THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15351 - 15400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Derby | REPORT ON A PHASE 1 HIA FOR THE PROPOSED DERBY EXTENSION 4 TOWNSHIP DEVELOPMENT ON A PORTION OF THE REMAINING EXTENT OF PORTION 25 OF THE FARM RIETFONTEIN 372JQ IN THE KGETLENGRIVIER LOCAL MUNICIPALITY DERBY, NORTHWEST PROVINCE | HIA Phase 1 | 17/06/2020 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 12/03/2021 - 11:43 |
Bra Cass Fuel station | A LETTER OF EXEMPTION FOR BRA CASS SERVICE STATION, OSIZWENI, KZN | HIA Letter of Exemption | 17/06/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 18/06/2020 - 06:04 |
PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT REPORT | PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE | HIA Phase 1 | 18/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | Vhufa Hashu Heritage Consultancy CC | 18/05/2021 - 12:36 |
Heritage Impact Assessment (HIA) Report | PROPOSED NEW TOWNSHIP DEVELOPMENT AT MANGAUNG | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Stephan Gaigher | G&A Heritage Management Consultants | INALUK Consulting services | 11/06/2020 - 12:35 |
Heritage Impact Assessment Eskom Aloe 132kV | Proposed Eskom Aloe 132kV Substation and Loop in Loop Out Powerlines | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | 02/10/2020 - 10:11 | |
Heritage Impact Assessment Eskom Aloe 132kV | Proposed Eskom Aloe Substation and Loop in Loop Out Powerlines | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Vhufa Hashu Heritage Consultancy CC | 02/10/2020 - 10:16 | ||
Ericure Proposed Coal Mine HIA | Heritage Impact Assessment for Ericure Mining Right | HIA Phase 1 | 20/06/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services (Pty) Ltd | 19/08/2020 - 16:01 |
Rapadi Palaentological Desktop Study | Palaentological Desktop Study | PIA Desktop | 20/06/2020 | Eskom - LOU | 20/08/2020 - 00:03 | ||
Development of farmland on Farm Skutwater 115 MS, Musina Local Municipality, Vhembe District | Development of farmland on Farm Skutwater 115 MS, Musina Local Municipality, Vhembe District | PIA Phase 1 | 20/06/2020 | JF Durand | Tua Conserva Environmental | 26/10/2020 - 10:42 | |
upgrading and re-laying of Ekuvukeni 450 MM Pipeline and Bulk Water Treatment Works. | Phase One Heritage Impact Assessment of the proposed upgrading and re-laying of Ekuvukeni 450 MM Pipeline and Bulk Water Treatment Works. | HIA Phase 1 | 20/06/2020 | Frans Prins | Active Heritage CC | ACER (Africa) Environmental Management Consultants | 02/07/2020 - 15:00 |
Heritage Screener: Gunstfontein OHL Extension | Desktop Heritage Screening Assessment for the Proposed Grid connection extension infrastructure for the Gunsfontein Wind Farm, Northern Cape. | Heritage Scoping | 23/06/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 23/06/2020 - 16:21 |
Heritage Impact Assessment (HIA) | HIA report on Portions 26 & 27 Of the Farm Middelburg Town and Townlands 287- JS, Steve Tshwete Local Municipality, Mpumalanga Province | AIA Phase 1 | 24/06/2020 | SINGO KENNETH | South African Heritage Resources Agency | 24/06/2020 - 15:55 | |
Heritage Impact Assessment (HIA) | The Phase 1 Archaeological Impact Assessment is to determine the presence of cultural heritage sites and the impact of the proposed project on these resources within the area demarcated for the proposed development on Portions 26 & 27 Of the Farm Middelburg Town and Townlands 287- JS together with Portions 364 of the Farm Middelburg Town and Townlands 287-JS Steve Tshwete Local Municipality, Mpumalanga Province. | AIA Phase 1 | 24/06/2020 | Ndinannyi Kenneth | 25/06/2020 - 08:49 | ||
Steve Tshwete HIA report | PHASE 1 HIA FOR PROPOSED MIXD DEVELOPMENTS ON PORTION 364 OF THE FARMS MIDDELBURG TOWN AND TOWNLANDS 287-JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. | HIA Phase 1 | 24/06/2020 | Trust Mlilo | Singo Consulting (Pty) Ltd | 26/07/2021 - 11:53 | |
