FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
PHASE 1 HIA KOSTER MRA REPORT APAC02317 PHASE 1 HIA REPORT FOR THE KOSTER MINING RIGHTS APPLICATION ON PORTION 6 OF SYFERFONTEIN 496JP & PORTION 8 OF RIETFONTEIN 464JP NEAR KOSTER IN THE NORTHWEST PROVINCE HIA Phase 1 01/03/2023 Anton Pelser 08/05/2023 - 13:08
EASTERN LINK SEWER LINE - HIA EXEMPTIONAPAC02082 EASTERN LINK SEWER LINE - HIA EXEMPTIONAPAC02082 HIA Letter of Exemption 01/10/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 20/01/2021 - 12:45
GATKOP CAVE ON FARM RANDSTEPHANE 415 KQ NEAR THABAZIMBI, LIMPOPO PROVINCE Palaeontological Impact Assessment: GATKOP CAVE ON FARM RANDSTEPHANE 415 KQ NEAR THABAZIMBI, LIMPOPO PROVINCE PIA Phase 1 01/02/2012 John E Almond Natura Viva CC Shangoni Management Services 23/04/2014 - 08:40
Makhasa Fuel Station CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED FUEL STATION ON Ptn OF THE FARM RESERVE NO. 1 NO 7638 AT MAKHASA VILLAGE, HLUHLUWE, WITHIN BIG FIVE FALSE BAY LOCAL MUNICIPALITY UNDER UMKHANYAKUDE DISTRICT MUNICIPALITY HIA Phase 1 15/11/2016 Frans Prins Active Heritage CC Icebo Environmental Consultants 29/12/2016 - 06:32
De Rust PV1 HIA Heritage Impact Assessment for the Proposed De Rust PV1 SEF Heritage Impact Assessment Specialist Reports 01/04/2023 Jaco van der Walt Beyond Heritage Enviro-Insight CC 09/06/2023 - 09:57
HIA for the Kathu cemetery Expansion Heritage Impact Assessment for the Proposed Kathu cemetery extension on parts of the remainder of the farm Uitkoms 463 on the north eastern side of the town of Kathu in the Gamagara Local Municipality, Northern Cape HIA Phase 1 11/12/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants 26/08/2015 - 09:14
LED2003 - NID Notification of Intent to Develop for the Koert Louw Zyn Pan MRA Heritage Impact Assessment Specialist Reports 27/02/2017 Johan Nel, Justin du Piesanie Digby Wells Environmental Waterberg One Coal (Pty) Ltd 06/03/2017 - 13:20
VMC3049_Heritage Impact Assessment Report Environmental Authorisation for the Pamish Magnetite Project: Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 31/07/2015 Justin du Piesanie, Tammy Hodgskiss (Reynard), Johan Nel Digby Wells Environmental Pamish Investments No. 39 (Pty) Ltd 23/10/2015 - 08:56
Heritage Impact Assessment Proposed Construction of a 132kV power line associated with the Photovoltaic Solar Plant on the Farm Droogfontein, Northern Cape Province HIA Phase 1 23/07/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants 12/10/2016 - 13:57
Sekgame Heritage Impact Assessment Sekgame Heritage Impact Assessment HIA Phase 1 12/10/2016 Prof. Anton van Vollenhoven 18/11/2016 - 14:46
HIA Wesselsbron Farm Herman 236 Poultry House Phase 1 Heritage Impact Assessment of the proposed new poultry facility on the farm Herman 236 near Wesselsbron, Free State Province. HIA Phase 1 13/08/2019 Lloyd Rossouw DESTEA-Free State Palaeo Field Services 12/09/2019 - 10:04
Deviation to existing building Deviation to an existing building over 60 years old Heritage Study 07/05/2013 Luke Naidoo LCN Architecture cc LCN Architecture cc 07/05/2013 - 12:52
PIA: Wag n Bietjie PALAEONTOLOGICAL IMPACT ASSESSMENT: ELECTRICAL INFRASTRUCTURE FOR THE WAG N BIETJIE SOLAR FACILITY, NEAR DE AAR, NORTHERN CAPE PROVINCE PIA Phase 1 02/09/2022 Elize Butler Banzai Environmental (Pty) Ltd Landscape Dynamics Environmental Consultants 02/09/2022 - 13:53
AIA FOR THE ST BARNABAS TO HLULEKA NATURE RESERVE ACCESS ROAD UPGRADE PROJECT, EASTERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE ST BARNABAS TO HLULEKA NATURE RESERVE ACCESS ROAD UPGRADE PROJECT, NYANDENI LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 10/12/2019 Neels Kruger Exigo Sustainability Coastal & Environmental Services - East London 12/12/2019 - 09:35
