THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 251 - 300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Paleontological Assessment Report | DESKTOP PALEONTOLOGICAL ASSESSMENT FOR THE DALINKOSI BRIDGE OVER THE WASBANK RIVER, SOUTHEAST OF DALINKOSI, KWA-ZULU NATAL | PIA Desktop | 04/08/2023 | Alan Smith | Alan Smith Consulting | 20/09/2023 - 17:58 | |
HIA: Erf 2747, Langa | Heritage Impact Assessment in terms of section 38(1) for the PROPOSED NEW TELECOMMUNICATION MAST ON ERF 2747, LANGA | Heritage Impact Assessment Specialist Reports | 18/08/2017 | Katie Smuts, Jenna Lavin, Kyla Bluff | Cedar Tower Services | Atlas Tower | 21/08/2017 - 13:46 |
HIA - Tiger Kloof | Archaeological Impact Assessment for the Proposed Tiger Kloof Photovoltaic Solar Energy Facility near Vryburg, North West Province | AIA Phase 1 | 11/12/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/02/2014 - 12:41 |
Heritage Statement: Padia House | 10 Lamont road, Glenwood, Durban-4001 | Heritage Statement | 12/07/2013 - 10:59 | ||||
Archaelogical and HIA - Tiergerpoort Lodge and Wedding Venue | Phase 1 Archaeological and Heritage Impact Assessment on the Remainder of Portion 186 of the farm Tiegerpoort 371 JR in respect of a proposed hospitality development, City of Tshwane, Gauteng Province. | HIA Phase 1 | 06/11/2018 | Jean-Pierre Celliers | Kudzala Antiquity | 28/11/2018 - 09:20 | |
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline | Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline, Distribution Gemma Cluster, Northwest Province | PIA Desktop | 31/08/2021 | Marion Bamford | Prof Marion Bamford | HUMBA ENVIRONMENTAL CONSULTANCY | 29/11/2021 - 11:22 |
132kv John Dube HIA Report | Phase1 Heritage Impact Assessment Report for proposed 132kv ±4km powerline for John Dube Ext 1 Development within City of Ekurhuleni Metropolitan Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 13/11/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | 06/03/2019 - 11:11 | |
Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site | Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site | 24/08/2020 - 21:40 | |||||
Klipdrift Shelter 2018 excavation report | Report on the 2018 archaeological excavations at Klipdrift Shelter, southern Cape, South Africa – 18 February to 2 April 2018 | Archaeological Specialist Reports | 12/12/2021 | Christopher Henshilwood, Karen van Niekerk, Samantha Mienies, Jenny Maccali | Centre for Early Sapiens Behaviour University of Bergen, Norway | Centre for Early Sapiens Behaviour University of Bergen, Norway | 01/03/2022 - 09:27 |
AIA FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARM SEKGAME 461 FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE, NORTHERN CAPE PROVINCE | AIA Phase 1 | 02/12/2014 | Neels Kruger | Exigo3 Sustainability | Sishen Iron Ore Company (Pty) Ltd | 17/06/2015 - 11:15 |
HIA Melkspruit Rouxville | THE PROPOSED DEVELOPMENT OF THE ESKOM MELKSPRUIT TO ROUXVILLE 132 KV OVERHEADPOWERLINE, FREE STATE PROVINCE Heritage Impact Assessment PGS Heritage, 2020 | HIA Phase 1 | 30/09/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | GA Environment (Pty) Ltd | 20/10/2020 - 08:13 |
HIA_Vyfhoek_428_ptn_685_(of_612)_Kiᄑsel_U_Jun07 | Cultural Heritage Resources Impact Assessment of a Portion 685 (A portion of 612) of the Farm Vyfhoek 428 IQ North West Province | HIA Phase 1 | 16/06/2012 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:52 | |
Icarus SPP - HIA | 15/02/2023 - 07:59 | ||||||
Draft BAR and EMPr | Draft Basic Assessment report and Environmental Management report regarding Matsulu Waste Transfer Station, in City of Mbombela Local Municipality, Mpumalanga Province | HIA Phase 1 | 27/09/2017 | Babalwa Fatyi | Myezo Environmental Management Services | Mbombela Local Municipality | 13/11/2017 - 12:59 |
Pakkies | The proposed forestry projects by B.N. Pakkies (18ha) in respect of the same activity occurring in several locations in Valkop farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 09:51 |
Prospecting for Manganese Ore on Portion 1 of the Farm Lizbeth 325, situated In the Magisterial District of John Taolo Gaetsewe (Kuruman) in Northern Cape Province. | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR MANGANESE ORE ON PORTION 1 OF THE FARM LIZBETH 325 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. | HIA Phase 1 | 30/03/2023 | Trust Mlilo | 17/04/2023 - 16:50 | ||
