THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1201 - 1250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
226 Ninth Avenue & 78 Madeline Road, Morningside, Durban | Historical: Nil Architectural: Building A - Although somewhat dilapidated and spoiled by various and inappropriate alterations and additions, a significant fair to large proportioned example of buildings of its style and era, worthy of restoration. Building B - Of little architectural significance due to modernisation through extensive alteration and addition. Urban Setting & Adjoining Properties: Both building A & B find themselves blending with adjoining and street opposite buildings of similar style and era, most of which have been altered and modernised to some extent including some conversion to Business use. (Please refer photographs attached) | Significance Report | 13/09/2013 - 17:52 | ||||
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE | AIA Phase 1 | 04/04/2018 | Munyadziwa Magoma | Nsovo Environmental Consulting | Nsovo Environmental Consulting | 03/08/2018 - 12:24 |
Heritage Impact Assessment Eskom Aloe Substation and LILO Powerlines | PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE | HIA Phase 1 | 08/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | GA Environment (Pty) Ltd | 22/10/2020 - 10:59 |
Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Construction of Apel Cross Taxi Terminal in Makhudutahamage Local Municipality, Limpopo Province | Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Construction of Apel Cross Taxi Terminal in Makhudutahamage Local Municipality, Limpopo Province | AIA Phase 1 | 04/01/2006 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 08:54 | |
Heritage Impact Assessment for CMH Datcentre situated on Erf 11135, 119-123 Monty Naicker Road, Durban | Heritage Impact Assessment for CMH Datcentre situated on Erf 11135, 119-123 Monty Naicker Road, Durban | 15/11/2013 | Deborah Whelan | Archaic Consulting | Delta Property Fund Ltd. | 15/11/2013 - 06:59 | |
Palaeontological Statement / Letter of Exemption - Humansrus Solar PV Energy Facility 1, RE/147 Humansrus, NCape. | Recommended Exemption from further Palaeontological Studies: Proposed Construction of Humansrus Solar PV Facility 1 (previously named RE Capital 13 Solar Development) on the Remainder of Farm 147, Humansrus near Copperton, Siyathemba Municipality, Northern Cape. | PIA Desktop | 30/11/2014 | John E Almond | Natura Viva CC | Humansrus Solar PV Energy Facility 1 (Pty) Ltd. | 03/02/2015 - 14:20 |
Paleontological desktop report | DESKTOP PALAEONTOLOGICAL HERITAGE IMPACT ASSESSEMENT REPORT ON THE SITE OF A PROPOSED HEALTH CARE RISK WASTE INCINERATOR TO BE CONSTRUCTED ON ERF 78 IN WALTLOO, PRETORIA GAUTENG PROVINCE | PIA Desktop | 12/02/2015 | BM Geological Services | ENERWASTE SOLUTIONS (PTY) LTD | 03/03/2015 - 14:52 | |
Heritage preconstruction walthrough report for Sutherland WEF | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 01/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2022 - 10:07 |
HIA-Celebration Sewer Pipeline B, North Riding, Johannesburg, Gauteng | HIA-Construction of the Celebration Sewer Pipeline B on Various Agricultural Holdings, North Riding, City of Johannesburg Metropolitan Municipality, Gauteng | HIA Phase 1 | 22/05/2015 | Karen Van Ryneveld | Strategic Environmental Focus (Pty) Ltd - Pretoria | 22/05/2015 - 09:03 | |
Amafa Application Erf 3191 | Amafa Application Erf 3191 | 22/09/2023 | Angela Winsome Wilson | 22/09/2023 - 15:52 | |||
Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | HIA Letter of Exemption | 12/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Knight Piesold Consultants | 19/02/2021 - 09:08 |
Cultural Heritage Assessment: Lewende Woord | Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE | Heritage Statement | 01/05/2016 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | LEAP - Lanscape Architect Environmental Planner | 24/01/2018 - 16:28 |
PAL6882 - BAR Appendix E (HBAR) | Environmental Authorisation Process for the Blinkwater Prospecting Right Application Heritage Basic Assessment Report | HIA Phase 1 | 12/05/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | PalRho Exploration (Pty) Ltd | 09/06/2021 - 18:54 |
AIA Greefspan Power Station II 2637 - Letter | Development of PV Power Station at Greefspan near Douglas, Northern Cape | Archaeological Specialist Reports | 18/06/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 18/06/2012 - 11:55 |
AIA for the proposed Orkney Solar Farm | AIA for the proposed Orkney Solar Farm, NW Province | Archaeological Specialist Reports | 17/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 24/01/2017 - 09:26 |
AIA_Noupoort_wind_energy_facility_2319_Van_Schalkwyk_JA_Feb12 | Heritage impact assessment for the PROPOSED ESTABLISHMENT OF A WIND FARM BY MAINSTREAM RENEWABLE POWER IN THE NOUPOORT REGION, NORTHERN CAPE PROVINCE | AIA Phase 1 | 19/02/2012 | Johnny Van Schalkwyk | 16/06/2012 - 14:48 | ||
HIA; Expansion or Construction of Balancing Dams - Vyeboom, Caledon | HERITAGE IMPACT ASSESSMENT: PROPOSED EXPANSION OR CONSTRUCTION OF BALANCING DAMS FOR THE VYEBOOM IRRIGATION BOARD ON KLIPFONTEIN FARM 23/82 AND TWAALFFONTEIN FARM 3/83, CALEDON | HIA Phase 1 | 01/09/2012 | John Almond | Natura Viva CC | BOLAND ENVIRO | 11/04/2018 - 13:47 |
NID Boipatong Community Library | NOTIFICATION OF INTENT TO DEVELOP FOR THE PROPOSED BOIPATONG COMMUNITY LIBRARY, GAUTENG PROVINCE | 22/04/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | METHALE ENVIRONMENTAL CONSULTING | 21/04/2017 - 09:56 | |
ARARAT-BAFOKENG PHASE 1 HERITAGE IMPACT ASSESSMENT | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE | HIA Phase 1 | 31/08/2021 | Makhosazana Mngomezulu | Vungandze Projects | HUMBA ENVIRONMENTAL CONSULTANCY | 15/02/2022 - 12:11 |
Dock Road, V&A Waterfront (Gateway Precinct) | Dock Road, Victoria and Alfred Waterfront (Gateway Precinct) Phase One Development Proposal. Heritage Impact Assessment in terms of Section 38 (4) of the NHR Act. Prepared for the Victoria and Alfred Waterfront Company | HIA Phase 1 | 01/08/2012 | Nicolas Baumann | Victoria and Alfred Waterfront Company | 21/09/2012 - 11:48 | |
PIA - Sammy Marks Extension | Palaeontological Impact Assessment for the proposed Sammy Marks Extension mixed use development, southwest of Mamelodi, Gauteng Province | PIA Desktop | 19/09/2020 | Marion Bamford | Heritage Contracts and Archaeological Consulting | 21/09/2020 - 11:42 | |
HIA | 1st Phase Heritage Impact Assessment: THE PROPOSED RONDEBULT OUTFALL SEWER LINE. | HIA Phase 1 | 22/01/2019 | Sidney Miller | 20/04/2022 - 15:54 | ||
ORWRDP Phase II Final Alignments and Previously Excluded Areas | Addendum 2 Heritage Resources Identification and Assessment. Final alignments and previously excluded areas Olifants River Water Resources Development Project Phase 2 (ORWRDP II). Assessments during August 2011 | Heritage Impact Assessment Specialist Reports | 01/08/2011 | Willem Coenraad Nienaber | University of Pretoria - Business Enterprises | Aurecon - Head Office | 14/02/2014 - 09:24 |
Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Combined with Waste License Application to Prospect for Chrome Ore (Cr), LG & MG Seams Together with Platinum Group Metals (PGM) on a certain Portion of the Remaining Extent and a certain Portion of Portion 2 of the Farm Uitvalgrond 105 JQ, Rustenburg Local Municipality, Bojanala Platinum District Municipality North West Province | HIA Phase 1 | 15/12/2022 | Francois Coetzee | Francois P Coetzee | Milnex 189 CC | 26/02/2023 - 18:52 |
Heritage Impact Assessment for the Proposed Allen’s Nek Light Industrial Development, Gauteng Province | Heritage Impact Assessment for the Proposed Allen’s Nek Light Industrial Development, Gauteng Province | HIA Phase 1 | 23/09/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 16/01/2020 - 09:35 |
AIA:PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH DISTRICT, WESTERN CAPE | AIA Phase 1 | 01/06/2009 | Timothy Hart, Lita Webley | ACO Associates CC | 04/09/2016 - 20:08 | |
AIA NC30/5/1/3/2/11005MP | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR A PROPOSED MINING RIGHT APPLICATION ON THE FARM CROPWELL 384/1 BETWEEN KURUMAN AND KATHU, NORTHERN CAPE | AIA Phase 1 | 21/04/2023 | David Morris | McGregor Museum | McGregor Museum | 25/04/2023 - 17:05 |
Amersfoort Piggery | PROPOSED 9600 SOW UNIT PIGGERY AND AN ABATTOIR TO BE ESTABLISHED 20 KM EAST OF AMERSFOORT MPUMALANGA PROVINCE | HIA Phase 1 | 01/08/2017 | Leonie Marais-Botes | 15/11/2017 - 10:16 | ||
Dannhauser HIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DURNACOL TO DANNHAUSER WATER PROJECT, NEWCASTLE LOCAL MUNICIPALITY, KZN. | HIA Phase 1 | 15/05/2019 | Frans Prins | Active Heritage CC | SLR Consulting (South Africa) (Pty) Ltd | 30/08/2019 - 14:10 |
PIA Letter - PROPOSED DEVELOPMENT OF THE REFELE VILLAGE SPORTS FACILITY | PALAEONTOLOGICAL HERITAGE: LETTER OF EXEMPTION FROM FURTHER STUDIES & MITIGATION Proposed new playing field and track at Refele Village near Mount Fletcher, Elundini Local Municipality, Eastern Cape | HIA Letter of Exemption | 18/08/2020 | John Almond | Natura Viva CC | Elundini Local Municipality | 14/04/2021 - 10:52 |
Clearance of vegetation for agriculture on the farm Boerlands, Barberton district | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE CLEARANCE OF VEGETATION FOR THE PURPOSE OF MACADAMIA FARMING ON PORTION 3 OF THE FARM BOERLANDS 631JT, BARBERTON CITY OF MBOMBELA, MPUMALANGA PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Core Environmental Services | 01/07/2020 - 15:48 |
Report GroenbergEnviro Norriseep illegal vineyard development - AIA | S24G Application, illegal vineyard development on Norriseep, Rem of the Farm Afstof No. 421, near Onseepkans, Kai! Ma Municipality, Northern Cape | AIA Phase 1 | 20/08/2020 | Jonathan Kaplan | ACRM | Valam Boerdery (Pty) Ltd | 31/03/2021 - 13:04 |
HIA Mooidraai-Smitskloof 132kV | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED CONSTRUCTION OF THE ESKOM MOOIDRAAI-SMITSKLOOF 132/22 KV POWERLINE AND SUBSTATION NEAR PRIESKA NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/08/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | SSI Engineering and Environmental Consultants | 30/01/2013 - 13:05 |
Bonizenzo Holdings Prospecting Rights Application | A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE BONIZENZO HOLDINGS PROSPECTING RIGHTS APPLICATION ON PORTIONS 20 & 23 OF ROODERAND 41JP ZEERUST LOCAL MUNICIPALITY, NORTHWEST PROVINCE - APAC022/50 | Heritage Scoping | 10/06/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Licebo Environmental and Mining (Pty) Ltd | 21/06/2022 - 08:26 |