Midway Unit 9 11kv powerline BASIC ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF MIDWAY UNIT 9 A 11KV POWERLINE (TORO YA AFRICA), AND ASSOCIATED INFRASTRUCTURE, GARANKUWA, GAUTENG PROVINCE. HIA Phase 1 10/11/2020 Muofhe Ravhura Mbviseni Sustainable Environmental Initiative Mbviseni Sustainable Environmental Initiative 14/03/2021 - 03:05
Biogas Plant Heritage Assessment CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BOMASS-TO-ELECTRICITY PLANT ON THE FARM BOSCHKOP 543 JR, CLOSE TO BRONKHORSTSPRUIT, GAUTENG PROVINCE Archaeological Specialist Reports 01/10/2008 Anton van Vollenhoven Core Earth Resources 15/07/2013 - 14:37
Noupoort Bulk Water A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF EXISTING WATER SUPPLY INFRASTRUCTURE AT NOUPOORT, NORTHERN CAPE PROVINCE AIA Phase 1 26/06/2014 Anton van Vollenhoven Archaetnos CC WSP Environmental Pty Ltd - Johannesburg 11/07/2014 - 13:30
GOQOKAZI HIA PHASE ONE (1) ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED GOQOKAZI COLLECTOR SEWER IN ETHEKWINI MUNICIPALITY, KWA- ZULU NATAL 31/07/2023 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd EnviroPro 31/07/2023 - 08:50
Ekuvukeni B Housing Service Sites. Alfred Duma Municipality Heritage Impact Studies: Ekuvukeni B Service Sites HIA Phase 1 03/09/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Bizycon Pty Ltd 11/05/2021 - 14:07
Heritage Screening Report for Mthatha RDP Housing Project HERITAGE SCREENING REPORT FOR THE RDP HOUSING PROPOSED AT MDINA, MCWILI, MBOMBHELENI, NDUNGU, ZINKUMBINI, MHLANGA, MARUBENI AND MPHANGANA VILLAGES IN LIBODE NEAR MTHATHA, EASTERN CAPE PROVINCE AIA Desktop 12/09/2014 Ms Vuyokazi April Envass Envass 09/10/2014 - 15:36
NID Boipatong Community Library NOTIFICATION OF INTENT TO DEVELOP FOR THE PROPOSED BOIPATONG COMMUNITY LIBRARY, GAUTENG PROVINCE 22/04/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting METHALE ENVIRONMENTAL CONSULTING 21/04/2017 - 09:56
HIA: Bronberg Heritage Impact Assessment for the Proposed Bronberg Township Development on Holding 18 and the Remainder of Holding 19 of the Olympus Agricultural Holdings, within the City of Tshwane Metropolitan Municipality, Gauteng Province. HIA Phase 1 30/01/2017 Stephan Gaigher G&A Heritage Management Consultants LEAP - Lanscape Architect Environmental Planner 19/06/2017 - 12:45
HIA; Proposed Upgrade and Rehabilitation of Kogmanskloof Pass, Montagu HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE AND REHABILITATION OF THE KOGMANSKLOOF PASS, MONTAGU MAGISTERIAL DISTRICT, WESTERN CAPE HIA Phase 1 12/09/2012 Jayson Orton, John Almond, Bernard Oberholzer, ACO Associates CC CCA ENVIRONMENTAL (Pty) Ltd 25/06/2018 - 08:32
borehole electrification mopani district project no:B416436031 electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed from bjm78/84A/12 23°30'45.96151"S 30°21'48.22749"E to borehole bjm78/84A/12/1: 23°30'47.82506"S 30°21'50.43645"E 85meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) Non Impact Assessment Related Reports 03/09/2021 Pro-Con Electrical (pty) Ltd Pro-Con Electrical (pty) Ltd 17/09/2021 - 07:15
AIA[P1]-Proposed Hempel Quarry, Crusher and Stockpile Area, Farm No 604, near Grahamstown, Makana Local Municipality, Eastern Cape Phase 1 Archaeological & Cultural Heritage Impact Assessment - Proposed Hempel Quarry, Crusher and Stockpile Area, Farm No 604, near Grahamstown, Makana Local Municipality, Eastern Cape AIA Phase 1 03/03/2016 Karen Van Ryneveld Terreco Environmental Terreco Environmental 03/03/2016 - 09:22
