THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16751 - 16800 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
9-2-253-0003-20080207-RRCRC | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) Residential Development Ivydale Smallholding 60 & 61 Polokwane, Limpopo | AIA Phase 1 | 07/02/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01077 | 16/06/2012 - 14:39 | |
9-2-269-0001-20070701-ACHMC | A Phase I Heritage Impact Assessment (HIA) Study for the Proposed New Nesengani Substation on the Farm Weltevreden 23 in the Limpopo Province of South Africa | AIA Phase 1 | 01/07/2007 | Julius CC Pistorius | MAPID_01078 | 16/06/2012 - 14:40 | ||
9-2-269-0017-20061101-RRCRC | Heritage Impact Assessment Report Development of a Medium Density Security Wildlife Estate on the Farm Modena 13 MS Vhembe District Municipality: Limpopo | AIA Phase 1 | 01/11/2006 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01079 | 16/06/2012 - 14:40 | |
9-2-281-0002-20080131-MPL | Archaeological Impact Assessment a Portion of the Remainder of Portion 29 of the Farm Vaalwater 137 KR, Vaalwater, Limpopo Province | AIA Phase 1 | 31/01/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01080 | 16/06/2012 - 14:41 | |
9-2-024-0001-20070501-AlbMus | Phase 1 Archaeological Heritage Impact Assessment for the Proposed Construction of an Overhead Power Line to LKCF001 (FRS 143) on the Farm Samekoms 392, Cradock District | AIA Phase 1 | 01/05/2007 | Johan Binneman | Albany Museum | Eskom Distribution Eastern Cape operating Unit | MAPID_01081 | 16/06/2012 - 14:34 |
9-2-044-0001-20071001-AlbMus | Phase 1 Archaeological Heritage Impact Assessment of the Proposed Development of a Hotel and Resort on Erf 6338, Jeffrey's Bay, Kouga Municipality, Eastern Cape Province | AIA Phase 1 | 01/10/2007 | Johan Binneman | Eastern Cape Heritage Consultants | MAPID_01082 | 16/06/2012 - 14:35 | |
AIA_Mooiplaas_Roodt_F_Mar08 | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) Mooiplaas Residential Development Mokopane, Limpopo Statement with Regard to Heritage Resources Management | AIA Phase 1 | 13/03/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01083 | 16/06/2012 - 14:48 | |
AIA_Sterkrivier_Nedersetting_Roodt_F_Mar08 | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) Sterkrivier Nedersetting Residential Development Mokopane, Limpopo Statement with Regard to Heritage Resources Management | AIA Phase 1 | 14/03/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01084 | 16/06/2012 - 14:50 | |
AIA_Sterkriviernedersetting_Roodt_F_Mar08 | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) Sterkriviernedersetting Residential Development Mokopane, Limpopo Statement with Regard to Heritage Resources Management | AIA Phase 1 | 14/03/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01085 | 16/06/2012 - 14:50 | |
9-2-269-0001-20080516-RRCRC | An Assessment of Possible Impacts on Heritage Resources on the Farm Hartbeestfontein 35 MS Resulting from the Drilling of Coal Exploration Boreholes: Vhembe District Municipality, Limpopo | AIA Phase 1 | 16/05/2008 | Frans Roodt | R & R Cultural Resource Consultants | MAPID_01086 | 16/06/2012 - 14:40 | |
9-2-274-0002-20070721a-AHCC | Cultural Heritage Resources Impact Assessment of the Farm Hardekoolbult 548 KQ in the Thabazimbi Municipal Area, Limpopo Province | AIA Phase 1 | 21/07/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01087 | 16/06/2012 - 14:41 | |
9-2-277-0006-20070721-AHCC | Cultural Heritage Resources Impact Assessment of Portion 4 and 8 of the Farm Kliprivier 464 KQ and Portion 10 of the Farm Rhenosterfontein 465 KQ near Rankins Pass Alma Limpopo Province | AIA Phase 1 | 21/07/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01088 | 16/06/2012 - 14:41 | |
