THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16351 - 16400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA Southern Cross PV | Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Southern Cross Solar Energy Facility Located West of Upington on the Farm Southern Cross Farms 425, Northern Cape Province | HIA Phase 1 | 07/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 14/06/2012 - 10:06 |
Heritage Impact Assessment for the proposed Manganese Sulphate (MnSO4) Plant at African Rainbow Minerals: Machadodorp Works (ARMMDW), Mpumalanga | Heritage Impact Assessment for the proposed Manganese Sulphate (MnSO4) Plant at African Rainbow Minerals: Machadodorp Works (ARMMDW), Mpumalanga | HIA Phase 1 | 11/07/2023 | Jaco van der Walt | Beyond Heritage | Envirogistics (Pty) Ltd | 26/07/2023 - 10:26 |
DWE_PBA1076_HerStat | HERITAGE STATEMENT FOR ESKOM TRANSMISSION DIVISION - ROODEPOORT STRENGTHENING PROJECT IN SUPPORT OF THE BASIC ASSESSMENT REPORT (BAR) | Heritage Statement | 31/08/2012 | Shahzaadee Karodia Khan, Natasha Higgitt, Justin du Piesanie | Digby Wells Environmental | Fourth Element Consulting (Pty) Ltd | 15/11/2012 - 11:00 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Rehabilitation of the wetland, Loskop Dam Natre Reserve, Farm Hondekraal 234, Mpumalanga Province | PIA Desktop | 27/11/2017 | Marion Bamford | Prof Marion Bamford | 12/07/2018 - 11:26 | |
HIA Final Kudu Oranjemund | HIA Final Kudu Oranjemund | HIA Phase 1 | 19/08/2016 | Anton van Vollenhoven | 14/09/2016 - 13:39 | ||
13_App C5 Palaeontological Screening Report | Palaeontological Heritage Screening Input: Proposed Khauta Solar PV Cluster Near Welkom, Free State Province | PIA Desktop | 01/07/2021 | John E. Almond | Natura Viva CC | Enviroworks | 18/08/2022 - 23:54 |
Phase 1 AIA for the Umlabu Colliery plant relocation | Phase 1 AIA for the proposed relocation of the Umlabu Colliery processing plant between Ermelo and Breyten, Mpumalanga | AIA Phase 1 | 15/02/2013 | Tobias Coetzee | Envass | South African Coal Mine Holdings (Pty) Ltd | 20/02/2013 - 15:14 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:09 |
Alldays REM 4 HIA Report | Phase 1 Heritage Impact Assessment of the Proposed Development of a Township on the Remaining Extent of Portion 4 of Alldays 295 MS within Blouberg Local Municipality of Capricorn District. | HIA Phase 1 | 17/01/2020 | Frans Roodt | Phaki Phakanani | 17/01/2020 - 12:06 | |
Revised Heritage Report:PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage, Archaeology and Palaeontology Impact Assessment Report: PROPOSED GRID CONNECTION AND SWITCHING STATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 02/12/2021 | John Gribble | ACO Associates CC | Arcus Consulting | 22/04/2021 - 10:36 |
HIA: Ummbila Emoyeni WEF | Heritage Impact Assessment in terms of section 38(3) of the NHRA for the proposed development of the Ummblia Emoyeni Wind Energy Facility, Mpumalanga | HIA Phase 1 | 23/09/2022 | Jenna Lavin, Heidi Fivaz, Gideon Groenewald | CTS Heritage | Savannah Environmental (Pty) Ltd | 13/10/2022 - 09:23 |
HIA for Blue-Green aquaculture. | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BLUE-GREEN AQUACULTURE PTY LTD FARMING DEVELOPMENT, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | CSIR | 14/05/2020 - 21:37 | |