AIA FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTIONS OF THE FARMS HONDSRIVIER 508JR & ROODEPOORT 504JR FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE AIA Phase 1 17/07/2018 Neels Kruger Exigo Sustainability SPOOR Environmental Services (PTY) Ltd. 24/08/2018 - 10:00
HIA PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE HERITAGE IMPACT ASSESSMENT: PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. Heritage Impact Assessment Specialist Reports 09/11/2021 Jayson Orton ASHA Consulting(Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 23/11/2021 - 10:27
HIA Phase 1 Heritage Impact Assessment of the Prieska Power Reserve Wonderpan Solar 1 Facility and associated 33 kV transmission line near Prieska, NC Province. HIA Phase 1 01/06/2022 Lloyd Rossouw Paleo Field Services Paleo Field Services 27/10/2022 - 15:09
Blauwbosch BWSS DESKTOP STUDY FOR THE BLAAUWBOSCH BWSS, OSIZWENI, NEWCASTLE, KZN Heritage Impact Assessment Specialist Reports Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Hanslab (Pty) Ltd 06/04/2020 - 14:13
Proposed Perseus Gamma 765 kV transmission line. Heritage impact assessment of the proposed additional Perseus-Gamma 765kV Transmission Line Prepared for Mokgope (Pty) Ltd March 2013 Draft 2 HIA Phase 1 16/09/2013 Timothy Hart ACO Associates CC Mokgope Consulting 16/09/2013 - 10:18
Kudu Solar Facility 12 Heritage Scoping Report HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 12) and associated infrastructure, near De Aar, Northern Cape Province Heritage Scoping 18/08/2022 Jayson Orton ASHA Consulting(Pty) Ltd CSIR 11/12/2022 - 23:08
Modder 4 and 5 Proposed Township Development for the Proposed Modder 4 and 5 on the Remaining extent of Portion 7 of the Farm Modder East 72 I.R. Ekurhuleni Metro, Gauteng. Heritage Statement 17/04/2020 Gwen Theron 17/08/2020 - 11:19
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP, ZEERUST, NORTH WEST PROVINCE HIA Phase 1 07/07/2021 Leonie Marais Heritage Practitioner Leonie Marais Heritage Practitioner EnviroSynergy Consulting (Pty) Ltd 06/07/2021 - 06:38
Klipkraal WEF 4 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 4 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 13/09/2023 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 24/09/2023 - 15:35
Cultural Heritage Impact Assessment Cultural Heritage Impact Assessment of The Proposed Ngomankulu/Nsuze Bridge, Ward 11, Nkandla Municipality Heritage Impact Assessment Specialist Reports 16/11/2013 Frans Prins Active Heritage CC Terratest (Pty) Ltd 16/11/2013 - 13:44
Palaeontological Statement / Letter of Exemption - Humansrus PV 1 Grid Connection Recommended Exemption from further Palaeontological Studies: Proposed Construction of Humansrus PV 1 Grid Connection (associated with the Humansrus PV Energy Facility 1, previously named RE Capital 13 Solar Development) on the Remainder of Farm 147, Humansrus near Copperton, Siyathemba Municipality, Northern Cape. PIA Desktop 30/11/2014 John E Almond Natura Viva CC Humansrus Solar PV Energy Facility 1 (Pty) Ltd. 03/02/2015 - 15:15
PIA Field survey for Khutsong south ext. 8 Palaeontological Impact Assessment for the proposed social housing development in Khutsong Ext 8, Carletonville, Gauteng Province PIA Phase 2 21/08/2021 Marion Bamford Prof Marion Bamford 25/08/2021 - 14:05
Proposed Tinley Manor South Bank Spatial Development Plan, Application for Exemption from a Phase 1 Heritage Impact Assessment in terms of Section 38 of the National Heritage Resources Act (NHRA, Act 25 of 1999) Proposed Tinley Manor South Bank Spatial Development Plan, KwaDukuza Municipality, KwaZulu-Natal HIA Letter of Exemption 05/03/2015 Len van Schalkwyk eThembeni Cultural Heritage Tongaat Hulett Developments 02/04/2015 - 03:29
