FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA Southern Cross PV Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Southern Cross Solar Energy Facility Located West of Upington on the Farm Southern Cross Farms 425, Northern Cape Province HIA Phase 1 07/05/2012 Stephan Gaigher G & A Heritage Savannah Environmental (Pty) Ltd 14/06/2012 - 10:06
PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROPOSED NORTH WEST UNIVERSITY DEVELOPMENT PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROPOSED NORTH WEST UNIVERSITY DEVELOPMENT IN POTCHEFSTROOM, NORTH WEST PROVINCE PIA Desktop 05/06/2023 Elize Butler BANZAI ENVIRONMENTAL (PTY) LTD. 05/07/2023 - 16:52
Integrated Heritage Impact Assessment for Construction of combined Dyasonsklip and Sirius Grid Connections PROPOSED CONSTRUCTION OF COMBINED DYASONSKLIP AND SIRIUS GRID CONNECTIONS ON PORTIONS OF THE FARM DYASON’S KLIP 454/ REMAINDER, FARM 638/ REMAINDER AND AGRICULTURAL HOLDING 1080, SIYANDA DISTRICT, KHAI GARIB LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 2 18/09/2015 Stefan de Kock Perception Heritage Planning 21/09/2015 - 20:56
Heritage impact Assessment PV 2 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 Heritage Impact Assessment Specialist Reports 31/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 03/04/2017 - 17:36
Mbhono Road HIA Phase 1 Heritage Impact Assessment Report for Mbhono Road Upgrade Project, near Tugela Ferry, Kwa Zulu-Natal Province HIA Phase 1 25/09/2015 Stephan Gaigher G & A Heritage Msinga Local Municipality 25/11/2015 - 10:07
Maritime Heritage in concession areas 12(c), 14(c), 15(c), 16(c), 17(c), 18(c) and 20(c) Desktop Study for De Beers Marine assessing the significance of Maritime Heritage in concession areas 12(c), 14(c), 15(c), 16(c), 17(c), 18(c) and 20(c) AIA Desktop Iziko Museums of South Africa: Archaeology De Beers Marine (Pty) Ltd 31/10/2016 - 15:50
PIA Portion of Erf 1075 Olyvenhoutsdrift Settlement Kenhardt N Cape Palaeontological Impact Assessment for the proposed sand mining operation farm Olywenhoutsdrift, north east of Louisvale, !Kai Garib Municipality, Northern Cape Province PIA Desktop 25/02/2018 Marion Bamford University of the Witwatersrand - Wits School of Arts University of the Witwatersrand - Wits School of Arts 01/06/2018 - 17:50
Exemption of a Heritage Impact Assessment (HIA) Letter of Recommendation for Exemption of a Heritage Impact Assessment (HIA) for the proposed refurbishment to be undertaken at the existing Bushkoppie Wastewater Treatment Works HIA Letter of Exemption 12/08/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting 07/11/2019 - 10:03
AIA_Loeriesfontein_Orlight_Power_Line_Webley_LE_May12 HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE AIA Phase 1 01/05/2012 Lita Webley, Dave Halkett ACO Associates CC 16/06/2012 - 14:47
Heritage Impact Assessment for the Proposed Bokoni Klipfontein Project Heritage Impact Assessment for the Proposed Bokoni Klipfontein Opencast Mine Project, Klipfontein 465 KS, Sekhukhune, Limpopo Province HIA Phase 1 19/06/2013 Shahzaadee Karodia Khan Digby Wells Environmental Bokoni Platinum Mine (Pty) Ltd 20/06/2013 - 15:19
Integrated Heritage Impact Assessment - Waterberg JV Heritage Impact Assessment Specialist Reports 28/02/2020 Prof. Anton van Vollenhoven, Gert Pretorius, Marietjie Eksteen, Lizinda Dickson Archaetnos Culture & Cultural Resource Consultants Bateleur Environmental & Monitoring Services (Pty) Ltd 28/02/2020 - 15:37
