FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
226 Ninth Avenue & 78 Madeline Road, Morningside, Durban Historical: Nil Architectural: Building A - Although somewhat dilapidated and spoiled by various and inappropriate alterations and additions, a significant fair to large proportioned example of buildings of its style and era, worthy of restoration. Building B - Of little architectural significance due to modernisation through extensive alteration and addition. Urban Setting & Adjoining Properties: Both building A & B find themselves blending with adjoining and street opposite buildings of similar style and era, most of which have been altered and modernised to some extent including some conversion to Business use. (Please refer photographs attached) Significance Report 13/09/2013 - 17:52
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE AIA Phase 1 04/04/2018 Munyadziwa Magoma Nsovo Environmental Consulting Nsovo Environmental Consulting 03/08/2018 - 12:24
Heritage Impact Assessment Eskom Aloe Substation and LILO Powerlines PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE HIA Phase 1 08/06/2020 Frans Roodt Vhufa Hashu Heritage Consultancy CC GA Environment (Pty) Ltd 22/10/2020 - 10:59
Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Construction of Apel Cross Taxi Terminal in Makhudutahamage Local Municipality, Limpopo Province Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Construction of Apel Cross Taxi Terminal in Makhudutahamage Local Municipality, Limpopo Province AIA Phase 1 04/01/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 08:54
Heritage Impact Assessment for CMH Datcentre situated on Erf 11135, 119-123 Monty Naicker Road, Durban Heritage Impact Assessment for CMH Datcentre situated on Erf 11135, 119-123 Monty Naicker Road, Durban 15/11/2013 Deborah Whelan Archaic Consulting Delta Property Fund Ltd. 15/11/2013 - 06:59
Palaeontological Statement / Letter of Exemption - Humansrus Solar PV Energy Facility 1, RE/147 Humansrus, NCape. Recommended Exemption from further Palaeontological Studies: Proposed Construction of Humansrus Solar PV Facility 1 (previously named RE Capital 13 Solar Development) on the Remainder of Farm 147, Humansrus near Copperton, Siyathemba Municipality, Northern Cape. PIA Desktop 30/11/2014 John E Almond Natura Viva CC Humansrus Solar PV Energy Facility 1 (Pty) Ltd. 03/02/2015 - 14:20
Paleontological desktop report DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF A PROPOSED HEALTH CARE RISK WASTE INCINERATOR TO BE CONSTRUCTED ON ERF 78 IN WALTLOO, PRETORIA GAUTENG PROVINCE PIA Desktop 12/02/2015 BM Geological Services ENERWASTE SOLUTIONS (PTY) LTD 03/03/2015 - 14:52
Heritage preconstruction walthrough report for Sutherland WEF PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 01/12/2022 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 15/12/2022 - 10:07
HIA-Celebration Sewer Pipeline B, North Riding, Johannesburg, Gauteng HIA-Construction of the Celebration Sewer Pipeline B on Various Agricultural Holdings, North Riding, City of Johannesburg Metropolitan Municipality, Gauteng HIA Phase 1 22/05/2015 Karen Van Ryneveld Strategic Environmental Focus (Pty) Ltd - Pretoria 22/05/2015 - 09:03
Amafa Application Erf 3191 Amafa Application Erf 3191 22/09/2023 Angela Winsome Wilson 22/09/2023 - 15:52
Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga HIA Letter of Exemption 12/02/2021 Jaco van der Walt Heritage Contracts and Archaeological Consulting Knight Piesold Consultants 19/02/2021 - 09:08
