FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
PIA 57A North BEach Road, Westbrook Palaeontological Impact Assessment for the proposed residential development on 57A North Beach Road, Westbrook, KwaZulu Natal Province PIA Desktop 09/06/2021 Marion Bamford 12/11/2021 - 12:15
Portion 23 of Kameel Zyn Kraal 547 JR Heritage Impact Assessment Report for The Proposed Pig Production Facility on Portion 23 Of Kameel Zyn Kraal 547 JR, Bapsfontein, Gauteng Province HIA Phase 1 30/07/2020 Alexander Antonites Indima Agri Group 30/07/2020 - 12:51
NHLAZATSHE 1 HIA ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FORMALIZATION OF NHLAZATSHE TOWNSHIP WITHIN THE CHIEF ALBERT LUTHULI LOCAL MUNICIPALITY OF MPUMALANGA PROVINCE. HIA Phase 1 19/09/2022 Richard Munyai Vhufa Hashu Heritage Consultancy CC 02/12/2022 - 11:02
Misgund Interchange INTERIM REPORT: ARCHAEOLOGICAL MITIGATION WORK, SITE PGS 01: N1 FREEWAY – MISGUND INTERCHANGE PROJECT, JOHANNESBURG, GAUTENG PROVINCE – SAHRA PERMIT 80/12/01/003/51 AIA Phase 2 21/05/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants 22/06/2012 - 15:31
ARCHAEOLOGICAL DESKTOP STUDY Archaeological Desktop Study for the Proposed Klei Minerale (Pty) Ltd Prospecting Right on Portions 16, 20 and 22 of the Farm Boekenhoutkloof 315 JR, Pretoria, Gauteng Archaeological Specialist Reports 21/07/2023 Tobias Coetzee Tobias Coetzee 18/09/2023 - 15:11
Phase 1 AIA: Ebika-Nqandu Road Upgrade PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF 35KM OF THE DR08344 AND DR08429 DISTRICT ROADS, BETWEEN EBIKA AND WILLOWVALE VIA NQADU IN THE MNQUMA LOCAL MUNICIPALITY AND MBHASHE LOCAL MUNICIPALITY, AMATOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 31/07/2021 Celeste Booth Booth Heritage Consulting Kimopax Pty Ltd 12/08/2021 - 12:14
HIA: Kiara PV 2 HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Kiara PV 2 Facility and Associated Infrastructure, North West Province HIA Phase 1 22/07/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 08/02/2023 - 11:16
PIA-Grootdrink Full Pallaeontological Heritage Impact Assessment Report on the Site of Proposed Solra Energy Generation Facilities (Grootdrink Solar Projects 1 and 2 ) to be located on the farm Albany 405 near Karos, Northern Cape Province PIA Desktop 10/02/2015 Barry Millsteed Savannah Environmental (Pty) Ltd 17/03/2015 - 16:54
Kimcrush PIA Revised with References_1 PALAEONTOLOGICAL ASSESSMENT (DESKTOP) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR A MINING RIGHT ON A PORTION OF PORTION 1 & PORTION OF PORTION 351 OF FARM VOORUITZIGT 81 KIMBERLEY DISTRICT, NORTHERN CAPE PROVINCE. PIA Desktop 31/07/2017 Joseph Chikumbirike Archaeological and Heritage Services Africa (Pty) Ltd Archaeological and Heritage Services Africa (Pty) Ltd 02/08/2017 - 10:05
ELANDSDRIFT OPENCAST A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SAMANCOR CHROME LTD (WESTERN CHROME MINES) ELANDSDRIFT SECTION OPENCAST PROJECT, NORTHWEST PROVINCE Heritage Impact Assessment Specialist Reports 05/09/2012 Anton van Vollenhoven Archaetnos CC Envass 15/10/2012 - 21:05
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA 21/11/2013 - 17:15
Jeanette heritage impact assessment HIA Phase 1 03/05/2016 - 08:40
NID: CCT desalination plant Harmony Park Cape Town NID & Annexures Desalination Plant Harmony Park Cape Town 23/10/2017 Bridget O'Donoghue City of Cape Town Metropolitan Municipality 23/10/2017 - 15:09