9-2-280-0002-20071129-AHCC | Cultural Heritage Resources Impact Assessment of Portions 103 and 104 of the Farm Bospoort 450 KR Bela - Bela Limpopo Province | AIA Phase 1 | 29/11/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01089 | 16/06/2012 - 14:41 | |
9-2-005-0001-20071205-AlbMus | Letter of Recommendation for the Exemption of a Full Phase 1 Archaeological Impact Assessment: Development of a Retirement Village on a Portion of the Farm Port Alfred Park, in the District of Ndlambe, Eastern Cape | HIA Letter of Exemption | 05/12/2007 | Lita Webley | Albany Museum | MAPID_01091 | 16/06/2012 - 14:33 | |
9-2-026-0001-20070928-AM | Phase 1 Archaeological Impact Assessment - Realignment of the 6Th Fairway, East London Golf Club, East London, Eastern Cape, South Africa | AIA Phase 1 | 28/09/2007 | Karen Van Ryneveld | MAPID_01092 | 16/06/2012 - 14:34 | ||
9-2-044-0001-20070901-NCHM | Proposed Marina Village Development, Jeffrey's Bay, Humansdorp Magisterial District, Eastern Cape Province | AIA Phase 1 | 01/09/2007 | Johnny Van Schalkwyk | National Cultural History Museum | MAPID_01093 | 16/06/2012 - 14:35 | |
9-2-228-0001-20080221-MARM | Heritage Scoping: Proposed Development on Part of Portion 23, Portion 69 and the Remainder of Portion 22 and 36 of the Farm Klipfontein 12 IR, Ekurhuleni, Gauteng Province | AIA Phase 1 | 21/02/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01094 | 16/06/2012 - 14:38 | |
9-2-258-0005-20080223-MARM | Archaeological Impact Assessment: Montana Park Extension 150, Holding 67 & 68 Montana AH, Pretoria, Gauteng Province | AIA Phase 1 | 23/02/2008 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01096 | 16/06/2012 - 14:40 | |
9-2-259-0017-20070716-AHCC | Cultural Heritage Resources Impact Assessment of Agricultural Holding 127 Raslouw, Centurion, Tshwane, Gauteng | AIA Phase 1 | 16/07/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01097 | 16/06/2012 - 14:40 | |
9-2-258-0005-20070915-AHCC | Cultural Heritage Resources Impact Assessment of Holding 516, 517 and Remainder of Portion 449 of the Farm Mooiplaats 367 JR Tshwane Gauteng | AIA Phase 1 | 15/09/2007 | Udo Kusel | African Heritage Consultants CC | MAPID_01098 | 16/06/2012 - 14:40 | |
9-2-225-0001-20041101-AACC | Cultural Heritage Assessment as Part of the EMP for the Proposed Mining of Granite on Portion 27 & Portion 63 of the Farm Rooikraal 188 JS | AIA Phase 1 | 01/11/2004 | Polke Birkholtz, A van Rooyen | Archaeology Africa CC | MAPID_01099 | 16/06/2012 - 14:38 | |
AIA_Morning_Tide_Rooidraai_34_JT_Birkholtz_PD_May06 | Phase 1 Heritage Impact Assessment for the Morning Tide Development Complex, Morning Tide Power Line and Abrina Residential Development - Rooidraai 34 JT | AIA Phase 1 | 11/05/2006 | Polke Birkholtz | Archaeology Africa CC | MAPID_01100 | 16/06/2012 - 14:48 | |
AIA_Dingwell_276_Jt_Celliers_JP_Jun05 | Report on Archaeological Survey of Portion 2 of the Farm Dingwell 276 JT in Respect of Phumulani Residential Development | AIA Phase 1 | 10/06/2005 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01101 | 16/06/2012 - 14:44 | |
9-2-236-0032-20070801-ACU | Cultural Heritage Impact Assessment of the Proposed Chrome Mine on Portions 4 & 5 of the Farm Spitskop 333 KT, Steelpoort, Mpumalanga Province | AIA Phase 1 | 01/08/2007 | Francois P Coetzee | University of South Africa - Archaeology Contracts Unit | MAPID_01102 | 16/06/2012 - 14:39 | |