Upgrade of R101 Section 8 - HIA Report | Heritage Impact Assessment for the Proposed Upgrade of SANRAL National Road R101 Section 8 from Bela Bela (km 0.0) to Modimolle (km 26.8) & Palaeontological Impact Assessment for the Proposed Upgrade of SANRAL National Road R101 Section 8 from Bela Bela (km 0.0) to Modimolle (km 26.8) | HIA Phase 1 | 21/05/2021 | Jaco van der Walt, Marion Bamford | SAHRA Council | HCAC Heritage Consultants | 18/06/2021 - 17:18 |
Harmony Estate - exemption | RECOMMENDED EXEMPTION FROM AN ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 4995, 4997, 5007, & 5009, HARMONY ESTATE, SPRINGBOK (NAMA KHOI MUNICIPALITY), NORTHERN CAPE PROVINCE | HIA Letter of Exemption | 27/06/2014 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviro Logic | 24/07/2014 - 15:52 |
AIA for Prospecting Right Application on Ptn 11 and 22 of the Farm Koesterfontein 45 IQ | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR PROPOSED PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON PORTION 11 AND 22 OF THE FARM KOESTERFONTEIN 45 IQ IN THE MOGALE CITY LOCAL MUNICIPALITY OF GAUTENG PROVINCE | AIA Phase 1 | 18/08/2018 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Joan Construction and Projects (Pty) Ltd | 22/02/2019 - 11:53 |
CAROLUSPOORT 146, DE AAR | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PV SOLAR ENERGY FACILITIES ON THE FARM CAROLUSPOORT 146, DE AAR IN THE NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 14/10/2014 | Cobus Dreyer | Eco-compliance | Eco-compliance | 27/10/2014 - 21:29 |
Bloemspruit development | Lloyd Rossouw | 14/09/2015 - 12:33 | |||||
Botshabelo Mission Station | Site Inspection Report- Botshabelo Mission Station | Site Inspection Report | 18/05/2016 | 30/03/2017 - 10:25 | |||
PROPOSED MPUPHUSI RIVER SAND WINNING PROJECT, NONGOMA LOCAL MUNICIPALITY, ZULULAND DISTRICT, KWAZULU-NATAL | PROPOSED MPUPHUSI RIVER SAND WINNING PROJECT, NONGOMA LOCAL MUNICIPALITY, ZULULAND DISTRICT, KWAZULU-NATAL | HIA Phase 1 | 31/07/2018 | Jean Beater | JLB Consulting | Enviroedge | 01/08/2018 - 15:00 |
Heritage-SolInvictus | Heritge Scoping Study for Sol Invictus Solar PV Development on ou Taaibosmond 66/5, Namakwaland Magisterial Disctrict, Northern Cape Province | Heritage Scoping | 13/11/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/11/2015 - 10:09 |
PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project | PHASE 1 HERITAGE SCOPING ASSESSMENT REPORT Jindal Melmoth Iron Ore Project Proposed South Block Mining Rights Area King Cetshwayo District Municipality, Mthonjaneni Local Municipality, KwaZulu-Natal | Heritage Scoping | 24/08/2023 | Len van Schalkwyk | eThembeni Cultural Heritage | SLR Consulting (South Africa) (Pty) Ltd | 21/09/2023 - 15:35 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng | AIA Phase 1 | 10/11/2021 | Tobias Coetzee | 10/11/2021 - 09:57 | ||
Upgrading of the DR2629, Middelburg Area | UTILIZATION OF 17 QUARRIES FOR UPGRADING OF THE DR2629, ROAD NR 654 AND THE DR2631, MIDDELBURG AREA, EASTERN CAPE | AIA Phase 1 | 06/10/2008 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | KV3 Engineers: Environmental & Waste Management Division | 13/05/2013 - 15:47 |
Vinci - Palaeontological Report | Palaeontological Desktop Assessment for the proposed Vinci Prospecting Right application on the Remainder of the farm Vinci 580, ZF Mgcawu District Municipality in the Northern Cape Province | PIA Desktop | 24/01/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 26/01/2022 - 09:16 | |