Cultural Heritage Assessment: Lewende Woord Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE Heritage Statement 01/05/2016 Johnny Van Schalkwyk JA van Schalkwyk Heritage Consultant LEAP - Lanscape Architect Environmental Planner 24/01/2018 - 16:28
PAL6882 - BAR Appendix E (HBAR) Environmental Authorisation Process for the Blinkwater Prospecting Right Application Heritage Basic Assessment Report HIA Phase 1 12/05/2021 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental PalRho Exploration (Pty) Ltd 09/06/2021 - 18:54
AIA Greefspan Power Station II 2637 - Letter Development of PV Power Station at Greefspan near Douglas, Northern Cape Archaeological Specialist Reports 18/06/2012 David Morris McGregor Museum Van Zyl Environmental Consultants 18/06/2012 - 11:55
AIA for the proposed Orkney Solar Farm AIA for the proposed Orkney Solar Farm, NW Province Archaeological Specialist Reports 17/01/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 24/01/2017 - 09:26
AIA_Noupoort_wind_energy_facility_2319_Van_Schalkwyk_JA_Feb12 Heritage impact assessment for the PROPOSED ESTABLISHMENT OF A WIND FARM BY MAINSTREAM RENEWABLE POWER IN THE NOUPOORT REGION, NORTHERN CAPE PROVINCE AIA Phase 1 19/02/2012 Johnny Van Schalkwyk 16/06/2012 - 14:48
HIA; Expansion or Construction of Balancing Dams - Vyeboom, Caledon HERITAGE IMPACT ASSESSMENT: PROPOSED EXPANSION OR CONSTRUCTION OF BALANCING DAMS FOR THE VYEBOOM IRRIGATION BOARD ON KLIPFONTEIN FARM 23/82 AND TWAALFFONTEIN FARM 3/83, CALEDON HIA Phase 1 01/09/2012 John Almond Natura Viva CC BOLAND ENVIRO 11/04/2018 - 13:47
NID Boipatong Community Library NOTIFICATION OF INTENT TO DEVELOP FOR THE PROPOSED BOIPATONG COMMUNITY LIBRARY, GAUTENG PROVINCE 22/04/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting METHALE ENVIRONMENTAL CONSULTING 21/04/2017 - 09:56
ARARAT-BAFOKENG PHASE 1 HERITAGE IMPACT ASSESSMENT PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE HIA Phase 1 31/08/2021 Makhosazana Mngomezulu Vungandze Projects HUMBA ENVIRONMENTAL CONSULTANCY 15/02/2022 - 12:11
Dock Road, V&A Waterfront (Gateway Precinct) Dock Road, Victoria and Alfred Waterfront (Gateway Precinct) Phase One Development Proposal. Heritage Impact Assessment in terms of Section 38 (4) of the NHR Act. Prepared for the Victoria and Alfred Waterfront Company HIA Phase 1 01/08/2012 Nicolas Baumann Victoria and Alfred Waterfront Company 21/09/2012 - 11:48
PIA - Sammy Marks Extension Palaeontological Impact Assessment for the proposed Sammy Marks Extension mixed use development, southwest of Mamelodi, Gauteng Province PIA Desktop 19/09/2020 Marion Bamford Heritage Contracts and Archaeological Consulting 21/09/2020 - 11:42
HIA 1st Phase Heritage Impact Assessment: THE PROPOSED RONDEBULT OUTFALL SEWER LINE. HIA Phase 1 22/01/2019 Sidney Miller 20/04/2022 - 15:54
ORWRDP Phase II Final Alignments and Previously Excluded Areas Addendum 2 Heritage Resources Identification and Assessment. Final alignments and previously excluded areas Olifants River Water Resources Development Project Phase 2 (ORWRDP II). Assessments during August 2011 Heritage Impact Assessment Specialist Reports 01/08/2011 Willem Coenraad Nienaber University of Pretoria - Business Enterprises Aurecon - Head Office 14/02/2014 - 09:24
