FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Paleontological Assessment Report DESKTOP PALEONTOLOGICAL ASSESSMENT FOR THE DALINKOSI BRIDGE OVER THE WASBANK RIVER, SOUTHEAST OF DALINKOSI, KWA-ZULU NATAL PIA Desktop 04/08/2023 Alan Smith Alan Smith Consulting 20/09/2023 - 17:58
HIA: Erf 2747, Langa Heritage Impact Assessment in terms of section 38(1) for the PROPOSED​ ​NEW​ ​TELECOMMUNICATION​ ​MAST​ ​ON​ ​ERF​ ​2747,​ ​LANGA Heritage Impact Assessment Specialist Reports 18/08/2017 Katie Smuts, Jenna Lavin, Kyla Bluff Cedar Tower Services Atlas Tower 21/08/2017 - 13:46
HIA - Tiger Kloof Archaeological Impact Assessment for the Proposed Tiger Kloof Photovoltaic Solar Energy Facility near Vryburg, North West Province AIA Phase 1 11/12/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 18/02/2014 - 12:41
Heritage Statement: Padia House 10 Lamont road, Glenwood, Durban-4001 Heritage Statement 12/07/2013 - 10:59
Archaelogical and HIA - Tiergerpoort Lodge and Wedding Venue Phase 1 Archaeological and Heritage Impact Assessment on the Remainder of Portion 186 of the farm Tiegerpoort 371 JR in respect of a proposed hospitality development, City of Tshwane, Gauteng Province. HIA Phase 1 06/11/2018 Jean-Pierre Celliers Kudzala Antiquity 28/11/2018 - 09:20
Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline Palaeontological Impact Assessment for the proposed Eskom Ararat-Bafokeng 88 kV powerline, Distribution Gemma Cluster, Northwest Province PIA Desktop 31/08/2021 Marion Bamford Prof Marion Bamford HUMBA ENVIRONMENTAL CONSULTANCY 29/11/2021 - 11:22
132kv John Dube HIA Report Phase1 Heritage Impact Assessment Report for proposed 132kv ±4km powerline for John Dube Ext 1 Development within City of Ekurhuleni Metropolitan Municipality, Gauteng Heritage Impact Assessment Specialist Reports 13/11/2018 Trust Mlilo Integrated Specialist Services (Pty) Ltd 06/03/2019 - 11:11
Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site 24/08/2020 - 21:40
Klipdrift Shelter 2018 excavation report Report on the 2018 archaeological excavations at Klipdrift Shelter, southern Cape, South Africa – 18 February to 2 April 2018 Archaeological Specialist Reports 12/12/2021 Christopher Henshilwood, Karen van Niekerk, Samantha Mienies, Jenny Maccali Centre for Early Sapiens Behaviour University of Bergen, Norway Centre for Early Sapiens Behaviour University of Bergen, Norway 01/03/2022 - 09:27
AIA FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARCATED SURFACE PORTIONS ON THE FARM SEKGAME 461 FOR THE PROPOSED SEKGAME ELECTRICITY INFRASTRUCTURE EXPANSION PROJECT, SISHEN MINE, NORTHERN CAPE PROVINCE AIA Phase 1 02/12/2014 Neels Kruger Exigo3 Sustainability Sishen Iron Ore Company (Pty) Ltd 17/06/2015 - 11:15
HIA Melkspruit Rouxville THE PROPOSED DEVELOPMENT OF THE ESKOM MELKSPRUIT TO ROUXVILLE 132 KV OVERHEADPOWERLINE, FREE STATE PROVINCE Heritage Impact Assessment PGS Heritage, 2020 HIA Phase 1 30/09/2020 Wouter Fourie PGS Heritage (Pty) Ltd GA Environment (Pty) Ltd 20/10/2020 - 08:13
HIA_Vyfhoek_428_ptn_685_(of_612)_Ki﾿ᄑsel_U_Jun07 Cultural Heritage Resources Impact Assessment of a Portion 685 (A portion of 612) of the Farm Vyfhoek 428 IQ North West Province HIA Phase 1 16/06/2012 Udo Kusel African Heritage Consultants CC 16/06/2012 - 14:52
Icarus SPP - HIA 15/02/2023 - 07:59
Draft BAR and EMPr Draft Basic Assessment report and Environmental Management report regarding Matsulu Waste Transfer Station, in City of Mbombela Local Municipality, Mpumalanga Province HIA Phase 1 27/09/2017 Babalwa Fatyi Myezo Environmental Management Services Mbombela Local Municipality 13/11/2017 - 12:59
Pakkies The proposed forestry projects by B.N. Pakkies (18ha) in respect of the same activity occurring in several locations in Valkop farm in UMzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 11/04/2014 - 09:51
Prospecting for Manganese Ore on Portion 1 of the Farm Lizbeth 325, situated In the Magisterial District of John Taolo Gaetsewe (Kuruman) in Northern Cape Province. PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR MANGANESE ORE ON PORTION 1 OF THE FARM LIZBETH 325 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. HIA Phase 1 30/03/2023 Trust Mlilo 17/04/2023 - 16:50