Malamulele Heritage Impact Assessment | PHASE 1 HIA REPORT FOR THE PROPOSED TOWNSHIP DEVELOPMENT AND FORMALISATION OF MALAMULELE EXTENTION E AT MALAMULELE, WITHIN THE COLLINS CHABANE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 25/11/2022 | Alexander Pelser | 25/11/2022 - 08:28 | ||
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE | 04/06/2021 | 06/08/2021 - 12:53 | ||||
HIA1 Proposed Chicken Broiler Development Thaba Nchu | Phase 1 Heritage Impact Assessment for proposed new chicken broiler development on Farm Fransina 2060 near Thaba Nchu, Free State Province. | HIA Phase 1 | 01/11/2022 | Lloyd Rossouw | 06/02/2023 - 09:43 | ||
PROPOSED REHABILITATION OF DRAINAGE LINE ON MUNICIPAL PROPERTY NEXT TO 16 BRUCE CLOSE, BRYANSTON, GAUTENG | PROPOSED REHABILITATION OF DRAINAGE LINE ON MUNICIPAL PROPERTY NEXT TO 16 BRUCE CLOSE, BRYANSTON, GAUTENG | AIA Phase 1 | 01/02/2019 | Liesl Stegmann | 06/06/2019 - 11:07 | ||
Ngululu Heritage and Paleontological reports | Heritage and paleontological specialist reports for the proposed Ngululu coal mine, Delmas, Mpumalanga | Archaeological Specialist Reports | Dr. Heidi Fourie | Dr Heidi Fourie | Dr Heidi Fourie | 06/02/2015 - 12:31 | |
HIA Kriel | PROPOSED EXPANSION OF THE EXISTING KRIEL ASH DAM FACILITY, KRIEL POWER STATION, KRIEL (GA-NALA), EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 07/12/2016 | Polke Birkholtz | Professional Grave Solutions (Pty) Limited | Aurecon - Cape Town | 09/05/2017 - 13:39 |
Palaeontology Letter - Rheboksfontein PL | Palaeontology Letter - Proposed Construction of a 132 kV Power Line from the Rheboksfontein Wind Energy Facility to the Aurora Substation, Western Cape Province | Palaeontological Specialist Reports | 16/11/2015 | Graham Avery | ACO Associates CC | Savannah Environmental (Pty) Ltd | 11/02/2016 - 16:56 |
HIA Proposed Lanseria Outfall Sewer Pipeline, Johannesburg, Gauteng | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LANSERIA OUTFALL SEWER, JOHANNESBURG | HIA Phase 1 | 17/05/2017 | Jessica Angel | PGS Heritage and Grave Relocation Consultants | Nemai Consulting | 21/07/2017 - 12:19 |
PIA - Tiger Kloof | Proposed Tiger Skloof Photovoltaic Solar Energy Facility near Vryburg, Naledi Local Municipality, North-West Province | Palaeontological Specialist Reports | 30/11/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 18/02/2014 - 12:48 |
JAW2291_Heritage_Statement_Dragline_Relocation | HERITAGE STATEMENT FOR ATCOM AND TWEEFONTEIN DRAGLINE RELOCATION PROJECT | Heritage Statement | 17/07/2013 | Natasha Higgitt | Digby Wells Environmental | Jones & Wagener Engineering and Environmental Consultants | 19/07/2013 - 13:37 |
Phase 1 HIA for changes to Bakubung Platinum Mine | PROPOSED CHANGES TO INFRASTRUCTURE AT BAKUBUNG PLATINUM MINE, LEDIG, BOJANALA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE Remaining Extent and Portions 1, 3, 4 and 11 of the farm Frischgewaagd 96 JQ and the Remainder of the farm Mimosa 81 JQ | HIA Phase 1 | 31/03/2016 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Wesizwe Platinum Limited | 01/04/2016 - 22:15 |
PROPOSED EXTENSION OF THE EXISTING GEORGE GRAVEL MINE, GEORGE | HERITAGE IMPACT ASSESSMENT PROPOSED EXTENSION OF THE EXISTING GEORGE GRAVEL MINE, GEORGE | HIA Phase 1 | 01/06/2018 | Jenna Lavin, Katie Smuts | CTS Heritage | PHS Consulting | 25/09/2020 - 11:01 |
