FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
PGS06 - Monitoring of destruction report Archaeological Monitoring report as part of the destruction of site PGS06 for the ACWA Power SolarReserve Redstone Solar Thermal Power Plant, on the farm No. 469, near Daniëlskuil, ZF Mgcawu District Municipality, Northern Cape. Archaeological Monitoring 29/10/2018 Wouter Fourie, Ilan Smeyatsky PGS Heritage (Pty) Ltd ACWA Power SolarReserve Redstone Solar Thermal Power Plant 29/10/2018 - 16:25
Phase 1 HIA sand mine on Jammerdrif 540/RE, Wepener Phase 1 Heritage Impact Assessment of a proposed new sand mine development on the farm Jammerdrif 540/RE near Wepener, FS Province (Version1.0) HIA Phase 1 18/09/2019 Lloyd Rossouw Lefatse EPS (Pty) Ltd t/a GreenRSA (Pty) Ltd 16/03/2020 - 09:31
Spionkop Prospecting Right -Draft Impact Assessment Report HIA Phase 1 22/09/2016 Polke Birkholtz PGS Heritage and Grave Relocation Consultants 07/11/2016 - 16:00
HIA; Proposed 66Kv Overhead Powerline, Clanwilliam and Graafwater AN ASSESSMENT OF THE IMPACTS ON HERITAGE OF THE PROPOSED 66Kv OVERHEAD POWERLINE BETWEEN THE TOWNS OF CLANWILLIAM AND GRAAFWATER HIA Phase 1 01/06/2009 David Halkett ACO Associates CC SHE Cape Environmental CC 07/06/2018 - 08:02
Phase 1 HIA Zone 7, Barkly West PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP ESTABLISHMENT & THE FORMALIZATION OF AN INFORMAL SETTLEMENT ON ERF 711, BARKLY-WEST, NORTHERN CAPE PROVINCE HIA Phase 1 31/03/2020 Anton Pelser A Pelser Archaeological Consulting NSVT Consultants 29/07/2020 - 23:57
AIA_Amandla_and_Kwaggafontein_Sub_Pistorius_JCC_Jun10 Phase 1 Heritage Impact Assessment (HIA) study for the proposed new 132KV power line running between Kwaggafontein and Amandla substations in the Mpumalanga and Limpopo Provinces of South Africa AIA Phase 1 01/06/2010 Julius CC Pistorius 16/06/2012 - 14:43
ARCHAEOLOGICAL DESKTOP STUDY Archaeological Desktop Study for the Application of a Prospecting Right on Several Portions of the Farms Zandfonteinpan 472, Nederlanden 32, Rebelfort 288, Bowie 621, Schiedam 124, Jacoba 878 and Stillerustig 548, Bothaville, Free State AIA Desktop 09/07/2021 12/08/2021 - 10:04
AIA Kwandwe Development A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF AN AIRSTRIP AND FAMILY LODGE ON PORTION 3 (KOODOOS RUN) (A PORTION OF PORTION 2) OF THE FARM NOOITGEDAGT NO. 92 AND PORTION 2 (THE FORT) OF THE FARM KOESTERS DRIFT NO. 129, KWANDWE PRIVATE GAME RESERVE IN THE ALBANY DISTRICT, EASTERN CAPE PROVINCE Amended to: A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF TWO PROPOSED SITES FOR THE CONSTRUCTION OF A FAMILY LODGE ON THE ABOVE PROPERTY AIA Phase 1 01/08/2013 Johan Binneman Eastern Cape Heritage Consultants CEN Integrated Environmental Management Unit 17/10/2013 - 12:16
A PHASE 1 HIA REPORT FOR THE PROPOSED CONSTRUCTION OF A A PHASE 1 HIA REPORT FOR THE PROPOSED CONSTRUCTION OF A CARAVAN PARK AND ASSOCIATED INFRASTRUCTURE AT MATHOLYWENI REST CAMP WITHIN THE ADDO ELEPHANT NATIONAL PARK, EASTERN CAPE PROVINCE. APAC013/73 HIA Phase 1 11/11/2013 Anton Pelser A Pelser Archaeological Consulting Delron Environmental Assessment Practitioners 11/12/2013 - 14:39
AIA Agricultural development, Onseepkans AIA Phase 1 report of proposed agricultural development, solar energy facility and reservoir with pipeline, Onseepkans, Northern Cape. AIA Phase 1 23/11/2015 Jan Engelbrecht UBIQUE HERITAGE CONSULTANTS Enviroafrica CC, Khâi Ma Local Municipality 28/11/2015 - 11:26
Brookdale Assessment Centre Housing Heritage Impact Assessment Report Brookdale Assessment Centre Housing Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports 28/06/2011 eThembeni Cultural Heritage 19/05/2017 - 14:19
