THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1051 - 1100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
PHASE 1 HIA KOSTER MRA REPORT APAC02317 | PHASE 1 HIA REPORT FOR THE KOSTER MINING RIGHTS APPLICATION ON PORTION 6 OF SYFERFONTEIN 496JP & PORTION 8 OF RIETFONTEIN 464JP NEAR KOSTER IN THE NORTHWEST PROVINCE | HIA Phase 1 | 01/03/2023 | Anton Pelser | 08/05/2023 - 13:08 | ||
EASTERN LINK SEWER LINE - HIA EXEMPTIONAPAC02082 | EASTERN LINK SEWER LINE - HIA EXEMPTIONAPAC02082 | HIA Letter of Exemption | 01/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 20/01/2021 - 12:45 | |
GATKOP CAVE ON FARM RANDSTEPHANE 415 KQ NEAR THABAZIMBI, LIMPOPO PROVINCE | Palaeontological Impact Assessment: GATKOP CAVE ON FARM RANDSTEPHANE 415 KQ NEAR THABAZIMBI, LIMPOPO PROVINCE | PIA Phase 1 | 01/02/2012 | John E Almond | Natura Viva CC | Shangoni Management Services | 23/04/2014 - 08:40 |
Makhasa Fuel Station | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED FUEL STATION ON Ptn OF THE FARM RESERVE NO. 1 NO 7638 AT MAKHASA VILLAGE, HLUHLUWE, WITHIN BIG FIVE FALSE BAY LOCAL MUNICIPALITY UNDER UMKHANYAKUDE DISTRICT MUNICIPALITY | HIA Phase 1 | 15/11/2016 | Frans Prins | Active Heritage CC | Icebo Environmental Consultants | 29/12/2016 - 06:32 |
De Rust PV1 HIA | Heritage Impact Assessment for the Proposed De Rust PV1 SEF | Heritage Impact Assessment Specialist Reports | 01/04/2023 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 09/06/2023 - 09:57 |
HIA for the Kathu cemetery Expansion | Heritage Impact Assessment for the Proposed Kathu cemetery extension on parts of the remainder of the farm Uitkoms 463 on the north eastern side of the town of Kathu in the Gamagara Local Municipality, Northern Cape | HIA Phase 1 | 11/12/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 26/08/2015 - 09:14 | |
LED2003 - NID | Notification of Intent to Develop for the Koert Louw Zyn Pan MRA | Heritage Impact Assessment Specialist Reports | 27/02/2017 | Johan Nel, Justin du Piesanie | Digby Wells Environmental | Waterberg One Coal (Pty) Ltd | 06/03/2017 - 13:20 |
VMC3049_Heritage Impact Assessment Report | Environmental Authorisation for the Pamish Magnetite Project: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/07/2015 | Justin du Piesanie, Tammy Hodgskiss (Reynard), Johan Nel | Digby Wells Environmental | Pamish Investments No. 39 (Pty) Ltd | 23/10/2015 - 08:56 |
Heritage Impact Assessment | Proposed Construction of a 132kV power line associated with the Photovoltaic Solar Plant on the Farm Droogfontein, Northern Cape Province | HIA Phase 1 | 23/07/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 12/10/2016 - 13:57 | |
Sekgame Heritage Impact Assessment | Sekgame Heritage Impact Assessment | HIA Phase 1 | 12/10/2016 | Prof. Anton van Vollenhoven | 18/11/2016 - 14:46 | ||
HIA Wesselsbron Farm Herman 236 Poultry House | Phase 1 Heritage Impact Assessment of the proposed new poultry facility on the farm Herman 236 near Wesselsbron, Free State Province. | HIA Phase 1 | 13/08/2019 | Lloyd Rossouw | DESTEA-Free State | Palaeo Field Services | 12/09/2019 - 10:04 |
Deviation to existing building | Deviation to an existing building over 60 years old | Heritage Study | 07/05/2013 | Luke Naidoo | LCN Architecture cc | LCN Architecture cc | 07/05/2013 - 12:52 |
PIA: Wag n Bietjie | PALAEONTOLOGICAL IMPACT ASSESSMENT: ELECTRICAL INFRASTRUCTURE FOR THE WAG N BIETJIE SOLAR FACILITY, NEAR DE AAR, NORTHERN CAPE PROVINCE | PIA Phase 1 | 02/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Landscape Dynamics Environmental Consultants | 02/09/2022 - 13:53 |
AIA FOR THE ST BARNABAS TO HLULEKA NATURE RESERVE ACCESS ROAD UPGRADE PROJECT, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE ST BARNABAS TO HLULEKA NATURE RESERVE ACCESS ROAD UPGRADE PROJECT, NYANDENI LOCAL MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 10/12/2019 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 12/12/2019 - 09:35 |