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 | AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 | 08/08/2016 | Karen Van Ryneveld | Enviroworks | 08/08/2016 - 07:43 | ||
Isondlo Dairy Irrigation Project Palaeontological Report | Palaeontological Impact Assessment for the proposed Isondlo Dairy CBAR (irrigation project), near Bergville, KwaZulu Natal Province | PIA Desktop | 20/01/2018 | Marion Bamford | GCS Water and Environmental Consultants - Durban | 13/02/2018 - 13:28 | |
Proposed township development for portion 127 and 131 of the farm De Rust 12 JU, Hazyview | Phase 1 archaeological and heritage impact assessment for the proposed township establishment on portions 127 and 131 of the farm Dew Rust 12 JU, Hazyview, Mpumalanga | AIA Phase 1 | 24/06/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 25/06/2014 - 10:47 |
Kenilworth Race Course | Kenilworth Race Course | AIA Phase 1 | 16/06/2012 | Christopher Henshilwood | 16/06/2012 - 08:54 | ||
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:32 | ||
NALEDI SEWER HIA | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT OF A SEWER PIPELINE IN NALEDI, GREATER SOWETO REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 15/05/2019 | J.A. van Schalkwyk | 30/05/2019 - 10:06 | ||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT for THE PROSPECTING RIGHT APPLICATION FOR DIAMONDS ALLUVIAL ON THE FARM AANSLUIT 250, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | PIA Desktop | 11/05/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 03/05/2022 - 14:54 | |
PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC | PIA Phase 1 | 22/12/2020 | Elize Butler | 22/12/2020 - 08:51 | ||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga | AIA Desktop | 30/05/2022 | Tobias Coetzee | Tobias Coetzee | 04/07/2022 - 14:26 | |
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC | Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa | AIA Phase 1 | 16/06/2014 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | Control Civil Services cc | 04/08/2014 - 12:20 |
AIA Greefspan Power Station II 2645 - upgraded | Archaeological Impact Assessment Phase 1 (upgraded): Proposed expanded development of PV Power Station at Greefspan, near Douglas, Northern Cape | AIA Phase 1 | 01/01/2011 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 18/06/2012 - 08:57 |
Heritage Impact Assessment Proposed Makhathini Irrigation Scheme | HIA Phase 1 | 13/06/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Nzingwe Consultancy | 21/09/2015 - 08:24 | |
Coral International Hotel Group | Erf 10192, Helliger Lane Bo-kaap Cape Town | Quahnita Samie | Vidamemoria Heritage Consultants | Vidamemoria Heritage Consultants | 23/01/2015 - 12:22 | ||
Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal | Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal | HIA Phase 1 | 08/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | SE Solutions | 04/03/2021 - 22:12 |
THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80, HOLDING 72, WATERKLOOF AGRICULTURAL HOLDINGS, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 22/02/2017 | Johnny Van Schalkwyk | J Paul van Wyk | JA van Schalkwyk Heritage Consultant | 23/02/2017 - 09:39 |
BRPM HIA | Cultural Heritage Survey of the Proposed New Ventilation Shaft Phase 3 Project, Bafokeng Rasimone Platinum Mine, North West Province | HIA Phase 1 | 01/01/2012 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | SRK Consulting (Pty) Ltd - Pretoria | 17/09/2012 - 08:43 |
Impofu-Ngwedi HIA | Impofu-Ngwedi 132kV line Heritage Impact Assessment | Archaeological Specialist Reports | 30/09/2015 | Anton van Vollenhoven | Archaetnos CC | Texture Environmental Consultants | 23/11/2015 - 19:06 |
Dalmanutha HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DALMANUTHA WIND ENERGY FACILITY (WEF), WITHIN THE EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. | HIA Phase 1 | 01/05/2023 | Jaco van der Walt | Beyond Heritage | WSP Group Africa (Pty) Ltd | 30/05/2023 - 15:23 |