Phase 1 Heritage Impact Assessment for Green Valley Phase 1 Heritage Impact Assessment for Green Valley Part of Portion 477 and Portion 484 of the farm Driefontein 85 IR, Ekurhuleni Metropolitan Municipality HIA Phase 1 17/09/2020 Udo Kusel, Siegwalt Udo Kusel African Heritage Consultants CC LEAP -Landscape Architectural and Environmental Planning 15/04/2021 - 17:34
Salvokop Bulk Water Supply Pipeline Phase 1 Heritage Impact Assessment THE PROPOSED CONSTRUCTION OF BULK WATER SUPPLY PIPELINE FOR SALVOKOP EXTENSION 5, CITY OF TSHWANE, GAUTENG PROVINCE AIA Phase 1 31/10/2022 Johnny van Schalkwyk SPOOR Environmental Services (PTY) Ltd. 10/10/2022 - 10:14
Phase 1 A and HIA for BP 3, Zoovoorby 458, Soverby FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE BORROW PITS FOR THE REPAIR & UPGRADE OF THE IRRIGATION INFRASTRUCTURE AT SOVERBY & CURRIESCAMP NEAR KEIMOES, NORTHERN CAPE PROVINCE AIA Phase 1 05/09/2013 Cobus Dreyer NSVT Consultants NSVT Consultants 05/09/2014 - 12:33
Heritage and Paleontological report_Gloria Prospecting activities on the farm Gloria 266, near Hotazel in the Northern Cape Province Heritage Impact Assessment Archaeological Specialist Reports 14/05/2013 Wouter Fourie PGS Heritage and Grave Relocation Consultants 26/08/2013 - 10:09
AIA_Ngcobo_Cluster_6_Gqaga_Villages_Van_Ryneveld_K_Jan11 GQAGA VILLAGES WATER RETICULATION SUPPLY SCHEME- BULK WATER SUPPLY BACKLOG: NGCOBO CLUSTER 6, EASTERN CAPE, SOUTH AFRICA AIA Phase 1 14/01/2011 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy 16/06/2012 - 14:48
REPAIR OR REPLACEMENT OF BRIDGES AND CULVERT STRUCTURES ON TRUNK ROADS 3305, 3501, 5801, DIVISIONAL ROAD 2307 AND MAIN ROAD 584 Palaeontological Impact Assessment: Phase 1: Field Study Repair or Replacement of Bridges and Culvert Structures on Trunk Roads 3305, 3501, 5801, Divisional Road D2307, and Main Road 584 PIA Phase 1 10/05/2021 Dr. Heidi Fourie Western Cape - Department of Environmental Affairs and Development Planning Chameleon Environmental 12/06/2021 - 11:33
Heritage Impact Assessment for Belfast Silica Mine, Belfast, Mpumalanga A Report on a Cultural Heritage Impact Assessment for the Proposed Extension of the Mining Area at the Belfast Silica Mine, Close to Belfast, Mpumalanga Province. HIA Phase 1 17/11/2014 Anton van Vollenhoven Archaetnos CC Clean Stream Environmental Services 08/12/2014 - 17:14
Mandlazini Road upgrade HERITAGE SURVEY OF THE PROPOSED MANDLAZINI ROAD UPGRADE, RICHARDS BAY, KWAZULU-NATAL HIA Phase 1 08/04/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exigent Engineering Consultants 16/05/2017 - 09:35
HERITAGE IMPACT ASSESSMENT OF MPUMALANGA TOWN CENTRE PRECINCT PLANNING PROJECT, HERITAGE IMPACT ASSESSMENT OF MPUMALANGA TOWN CENTRE PRECINCT PLANNING PROJECT, Heritage Impact Assessment Specialist Reports eThembeni Cultural Heritage 26/07/2018 - 10:52
Exxaro_Belfast_BGGC_report Exxaro Relocation Project Burial Grounds and Graves Project BGG Phase 1 11/11/2015 Johan Nel Digby Wells Environmental Exxaro Resources 15/04/2016 - 12:14
Heritage Screener: Van Wyks Vlei Borrow Pit Desktop Heritage Screening Assessment for the Proposed development of a sand mine borrow pit outside of Van Wyks Vlei, Northern Cape Heritage Scoping 11/10/2018 Jenna Lavin, John Almond CTS Heritage Guillaume Nel Environmental Consultancy 18/10/2018 - 08:29
HIA FOR TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, NEAR KRIEL, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 03/11/2020 Makhosazana Mngomezulu Barzani Mining (Pty) Ltd Barzani Mining (Pty) Ltd 02/11/2021 - 22:33
PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA OF THE EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG - APAC020/48 HIA Phase 1 01/07/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Vulcano Engineering & Environmental Consulting 23/07/2020 - 10:22
PIA: Becrux PV 1 and 3 Palaeontological Impact Assessment for the two proposed PV facilities south of Secunda, Mpumalanga Province PIA Phase 1 27/10/2021 Marion Bamford Savannah Environmental (Pty) Ltd 21/01/2022 - 10:46
Dominion 2 PV HIA Heritage Impact Assessment for the proposed Dominion 2 Solar Park On the remaining extent of Portion 8 of the farm Wolwerand 425 IR, City of Matlosana, North West Province HIA Phase 1 26/10/2022 Wouter Fourie PGS Heritage (Pty) Ltd Terramanzi Group (Pty) Ltd 23/11/2022 - 17:07
Palaeo Statement - EMPR AMENDMENT APPLICATION FOR THE AUTHORISED VIRGINIA 1 SOLAR PV PARK DFFE PALAEONTOLOGICAL VERIFICATION STATEMENT - EMPR AMENDMENT APPLICATION FOR THE AUTHORISED VIRGINIA 1 SOLAR PV PARK DFFE REF: 14/12/16/3/3/2/2099 PIA Desktop 19/05/2023 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 12/09/2023 - 16:32
Klipsruit Water Pipe Bridge HIA Klipsruit Water Pipe Bridge Basic Heritage Report Heritage Impact Assessment Specialist Reports 30/08/2013 31/10/2013 - 11:07
Erf 1820 LoE DESKTOP HERITAGE SURVEY OF THE PROPOSED REZONING AND SUBDIVISION OF ERF 1820 (MTHATHA) TO ACCOMMODATE A RESIDENTIAL/BUSINESS DEVELOPMENT IN MTHATHA, EASTERN CAPE HIA Letter of Exemption 22/09/2020 Gavin Anderson, Alan Smith Umlando: Archaeological Surveys & Heritage Management Indwe Environmental Consulting 23/09/2020 - 11:27
HIA Report for Proposed Filling Station 05/08/2021 - 12:25
Springhaas to Artemis Line 2 HIA HERITAGE IMPACT ASSESSMENT: PROPOSED POWERLINE FROM THE SPRINGHAAS COLLECTOR SUBSTATION B TO THE AUTHORISED ARTEMIS SUBSTATION NEAR DEALESVILLE, FREE STATE Heritage Impact Assessment: Proposed powerline from the Springhaas Collector Substation B to the authorised Artemis substation near Dealesville, Free State HIA Phase 2 20/12/2022 Jayson Orton ASHA Consulting(Pty) Ltd GIBB Environmental (Pty) Ltd 31/01/2023 - 10:52
HIA: Granite Prospecting near Pofadder HERITAGE IMPACT ASSESSMENT FOR PROPOSED GRANITE PROSPECTING NEAR POFADDER, NORTHERN CAPE HIA Phase 1 28/01/2013 Jayson Orton, Lita Webley ACO Associates CC Sizisa Ukhanyo Trading 830 cc 14/01/2014 - 16:15
Heritage Impact Assessment for the Proposed Kathu Supplier Park Heritage Impact Assessment for the Proposed Kathu Supplier Park on parts of the Remainder and on Portion 9 of the Farm Sekgame 461 on the southern side of the town of Kathu in the Gamagara Local Municipality, Northern Cape. Heritage Impact Assessment Specialist Reports 18/07/2014 Marko Hutten, Polke Birkholtz PGS Heritage and Grave Relocation Consultants PGS Heritage and Grave Relocation Consultants 10/03/2015 - 11:41
HIA Dukuduku Heritage Impact Assessment Heritage Statement 26/10/2023 - 11:04
Estoire Plots 67, 68, 69, Estoire Exemption of a Phase 1 Heritage Impact Assessment for a proposed township development at Plots 67, 68 and 69 Estoire, Bloemfontein Free State Province. HIA Letter of Exemption 28/05/2015 Lloyd Rossouw Eko Environmental 01/06/2015 - 09:56
Heritage Scoping Report LONZA Water Products and Wood Preservation Facility Heritage Scoping Report LONZA Water Products and Wood Preservation Facility Cato Ridge, eThekweni Municipality, KwaZulu-Natal Heritage Scoping 27/06/2017 Len van Schalkwyk eThembeni Cultural Heritage Kantey & Templer Consulting Engineers 05/10/2017 - 04:22