Midway Unit 9 11kv powerline | BASIC ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF MIDWAY UNIT 9 A 11KV POWERLINE (TORO YA AFRICA), AND ASSOCIATED INFRASTRUCTURE, GARANKUWA, GAUTENG PROVINCE. | HIA Phase 1 | 10/11/2020 | Muofhe Ravhura | Mbviseni Sustainable Environmental Initiative | Mbviseni Sustainable Environmental Initiative | 14/03/2021 - 03:05 |
Biogas Plant Heritage Assessment | CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BOMASS-TO-ELECTRICITY PLANT ON THE FARM BOSCHKOP 543 JR, CLOSE TO BRONKHORSTSPRUIT, GAUTENG PROVINCE | Archaeological Specialist Reports | 01/10/2008 | Anton van Vollenhoven | Core Earth Resources | 15/07/2013 - 14:37 | |
Noupoort Bulk Water | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF EXISTING WATER SUPPLY INFRASTRUCTURE AT NOUPOORT, NORTHERN CAPE PROVINCE | AIA Phase 1 | 26/06/2014 | Anton van Vollenhoven | Archaetnos CC | WSP Environmental Pty Ltd - Johannesburg | 11/07/2014 - 13:30 |
GOQOKAZI HIA | PHASE ONE (1) ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED GOQOKAZI COLLECTOR SEWER IN ETHEKWINI MUNICIPALITY, KWA- ZULU NATAL | 31/07/2023 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | EnviroPro | 31/07/2023 - 08:50 | |
Ekuvukeni B Housing Service Sites. Alfred Duma Municipality | Heritage Impact Studies: Ekuvukeni B Service Sites | HIA Phase 1 | 03/09/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Bizycon Pty Ltd | 11/05/2021 - 14:07 |
Heritage Screening Report for Mthatha RDP Housing Project | HERITAGE SCREENING REPORT FOR THE RDP HOUSING PROPOSED AT MDINA, MCWILI, MBOMBHELENI, NDUNGU, ZINKUMBINI, MHLANGA, MARUBENI AND MPHANGANA VILLAGES IN LIBODE NEAR MTHATHA, EASTERN CAPE PROVINCE | AIA Desktop | 12/09/2014 | Ms Vuyokazi April | Envass | Envass | 09/10/2014 - 15:36 |
NID Boipatong Community Library | NOTIFICATION OF INTENT TO DEVELOP FOR THE PROPOSED BOIPATONG COMMUNITY LIBRARY, GAUTENG PROVINCE | 22/04/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | METHALE ENVIRONMENTAL CONSULTING | 21/04/2017 - 09:56 | |
HIA: Bronberg | Heritage Impact Assessment for the Proposed Bronberg Township Development on Holding 18 and the Remainder of Holding 19 of the Olympus Agricultural Holdings, within the City of Tshwane Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 30/01/2017 | Stephan Gaigher | G&A Heritage Management Consultants | LEAP - Lanscape Architect Environmental Planner | 19/06/2017 - 12:45 |
HIA; Proposed Upgrade and Rehabilitation of Kogmanskloof Pass, Montagu | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE AND REHABILITATION OF THE KOGMANSKLOOF PASS, MONTAGU MAGISTERIAL DISTRICT, WESTERN CAPE | HIA Phase 1 | 12/09/2012 | Jayson Orton, John Almond, Bernard Oberholzer, | ACO Associates CC | CCA ENVIRONMENTAL (Pty) Ltd | 25/06/2018 - 08:32 |
borehole electrification mopani district | project no:B416436031 electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed from bjm78/84A/12 23°30'45.96151"S 30°21'48.22749"E to borehole bjm78/84A/12/1: 23°30'47.82506"S 30°21'50.43645"E 85meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) | Non Impact Assessment Related Reports | 03/09/2021 | Pro-Con Electrical (pty) Ltd | Pro-Con Electrical (pty) Ltd | 17/09/2021 - 07:15 | |
AIA[P1]-Proposed Hempel Quarry, Crusher and Stockpile Area, Farm No 604, near Grahamstown, Makana Local Municipality, Eastern Cape | Phase 1 Archaeological & Cultural Heritage Impact Assessment - Proposed Hempel Quarry, Crusher and Stockpile Area, Farm No 604, near Grahamstown, Makana Local Municipality, Eastern Cape | AIA Phase 1 | 03/03/2016 | Karen Van Ryneveld | Terreco Environmental | Terreco Environmental | 03/03/2016 - 09:22 |