HIA Hoekplaas | Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. | Heritage Impact Assessment Specialist Reports | 09/07/2013 | Jayson Orton | ACO Associates CC | Aurecon - Cape Town | 24/03/2015 - 10:51 |
9-2-303-0003-20060201-PBA | Zeus-Perseus 765 KV transmission Line: EIA : Heritage Impact Assessment | HIA Phase 1 | 01/02/2006 | Jean Beater | PBA International (SA) Engineering & Environmental Consultants | 16/06/2012 - 14:42 | |
Phase 1 HIA for Komati Solar PV and BESS | A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE ESKOM KOMATI POWER STATION SOLAR ENERGY FACILILTY (SEF) MPUMALANGA PROVINCE | HIA Phase 1 | 01/06/2023 | Anton Apelser | A Pelser Archaeological Consulting | WSP Group Africa (Pty) Ltd | 05/07/2023 - 11:20 |
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE | HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE | HIA Letter of Exemption | 15/09/2016 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/11/2016 - 15:48 |
HIA; Expansion of Existing Borrow Pit, DR01380, Cape Winelands | Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01380 Approximately 18 km southeast of Worcester in Cape Winelands District Municipality, Western Cape | HIA Phase 1 | 29/08/2012 | Quahnita Samie, John Almond, Madelon Tusenius | Vidamemoria Heritage Consultants | Nadeson Consulting Services | 12/06/2018 - 12:55 |
Palaeontological Impact Assessment: Desktop study | PIA Desktop | 20/08/2015 | Barry Millsteed | BM Geological Services | Jacana Environmental cc | 29/08/2019 - 14:55 | |
HIA_Gemsbok Horn Prospect | Heritage Impact Assessment of proposed prospecting drilling sites at two pans on Gemsbok Horn 242 in the Dawid Kruiper Local Municipality, Northern Cape | HIA Phase 1 | 01/11/2019 | David Morris | McGregor Museum | Site Plan Consulting | 25/11/2019 - 10:56 |
HIA Kosibiya Road Upgrade | Phase 1 Heritage Impact Assessment reoprt for the Kosibiya Road Upgrade Project near Weenen, KwaZulu-Natal | HIA Phase 1 | 11/08/2014 | Stephan Gaigher | G & A Heritage | GBS Environmental Consulting | 30/10/2014 - 15:02 |
HIA 10857MP | HERITAGE IMPACT ASSESSMENT: PROPOSED QUARTZ MINE ON KABIS 27/REM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 20/02/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 05/05/2021 - 13:12 |
REPORT ON A PHASE 1 HERITAGE ASSESSMENT | REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE OVERHEAD POWERLINE AND ZETA SUBSTATION, LOCATED ON ERF 1806 VAN DER HOFF PARK & PORTION 17 OF THE FARM VYFHOEK 424IQ POTCHEFSTROOM, NORTHWEST PROVINCE - APAC017/26. April 2017 | HIA Phase 1 | 01/04/2017 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | AB Enviro Consult CC | 11/04/2017 - 09:37 |
PIA Study Loskop Quarry Estcourt KwaZulu Natal | A Phase 1 Palaeontological Impact Assessment Study for the Proposed Loskop Quarry Re-mining Project, Estcourt, KwaZulu Natal Province | PIA Phase 1 | 28/05/2013 | Nonhlanhla Vilakazi | Evolutionary Studies Institute | ENPROCON (Pty) Ltd | 04/09/2013 - 12:37 |
PIA Waterloo South | PALAEONTOLOGICAL HERITAGE ASSESSMENT: COMBINED DESKTOP & FIELD-BASED STUDY Proposed PV Solar Facility on a portion of the farm Waterloo 992 near Vryburg, Naledi Local Municipality, North-West Province | PIA Phase 1 | 01/01/2013 | John E Almond | Natura Viva CC | Sonvanger Solar Power Plant (Pty) Ltd. | 28/01/2013 - 14:22 |
Weenen Survey Report | Survey and condition assessment of archaeological sites in Weenen Nature Reserve and investigation into the possibility of opening a low-impact archaeological tourism destination | Heritage Study | 28/06/2018 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 07/10/2022 - 15:00 |
Calodex Solar PV Palaeontological Report | Palaeontological Impact Assessment for the Proposed Establishment of a 115 MW Solar Photovoltaic (PV) Facility in Springs, Gauteng | PIA Phase 1 | 06/05/2021 | Dr. Heidi Fourie | 25/06/2021 - 15:23 | ||
MSix Wits Application | Basic Assessment Report | 26/06/2017 | Ephraim Masibhera | Kweneng Group | Kweneng Group | 31/05/2017 - 14:37 | |
PIA Exemption Augrabies PV | PALAEONTOLOGICAL ASSESSMENT: RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: Proposed Photovoltaic Solar Plant on the Farm Rooipad No. 15 near Augrabies, Northern Cape Province | PIA Desktop | 01/02/2012 | John E Almond | Natura Viva CC | 08/11/2013 - 09:12 |