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT Phase 1 Archaeological Impact Assessment for the Proposed Casteel Dam Safety Rehabilitation Project on a Portion of the Remaining Extent of the Farm Kasteel 231 KU, Acornhoek, Mpumalanga AIA Phase 1 04/04/2023 Tobias Coetzee Agri Civils Geo-Tech & Heritage Naledzi Environmental Consultants 27/06/2023 - 07:13
Marang to Matte Power Line Phase 1 Archaeological Impact Assessment investigations for the proposed establishment of 9.5km 88Kv Power Line from Marang to Matte Substation, within the jurisdiction of Moses Kotane Local Municipality, Bojanala Platinum District, North West Province. AIA Phase 1 21/02/2012 Eric Ndivhuho Mathoho Vhufa Hashu Heritage Consultants EnviroXcellence 20/08/2012 - 11:50
Hendrina Heritage Report Heritage Impact Assessment FOR THE HENDRINA NORTH 132 KV POWERLINE, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2022 Jaco van der Walt Beyond Heritage SiVEST SA (Pty) Ltd 01/11/2022 - 15:30
Palaeontological Impact Assessment Erf 10 Delportshoop Palaeontological Impact Assessment for the proposed Mining Rights, west of Delportshoop on the Vaal River bank, Northern Cape Province PIA Desktop 09/02/2019 Marion Bamford Prof Marion Bamford Prof Marion Bamford 11/02/2019 - 13:32
CTS15_006_Residential and related infrastructure CTS15_006_Residential and related infrastructure 31/07/2015 Mariagrazia Galimberti, Nicholas Wiltshire, Kyla Bluff CTS Heritage CEN Integrated Environmental Management Unit 17/02/2016 - 15:29
PIA Paulpietersberg Telecommunication Radio Tower Palaeontological Impact Assessment: Phase 1 Field Study: The Proposed Paulpietersburg Telecommunication Radio Tower for the Transnet Coal Link Project in KwaZulu Natal Province eDumbe Local Municipality, Zululand District Municipality, KwaZulu-Natal Province. PIA Phase 1 28/05/2023 Dr. Heidi Fourie 16/08/2023 - 11:58
HIA for the proposed township establishment extension 42 on Portion 11 of the farm Tweefontein 915 LS Proposed Township Establishment Extension 42 on Portion 11 of the Farm Tweefontein 915 LS within Polokwane Local Municipality of the Capricorn District, Limpopo Province 15/12/2022 Frans Roodt Phaki Phakanani 15/12/2022 - 11:56
Rondekop Heritage Impact Assessment Report ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 325MW RONDEKOP WIND ENERGY FACILITY BETWEEN MATJIESFONTEIN SUTHERLAND IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 10/09/2018 IIan Smeyatsky PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 09/05/2019 - 16:42
Heritage Impact Assessment Eskom Aloe 132kV Proposed Eskom Aloe Substation and Loop in Loop Out Powerlines Heritage Impact Assessment Specialist Reports 19/06/2020 Vhufa Hashu Heritage Consultancy CC 02/10/2020 - 10:16
PIA Siza Gary Trower Gary Trower University of Johannesburg-Palaeo-Research Institute (P-R I) 10/11/2021 - 11:44
HIA for the Proposed Upgrade and Construction Activities Outside of the National Route N2 Wild Coast Toll Highway Road Reserve Heritage Impact Assessment for the Proposed Upgrade and Construction Activities outside of the National Route N2 Wild Coast Toll Highway Road Reserve. HIA Phase 1 20/09/2020 Stephan Gaigher G&A Heritage Management Consultants KSEMS Environmental Consulting 24/11/2020 - 09:00
EIA 496 PIA_EButler December 2021 Percy PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT WITH BULK SAMPLING FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS GENERAL & DIAMONDS IN KIMBERLITE INCLUDING ASSOCIATED INFRASTRUCTURE, STRUCTURE AND EARTHWORKS ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE Palaeontological Specialist Reports 01/12/2021 Elize Butler, Johnny van Schalkwyk 27/01/2022 - 15:29