HIA for the Control of Watercourse / Rivers / Streams / Hydraulics in Lombardy East within the City of Johannesburg | HIA for the Control of Watercourse / Rivers / Streams / Hydraulics in Lombardy East within the City of Johannesburg | HIA Phase 1 | 24/06/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP -Landscape Architectural and Environmental Planning | 02/07/2020 - 17:17 |
AIA ERF 30, LETAMO TOWN | Archaeological Impact Assessment for a proposed development on Erf 30 Letamo Town, Farm Honingklip 178 IQ, Mogale Local Municipality, Gauteng Province | Archaeological Specialist Reports | 25/06/2020 | Polke Birkholtz, Cherene de Bruyn | PGS Heritage (Pty) Ltd | 08/07/2020 - 09:10 | |
452HIA-Erf 30 Letamo Town, Farm Honingklip 178 | Archaeological Specialist Reports | 25/06/2020 | Cherene de Bruyn, Polke Birkholtz | PGS Heritage (Pty) Ltd | 11/08/2020 - 19:43 | ||
Phase 2 Slovopark HIA | Phase 1 Heritage Impact Assessment of the proposed Slovopark residential development. Brandfort, FS Province. | Heritage Impact Assessment Specialist Reports | 25/06/2020 | Lloyd Rossouw | Paleo Field Services | NSVT Consultants | 11/11/2020 - 20:52 |
Mbizana Mixed Use Township | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBIZANA MIXED USE TOWNSHIP DEVELOPMENT, BIZANA MUNICIPALITY, EASTERN CAPE PROVINCE. | HIA Phase 1 | 26/06/2020 | Frans Prins | Active Heritage CC | Matangana and Associates: Environmental and Social Consultants | 29/06/2020 - 10:53 |
Okapi Diamonds Prospecting PIA_EButler | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED OKAPI DIAMONDS (PTY) LTD MINING RIGHT OF DIAMONDS ALLUVIAL (DA) & DIAMONDS GENERAL (D) COMBINED WITH A WASTE LICENCE APPLICATION ON THE REMAINING EXTENT OF PORTION 9 (WOUTER) OF THE FARM LANYON VALE 376; REGISTRATION DIVISION: HAY; NORTHERN CAPE PROVINCE | PIA Desktop | 28/06/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | 18/03/2021 - 09:13 | |
Phase 1 AIA Heritage Screener Borrow Pits Sterkspruit Eastern Cape | PHASE 1 AIA HERITAGE SCREENER BORROW PITS STERKSPRUIT EASTERN CAPE. PROPOSED DEVELOPMENT OF BORROW PITS ALONG ROADS DR08606 AND DR08515, FARM 301 RE/88, STERKSPRUIT, SENQU LOCAL MUNICIPALITY, JOE GQABI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | Heritage Scoping | 28/06/2020 | Sky-Lee Fairhurst, Heidi Fivaz, Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Eastern Cape - Department of Transport | 05/08/2020 - 12:42 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D), DIAMONDS (DIA) AND DIAMONDS IN KIMBERLITE (DK) NEAR PRIESKA ON PORTION 7, A CERTAIN PORTION OF THE REMAINING EXTENT OF PORTION 9 (WOUTER), PORTION 11 (DE HOEK), PORTION 14 (STOFDRAAI) (PORTION OF PORTION 4), THE REMAINING EXTENT OF PORTION 16 (PORTION OF PORTION 9) (WOUTER) AND THE REMAINING EXTENT OF PORTION 18 (PORTION OF PORTION 10) OF THE FARM LANYON VALE 376, REGISTRATION DIVISION: HAY, NORTHERN CAPE. | PIA Desktop | 28/06/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | 18/01/2023 - 16:26 | |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION BOEGOEBERG NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON REMAINDER OF THE FARM NO. 142, REMAINDER OF THE FARM, NO. 144, AND PLOT 1890 BOEGOEBERG SETTLEMENT (PRIESKA), !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | Heritage Impact Assessment Specialist Reports | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 05/08/2020 - 11:16 |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GROBLERSHOOP NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON PORTION 16 FARM BOEGOEBERGNEDERSETTING RE/48, GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 05/08/2020 - 11:41 |
Heritage Screener: Kamaggas Prospecting | DESKTOP HERITAGE SCREENING ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT FOR THE PROSPECTING OF HEAVY MINERALS SANDS AND RARE EARTH ELEMENTS NEAR KLEINZEE ON A PORTION ON THE REMAINING EXTENT OF PORTION 5 OF THE FARM KAMAGGAS 200, REGISTRATION DIVISION: IP, NORTHERN CAPE PROVINCE | Heritage Scoping | 29/06/2020 | Jenna Lavin | CTS Heritage | PHS Consulting | 29/06/2020 - 14:43 |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GROOTDRINK NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON ERF 131, GROOTDRINK, AND PLOT 2627, BOEGOEBERG SETTLEMENT (KENHARDT), ON THE FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | !Kheis Local Municipality , Enviroafrica CC | 05/08/2020 - 12:24 |
