Displaying 251 - 300 of 17963
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Portion 60 and 64 Sterkspruit 33 JT | Phase 1 Archaeological Impact Assessment on portions 60 and 64 of the remainder of the farm Sterkspruit 33 JT in Lydenburg, Mpumalanga Province. | AIA Phase 1 | 12/05/2011 | Jean-Pierre Celliers | Kudzala Antiquity | Tua Conserva Environmental | 26/09/2012 - 15:59 |
HIA: Plaas 438 and 588 | HERITAGE IMPACT ASSESSMENT REPORT FOR THE FARMS PLAAS 438 PORTION 1 & PLAAS 588 RE | HIA Phase 1 | 01/11/2013 | Louisa Hutten | Blue Limit Trading 26 (Pty) Ltd | 18/11/2013 - 16:01 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BAFOKENG-ARARAT 88KV POWERLINE. THE PROJECT FALLS UNDER RUSTENBURG LOCAL MUNICIPALITY IN THE NORTH WEST PROVINCE. | HIA Phase 1 | 31/08/2021 | Makhosazana Mngomezulu | Vungandze Projects | HUMBA ENVIRONMENTAL CONSULTANCY | 27/10/2021 - 10:36 |
HIA: Sikwebezi River, KZN | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED SIKWEBEZI RIVER BRIDGE AND ASSOCIATED ROAD LOCATED IN OMBUMBINI, NEAR NONGOMA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 11:37 |
Greater Kilimon HIA | HIA Phase 1 | 06/04/2020 | Gideon Groenewald | Dr. Gideon Groenewald | Umlando: Archaeological Surveys & Heritage Management | 14/07/2020 - 14:34 | |
HIA Proposed Tawana Hotazel Mine Rev 1 | A Revised Report on a Heritage Impact Assessment for the Proposed Tawana Hotazel Mine, Hotazel, Northern Cape Province | HIA Phase 1 | 17/01/2022 | Anton van Vollenhoven, Johan Smit | Archaetnos Culture & Cultural Resource Consultants | Prime Resources (Pty) Ltd | 19/01/2022 - 08:39 |
Harmanus kraal mitigation | MITIGATION AT HERMANUS KRAAL, LADYSMITH, KWAZULU-NATAL | Archaeological Permit Report | 22/06/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Ladysmith Crushed Stonel | 24/06/2015 - 11:51 |
PIA for Portion 132 of the Farm Elandsfontein 334IQ | Palaeontological Impact Assessment (PIA) to assess the AA Bakery expansion on Portion 132 of the Farm Elandsfontein 334IQ | Palaeontological Specialist Reports | 13/09/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | Elethu Town Planners and Environmental Consultants | 18/09/2020 - 09:36 |
Heritage Screener: Spreeukloof WEF | Desktop Heritage Screening Assessment: PROPOSED AMENDMENTS TO THE AUTHORISED RAINMAKER SPREEUKLOOF WIND ENERGY FACILITIES NEAR MOLTENO IN THE EASTERN CAPE | HIA Letter of Exemption | 17/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/07/2021 - 11:04 |
HIA and PIA for Skeerhok PV1 | Heritage Impact Assessment Specialist Reports | 21/02/2018 - 15:39 | |||||
Heritage Walkthrough Report | Site Inspection Report | 03/01/2023 | 25/01/2023 - 15:35 | ||||
M1562 Oribi Gorge Dams Heritage Screener | M1562 Oribi Gorge Dams Heritage Screener (CTS15_005) | 28/07/2015 | Kyla Bluff, Mariagrazia Galimberti, Peter Kloos, Nicholas Wiltshire | CTS Heritage | Envirosol - Environmental Solutions | 28/07/2015 - 14:20 | |
AIA for the proposed K148, Vosloorus, Gauteng. | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED K148 ROAD DEVELOPMENT, VOSLOORUS, GAUTENG PROVINCE | AIA Phase 1 | 29/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Envirolution Consulting (Pty) Ltd | 30/07/2016 - 14:00 |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:23 | ||
Heritage Report for Gilmer Solar Energy Facility 735 | Archaeological Impact Assessment for the Proposed Establishment of the Gilmer Solar Energy Facility on remainder of ERF306, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 31/01/2013 - 12:59 | ||