Phase 1 HIA - Harmony Gold Mine Bioenergy Facility, Welkom, Free State | Cultural Heritage Desktop Assessment of the proposed Bioenergy Facility, Harmony Gold Mine, Welkom, Free State Province | HIA Phase 1 | 31/01/2013 | Frans Prins | Active Heritage CC | Green Door Environmental | 10/04/2013 - 12:46 |
HERITAGE SURVEY OF THE LIBODE BORROW PIT, EASTERN CAPE. | HERITAGE SURVEY OF THE LIBODE BORROW PIT, EASTERN CAPE. | HIA Phase 1 | 04/03/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Site Plan Consulting | 07/04/2014 - 09:30 |
Kagiso Basic Assessment HIA Input | 15/12/2020 - 12:37 | ||||||
HIA Carter-Brown Proposed Dam | CULTURAL HERITAGE IMPACT ASSESSMENT OF A DAM (250 000 CUBIC METRES) NEAR CREIGHTON, INGWE LOCAL MUNICIPALITY. | 14/07/2017 - 14:58 | |||||
HIA: Riet Fountain PV | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 01/08/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/08/2022 - 09:36 |
KwaNobamba Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/05/2014 | Frans Prins | Active Heritage CC | Brousse-James & Associates | 13/06/2014 - 12:18 | |
Heritage Impact Assessment | Heritage Impact Assessment of Application for Prospecting Right for Iron Ore and Manganese Ore on the Remaining Extent of the Farm Gaylong 191, Portion 1 of the Farm Gayelong 191, Portion 2 of the Farm Gayelong 191 and Portion 3 of the Farm Gayelong 191, Kuruman District, Northern Cape Province | HIA Phase 1 | 29/05/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 05/06/2023 - 09:24 | |
HIA; Dock Road, V&A Waterfront | DOCK ROAD, VICTORIA AND ALFRED WATERFRONT (GATEWAY PRECINCT) | HIA Phase 1 | 01/08/2012 | Nicolas Baumann, Nicole Strong | Nicolas Baumann Urban Conservation and Planning | Victoria and Alfred Waterfront Company | 19/07/2018 - 12:45 |
Heritage Screener: Mdantesane Bridges | Desktop Heritage Screening Assessment for the Proposed development of two high level pedestrian bridges in Mdantsane, East London | Heritage Scoping | 18/03/2019 | Jenna Lavin | CTS Heritage | Terreco Environmental | 18/03/2019 - 11:06 |
Pluto-Mahikeng Line and Mahikeng Substation PIA | Palaeontological Impact Assessment for Proposed construction of the Mahikeng Main Transmission Substation and 400KV Pluto-Mahikeng powerline, North West Province | PIA Phase 1 | 15/07/2018 | JF Durand | 26/09/2018 - 11:07 | ||
Veld North Heritage Letter | VELD PV NORTH AND VELD PV SOUTH EA AMENDMENTS AND APPROVAL OF FINAL LAYOUTS: HERITAGE | 06/06/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 09/07/2021 - 14:33 | ||
HIA Report: CCUS Project - 3D Seismic Survey and Drilling | CARBON CAPTURE UTILISATION AND STORAGE (CCUS) PROJECT: 3D SEISMIC SURVEY AND DRILLING, LEANDRA, MPUMALANGA PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 26/04/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 11/07/2023 - 17:39 |
HIA - Klerksoord X25 & X26 | Heritage Assessment of the Proposed Industrial Development: Platinum Park, Klerksoord, Tshwane Metropolitan Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 01/03/2008 | Francois P Coetzee | University of South Africa - Archaeology Contracts Unit | LEAP - Lanscape Architect Environmental Planner | 21/06/2013 - 13:57 |
Heritage Screener: Cleary Park IPTS | Heritage Screening Report for the Cleary Park IPTS, Nelson Mandela Metropolitan Municipality | Heritage Scoping | 08/11/2018 | Jenna Lavin | CTS Heritage | Aurecon South Africa (Pty) Ltd | 08/11/2018 - 13:07 |
Kutlwano Paleontological Impact Assessment | 30/07/2021 - 10:04 | ||||||
Spioenkop Nature Reserve Management Plan and Survey | Spioenkop Nature Reserve Management Plan and Survey | Conservation Management Plan | 20/02/2020 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 07/10/2022 - 14:29 |