9-2-236-0032-20071001-ACO | Cultural Heritage Impact Assessment of the Proposed Chrome Mine on the Farm Mecklenburg 112KT, Steelpoort, Mpumalanga Province | AIA Phase 1 | 01/10/2007 | Francois P Coetzee | ACO Associates CC | MAPID_01103 | 16/06/2012 - 14:39 | |
9-2-248-0001-20060327-KA | Report on Archaeological Survey of Boschrand Heights Residential and Golf Development Situated on: A Portion of the Remainder of Dingwell 276 JT; a Portion of the Remainder of Portion 14 of Boschrand 283 JT and Portion 56 of Boschrand 283 JT, Nelspruit | AIA Phase 1 | 27/03/2006 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01104 | 16/06/2012 - 14:39 | |
9-2-248-0001-20060926-KA | Report on Heritage Impact Assessment and Archaeological Survey for the Karino Urban Development on Portion 7, 15, 16, 18, 19, 20, 26, 44, and 73 of the Farm Goedehoop 128 JU, Portion 23 of the Farm Broedershoek 129 JU, Mbombela | AIA Phase 1 | 26/09/2006 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01105 | 16/06/2012 - 14:39 | |
9-2-248-0001-20070901-KA | Phase 1 Archaeological Impact Assessment for the Proposed Town Development on 98Ha of the Farm Broedershoek 129 JU, Portions 15 and 16 | AIA Phase 1 | 01/09/2007 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01106 | 16/06/2012 - 14:39 | |
9-2-248-0001-20080306-KA | Phase 1 Archaeological Impact Assessment for the Proposed Development on Portion 3 of the Farm Geluk 299 JT and Portion 6, 35, 36, and 68 of the Farm Rietvly 295 JT in Schoemanskloof | AIA Phase 1 | 06/03/2008 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01107 | 16/06/2012 - 14:39 | |
9-2-248-0001-20080630-KA | Phase 1 Archaeological Impact Assessment for the Proposed Development on the Farm Sterkstroom 118 JT in the Schoemanskloof | AIA Phase 1 | 30/06/2008 | Jean-Pierre Celliers | Kudzala Antiquity | MAPID_01108 | 16/06/2012 - 14:39 | |
9-2-266-0002-20050629-AACC | Phase 1 Heritage Impact Assessment, Motaganeng Project on Portions of the Farm Aapiesdoorndraai 298 KT | AIA Phase 1 | 29/06/2005 | Polke Birkholtz | Archaeology Africa CC | MAPID_01109 | 16/06/2012 - 14:40 | |
9-2-282-0006-20051001-ACU | Archaeological Investigation of the Proposed Black Eagle Valley - Residential Estate, Waterval Boven, Mpumalanga | AIA Phase 1 | 01/10/2005 | Francois P Coetzee | University of South Africa - Archaeology Contracts Unit | MAPID_01110 | 16/06/2012 - 14:41 | |
AIA_Grootvlei-Balfour_Powerline_Huffman_TN_Aug07 | Archaeological Impact Assessment for the Grootvlei-Balfour Powerline, Mpumalanga | AIA Phase 1 | 01/08/2007 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01111 | 16/06/2012 - 14:45 | |
9-2-203-0028-20071214-MARM | Heritage Scoping Proposed Feedlot Development on a Portion of the Farm Zoekmy 177 IT, Chrissiesmeer, Mpumalanga Province | AIA Phase 1 | 14/12/2007 | Wouter Fourie, Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01112 | 16/06/2012 - 14:38 | |
AIA_Khutala_Colliery_Fourie_W_Jan07 | Heritage Impact Assessment Certain Portions of the Farms Zondagsvlei, Schoongezicht, Leeuwfontein, Klippoortje, Springboklaagte, Cologne, Bombardie and Smithfield, Nkangala District, Mpumalanga Province | AIA Phase 1 | 24/01/2007 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01113 | 16/06/2012 - 14:46 | |
AIA_Everest_South_Bulk_Sample_Huffman_TN_Feb02 | Archaeological Reconnaissance of the Everest South Bulk Sample Area and the Former Headquarters of the Phetla Chief | AIA Phase 1 | 01/02/2002 | Thomas Huffman, MH Alex Schoeman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01114 | 16/06/2012 - 14:45 | |