HERITAGE IMPACT ASSESSMENT: of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 12:38 |
HERITAGE SURVEY OF THE DR08017 FROM MT. FRERE TO CEDARVILLE, EASTERN CAPE. | Archaeological Specialist Reports | 30/03/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Eastern Cape - Department of Roads and Public Works | 12/04/2013 - 12:17 | |
New Ancillary Unit at 125 Edgeley Road, Briardene, Durban. | 07/04/2014 - 23:20 | ||||||
Palaeontological Study | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED TETRA4 DEVELOPMENT NEAR MATJHABENG (VIRGINIA), MATJHABENG LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALTY, FREE STATE PROVINCE | PIA Desktop | 09/05/2016 | Gideon Groenewald | PGS Heritage and Grave Relocation Consultants | Environmental Impact Management Services (Pty) Ltd | 20/02/2017 - 10:26 |
HIA - Aggeneys PV 2 31.03.19 | Heritage Impact Assessment for the Proposed Aggeneys 2 - 100 MW Solar PV Facility and Associated Infrastructure Near Aggeneys, Namakwaland Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 17/04/2019 - 09:14 |
HIA - Block L | Heritage Impact Assessment for the N'Komati Anthracite Mine, Nkomazi Local Municipality, in the Ehlanzeni Ditrict Municipality, Mpumalanga Province | HIA Phase 1 | 27/01/2022 | Henk Steyn | PGS Heritage (Pty) Ltd | Alta van Dyk Environmental Consultants cc | 28/03/2022 - 16:43 |
Lindokuhle | Phase 1 Heritage Impact Assessment Report: Proposed Lindokuhle Residential Development, Tongaat, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 19/05/2014 | Elizabeth Wahl | eThembeni Cultural Heritage | Tongaat Hulett Developments | 19/06/2014 - 09:20 |
Heritage Impact Assessment for MTN ACE Cable System Project | HERITAGE IMPACT ASSESSMENT: PROPOSED MARINE TELECOMMUNICATIONS SYSTEM (ACE CABLE SYSTEM) TO BE LANDED AT VAN RIEBEECKSTRAND ON THE WEST COAST OF SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 09/01/2017 | Lita Webley | ACO Associates CC | ACER (Africa) Environmental Management Consultants | 05/04/2017 - 08:33 |
Kakamas Arendsnes Agricultural PIA LOE 2020 | PALAEONTOLOGICAL ASSESSMENT: Rectification of agricultural developments and associated infrastructure on Farm Arendsnes (Portion 30 of Farm Zeekoesteek No. 09), Kai! Garib Municipality, Northern Cape | PIA Desktop | 20/08/2020 | John E Almond | Natura Viva CC | GroenbergEnviro (Pty) Ltd | 13/11/2020 - 14:55 |
Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMOND (ALLUVIAL), DIAMOND (GENERAL) DIAMONDS AND DIAMONDS (KIMBERLITE) NEAR UPINGTON ON PORTION 7 OF THE FARM ADEISESTAD 409, PORTION 1 OF THE FARM KALKPUT 407, REMAINING EXTENT OF PORTION 21 AND PORTION 29 (PORTION OF PORTION 21) OF THE FARM UAP 418 AND ON FARM 596, REGISTRATION DIVISION GORDONIA, NORTHERN CAPE PROVINCE | HIA Phase 1 | 31/05/2022 | J A van Schalkwyk | J A van Schalkwyk | Milnex 189 CC | 01/06/2022 - 15:08 |
AIA FOR THE PROPOSED AMD PIPELINE, WESTERN BASIN, RANDFONTEIN ESTATES AREA | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED AMD PIPELINE, WESTERN BASIN, RANDFONTEIN ESTATES AREA | AIA Phase 1 | 25/07/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | AECOM SA - Head Office | 30/09/2015 - 09:56 |
Palaeontological Desktop Study – Siyanda Chrome Smelting Company Pty. Ltd | Palaeontological Desktop Study – Siyanda Chrome Smelting Company Pty. Ltd | PIA Desktop | 01/12/2015 | Bruce Rubidge | 04/11/2016 - 17:29 | ||