AIA OF SURFACE AREAS DEMARCATED FOR THE: PROPOSED CLUSER 2 LOKHUVALA & NOLUTHANDO WATER SUPPLY PROJECTS ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF SURFACE AREAS DEMARCATED FOR THE: PROPOSED CLUSER 2 LOKHUVALA & NOLUTHANDO WATER SUPPLY PROJECTS, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 30/11/2013 Neels Kruger AGES (PTY) Ltd - Pretoria AGES (PTY) Ltd - East London 20/02/2014 - 12:05
Rietvlei Heritage Assessment A REVISED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED RIETVLEI OPEN CAST COAL MINING OPERATION BETWEEN MIDDELBURG, BELFAST AND STOFBERG IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA HIA Phase 1 04/06/2014 Dr Julius CC Pistorious Archaeologist and heritage Consultant WSP Environmental Pty Ltd - Johannesburg 19/07/2016 - 14:10
Palaeontological Impact Assessment Erf 10 Delportshoop Palaeontological Impact Assessment for the proposed Mining Rights, west of Delportshoop on the Vaal River bank, Northern Cape Province PIA Desktop 09/02/2019 Marion Bamford Prof Marion Bamford Prof Marion Bamford 11/02/2019 - 14:13
Silverstone Diamond Mine and Investment (Pty) Ltd_NW 11006 MP BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON A PORTION OF PORTION 3 OF THE FARM KAREEFONTEIN 340, IN THE MAGISTERIAL DISTRICT OF BLOEMHOF, NORTH WEST 04/02/2022 - 12:30
AIA_Onbekend_54_IT_Hutten_L_Feb11 Heritage Impact Assessment for the farm Onbekend 54 IT Portion 9, 12 and RE, Mpumalanga AIA Phase 1 01/02/2011 Louisa Hutten, Marko Hutten 16/06/2012 - 14:48
Heritage Impact Assessment for Diamond Dump Recoveries PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING AND APPLICATION FOR MINING RIGHT ON A PORTION OF THE REMAINING EXTENT OF THE FARM KRANSFONTEIN 19 & PORTION 2 (DE RUST) OF THE FAR KRANSFONTEIN 19,PRIESKA DISTRICT, NORTHERN CAPE PROVINCE HIA Phase 1 10/06/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd 10/05/2019 - 15:05
Bronkhorstspruit Biogas Plant Abbreviated 1st phase1 heritage assessment of proposed alterations to the Bronkhorstspruit Biogas Plant on a portion of the farm Boskop 543 JR, Gauteng. HIA Phase 1 30/09/2020 Sidney Miller Shangoni Management Services 05/10/2020 - 09:12
D6 Site Levelling Permit Application Archaeological Permit Application for Site Levelling: submitted in support of a permit application in terms of Section 35 of the NHRA (1999) for Site Levelling on Several parcels And Various Erven ahead of Redevelopment, District Six, Cape Town Archaeological Permit Report 25/03/2022 Katie Smuts Rennie Scurr Adendorff Delta Built Environment Consultants (Pty) Ltd 13/04/2022 - 11:49
AIA_Riverbank_Wind_Energy_Facility_Binneman_J_Oct10 A Phase 1 Archaeological Impact Assessment (AIA) for the proposed Riverbank Wind Energy Facility between Hamburg and Wesley, Amathole District Municipality, Eastern Cape Province AIA Phase 1 16/10/2010 Johan Binneman, Celeste Booth, Natasha Higgitt Albany Museum 16/06/2012 - 14:49
Weltevreden 386JS Phase 1 Archaeological/Heritage Impact Assessment for proposed residential township: extention 7 of portion 5 (a portion of portion 2) of the farm Weltevreden 386 JS, Belfast AIA Phase 1 01/02/2012 Christine Van Wyk Rowe Adansonia Heritage Consultants Wandima Environmental Services cc 17/10/2012 - 14:51
Phase 1 HIA Report D432 Road Re-alignment Phase 1 HIA report for the D432 Northern Bypass Road Re-alignment project location on Portion 4 and 39 of the Farm Hartebeestlaagte 325JS close to Phola, Province of Mpumalanga HIA Phase 1 20/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING South32 SA Coal Holdings (Pty) Limited 25/11/2020 - 13:06
