THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14701 - 14750 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
AIA Jan Kempdorp Infill | Heritage Impact Assessment (Archaeology) for the proposed Guldenskat Residential Development, Jan Kempdorp, Northern Cape | AIA Phase 1 | 31/07/2019 | David Morris | Archaeology department, McGreggor Museum | NSVT Consultants | 20/08/2019 - 14:30 |
2019JvS081N3Bridge | THE PROPOSED CONSTRUCTION OF A SECOND CARRIAGEWAY ON THE N3 TOLL ROAD BETWEEN THE WILGE PLAZA AND THE VAAL RIVER, VILLIERS REGION, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 31/07/2019 | 22/11/2019 - 15:44 | |||
PIA: EGI to support the Sutherland, Sutherland 2 and Rietrug WEFs | PALAEONTOLOGICAL HERITAGE: DESKTOP & FIELD-BASED BASIC ASSESSMENT: Proposed construction of electrical grid infrastructure to support the authorised Rietrug, Sutherland and Sutherland 2 Wind Energy Facilities, Northern and Western Cape Provinces | Palaeontological Specialist Reports | 31/07/2019 | John Almond | Natura Viva CC | CSIR | 01/10/2019 - 21:30 |
Palaeontological Impact Assessment: Desktop study | PIA Desktop | 31/07/2019 | Dr. Heidi Fourie | Bateleur Environmental & Monitoring Services (Pty) Ltd | 16/08/2019 - 10:40 | ||
Bloemsmond Grid Connection Palaeontology Impact Assessment | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED BLOEMSMOND 3, BLOEMSMOND 4 AND BLOEMSMOND 5 SOLAR PV FACILITIES ON PORTIONS 5 AND 14 OF THE FARM BLOEMSMOND 455 NEAR UPINGTON AND THEIR CONNECTION TO THE NATIONAL GRID VIA THE UPINGTON MAIN TRANSMISSION SUBSTATION, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 31/07/2019 | John Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 04/03/2021 - 16:22 |
Palaeontological Impact Assessment, Katlani 236 | Palaeontological Impact Assessment for the proposed Prospecting and Mining rights Applications for Katlani 236, west of Douglas, Northern Cape Province | PIA Desktop | 31/07/2019 | Marion Bamford | Prof Marion Bamford | Archaeological and Heritage Services Africa (Pty) Ltd | 10/08/2019 - 18:32 |
Palaeontological Impact Assessment: Desktop study | Palaeontological Assessment of the farm Gruisfontein 230 LQ near Lephalale, Limpopo Province, South Africa - Field Trip, Desktop Study and Protocol for Palaeontological Finds | PIA Desktop | 31/07/2019 | Chris Jones | University of Limpopo | Jacana Environmental cc | 19/09/2019 - 08:13 |
Babylonstoren Perdehuis | Heritage Application Babylonstoren Perdehuis - July 2019 | Heritage Statement | 31/07/2019 | Malherbe Rust Architects | 27/09/2019 - 15:15 | ||
PALAEONTOLOGICAL DESKTOP STUDY | PALAEONTOLOGICAL DESKTOP STUDY PROPOSED MINING RIGHT FOR MAXWILL 146 CC ALLUVIAL DIAMOND MINING, NORTHERN CAPE PROVINCE, SIYANCUMA LOCAL MUNICIPALITY UNDER PIXLEY KA SEME DISTRICT MUNICIPALITY | PIA Desktop | 31/07/2019 | JF Durand | Francois Durand | MAXWILL 146 CC | 04/11/2019 - 14:21 |
Kathu Extensions 6-10 Cultural Heritage Management Plan for Grave Site | A CULTURAL HERITAGE MANAGEMENT PLAN FOR A GRAVE SITE LOCATED AT THE KATHU EXTENSIONS 6-10 TOWNSHIP ESTABLISHMENT ON PORTIONS 1 & 2 OF THE FARM KALAHARI GHOLF & JAG LANDGOED 775 GAMAGARA LOCAL MUNICIPALITY (KATHU), NORTHERN CAPE PROVINCE | BGG Phase 1 | 31/07/2019 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 20/08/2019 - 08:29 |
HIA Study for VDDC mining and infrastructure development | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED VANDYKSDRIFT CENTRAL (VDDC) MINING AND INFRASTRUCTURAL DEVELOPMENT IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 31/07/2019 | Julius Pistorius | South32 SA Coal Holdings (Pty) Limited | 29/11/2019 - 07:45 | |
AIA BREIDBACH SEWER AND PUMPSTATION | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED BREIDBACH CROSS CATCHMENT TRANSFER PUMPING SCHEME (SEWER PIPELINE), BREIDBACH, KING WILLIAMS TOWN, AMATHOLE DISTRICT MUNICIPALITY. | AIA Phase 1 | 31/07/2019 | Celeste Booth | Booth Heritage Consulting | Makhetha Environmental Consultants | 11/09/2019 - 10:13 |