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 08/08/2016 Karen Van Ryneveld Enviroworks 08/08/2016 - 07:43
Isondlo Dairy Irrigation Project Palaeontological Report Palaeontological Impact Assessment for the proposed Isondlo Dairy CBAR (irrigation project), near Bergville, KwaZulu Natal Province PIA Desktop 20/01/2018 Marion Bamford GCS Water and Environmental Consultants - Durban 13/02/2018 - 13:28
Proposed township development for portion 127 and 131 of the farm De Rust 12 JU, Hazyview Phase 1 archaeological and heritage impact assessment for the proposed township establishment on portions 127 and 131 of the farm Dew Rust 12 JU, Hazyview, Mpumalanga AIA Phase 1 24/06/2014 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 25/06/2014 - 10:47
Kenilworth Race Course Kenilworth Race Course AIA Phase 1 16/06/2012 Christopher Henshilwood 16/06/2012 - 08:54
Archaeological Impact Assessment - Draft EIA Buffels 2 31/08/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 26/09/2016 - 13:32
NALEDI SEWER HIA Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT OF A SEWER PIPELINE IN NALEDI, GREATER SOWETO REGION, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 15/05/2019 J.A. van Schalkwyk 30/05/2019 - 10:06
PALAEONTOLOGICAL DESKTOP ASSESSMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT for THE PROSPECTING RIGHT APPLICATION FOR DIAMONDS ALLUVIAL ON THE FARM AANSLUIT 250, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE PIA Desktop 11/05/2022 Elize Butler Banzai Environmental (Pty) Ltd 03/05/2022 - 14:54
PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC PIA-Lowlands Hydropower and Distribution, near Cradock, CHDM, EC PIA Phase 1 22/12/2020 Elize Butler 22/12/2020 - 08:51
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tsebeblox Prospecting Right Application on Portion 25 and the Remaining Extent of the Farm Bankpan 225 IS and Portion 1 and the Remaining Extent of the Farm Killowen 465 IS, Bethal, Mpumalanga AIA Desktop 30/05/2022 Tobias Coetzee Tobias Coetzee 04/07/2022 - 14:26
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa AIA Phase 1 16/06/2014 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Control Civil Services cc 04/08/2014 - 12:20
AIA Greefspan Power Station II 2645 - upgraded Archaeological Impact Assessment Phase 1 (upgraded): Proposed expanded development of PV Power Station at Greefspan, near Douglas, Northern Cape AIA Phase 1 01/01/2011 David Morris McGregor Museum Van Zyl Environmental Consultants 18/06/2012 - 08:57
Heritage Impact Assessment Proposed Makhathini Irrigation Scheme HIA Phase 1 13/06/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Nzingwe Consultancy 21/09/2015 - 08:24
Coral International Hotel Group Erf 10192, Helliger Lane Bo-kaap Cape Town Quahnita Samie Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants 23/01/2015 - 12:22
Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal Heritage Impact Assessment for the the proposed Nseleni Independent Floating Power Plant (NIFPP) and associated infrastructure, Port of Richards Bay, Kwazulu-Natal HIA Phase 1 08/02/2021 Jaco van der Walt Heritage Contracts and Archaeological Consulting SE Solutions 04/03/2021 - 22:12
THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80 Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED EMERALD VALLEY ESTATE, RIETVALLEIRAND EXTENSION 80, HOLDING 72, WATERKLOOF AGRICULTURAL HOLDINGS, CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 22/02/2017 Johnny Van Schalkwyk J Paul van Wyk JA van Schalkwyk Heritage Consultant 23/02/2017 - 09:39
BRPM HIA Cultural Heritage Survey of the Proposed New Ventilation Shaft Phase 3 Project, Bafokeng Rasimone Platinum Mine, North West Province HIA Phase 1 01/01/2012 Francois P Coetzee Department of Anthropology and Archaeology, UNISA SRK Consulting (Pty) Ltd - Pretoria 17/09/2012 - 08:43
Impofu-Ngwedi HIA Impofu-Ngwedi 132kV line Heritage Impact Assessment Archaeological Specialist Reports 30/09/2015 Anton van Vollenhoven Archaetnos CC Texture Environmental Consultants 23/11/2015 - 19:06