AIA_Lydenburg_Erf_191_Fourie_W_Nov06 | Archaeological Impact Assessment Erf 191, Lydenburg, Mpumalanga Province | AIA Phase 1 | 28/11/2006 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01115 | 16/06/2012 - 14:47 | |
AIA_Lydenburg_ext_74_Fourie_W_Oct07 | Lydenburg Ext 74 Heritage Scoping Proposed Residential Development on Portion 140 of the Farm Sterkspruit 33 JT, Thaba Chweu, Mpumalanga Province | AIA Phase 1 | 15/10/2007 | Wouter Fourie, Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01116 | 16/06/2012 - 14:47 | |
9-2-236-0032-20031001-AHCC | Archaeological and Cultural Assessment of the New Residential Development at the Farm Spitskop 333 KT, Steelpoort | AIA Phase 1 | 01/10/2003 | Udo Kusel, Cobus Dreyer | African Heritage Consultants CC | MAPID_01117 | 16/06/2012 - 14:39 | |
9-2-242-0003-20051001-AI | Heritage Impact Assessment for the Proposed Simphlon Sub-Station to Mapoch Substation 132 Distribution Power Line near Roossenekal | AIA Phase 1 | 01/10/2005 | Stephan Gaigher | Archaeo-Info | MAPID_01118 | 16/06/2012 - 14:39 | |
AIA_Middlewit_Stene_Huffman_TN_Feb05 | Archaeological Assessment for Middlewit Stene, Mpumalanga | AIA Phase 1 | 01/02/2005 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01119 | 16/06/2012 - 14:47 | |
AIA_Optimum_Mine_EMP_De_Jong_RC_Oct06 | Archaeological and Heritage Assessment Report Version 3: Optimum Mine EMP Amendment, North of Hendrina, Mpumalanga | HIA Phase 1 | 06/10/2006 | Robert de Jong | Cultmatrix CC | MAPID_01121 | 16/06/2012 - 14:48 | |
AIA_Stonehenge_Fourie_W_Nov07 | Heritage Assessment Stonehenge Extension 16, Portion 9 & 10 of the Farm Stonehenge 310 JT, Nelspruit, Mpumalanga | AIA Phase 1 | 11/11/2007 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01122 | 16/06/2012 - 14:50 | |
9-2-253-0002-20070727-CCC | Archaeological and Heritage Impact Assessment Report: Proposed New Goedgevonden Colliery Expansion Project on the Farms Goedgevonden 10 IS, Zaaiwater 11 IS and Kleinzuikerboschplaats 5 IS near Ogies, Emalahleni Local Municipality, Mpumalanga | HIA Phase 1 | 27/07/2007 | Robert de Jong | Cultmatrix CC | MAPID_01123 | 16/06/2012 - 14:39 | |
9-2-263-0003-20050310-AHCC | Cultural Heritage Impact Assessment Cape Archaeological Survey CChan Extension 3 Rustenburg | AIA Phase 1 | 10/03/2005 | Udo Kusel | African Heritage Consultants CC | MAPID_01124 | 16/06/2012 - 14:40 | |
AIA_Lebalelo_Pipeline_Huffman_TN_Oct00 | Archaeological Survey of the Lebalelo Pipeline Sukhukhuneland | AIA Phase 1 | 01/10/2000 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01125 | 16/06/2012 - 14:47 | |
9-2-279-0006-20000501-AI | Preliminary Archaeological Impact Assessment of Three Proposed Sites for a Telkom Mast at Wakkerstroom Mpumalanga | AIA Phase 1 | 01/05/2000 | Stephan Gaigher | Archaeo-Info | MAPID_01126 | 16/06/2012 - 14:41 | |
AIA_Bankenveld_Golf_Estate_Huffman_TN_Sep06 | Archaeological Assessment for the Proposed Bankenveld Golf Estate, Witbank | AIA Phase 1 | 01/09/2006 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | MAPID_01127 | 16/06/2012 - 14:43 | |
9-2-284-0009-20071217-CCC | Specialist Report: Heritage Impact Assessment Report in Connection with Two Alternative Routes for a Proposed Raw Water Pipeline Between Vlaklaagte 330 JS and Waterpan 8 IS Servicing the Goedgevonden Colliery near Ogies, Mpumalanga | HIA Phase 1 | 17/12/2007 | Robert de Jong | Cultmatrix CC | MAPID_01128 | 16/06/2012 - 14:41 | |
9-2-225-0005-20030701-ACHMC | Heritage Impact Assessment Study for a Proposed New 22 kV Powerline on the Farm Kameelrivier 160 JR near Siyabuswa, Mpumalanga | AIA Phase 1 | 01/07/2003 | Julius CC Pistorius | MAPID_01129 | 16/06/2012 - 14:38 |