HIA: PROPOSED BEESHOEK RAILWAY LINE LINK | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BEESHOEK RAILWAY LINE LINK, POSTMASBURG, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 31/07/2019 | Jaco van der Walt | HCAC Heritage Consultants | Envirogistics (Pty) Ltd | 27/08/2021 - 09:17 |
SAMANCOR CHROME (EASTERN CHROME MINES) CONSOLIDATION OF ENVIRONMENTAL AUTHORISATIONS, CONTINUATION OF LWALA UNDERGROUND/OPENCAST, EMPR AMENDMENT AND FULL WATER USE LICENCE APPLICATION | Heritage Impact Assessment Report for Sekgoshi Hill on the Farm Clapham 118 KT Clapham / Lwala Section, Driekop in the Greater Tubatse Local Municipality, Limpopo Province | HIA Phase 1 | 01/08/2019 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | Vhufa Hashu Heritage Consultancy CC | 28/07/2021 - 12:20 |
Paleontology Report for the Impofu Grid Connection | Grid Connections for the proposed Impofu North, Impofu West & Impofu East Wind Farms near Humansdorp, Eastern Cape | Archaeological Specialist Reports | 01/08/2019 | John E Almond | Natura Viva CC | 22/04/2019 - 13:34 | |
Haarlem shipwreck. Final report on test excavations. | Haarlem shipwreck. Final report on 2017 - 2018 test excavations. | Archaeological Permit Report | 01/08/2019 | Bruno Werz | African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) | African Institute for Marine and Underwater Research, Exploration and Education (AIMURE) | 31/07/2019 - 16:10 |
ERG5884 - HSMP | City Deep 4L2 Mine Dump Heritage Management: Heritage Site Management Plan | Conservation Management Plan | 01/08/2019 | Justin du Piesanie | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 01/08/2019 - 08:23 |
Zithulele Heritage Report | Heritage Impact Assessment of the complex making up Zithulele Hospital, Mqanduli district, Eastern Cape | HIA Phase 1 | 01/08/2019 | Deborah Whelan | Archaic Consulting | WSP Group Africa (Pty) Ltd | 08/08/2022 - 14:40 |
REQUEST FOR CULTURAL HERITAGE EXCEMPTION: MTN CELL MAST (THE GREEN GABLES) – PORTION 12 OF LOT 93 OF EDENBURG TOWNSHIP, GAUTENG | REQUEST FOR CULTURAL HERITAGE EXCEMPTION: MTN CELL MAST (THE GREEN GABLES) – PORTION 12 OF LOT 93 OF EDENBURG TOWNSHIP, GAUTENG APAC019/81 | HIA Letter of Exemption | 01/08/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Smit & Fisher Planning | 05/08/2019 - 11:44 |
Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | Heritage Impact Assessment for the proposed Ilima Coal Company Kranspan Project | HIA Phase 1 | 02/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 30/01/2020 - 10:19 |
Archaeological Impact Assessment | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA | Archaeological Specialist Reports | 02/08/2019 | Mathoho Ndivhuho Eric | Millennium Heritage Group (PTY) LTD | 24/02/2021 - 03:41 | |
Archaeological Impact Assessment | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 02/08/2019 | Eric Mathoho | Millennium Heritage Group (PTY) LTD | 02/12/2021 - 20:10 | |
Supporting documentation for proposed alterations to the Main Building at SAAO | Supporting documentation for proposed alterations to the Main Building at SAAO | 02/08/2019 | SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION | SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION | 02/08/2019 - 14:19 | ||
MBU5710 - NID | Notification of Intent to Develop: Environmental Authorisations, IWULA and Mining Right Application for the proposed Weltervreden Mine, Mpumalanga | Heritage Impact Assessment Specialist Reports | 05/08/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Mbuyelo Group (Pty) Ltd | 05/08/2019 - 15:45 |
MBU5710 - HSR | Heritage Scoping Report: Proposed Weltervreden Coal Mining Project near Belfast, Mpumalanga Province | Heritage Scoping | 05/08/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Mbuyelo Group (Pty) Ltd | 05/08/2019 - 15:48 |
HIA Elandspoort 357- JR | Lifts upgrade on Portions of the Farm Elandspoort 357- JR, Pretoria, Tshwane, Gauteng | Heritage Impact Assessment Specialist Reports | 05/08/2019 | Judith Muindisi, Monika Lauferts le Roux | Tsica Heritage Consultants | Department of Public Works | 05/08/2019 - 13:54 |