PIA for the Proposed Extension of the Klipfontein Section of Middelburg Mine Palaeontological Impact Assessment (PIA) for proposed expansion of the Klipfontein Section of Middelburg Mine, Mpumalanga PIA Phase 2 22/07/2015 Marion Bamford Evolutionary Studies Institute Jones & Wagener Engineering and Environmental Consultants 03/03/2016 - 10:26
ANK3784 - Elandsfontein NID Notification of Intent to Develop: Environmental Regulatory Processes relating to the amendment of the Environmental Management Programme for its Elandsfontein Operations Heritage Impact Assessment Specialist Reports 28/02/2017 Justin du Piesanie Digby Wells Environmental Anker Coal and Mineral Holdings SA (Pty) Ltd 15/08/2017 - 06:22
AIA_Maroeloesfontein_366_KQ_updated_Kusel_U_Jul08 New Updated Report of the Cultural Heritage Resources Impact Assessment for Portions 1,4,5,6,7,18,19,27 and 28, of the farm Maroeloesfontein 366 KQ, Limpopo Province AIA Phase 1 30/07/2008 Udo Kusel African Heritage Consultants CC 16/06/2012 - 14:47
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) Heritage Impact Assessment Specialist Reports 15/11/2015 Timothy Hart ACO Associates CC Arcus Consulting 18/05/2016 - 10:40
NID: CCT desalination plant Hout Bay Cape Town NID & Annexures: CCT desalination plant Hout Bay Cape Town Built Environment and Cultural Landscapes 07/11/2017 Bridget O'Donoghue City of Cape Town Metropolitan Municipality 07/11/2017 - 07:56
CLA - Kudusberg CULTURAL LANDSCAPES ASSESSMENT Basic Assessment for the Proposed Development of the 325MW Kudusberg Wind Energy Facility and associated infrastructure, between Matjiesfontein and Sutherland in the Western and Northern Cape Provinces: BA REPORT BE & CL Phase 1 21/08/2018 Emmylou Rabe Bailey Hearth Heritage CSIR 15/11/2018 - 16:37
AIA_Ntabankulu_WWTW_Anderson_G_Aug11 HERITAGE SURVEY OF THE PROPOSED WASTE WATER TREATEMENT WORKS, NTABANKULU AIA Phase 1 28/08/2011 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 16/06/2012 - 14:48
AIA Inkululeko Carolus Poort 553 A Phase 1 Archaeological Impact Assessment for the Proposed Establishment of the Inkululeko Solar Energy Facility on Portion 2 of the Farm Carolus Poort 167, near Noupoort, Northern Cape Province AIA Phase 1 01/04/2012 Celeste Booth Albany Museum Savannah Environmental (Pty) Ltd 19/06/2012 - 08:39
rikaka demaracation of sites HIA PHASE 1 HIA’S FOR PROPOSED TOWNSHIP ESTABLISHMENT PORTIONS OF NATORP 227LT & MCKHENIE 228LT (RIKAKA VILLAGE) IN THE MALAMULELE REGION OF THE COLLINS CHABANE LOCAL MUNICIPALITY IN THE LIMPOPO PROVINCE HIA Phase 1 24/03/2022 22/02/2022 - 13:21
Heritage Impact Assessment for Kimswa Mining (Pty) Ltd Phase 1 Heritage Impact Assessment (Including Palaeontological Assessment) requested in terms of section 38 of the National Heritage Resources act (No 25/1999) for a mining permit on A Portion of the remainder of Pniel 218 and A portion of the Vaal river at Gong Gong on the Southern bank of the Vaal river in Barkly west District, Northern Cape Province. HIA Phase 1 27/03/2019 Edward Matenga AHSA 27/02/2019 - 12:24
Clocolan Solid Waste Desktop PIA Palaeontological Impact Screening Report: Proposed Clocolan Solid Waste Disposal Facility PIA Desktop 22/03/2012 Gideon Groenewald Metsi Metseng Geological Services CC 26/09/2012 - 08:50
Bokamoso Heritage Report Proposed Bokamosos Solar Photovoltaic Energy Facility near Leeudoringstad, North West Province Heritage Study 02/09/2013 Johnny Van Schalkwyk Sonvanger Solar Power Plant (Pty) Ltd. 18/11/2013 - 15:17

Pages

CSV
 
 

Search form