invest in Property Heritage Impact Assessment Phase I PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd 12/04/2023 - 20:54
Old Tea Room - Historical background Heritage Statement 11/06/2015 Frederik Saaiman Vermeulen Table Mountain Aerial Cableway Company Ltd 11/06/2015 - 17:01
Basic Heritage Impact Assessment A BASIC HERITAGE IMPACT ASSESSMENT REPORT FOR THE LAKEVIEW FLOODLINE CONFINEMENT AND WATER USE LICENCE APPLICATION, CONSTANTIA KLOOF, ROODEPOORT HIA Phase 1 31/01/2013 Anton Pelser A Pelser Archaeological Consulting 05/02/2013 - 12:15
NR 2 and NR 5 Reservoirs at Jimmy Jones 205 LS, Mavi-Hambe Village and at the Malai-Mulele Municipal Depot NR 2 and NR 5 Reservoirs at Jimmy Jones 205 LS, Mavi-Hambe Village and at the Malai-Mulele Municipal Depot AIA Phase 1 16/06/2012 Johnny Van Schalkwyk National Cultural History Museum 16/06/2012 - 14:33
ERF 212 EDGLEYW DESKTOP HIA FOR THE PROPOSED SUBDIVISION OF ERF 212 EDGLEY, KZN Heritage Impact Assessment Specialist Reports 19/05/2023 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Private 25/05/2023 - 09:18
Leslie 2 - Heritage Impact Assessment Leslie 2 - Heritage Impact Assessment HIA Phase 1 Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Shangoni Management Services 03/02/2017 - 14:46
SANRAL R61 Mudstone Borrow Pit, Engcobo, Eastern Cape Heritage Impact Assessment for the Proposed SANRAL R61 Section 6 Borrow Pit in the Engcobo Local Municipality, Chris Hani District Municipality of the Eastern Cape Province. AIA Phase 1 23/10/2017 EOH Coastal and Environmental Services 10/01/2018 - 13:16
Georgedale HIA Phase One Heritage Impact Assessment of the proposed Georgedale and Surrounds Bulk Sewer Infrastructure, eThekwini Metro Municipality HIA Phase 1 15/12/2013 Frans Prins Active Heritage CC Jeffares & Green - Pietermaritzburg 14/04/2014 - 08:35
HIA Final Kudu Oranjemund HIA Final Kudu Oranjemund HIA Phase 1 19/08/2016 Anton van Vollenhoven 14/09/2016 - 13:39
Phase 1 Cultural Heritage Impact Assessment: Mimosa 61 Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT OF DIAMOND ALLUVIAL AND DIAMOND GENERAL ON THE REMAINING EXTENT OF PORTION 23 OF THE FARM MIMOSA, NEAR SCHWEIZER-RENEKE, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 03/04/2018 Johnny van Schalkwyk 09/04/2018 - 12:37
Wolmaransstad X20 HIA Phase 1 HIA Report for the proposed Wolmaransstad Extension 20 (Unit U) township development on a portion of the Remaining Extent of Portion 2 of the farm Wolmaransstad Town and Townlands 184 HO, Wolmaransstad, North West Province HIA Phase 1 01/07/2018 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 13/05/2019 - 16:54
Roodepoort Kebrafield Palaeontological Impact Assessment Roodepoort Kebrafield Palaeontological Impact Assessment Palaeontological Specialist Reports 13/03/2014 Barry Millsteed South African Heritage Resources Agency Eco Elementum (Pty) Ltd 30/06/2014 - 14:46
Umqeku river bridge HIA desktop DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: HIA Letter of Exemption 22/09/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Jeffares & Green - Pietermaritzburg 27/10/2016 - 15:09
Haarlem shipwreck. Final report on test excavations. Haarlem shipwreck. Final report on 2017 - 2018 test excavations. Archaeological Permit Report 01/08/2019 Bruno Werz African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) 31/07/2019 - 16:10