Bonginkosi Mbanjwa The proposed forestry projects by Mbanjwa, B.W. (40ha) in respect of the same activity occurring in several locations in Bedford 180ES Portion A farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 05/03/2014 - 10:06
HIA Nelsonskop Farm Township and Associated Infrastructure. HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) FOR THE PROPOSED NELSONSKOP FARM TOWNSHIP DEVELOPMENT, LIMPOPO PROVINCE HIA Phase 1 26/07/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tekplan Environmental 31/07/2017 - 09:44
De Aar Maanhaarberg Wind Energy Facility Proposed construction of a 132kV transmission line from the Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility near De Aar, Northern Cape Heritage Impact Assessment Specialist Reports 10/04/2014 Wouter Fourie PGS Heritage and Grave Relocation Consultants Aurecon - Cape Town 09/05/2014 - 15:11
AIA_Lekgalong_La_Mantsopa_Murimbika_M_Nov10 Phase 1 Archaeological and Heritage Impact Assessment Study for the Proposed Rehabilitation of Heritage Sites Associated with Lekgalong La Mantsopa Project in Mantsopa Local Municipality, Moteo District in the Free State Province AIA Phase 1 01/11/2010 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 14:47
Rooipan Prospecting Heritage opinion Heritage Opinion For the Proposed Prospecting Activities on the farm Rooipan 96 IQ, Ventersdorp, North West Province. AIA Phase 1 04/06/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Zitholele Consulting 08/06/2015 - 09:18
Heritage Assessment - Ilanga CSP2 Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province Heritage Impact Assessment Specialist Reports 18/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 22/04/2016 - 16:59
Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION OF DIAMONDS ALLUVIAL AND DIAMONDS GENERAL NEAR CHRISTIANA ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM KAFFRARIA 314HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 29/09/2017 J.A. van Schalkwyk 13/10/2017 - 15:43
Karreebosch Letter Feb 2023 Letter re: FINAL WALKDOWN REPORT FOR THE APPROVED KARREEBOSCH WEF NEAR SUTHERLAND Heritage Impact Assessment Specialist Reports 21/02/2023 Jenna Lavin CTS Heritage G7 Energies (Pty) Ltd 27/02/2023 - 10:38
HIA 1: Cwaka Town Development HIA1 CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MSINGA NEW TOWN CENTRE DEVELOPMENT AT CWAKA, MSINGA LOCAL AND MZINYATHI REGIONAL DISTRICT MUNICIPALITIES,KWAZULU-NATAL HIA Phase 1 07/09/2017 Frans Prins Active Heritage CC Green Door Environmental 31/07/2019 - 08:14
Heritage report - Draft EiA Achaeological Impact Assessment Report for the Proposed Ilanga Tower 7, Near Upington, Western Cape Province 30/06/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 08/07/2016 - 13:59
Heritage Impact Assessment for proposed New Ntshona Substation and 132 kV Powerline, Mogale City, Gauteng Province Ntshona Heritage Reports AIA Phase 1 13/02/2013 13/02/2013 - 16:57
CULTURAL HERITAGE IMPACT ASSESSMENT ON THE FARM HARRIET’S WISH 393 LR, PORTION 3 A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR, PORTION 3, FORMING PART OF THE PLATINUM GROUP METALS WATERBERG PROSPECTING AREA, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 26/09/2022 Prof. Anton van Vollenhoven Archaetnos CC 26/04/2023 - 09:34
Heritage Impact Statement BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT Heritage Statement 05/08/2020 John Gribble ACO Associates CC Landscape Dynamics Environmental Consultants 22/02/2021 - 16:11