Heritage Screener: Komaggas Prospecting | DESKTOP HERITAGE SCREENING ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT FOR THE PROSPECTING OF HEAVY MINERALS SANDS AND RARE EARTH ELEMENTS NEAR KLEINZEE ON A PORTION ON THE REMAINING EXTENT OF PORTION 5 OF THE FARM KAMAGGAS 200, REGISTRATION DIVISION: IP, NORTHERN CAPE PROVINCE | Heritage Scoping | 29/06/2020 | Jenna Lavin | CTS Heritage | PHS Consulting | 29/06/2020 - 15:42 |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GARIEP NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON PLOT 113, GARIEP SETTLEMENT, FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 30/10/2020 - 09:22 |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION OPWAG NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON PLOT 2642 BOEGOEBERG SETTLEMENT (KENHARDT), AND PORTION 14 FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 05/08/2020 - 12:49 |
Heritage Crime - Proposed Declaration of the Harry Gwala Grave Site as a National Heritage Site (KZN) vs. The Proposed Dismantlement of the Orania Afrikaner Cultural Community and Town (NC) | Heritage Crime - Proposed Declaration of the Harry Gwala Grave Site as a National Heritage Site (KZN) vs. The Proposed Dismantlement of the Orania Afrikaner Cultural Community and Town (NC) | 29/06/2020 | Karen Van Ryneveld | 29/06/2020 - 20:17 | |||
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION TOPLINE NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON ERVEN 1, 16, 87, SAALSKOP (TOPLINE) & PLOT 2777, BOEGOEBERG SETTLEMENT (KENHARDT), FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 05/08/2020 - 13:09 |
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION WEGDRAAI NORTHERN CAPE | PROPOSED TOWNSHIP EXPANSION ON ERVEN 1, 45 & 47 WEGDRAAI, BOEGOEBERG SETTLEMENT (KENHARDT), FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | AIA Phase 1 | 29/06/2020 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 05/08/2020 - 13:33 |
Phase 1 HIA for the Proposed Khutsong South Extension 8 Housing Development | Phase 1 Heritage Impact Assessment for the Proposed Khutsong South Extension 8 Housing Development, Merafong City Local Municipality, West Rand District Municipality, Gauteng | HIA Phase 1 | 30/06/2020 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Afzelia Environmental Consultants Pty Ltd | 12/04/2021 - 18:15 |
Assessment of burials Polokwane CONTRACT No. PM 132 2018 | ASSESMENT OF ACCIDENTALLY EXPOSED SKELETAL REMAINS RE: CONTRACT No. PM 132/2018 Construction of Borehole Infrastructure & Pumping Mains for the Sterkloop and Sandriver South Wellfields. Polokwane Local Municipality. | Site Inspection Report | 30/06/2020 | Frans Roodt | 15/02/2021 - 12:58 | ||
Paleontological Report | Paleontological Impact Assessment Report | PIA Phase 1 | 30/06/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | Tholoana Sustainable Development and Environmental Consultants | 23/02/2021 - 09:09 |
HIA Stormvoel to Baviaanspoort Road including the Moepel Road Overpass | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADING OF PROVINCIAL ROAD R573 (MOLOTO ROAD) AND K139, AS WELL AS THE MOEPEL ROAD OVERPASS, NORTH OF PRETORIA, GAUTENG PROVINCE | HIA Phase 1 | 30/06/2020 | J van Schalkwyk | JA van Schalkwyk Heritage Consultant | GA Environment (Pty) Ltd | 10/07/2020 - 15:55 |
Palaeontological Impact Assessment: Desktop Study: Stormvoel to Baviaanspoort Road including the Moepel Road Overpass | Basic Assessment and Water Use Authorisation Process for the Proposed Upgrade of National Road R573 Section 1 (Moloto Road), Gauteng Province, Part 1: R573 From Baviaanspoort Road (M15) to Stormvoël Road (M5) and Moepel Road Overpass Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 30/06/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | GA Environment (Pty) Ltd | 10/07/2020 - 15:58 |