HIA_Proposed KZN ASP | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED ILLOVO AUTOMOTIVE SUPPLIER PARK (ASP), ACCESS ROAD AND INDUSTRIAL DEVELOPMENT ON THE REMAINDER OF THE FARM NOGI NO. 17469, ILLOVO, WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 06/08/2019 | Trust Mlilo | Sativa Travel and Environmental Consultants | GIBB (Pty) Ltd | 01/11/2019 - 08:36 |
AMENDMENT TO THE EA FOR THE HOTAZEL SOLAR FACILITY | AMENDMENT TO THE EA FOR THE HOTAZEL SOLAR FACILITY | Heritage Statement | 06/08/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Aurecon - Cape Town | 20/11/2019 - 15:26 |
Barberton Mines (Pty) Ltd HIA Updated | Updated HIA for the prospecting right by Barberton Mines | HIA Phase 1 | 08/08/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | EcoPartners | 14/08/2019 - 11:23 |
Heritage Impact Assessment, Katlani 236 | PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING AND APPLICATION FOR MINING RIGHT ON THE FARM KATLANI 236 NEAR DOUGLAS, SIYANCUMA LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 09/08/2019 | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | Thaya Trading Enterprise | 10/08/2019 - 18:28 |
Augrabies Tierkop Agricultural PIA LOE 2019 revised | Augrabies Tierkop Agricultural PIA LOE 2019 revised | PIA Desktop | 10/08/2019 | John Almond | Natura Viva CC | 11/12/2019 - 15:25 | |
Exemption of a Heritage Impact Assessment (HIA) | Letter of Recommendation for Exemption of a Heritage Impact Assessment (HIA) for the proposed refurbishment to be undertaken at the existing Bushkoppie Wastewater Treatment Works | HIA Letter of Exemption | 12/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 07/11/2019 - 10:03 | |
FS 30/5/1/1/2/10548 PR | BASIC ASSESSMENT REPORT FOR THE PROPOSED COAL PROSPECTING RIGHT APPLICATION ON FARM THOR 142 RD, PRTN 0, 5, 6, 7 KRUIDFONTEIN 67 RD, DORKING 206 RD, KRONEBLOEM 68 RD, ODIN 93 RD, AND DIE PAN 225 RD. | 13/08/2019 | Gregory N | Lushika Services | Lushika Services | 15/08/2019 - 21:29 | |
Phase 1 Heritage Impact Assessment of a proposed new 0.6 ha ostrich farming facility near Petrusburg, FS Province. | Phase 1 Heritage Impact Assessment of a proposed new 0.6 ha ostrich farming facility near Petrusburg, FS Province. | HIA Phase 1 | 13/08/2019 | Lloyd Rossouw | Palaeo Field Services | 12/09/2019 - 09:01 | |
HIA Wesselsbron Farm Herman 236 Poultry House | Phase 1 Heritage Impact Assessment of the proposed new poultry facility on the farm Herman 236 near Wesselsbron, Free State Province. | HIA Phase 1 | 13/08/2019 | Lloyd Rossouw | DESTEA-Free State | Palaeo Field Services | 12/09/2019 - 10:04 |
AIA FOR THE PROPOSED DOUBLE CIRCUIT 132KV POWERLINE FOR THE RHODES 1, RHODES 2, EAST 3, EAST 2 AND EAST PV PLANTS TO THE UMTU SUBSTATION NEAR HOTAZEL, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON VARIOUS PORTIONS OF ON THE FARM RHODES 269, THE REMAINDER AND PORTION 2 OF THE FARM EAST 270, THE FARM KIPLING 271, THE REMAINDER OF THE FARM HOTAZEL 280, THE FARM UMTU 281 AND THE REMAINDER OF THE FARM OLIVE PAN 282 FOR THE PROPOSED DOUBLE CIRCUIT 132KV POWERLINE FOR THE RHODES 1, RHODES 2, EAST 3, EAST 2 AND EAST PV PLANTS TO THE UMTU SUBSTATION NEAR HOTAZEL, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 15/08/2019 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - Limpopo | 31/08/2020 - 09:30 |
Palaeontological Heritage Assessment Baviaanskloof WHS Interpretive Center | Palaeontological Heritage Assessment - Desktop Study: Proposed development of an Interpretive Centre on the Farm Nieuwe Kloof 202 in the Baviaanskloof World Heritage Site, Willowmore District, Eastern Cape | PIA Desktop | 15/08/2019 | 03/10/2019 - 13:01 | |||
Existing Persberg Dam Wall - Phase 1 Heritage Impact Assessment | EXISTING PERSBERG DAM WALL, PERSBERG FARM (PORTION LINDE NO 4733) SITUATED NEAR HELPMEKAAR, MSINGA LOCAL MUNICIPALITY, UMZINYATHI DISTRICT MUNICIPALITY, KWAZULU-NATAL - Phase 1 Heritage Impact Assessment | HIA Phase 1 | 15/08/2019 | Jean Beater | KwaZulu-Natal Amafa and Research Institute | Afzelia Environmental Consultants Pty Ltd | 19/08/2019 - 10:23 |