Dalmanutha HIA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DALMANUTHA WIND ENERGY FACILITY (WEF), WITHIN THE EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. HIA Phase 1 01/05/2023 Jaco van der Walt Beyond Heritage WSP Group Africa (Pty) Ltd 30/05/2023 - 15:23
HIA Hoekplaas Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. Heritage Impact Assessment Specialist Reports 09/07/2013 Jayson Orton ACO Associates CC Aurecon - Cape Town 24/03/2015 - 10:51
9-2-303-0003-20060201-PBA Zeus-Perseus 765 KV transmission Line: EIA : Heritage Impact Assessment HIA Phase 1 01/02/2006 Jean Beater PBA International (SA) Engineering & Environmental Consultants 16/06/2012 - 14:42
Phase 1 HIA for Komati Solar PV and BESS A PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE ESKOM KOMATI POWER STATION SOLAR ENERGY FACILILTY (SEF) MPUMALANGA PROVINCE HIA Phase 1 01/06/2023 Anton Apelser A Pelser Archaeological Consulting WSP Group Africa (Pty) Ltd 05/07/2023 - 11:20
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:48
HIA; Expansion of Existing Borrow Pit, DR01380, Cape Winelands Heritage Impact Assessment for Expansion of an Existing Borrow Pit Located Along DR01380 Approximately 18 km southeast of Worcester in Cape Winelands District Municipality, Western Cape HIA Phase 1 29/08/2012 Quahnita Samie, John Almond, Madelon Tusenius Vidamemoria Heritage Consultants Nadeson Consulting Services 12/06/2018 - 12:55
Palaeontological Impact Assessment: Desktop study PIA Desktop 20/08/2015 Barry Millsteed BM Geological Services Jacana Environmental cc 29/08/2019 - 14:55
HIA_Gemsbok Horn Prospect Heritage Impact Assessment of proposed prospecting drilling sites at two pans on Gemsbok Horn 242 in the Dawid Kruiper Local Municipality, Northern Cape HIA Phase 1 01/11/2019 David Morris McGregor Museum Site Plan Consulting 25/11/2019 - 10:56
HIA Kosibiya Road Upgrade Phase 1 Heritage Impact Assessment reoprt for the Kosibiya Road Upgrade Project near Weenen, KwaZulu-Natal HIA Phase 1 11/08/2014 Stephan Gaigher G & A Heritage GBS Environmental Consulting 30/10/2014 - 15:02
HIA 10857MP HERITAGE IMPACT ASSESSMENT: PROPOSED QUARTZ MINE ON KABIS 27/REM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE HIA Phase 1 20/02/2021 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 05/05/2021 - 13:12
REPORT ON A PHASE 1 HERITAGE ASSESSMENT REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE OVERHEAD POWERLINE AND ZETA SUBSTATION, LOCATED ON ERF 1806 VAN DER HOFF PARK & PORTION 17 OF THE FARM VYFHOEK 424IQ POTCHEFSTROOM, NORTHWEST PROVINCE - APAC017/26. April 2017 HIA Phase 1 01/04/2017 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 11/04/2017 - 09:37
PIA Study Loskop Quarry Estcourt KwaZulu Natal A Phase 1 Palaeontological Impact Assessment Study for the Proposed Loskop Quarry Re-mining Project, Estcourt, KwaZulu Natal Province PIA Phase 1 28/05/2013 Nonhlanhla Vilakazi Evolutionary Studies Institute ENPROCON (Pty) Ltd 04/09/2013 - 12:37
PIA Waterloo South PALAEONTOLOGICAL HERITAGE ASSESSMENT: COMBINED DESKTOP & FIELD-BASED STUDY Proposed PV Solar Facility on a portion of the farm Waterloo 992 near Vryburg, Naledi Local Municipality, North-West Province PIA Phase 1 01/01/2013 John E Almond Natura Viva CC Sonvanger Solar Power Plant (Pty) Ltd. 28/01/2013 - 14:22
Weenen Survey Report Survey and condition assessment of archaeological sites in Weenen Nature Reserve and investigation into the possibility of opening a low-impact archaeological tourism destination Heritage Study 28/06/2018 Celeste Rossouw KwaZulu-Natal Amafa and Research Institute KwaZulu-Natal Amafa and Research Institute 07/10/2022 - 15:00
Calodex Solar PV Palaeontological Report Palaeontological Impact Assessment for the Proposed Establishment of a 115 MW Solar Photovoltaic (PV) Facility in Springs, Gauteng PIA Phase 1 06/05/2021 Dr. Heidi Fourie 25/06/2021 - 15:23
MSix Wits Application Basic Assessment Report 26/06/2017 Ephraim Masibhera Kweneng Group Kweneng Group 31/05/2017 - 14:37
PIA Exemption Augrabies PV PALAEONTOLOGICAL ASSESSMENT: RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: Proposed Photovoltaic Solar Plant on the Farm Rooipad No. 15 near Augrabies, Northern Cape Province PIA Desktop 01/02/2012 John E Almond Natura Viva CC 08/11/2013 - 09:12

Pages

CSV
 
 

Search form