Heritage Impact Assessment Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Combined with Waste License Application to Prospect for Chrome Ore (Cr), LG & MG Seams Together with Platinum Group Metals (PGM) on a certain Portion of the Remaining Extent and a certain Portion of Portion 2 of the Farm Uitvalgrond 105 JQ, Rustenburg Local Municipality, Bojanala Platinum District Municipality North West Province HIA Phase 1 15/12/2022 Francois Coetzee Francois P Coetzee Milnex 189 CC 26/02/2023 - 18:52
Heritage Impact Assessment for the Proposed Allen’s Nek Light Industrial Development, Gauteng Province Heritage Impact Assessment for the Proposed Allen’s Nek Light Industrial Development, Gauteng Province HIA Phase 1 23/09/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Eco Assessments 16/01/2020 - 09:35
AIA:PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH DISTRICT, WESTERN CAPE AIA Phase 1 01/06/2009 Timothy Hart, Lita Webley ACO Associates CC 04/09/2016 - 20:08
AIA NC30/5/1/3/2/11005MP PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR A PROPOSED MINING RIGHT APPLICATION ON THE FARM CROPWELL 384/1 BETWEEN KURUMAN AND KATHU, NORTHERN CAPE AIA Phase 1 21/04/2023 David Morris McGregor Museum McGregor Museum 25/04/2023 - 17:05
Amersfoort Piggery PROPOSED 9600 SOW UNIT PIGGERY AND AN ABATTOIR TO BE ESTABLISHED 20 KM EAST OF AMERSFOORT MPUMALANGA PROVINCE HIA Phase 1 01/08/2017 Leonie Marais-Botes 15/11/2017 - 10:16
Dannhauser HIA PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DURNACOL TO DANNHAUSER WATER PROJECT, NEWCASTLE LOCAL MUNICIPALITY, KZN. HIA Phase 1 15/05/2019 Frans Prins Active Heritage CC SLR Consulting (South Africa) (Pty) Ltd 30/08/2019 - 14:10
PIA Letter - PROPOSED DEVELOPMENT OF THE REFELE VILLAGE SPORTS FACILITY PALAEONTOLOGICAL HERITAGE: LETTER OF EXEMPTION FROM FURTHER STUDIES & MITIGATION Proposed new playing field and track at Refele Village near Mount Fletcher, Elundini Local Municipality, Eastern Cape HIA Letter of Exemption 18/08/2020 John Almond Natura Viva CC Elundini Local Municipality 14/04/2021 - 10:52
Clearance of vegetation for agriculture on the farm Boerlands, Barberton district PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE CLEARANCE OF VEGETATION FOR THE PURPOSE OF MACADAMIA FARMING ON PORTION 3 OF THE FARM BOERLANDS 631JT, BARBERTON CITY OF MBOMBELA, MPUMALANGA PROVINCE AIA Phase 1 27/04/2019 Christine Van Wyk Rowe Adansonia Heritage Consultants Core Environmental Services 01/07/2020 - 15:48
Report GroenbergEnviro Norriseep illegal vineyard development - AIA S24G Application, illegal vineyard development on Norriseep, Rem of the Farm Afstof No. 421, near Onseepkans, Kai! Ma Municipality, Northern Cape AIA Phase 1 20/08/2020 Jonathan Kaplan ACRM Valam Boerdery (Pty) Ltd 31/03/2021 - 13:04
HIA Mooidraai-Smitskloof 132kV ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED CONSTRUCTION OF THE ESKOM MOOIDRAAI-SMITSKLOOF 132/22 KV POWERLINE AND SUBSTATION NEAR PRIESKA NORTHERN CAPE PROVINCE HIA Phase 1 01/08/2012 Jonathan Kaplan Agency for Cultural Resources Management SSI Engineering and Environmental Consultants 30/01/2013 - 13:05
Bonizenzo Holdings Prospecting Rights Application A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 20 & 23 OF ROODERAND 41JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/50 Heritage Scoping 10/06/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Licebo Environmental and Mining (Pty) Ltd 21/06/2022 - 08:26
Phase 1 HIA - Harmony Gold Mine Bioenergy Facility, Welkom, Free State Cultural Heritage Desktop Assessment of the proposed Bioenergy Facility, Harmony Gold Mine, Welkom, Free State Province HIA Phase 1 31/01/2013 Frans Prins Active Heritage CC Green Door Environmental 10/04/2013 - 12:46