Fairbreeze 2020 | ANNUAL HERITAGE REPORT FOR FAIRBREEZE MINE | Archaeological Permit Report | 08/01/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Tronox KZN Sands | 04/02/2021 - 15:10 |
Final report on excavation of ash dump | FINAL REPORT ON THE ARCHAEOLOGICAL INVESTIGATION OF A HISTORICAL ASH DUMP ASSOCIATED WITH THE MODDERFONTEIN EXPLOSIVES FACTORY (AECL) TO BE IMPACTED BY THE WESTLAKE VIEW INDUSTRIAL DEVELOPMENT, NEAR MODDERFONTEIN GAUTENG | AIA Phase 2 | 10/05/2013 | Anton Pelser | A Pelser Archaeological Consulting | Imperio (Pty) Ltd | 24/06/2013 - 12:47 |
EXX5635 - Matla HSMP (Update) | Heritage Resources Management Process Update for the Exxaro Matla Mine, Mpumalanga: Heritage Site Management Plan | Conservation Management Plan | 09/07/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 09/07/2019 - 15:50 |
Kusile 60Year Ash Disposal Facility | Kusile Power Station Ash Disposal Facility | HIA Phase 1 | 11/10/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Zitholele Consulting | 17/09/2014 - 10:56 |
Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/06/2011 | eThembeni Cultural Heritage | 19/05/2017 - 14:19 | ||
PHASE 1 HIA REPORT FOR A PROPOSED TOWNSHIP ESTABLISHMENT WATERKLOOF EAST X63 | PHASE 1 HIA REPORT FOR A PROPOSED TOWNSHIP ESTABLISHMENT ON A PORTION OF THE REMAINING EXTENT OF PORTION 399 ON PORTIONS 450 & 451 OF THE FARM WATERKLOOF 305JQ NEAR RUSTENBURG IN THE RUSTENBURG LOCAL MUNICIPALITY OF NORTHWEST - APAC019/96 | HIA Phase 1 | 26/09/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | AB Enviro Consult CC | 07/10/2019 - 13:12 |
9-2-069-0067-20000201-McD | Farm Lives a Study of Historical Archaeology in the Western Cape, South Africa | Archaeological Permit Report | 01/02/2000 | University of Cambridge - McDonald Institute for Archaeological Research | 16/06/2012 - 14:36 | ||
conditional assessment report | Conditional Assessment Report to the MLB Building | Visual Impact Assessment | 28/07/2022 | Nishara Sukhlal | 28/07/2022 - 11:50 | ||
Rooidam Diesel Depot | The Proposed Upgrading of an Existing Diesel Depot on Portion 1 of the Farm Rooidam 2354, Bloemfontein, Free State Province. | HIA Phase 1 | 23/05/2018 | Lloyd Rossouw | 18/06/2018 - 13:27 | ||
Nokophela Road HIA | Phase 1 Heritage Impact Assessment Report-Nokophela Road Upgrade Project, near Muden, KwaZulu-Natal Province | HIA Phase 1 | 19/11/2014 | Stephan Gaigher | G & A Heritage | GBS Environmental Consulting | 06/01/2015 - 13:32 |
Phase 1 HIA report prior to core drilling | Heritage Impact Assessment for proposed drilling site at Kareeboschbult 76 IP near Coligny, North west province | HIA Phase 1 | 01/03/2021 | David Morris | Archaeology department, McGreggor Museum | De Beers Consolidated Mines (Pty) Ltd | 23/03/2021 - 11:29 |
Springhaas Collector Substation B Heritage Impact Assessment | Springhaas Collector Substation B Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 10:22 |
Eshowe Gardens Multi-purpose Retail and Office Park | Heritage Scoping Report Proposed establishment of Eshowe Gardens Multi-Purpose Retail and Office Park Umlalazi LM, King Cetshwayo DM, KwaZulu-Natal | Heritage Scoping | 23/07/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | Stott, Milton & Conway | 21/08/2018 - 18:17 |