Thabazimbi Mostert Tunnel Cave Geology The Thabazimbi Mine Cave, Limpopo Province, South Africa: Assessment of the Cave and its Speleothems 22/11/2011 Bruce Cairncross PGS Heritage and Grave Relocation Consultants Shangoni Management Services 20/12/2012 - 15:56
Eersterust X7 Phase 1 HIA PHASE 1 HIA REPORT FOR THE PROPOSED EERSTERUST EXTENSION 7 RESIDENTIAL, EDUCATIONAL AND ROAD DEVELOPMENT ON THE REMAINDER OF PORTION 171 & PART OF PORTION 306 OF THE FARM DERDEPOORT 326JR, CITY OF TSHWANE, GAUTENG HIA Phase 1 01/11/2019 06/04/2021 - 12:00
PIA: Wolf-Skillpad-Grassridge 132kV Transmission Line Palaeontological Impact Assessment for the proposed Wolf-Skilpad-Grassridge 132 kV powerline, Kirkwood area, Eastern Cape Province PIA Phase 2 29/03/2022 Marion Bamford University of the Witwatersrand Zutari (Pty) Ltd 08/04/2022 - 09:52
Paleo - Newcastle Desktop Palaeontological Heritage Impact Assessment Report on a site of a Proposed Solar Power Production Facility known as the Newcastle Solar Energy Facility to be Located ion the Remainder of the EFT 13661 within Portion 17 of The Farm Tweefontein 344, Kwazulu-Natal Province Palaeontological Specialist Reports 13/07/2014 Barry Millsteed Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 24/07/2014 - 16:58
Exemption from HIA for EPL TD2 remining Application for exemption from a Heritage Impact Assessment for the Retreatment of Eastern Platinum (Pty) Ltd (EPL) Tailings Dam 2, Marikana, North West Province Heritage Impact Assessment Specialist Reports 08/08/2023 Jaco van der Walt Beyond Heritage Alta van Dyk Environmental Consultants cc 12/10/2023 - 10:56
Werda HIA PHASE 1 HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON REMAINING PORTION OF THE FARM JACOBSFONTEIN 503 (WERDA) NEAR POSTMASBURG IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2016 Edward Matenga 31/01/2017 - 10:01
Heritage Report for SASA 4c-6c Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa Heritage Impact Assessment Specialist Reports 12/12/2017 Vanessa Maitland De Beers Marine (Pty) Ltd 21/12/2017 - 15:05
BLAAUKRANTZ 144, DE AAR FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PV SOLAR ENERGY FACILITIES ON THE FARM BLAAUKRANTZ 144, DE AAR IN THE NORTHERN CAPE Heritage Impact Assessment Specialist Reports 20/10/2014 Cobus Dreyer Eco-compliance Eco-compliance 27/10/2014 - 21:48
AIA; Archaeology of Sealing at the Prince Edward Islands The Archaeology of Sealing at the Prince Edward Islands AIA Phase 1 01/03/2011 Jaco Jacques Boshoff 18/07/2018 - 10:01
HIA Magatle Filling Station HIA Magatle Filling Station, Limpopo Province HIA Phase 1 21/10/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Lokisa Environmental Consulting CC 28/10/2019 - 22:03
SignificanceReport_WelgevallenfarmStellenbosch_HistoricFarmProperty PROPOSED DECLARATlON AS A NATlONAL MONUMENT: HISTORICAL ARCHAEOLOGICAL SITE ON THE FARM WELGEVALLEN, STELLENBOSCH DISTRICT Significance Report 30/11/1999 Janette Deacon 13/09/2016 - 14:27
AIA; Century Graveyard Village of Elim Phase 1 Archaeological Impact Assessment of a 19th Century Graveyard in the Village of Elim. AIA Phase 1 01/02/2011 Mary Patrick, Cedric Poggenpoel Cape Archaeological Survey CC MCiSA Property Managers (Pty) Ltd 04/04/2018 - 15:06
Rhino Hotel Rietfontein Rhino Hotel Rietfontein AIA Phase 1 16/06/2012 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 14:33
Phase 1 AIA Farm Wolverton, Addo Phase 1 Archaeological Impact Assessment for the proposed agricultural activities on Portion 1 of the Farm Wolverton No. 119, located in the Sundays River Valley Local Municipality of the Eastern Cape Province AIA Phase 1 19/02/2020 Johan Binneman, Kobus Reichert Eastern Cape Heritage Consultants Habitat Link Consulting (Pty) Ltd 19/02/2020 - 17:13

Pages

CSV
 
 

Search form