AIA FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON PORTIONS OF THE FARMS HONDSRIVIER 508JR & ROODEPOORT 504JR FOR THE PROPOSED ZITHOBENI HEIGHTS BULK OUTFALL SEWER PROJECT IN THE CITY OF TSHWANE MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 17/07/2018 | Neels Kruger | Exigo Sustainability | SPOOR Environmental Services (PTY) Ltd. | 24/08/2018 - 10:00 |
HIA PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE | HERITAGE IMPACT ASSESSMENT: PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE NEAR DEALESVILLE, BOSHOF MAGISTERIAL DISTRICT, FREE STATE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999) as part of a Heritage Impact Assessment. | Heritage Impact Assessment Specialist Reports | 09/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 10:27 |
HIA | Phase 1 Heritage Impact Assessment of the Prieska Power Reserve Wonderpan Solar 1 Facility and associated 33 kV transmission line near Prieska, NC Province. | HIA Phase 1 | 01/06/2022 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 27/10/2022 - 15:09 |
Blauwbosch BWSS | DESKTOP STUDY FOR THE BLAAUWBOSCH BWSS, OSIZWENI, NEWCASTLE, KZN | Heritage Impact Assessment Specialist Reports | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Hanslab (Pty) Ltd | 06/04/2020 - 14:13 | |
Proposed Perseus Gamma 765 kV transmission line. | Heritage impact assessment of the proposed additional Perseus-Gamma 765kV Transmission Line Prepared for Mokgope (Pty) Ltd March 2013 Draft 2 | HIA Phase 1 | 16/09/2013 | Timothy Hart | ACO Associates CC | Mokgope Consulting | 16/09/2013 - 10:18 |
Kudu Solar Facility 12 Heritage Scoping Report | HERITAGE SPECIALIST SCOPING REPORT INPUTS: Scoping and Environmental Impact Assessment (EIA) Process for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 12) and associated infrastructure, near De Aar, Northern Cape Province | Heritage Scoping | 18/08/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | CSIR | 11/12/2022 - 23:08 |
Modder 4 and 5 | Proposed Township Development for the Proposed Modder 4 and 5 on the Remaining extent of Portion 7 of the Farm Modder East 72 I.R. Ekurhuleni Metro, Gauteng. | Heritage Statement | 17/04/2020 | Gwen Theron | 17/08/2020 - 11:19 | ||
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP, ZEERUST, NORTH WEST PROVINCE | HIA Phase 1 | 07/07/2021 | Leonie Marais Heritage Practitioner | Leonie Marais Heritage Practitioner | EnviroSynergy Consulting (Pty) Ltd | 06/07/2021 - 06:38 |
Klipkraal WEF 4 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 4 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 13/09/2023 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 24/09/2023 - 15:35 |
Cultural Heritage Impact Assessment | Cultural Heritage Impact Assessment of The Proposed Ngomankulu/Nsuze Bridge, Ward 11, Nkandla Municipality | Heritage Impact Assessment Specialist Reports | 16/11/2013 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 16/11/2013 - 13:44 |
Palaeontological Statement / Letter of Exemption - Humansrus PV 1 Grid Connection | Recommended Exemption from further Palaeontological Studies: Proposed Construction of Humansrus PV 1 Grid Connection (associated with the Humansrus PV Energy Facility 1, previously named RE Capital 13 Solar Development) on the Remainder of Farm 147, Humansrus near Copperton, Siyathemba Municipality, Northern Cape. | PIA Desktop | 30/11/2014 | John E Almond | Natura Viva CC | Humansrus Solar PV Energy Facility 1 (Pty) Ltd. | 03/02/2015 - 15:15 |
PIA Field survey for Khutsong south ext. 8 | Palaeontological Impact Assessment for the proposed social housing development in Khutsong Ext 8, Carletonville, Gauteng Province | PIA Phase 2 | 21/08/2021 | Marion Bamford | Prof Marion Bamford | 25/08/2021 - 14:05 | |
Proposed Tinley Manor South Bank Spatial Development Plan, | Application for Exemption from a Phase 1 Heritage Impact Assessment in terms of Section 38 of the National Heritage Resources Act (NHRA, Act 25 of 1999) Proposed Tinley Manor South Bank Spatial Development Plan, KwaDukuza Municipality, KwaZulu-Natal | HIA Letter of Exemption | 05/03/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | Tongaat Hulett Developments | 02/04/2015 - 03:29 |