DPD PV1 & 2 grid connection palaeo Palaeontological Impact Assessment for the proposed Du Plessis Dam Solar PV1 and Du Plessis Dam Solar PV2 Grid Connections, De Aar, Northern Cape Province PIA Phase 1 15/05/2022 Marion Bamford Prof Marion Bamford ASHA Consulting(Pty) Ltd 17/06/2022 - 00:17
Motivational Report for EA Amendment BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT Heritage Statement 05/08/2020 John Gribble ACO Associates CC Landscape Dynamics Environmental Consultants 22/02/2021 - 16:20
ESKOM CUPRUM BESS: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE AIA Phase 1 01/06/2021 Trust Mlilo Sativa Travel and Environmental Consultants AECOM SA - Head Office 10/08/2022 - 10:14
Empire-Perth Storm water Conduits HIA Report Cultural heritage impact assessment for THE PROPOSED INSTALLATION OF EMPIRE-PERTH CORRIDOR CONDUITS AND OUTFALLS STORM WATER MANAGEMENT SYSTEMS, CITY OF JOHANNESBURG DISTRICT MUNICIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 30/07/2016 J.A. van Schalkwyk Envirolution Consulting (Pty) Ltd 03/02/2017 - 14:57
HIA_Ptn 29 of Farm Goedehoop 308 Cultural Heritage Resources Impact Assessment for Portion 29 of the Farm Goedehoop 308 IR, Govan Mbeki Local Municipality, Mpumalanga HIA Phase 1 07/09/2011 Udo Kusel African Heritage Consultants CC Thallos Environmental Consulting 25/04/2013 - 12:12
Phase 1 HIA report for the proposed Klerksoord filling station Phase 1 HIA Klerksoord Filling Station HIA Phase 1 22/01/2021 Anton Pelser Bokamoso Landscape Architects and Environmental Consultants CC Bokamoso Landscape Architects and Environmental Consultants CC 06/04/2021 - 13:41
PDA Report Onderstepoort Solar 2 PV PALAEONTOLOGICAL IMPACT ASSESSMENT - PROPOSED 240MW ONDERSTEPOORT SOLAR 2 PHOTOVOLTAIC PROJECT NORTH WEST OF RUSTENBURG, NORTH WEST PROVINCE PIA Desktop 13/06/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 03/07/2023 - 12:01
Heritage Scoping Assessment Scoping Report: Proposed Construction of RE Capital 10 PV Development on Remaining Extent of the Farm Kapstewel 436, Postmasburg, Northern Cape. AIA Desktop 24/07/2014 Lita Webley ACO Associates CC Perception Heritage Planning 27/08/2014 - 09:03
HL Hall Graves Mitigation Report REPORT ON THE RELOCATION OF GRAVES HALL GRAVE RELOCATION PROJECT PLOT 13 OF THE OLD BOSCH STREET CEMETERY NELSPRUIT, MPUMALANGA BGG Phase 3 14/09/2015 Henk Steyn, Marko Hutten, Lineree de Jager PGS Heritage and Grave Relocation Consultants HL Hall & Sons (Pty) Ltd 15/09/2015 - 08:57
Egazini Memorial Garden Site Inspection Report: Egazini Memorial Site Inspection Report 13/03/2017 30/03/2017 - 11:30
PDA King William’s Town bulk regional sewage scheme Palaeontological Desktop Assessment for f the proposed upgrading of the King William’s Town bulk regional sewage scheme by the Buffalo City Municipality in the Eastern Cape. PIA Desktop 08/06/2013 Gideon Groenewald PGS Heritage and Grave Relocation Consultants GIBB Engineering & Science - East London 02/07/2013 - 21:28
ASR-IlangaSites Archeological Scoping Report for the Additional CSP Facilities Associated with the Authorized CSP Sites (1.3, 1.4, 3, 4 & 5) within the Karoshoek Solar Valley Development near Upington, ZK Mgcawu Distrcitu, NC Province Heritage Scoping 13/11/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 18/11/2015 - 10:47