HERITAGE SURVEY OF THE LIBODE BORROW PIT, EASTERN CAPE. HERITAGE SURVEY OF THE LIBODE BORROW PIT, EASTERN CAPE. HIA Phase 1 04/03/2013 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Site Plan Consulting 07/04/2014 - 09:30
Kagiso Basic Assessment HIA Input 15/12/2020 - 12:37
HIA Carter-Brown Proposed Dam CULTURAL HERITAGE IMPACT ASSESSMENT OF A DAM (250 000 CUBIC METRES) NEAR CREIGHTON, INGWE LOCAL MUNICIPALITY. 14/07/2017 - 14:58
HIA: Riet Fountain PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province HIA Phase 1 01/08/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 15/08/2022 - 09:36
KwaNobamba Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports 28/05/2014 Frans Prins Active Heritage CC Brousse-James & Associates 13/06/2014 - 12:18
Heritage Impact Assessment Heritage Impact Assessment of Application for Prospecting Right for Iron Ore and Manganese Ore on the Remaining Extent of the Farm Gaylong 191, Portion 1 of the Farm Gayelong 191, Portion 2 of the Farm Gayelong 191 and Portion 3 of the Farm Gayelong 191, Kuruman District, Northern Cape Province HIA Phase 1 29/05/2023 Joseph Chikumbirike Pulafel 4D Consulting (Pty) Ltd 05/06/2023 - 09:24
HIA; Dock Road, V&A Waterfront DOCK ROAD, VICTORIA AND ALFRED WATERFRONT (GATEWAY PRECINCT) HIA Phase 1 01/08/2012 Nicolas Baumann, Nicole Strong Nicolas Baumann Urban Conservation and Planning Victoria and Alfred Waterfront Company 19/07/2018 - 12:45
Heritage Screener: Mdantesane Bridges Desktop Heritage Screening Assessment for the Proposed development of two high level pedestrian bridges in Mdantsane, East London Heritage Scoping 18/03/2019 Jenna Lavin CTS Heritage Terreco Environmental 18/03/2019 - 11:06
Pluto-Mahikeng Line and Mahikeng Substation PIA Palaeontological Impact Assessment for Proposed construction of the Mahikeng Main Transmission Substation and 400KV Pluto-Mahikeng powerline, North West Province PIA Phase 1 15/07/2018 JF Durand 26/09/2018 - 11:07
Veld North Heritage Letter VELD PV NORTH AND VELD PV SOUTH EA AMENDMENTS AND APPROVAL OF FINAL LAYOUTS: HERITAGE 06/06/2021 Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 14:33
HIA Report: CCUS Project - 3D Seismic Survey and Drilling CARBON CAPTURE UTILISATION AND STORAGE (CCUS) PROJECT: 3D SEISMIC SURVEY AND DRILLING, LEANDRA, MPUMALANGA PROVINCE - HERITAGE IMPACT ASSESSMENT HIA Phase 1 26/04/2023 Jennifer Kitto Nitai Consulting Nemai Consulting 11/07/2023 - 17:39
HIA - Klerksoord X25 & X26 Heritage Assessment of the Proposed Industrial Development: Platinum Park, Klerksoord, Tshwane Metropolitan Municipality, Gauteng Heritage Impact Assessment Specialist Reports 01/03/2008 Francois P Coetzee University of South Africa - Archaeology Contracts Unit LEAP - Lanscape Architect Environmental Planner 21/06/2013 - 13:57
Heritage Screener: Cleary Park IPTS Heritage Screening Report for the Cleary Park IPTS, Nelson Mandela Metropolitan Municipality Heritage Scoping 08/11/2018 Jenna Lavin CTS Heritage Aurecon South Africa (Pty) Ltd 08/11/2018 - 13:07
Kutlwano Paleontological Impact Assessment 30/07/2021 - 10:04
Spioenkop Nature Reserve Management Plan and Survey Spioenkop Nature Reserve Management Plan and Survey Conservation Management Plan 20/02/2020 Celeste Rossouw KwaZulu-Natal Amafa and Research Institute KwaZulu-Natal Amafa and Research Institute 07/10/2022 - 14:29

Pages

CSV
 
 

Search form