining of the Verwoedburg Substation | BASIC ASSESSMENT PROCESS FOR THE PROPOSED DECOMMISSIONING OF VERWOEDBURG 275kV SUBSTATION AND 2 x 275kV VERWOEDBURG APOLLO LINES | Non Impact Assessment Related Reports | 07/11/2013 | Khuliso Mudau | Nsovo Environmental Consulting | Eskom Holdings SOC Ltd | 07/11/2013 - 14:14 |
HIA Study for VDDC mining and infrastructure development | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED VANDYKSDRIFT CENTRAL (VDDC) MINING AND INFRASTRUCTURAL DEVELOPMENT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 31/07/2019 | Julius Pistorius | South32 SA Coal Holdings (Pty) Limited | 29/11/2019 - 07:45 | |
rspoed 836-MS Palaeontological Impact Assessment: Phase 1 Field Study, Musina Local Municipality, Vhembe District Municipality, Limpopo Province. | G3 Citrus Lands Farm: Voorspoed 836-MS Palaeontological Impact Assessment: Phase 1 Field Study, Musina Local Municipality, Vhembe District Municipality, Limpopo Province. | PIA Phase 1 | 05/01/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | AGES (PTY) Ltd - Limpopo | 19/03/2021 - 14:18 |
Klipkraal WEF 3 Heritage Report | PROPOSED CONTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 3, NEAR FRASERBURG, NORTHERN CPE PROVINCE, SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 19/08/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 16/09/2022 - 16:57 |