Cultural Heritage Scoping Assessment: | Cultural Heritage Scoping Assessment: THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) NEAR WARRENTON ON PORTION 17 AND THE REMINING EXTENT OF THE FARM SLYPKLIP NORTH 32, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | Heritage Scoping | 01/12/2021 | Johnny van Schalkwyk | 06/04/2022 - 08:54 | ||
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 19/09/2013 - 17:55 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT AREA AND MINING PERMIT AREA NEAR RITCHIE ON THE REMAINING EXTENT OF PORTION 3 (ANNA’S HOOP) OF THE FARM ZANDHEUVEL 144, REGISTRATION DIVISION: KIMBERLEY, NORTHERN CAPE PROVINCE | PIA Desktop | Elize Butler | 19/11/2020 - 16:15 | |||
PIA | 03/04/2023 - 13:06 | ||||||
PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED COAL-LINK | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED COAL-LINK, NZALO (MQABE) NEAR VRYHEID, KZN. | HIA Phase 1 | 21/02/2015 | Frans Prins | Active Heritage CC | Sivest - Gauteng | 16/04/2015 - 15:30 |
Heritage Report for SASA 4c-6c | Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa | Heritage Impact Assessment Specialist Reports | 12/12/2017 | Vanessa Maitland | De Beers Marine (Pty) Ltd | 21/12/2017 - 15:00 | |
Beynespoort Memorial Park | PROPOSED CEMETERY DEVELOPMENT ON PORTION 45 OF THE FARM BEYNESPOORT 335 JR, GAUTENG PROVINCE | HIA Phase 1 | 01/05/2017 | Leonie Marais-Botes | 26/09/2017 - 10:11 | ||
Information & Progress Report to SAHRA for the Union Building Canteen & Kitchen | Information & Progress Report to SAHRA for the Union Buildings Canteen & Kitchen Portions of the Farm Elandspoort 357- JR | Heritage Study | 29/05/2023 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | National Department of Public Works | 02/06/2023 - 14:57 |
PIA Blue Wind | Palaeontological Impact Assessment (Desktop Study) Proposed Wind Energy Facility on Three Project Areas on the Namaqualand Coast, Northern Cape, Including Project Blue Wind Energy Facility, North of Kleinsee | PIA Desktop | 22/09/2011 | John Pether | Geological and Palaeontological Consultant | Savannah Environmental (Pty) Ltd | 22/06/2012 - 11:31 |
Kalkaar 132kV Power Line Heritage Impact Assessment | PROPOSED POWER LINES AND ASSOCAITED INFRASTRUCTURE FOR THE PROPOSED KALKAAR SOLAR THERMAL POWER PROJECT NEAR KIMBERLEY, FREE STATE PROVINCE - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/05/2016 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | PGS Heritage and Grave Relocation Consultants | 15/06/2016 - 14:53 |
Lorraine Heritage Study | Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on the farm Lorraine 100 near Douglas, Northern Cape Province. | HIA Phase 1 | 13/11/2017 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 04/12/2017 - 16:04 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed 1 Edward Place Residential Units, Ballito, KwaZulu Natal Province. | PIA Desktop | 19/03/2022 | Marion Bamford | 10/06/2022 - 15:16 | ||
NR 2 and NR 5 Reservoirs at Jimmy Jones 205 LS, Mavi-Hambe Village and at the Malai-Mulele Municipal Depot | NR 2 and NR 5 Reservoirs at Jimmy Jones 205 LS, Mavi-Hambe Village and at the Malai-Mulele Municipal Depot | AIA Phase 1 | 16/06/2012 | Johnny Van Schalkwyk | National Cultural History Museum | 16/06/2012 - 14:33 | |
HIA-BOK | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON PORTION 74 OF THE FARM BOKFONTEIN 448 JQ, MADIBENG LOCAL MUNICIPALITY, NORTH-WEST PROVINCE | HIA Phase 1 | 11/07/2023 - 16:14 |