Klien Pella agriculture HIA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CULTIVATION OF NEW LANDS AT KLEIN PELLA, NAMAKWALAND MAGISTERIAL DISTRICT, WESTERN CAPE Heritage Impact Assessment Specialist Reports 20/06/2015 Jayson Orton 30/06/2016 - 13:59
Palaeontological desktop study Palaeontological desktop study of a 10 ha expansion of the Khumani low grade mine at Sishen, Northern Cape Province PIA Desktop 28/06/2017 Palaeo Field Services 14/12/2017 - 16:07
Phase 1 Archaeological Assessment Report on a Phase 1 Archaeological Assessment of proposed mining areas on the farm Sivonel 42 er Schmidtsdrit Northern cape AIA Desktop 01/03/2015 David Morris Eddie Fortune Diamonds (Pty) Ltd 30/01/2019 - 14:20
GL21009-RW-B19 Pipeline GL21009-RW-B19 Pipeline - Lethabo Pump Station in the Free State Province to Vereeniging Pump Station in the Gauteng Province AIA Phase 1 22/11/2011 Wouter Fourie PGS Heritage and Grave Relocation Consultants Rand Water 07/08/2012 - 13:48
Tugela Ferry Irrigation Scheme Upgrade HIA Frans Prins Active Heritage CC 24/04/2019 - 11:26
Heritage Screener: Becrux PV 2 Desktop Heritage Screening Assessment for the Proposed development of a solar photovoltaic (PV) energy facility and associated infrastructure with a generation capacity of up to 10MWac, located near Sasolburg in the Free State Province Heritage Scoping 21/02/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 04/04/2022 - 14:32
Kalahari Solar Power Project Heritage Impact Report Kalahari Solar Power Project Heritage Impact Assessment Report and Heritage Management Plan developed by Robert De Jong and Associates Heritage Impact Assessment Specialist Reports 22/02/2011 Robert de Jong SAHRA Council WSP Environmental Pty Ltd - Johannesburg 15/01/2014 - 12:04
AIA_Prospecting_Rights_Pelser_AJ_Aug11 A Desktop Heritage Assessment Sudy for a prospecting rights application on various near Musina, Lephalale Local Municipality, Limpopo Province AIA Phase 1 01/08/2011 Anton Pelser Archaetnos CC 16/06/2012 - 14:49
PIA-Ripplemead Packshed, near Peddie, Eastern Cape Phase 1 PIA of a Proposed New Citrus Packshed at Ripplemead Farm near Peddie, Eastern Cape Province PIA Phase 1 11/12/2012 Lloyd Rossouw 11/12/2012 - 12:34
Scoteville Phase II HIA for Built Environment Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. HIA Phase 2 17/11/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 17/11/2020 - 16:22
Flimieda X3 HIA PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP ESTABLISHMENT (FLIMEDIA EXTENSION 3) ON PORTIONS 127 & 128 OF THE FARM ELANDSHEUVEL 402IP CITY OF MATLOSANA LOCAL MUNICIPALITY (KLERKSDORP) NORTHWEST PROVINCE HIA Phase 1 01/09/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Charl Trivunovic 06/06/2022 - 19:28
HIA 31/03/2023 - 12:14
Heritage report N1 Ventersburg to Kroonstad Cultural heritage impact assessment for the UPGRADE OF A SECTION OF NATIONAL ROUTE 1, BETWEEN KROONSTAD AND VENTERSBURG, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 10/12/2013 SAHRA Council Chameleon Environmental 13/03/2014 - 16:33
Palaeontological Impact Assessment for the Cygnis Energy (Pty) Ltd Palaeontological Impact Assessment for the Cygnis Energy (Pty) Ltd (Lyra 2 Solar Park) Renewable Energy Generation Project on Farm Groot Vogelstruisfontein 644 LQ with Overhead Powerlines to the Eskom Matimba Substation and/or to the Eskom Waterberg Distribution Substation, within the Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province PIA Phase 2 18/03/2023 Marion Bamford Prof Marion Bamford 19/05/2023 - 12:32

Pages

CSV
 
 

Search form