Palaeontological Report - Steynsrus Solar Energy Facility | Palaeontological report for the proposed Steynsrus Solar Energy Facility | Palaeontological Specialist Reports | 01/08/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 30/08/2013 - 10:22 |
Sun Valley Heritage Report | HIA Phase 1 | Anton Pelser | North West - Department of Economic Development, Environment, Conservation and Tourism | Fouries Poultry Farms (Pty) Ltd. | 05/11/2013 - 07:05 | ||
Proposed (8 Broiler houses) on portion 42 of the farm Zandfontein 386 JQ. | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED POULTRY FARM ( 8 BROILER HOUSES) ON PORTION 42 OF THE FARM ZANDFONTEIN 386 JQ NEAR MAGALIESBURG WITHIN RUSTENBURG LOCAL MUNICIPALITY OF THE BOJANALA DISTRICT, NORTH WESTPROVINCE, SOUTH AFFRICA | AIA Phase 1 | 07/11/2019 | Ndivhuho Eric Mathoho | North West Provincial Heritage Resources Authority | Tholoana Sustainable Development and Environmental Consultants | 30/01/2020 - 16:56 |
Heritage Impact Assessment for the Koster Substation | Heritage Impact Assessment for the Koster Substation | HIA Phase 1 | 01/01/2007 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 08:54 | |
Bhambayi Housing Project, eThekwini Municipality | Bhambayi Housing Project Phase 1 Extension (Juba Blose), eThekwini Municipality, KwaZulu-Natal | HIA Phase 1 | 26/05/2021 | Jean Beater | JLB Consulting | eThekwini Department of Human Settlements | 06/10/2021 - 16:21 |
Protection of rock art sites | REPORT ON THE PROTECTION OF ROCK ART SITES ON PORTION 5 OF DRIEKUIL 280 IP NORTH-‐WEST PROVINCE, SOUTH AFRICA | Conservation Management Plan | 02/02/2015 | Sino Rock | 16/03/2015 - 15:45 | ||
PIA - H2 Energy (02.10.17) | Palaeontological Impact Assessment for the H2 Energy Power Station, Mpumalanga Province | Palaeontological Specialist Reports | 02/10/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/10/2017 - 14:58 |
Proposed Crownwood Road Bridge Demolition | Phase 2 Cultural Heritage Documentation: THE PROPOSED DEMOLISHING OF THE OLD CROWNWOOD ROAD BRIDGE, LOCATED IN THETA, JOHANNESBURG SOUTH, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE Prepared for: Envirolution Consulting: Ms S Pillay • Address: Vista Place 1a & 2, No. 52 Cnr Vorster Avenue & Glen Avenue, Glenanda Tel. 0861 44 44 99; E-mail: serina@envirolution.co.za Prepared by: J A van Schalkwyk (D Litt et Phil), • Heritage Consultant: ASAPA Registration No.: 164 - Principal Investigator: Iron Age, Colonial Period, Industrial Heritage. • Postal Address: 62 Coetzer Avenue, Monument Park, 0181; Tel: 076 790 6777; E-mail: jvschalkwyk@mweb.co.za Report No: | HIA Phase 2 | 04/03/2020 | J.A. van Schalkwyk | 05/06/2020 - 13:09 | ||
Heritage Impact Assessment for the Proposed Sefanjeskraal Vodacom Mast, North West Province. | Heritage Impact Assessment for the Proposed Sefanjeskraal Vodacom Mast, North West Province. | HIA Phase 1 | 18/05/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 24/05/2021 - 09:43 |
Cultural Heritage Resources Impact Assessment for proposed development of Vryburg Shooting Range remaining extent of erf 506 as part of the stablishment of the township areas of Vryburg Extensions 25, 28 and 29. | Cultural Heritage Resources Impact Assessment for proposed development of Vryburg Shooting Range remaining extent of erf 506 as part of the stablishment of the township areas of Vryburg Extensions 25, 28 and 29. | HIA Phase 1 | 02/01/2011 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 08:54 |