PIA for the Proposed Extension of the Klipfontein Section of Middelburg Mine | Palaeontological Impact Assessment (PIA) for proposed expansion of the Klipfontein Section of Middelburg Mine, Mpumalanga | PIA Phase 2 | 22/07/2015 | Marion Bamford | Evolutionary Studies Institute | Jones & Wagener Engineering and Environmental Consultants | 03/03/2016 - 10:26 |
ANK3784 - Elandsfontein NID | Notification of Intent to Develop: Environmental Regulatory Processes relating to the amendment of the Environmental Management Programme for its Elandsfontein Operations | Heritage Impact Assessment Specialist Reports | 28/02/2017 | Justin du Piesanie | Digby Wells Environmental | Anker Coal and Mineral Holdings SA (Pty) Ltd | 15/08/2017 - 06:22 |
AIA_Maroeloesfontein_366_KQ_updated_Kusel_U_Jul08 | New Updated Report of the Cultural Heritage Resources Impact Assessment for Portions 1,4,5,6,7,18,19,27 and 28, of the farm Maroeloesfontein 366 KQ, Limpopo Province | AIA Phase 1 | 30/07/2008 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:47 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES AND ASSOCIATED GRID CONNECTIONS (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 18/05/2016 - 10:40 |
NID: CCT desalination plant Hout Bay Cape Town | NID & Annexures: CCT desalination plant Hout Bay Cape Town | Built Environment and Cultural Landscapes | 07/11/2017 | Bridget O'Donoghue | City of Cape Town Metropolitan Municipality | 07/11/2017 - 07:56 | |
CLA - Kudusberg | CULTURAL LANDSCAPES ASSESSMENT Basic Assessment for the Proposed Development of the 325MW Kudusberg Wind Energy Facility and associated infrastructure, between Matjiesfontein and Sutherland in the Western and Northern Cape Provinces: BA REPORT | BE & CL Phase 1 | 21/08/2018 | Emmylou Rabe Bailey | Hearth Heritage | CSIR | 15/11/2018 - 16:37 |
AIA_Ntabankulu_WWTW_Anderson_G_Aug11 | HERITAGE SURVEY OF THE PROPOSED WASTE WATER TREATEMENT WORKS, NTABANKULU | AIA Phase 1 | 28/08/2011 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 16/06/2012 - 14:48 | |
AIA Inkululeko Carolus Poort 553 | A Phase 1 Archaeological Impact Assessment for the Proposed Establishment of the Inkululeko Solar Energy Facility on Portion 2 of the Farm Carolus Poort 167, near Noupoort, Northern Cape Province | AIA Phase 1 | 01/04/2012 | Celeste Booth | Albany Museum | Savannah Environmental (Pty) Ltd | 19/06/2012 - 08:39 |
rikaka demaracation of sites HIA | PHASE 1 HIA’S FOR PROPOSED TOWNSHIP ESTABLISHMENT PORTIONS OF NATORP 227LT & MCKHENIE 228LT (RIKAKA VILLAGE) IN THE MALAMULELE REGION OF THE COLLINS CHABANE LOCAL MUNICIPALITY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 24/03/2022 | 22/02/2022 - 13:21 | |||
Heritage Impact Assessment for Kimswa Mining (Pty) Ltd | Phase 1 Heritage Impact Assessment (Including Palaeontological Assessment) requested in terms of section 38 of the National Heritage Resources act (No 25/1999) for a mining permit on A Portion of the remainder of Pniel 218 and A portion of the Vaal river at Gong Gong on the Southern bank of the Vaal river in Barkly west District, Northern Cape Province. | HIA Phase 1 | 27/03/2019 | Edward Matenga | AHSA | 27/02/2019 - 12:24 | |
Clocolan Solid Waste Desktop PIA | Palaeontological Impact Screening Report: Proposed Clocolan Solid Waste Disposal Facility | PIA Desktop | 22/03/2012 | Gideon Groenewald | Metsi Metseng Geological Services CC | 26/09/2012 - 08:50 | |
Bokamoso Heritage Report | Proposed Bokamosos Solar Photovoltaic Energy Facility near Leeudoringstad, North West Province | Heritage Study | 02/09/2013 | Johnny Van Schalkwyk | Sonvanger Solar Power Plant (Pty) Ltd. | 18/11/2013 - 15:17 |