Exemption letter | RECOMMENDATION FOR EXEMPTION FROM HERITAGE AND PALAEONTOLOGICAL IMPACT STUDIES: ENVIRONMENTAL AUTHORISATION (EA) AND CLOSURE AND REHABILITATION OPTIMISATION PROJECT AT THE TSHIPI BORWA MINE, NEAR HOTAZEL, NORTHERN CAPE PROVINCE - CASEID: 13996 | HIA Letter of Exemption | 15/08/2019 | 20/08/2019 - 11:49 | |||
PIA Dunbar Opencast Coal Mine | Palaeontological Impact Assessment for the proposed Mining Rights application on Dunbar 189, west of Hendrina, Mpumalanga Province | PIA Phase 1 | 16/08/2019 | Marion Bamford | Prof Marion Bamford | Enviro-Insight CC | 28/10/2019 - 12:02 |
PIA and Protocol for Finds for a proposed rock quarry on Mimosa Glen 885/9 Bloemfontein | Palaeontological Impact Assessment and Protocol for Finds of a proposed new quarry on Portion 9 (of 6) of the farm Mimosa Glen 885, Bloemfontein, Free State Province | PIA Desktop | 16/08/2019 | Elize Butler | 22/08/2019 - 09:07 | ||
Ecological & Wetland Assessment Report for Annesley Salt (Pty) Ltd | Ecological & Wetland Assessment Report for Annesley Salt (Pty) Ltd on Remainder of the Farm Annesley 338 | 16/08/2019 | Dr Elizabeth (Betsie) Milne | Boscia Ecological Consulting | 16/07/2019 - 11:02 | ||
Proof of Correspondence | As per interim comment please find the proof of correspondence sent to the Rock Art Research Institute to request comment. No response was received. | Non Impact Assessment Related Reports | 16/08/2019 | Lizinda Dickson | Waterberg JV Resources (Pty) Ltd | Bateleur Environmental & Monitoring Services (Pty) Ltd | 18/08/2020 - 16:44 |
Heritage Impact Assessment for Annesley Salt (Pty) Ltd | Phase 1 HIA Report Bloupan, Remainder of the Farm Annesley No. 338/ Northern Cape | HIA Phase 1 | 16/08/2019 | Jan Engelbrecht, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | 16/07/2019 - 11:14 | |
Aquatic Assessment | Report on the aquatic assessment for the proposed alluvial diamond mining operations on a portion of the Remainder of the Farm Pniel 218 including a portion of the Vaal River near the town of Delportshoop, Northern Cape Province. | 16/08/2019 | J.C Potgieter | DPR Ecologists and Environmental Services | 16/07/2019 - 13:37 | ||
Ecological and Wetland Assessment for Kimswa MR | Report on the ecological and wetland assessment for the proposed alluvial diamond mining operations on a portion of the Remainder of the Farm Pniel 218 including a portion of the Vaal River near the town of Delportshoop, Northern Cape Province. | 16/08/2019 | Darius van Rensburg | DPR Ecologists and Environmental Services | 16/07/2019 - 13:43 | ||
Paleontology Letter | Request for Exemption for Palaeontological Impact Assessment for the proposed development of a Commercial Township at extensions 15, 16 and 17 Grand Central, Midrand, Gauteng (GAUT002/12-13/E0226) SAHRIS Case ID:13950 | Palaeontological Specialist Reports | 17/08/2019 | Marion Bamford | Prof Marion Bamford | 20/08/2019 - 11:19 | |
PIA for the proposed residential development on farm Strathearn 2154/1 (RE), Bloemfontein | Palaeontological exemption letter for the proposed residential development on the Remainder of Portion 1 of the farm Strathearn 22154 in the Magisterial District of Bloemfontein, Free State | PIA Desktop | 18/08/2019 | Elize Butler | Lefatse EPS (Pty) Ltd t/a GreenRSA (Pty) Ltd | 09/10/2019 - 16:00 | |
Phase 1 Heritage Impact Assessment of a proposed new piggery on the farm Sediba 35 near Excelsior, FS Province | Phase 1 Heritage Impact Assessment of a proposed new piggery on the farm Sediba 35 near Excelsior, FS Province | HIA Phase 1 | 19/08/2019 | Lloyd Rossouw | Paleo Field Services | 12/09/2019 - 08:21 | |
Phase 1 Heritage Impact Assessment of a proposed new piggery on the farm Paradys 358 near Thaba Nchu, FS Province. | Phase 1 Heritage Impact Assessment of a proposed new piggery on the farm Paradys 358 near Thaba Nchu, FS Province. | HIA Phase 1 | 19/08/2019 | Lloyd Rossouw | Paleo Field Services | 12/09/2019 - 09:40 |