Phase 1 AIA Report- Sylvania Mooinooi | A PHASE 1 AIA REPORT FOR THE SYLVANIA MOOINOOI TSF AND PIPELINES PROJECT ON PORTIONS 152-154 OF THE FARM ELANDSKRAAL 469JQ NEAR MOOINOOI, BOJANALA DISTRICT MUNICIPALITY NORTHWEST PROVINCE | HIA Phase 1 | 01/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 13/04/2021 - 11:47 | |
Heritage Impact Assessment Report for the Proposed Roypoint Housing Project | Phase One Heritage Impact Assessment Report For The Proposed Development Of Roypoint Housing Units Within The Newcastle Local Municipality, Amajuba District, Kwazulu Natal | HIA Phase 1 | 01/07/2020 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | 22/09/2020 - 14:56 | |
2020/JvS/051Wouter | THE MINING RIGHT APPLICATION FOR DIAMONDS ON PORTION OF REMAINING EXTENT OF PORTION 9 (WOUTER) OF THE FARM LANYON VALE 376, NEAR NIEKERSHOOP, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/07/2020 | Johnny van Schalkwyk | 18/03/2021 - 09:09 | ||
PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA | PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA OF THE EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG - APAC020/48 | HIA Phase 1 | 01/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Vulcano Engineering & Environmental Consulting | 23/07/2020 - 10:22 |
2020/JvS/051Wouter | THE MINING RIGHT APPLICATION FOR DIAMONDS ON PORTION OF REMAINING EXTENT OF PORTION 9 (WOUTER) OF THE FARM LANYON VALE 376, NEAR NIEKERSHOOP, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/07/2020 | Johnny van Schalkwyk | 18/03/2021 - 09:22 | ||
Gilmoe Mining Rights Application | A HERITAGE IMPACT ASSESSMENT REPORTFOR THE GILMOE MINING RIGHTS APPLICATION ON VARIOUS FARMS AND FARM PORTIONS IN THE TAUNG DISTRICT OF THE NORTHWEST PROVINCE - APAC020/42 | Heritage Scoping | 01/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Gudani Consulting | 26/05/2022 - 14:36 |
PROPOSED ESTABLISHMENT OF FILLING STATION & BUSINESS CENTRE ON A PORTION OF THE FARM BUFFELSDOORN 592IP | MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT –PROPOSED ESTABLISHMENT OF FILLING STATION & BUSINESS CENTRE ON A PORTION OF THE FARM BUFFELSDOORN 592IP, CITY OF MATLOSANA LOCAL MUNICIPALITY - APAC020/47 | HIA Letter of Exemption | 01/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Joze Maleta Land Surveyor & Town Planner | 07/07/2020 - 09:18 |
Phase 1 Cultural Heritage Impact Assessment | THE PROPOSED PARYS ESTATE (RIETPOORT) ESTABLISHMENT ON PORTIONS 95 AND 96 OF THE FARM RIETPOORT 518-IQ, TLOKWE CITY LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 01/07/2020 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | JA van Schalkwyk Heritage Consultant | 16/11/2020 - 12:05 |
HIA for Portion 59 of the Farm Bultfontein 533 JQ | HERITAGE IMPACT ASSESSMENT REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) Heritage Impact Assessment requried under Section 38 (8) of the NHRA (No 25 of 1999) for the the Proposed Development of Vehicle Dealerships And Facilities on Portion 59 Of The Farm Bultfontein 533 JQ, Lanseria, Gauteng | HIA Phase 1 | 01/07/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 15/10/2020 - 11:30 |
Lakeside/Leeuwfontein AIA | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Lakeside/Leeuwfontein Colliery Expansion near Ogies, Mpumalanga | AIA Phase 1 | 01/07/2020 | Tobias Coetzee | Eco Elementum (Pty) Ltd | 01/04/2022 - 20:30 | |
AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTIONS OF FARM 1038 FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 02/07/2020 | Neels Kruger | Exigo3 Sustainability | ControLab South Africa (Pty) Ltd | 05/08/2020 - 15:04 |
Palaeontological Impact Assessment: Desktop Study | Palaeontological Impact Assessment: Desktop Study New Hope – Ncera Pedestrian Bridge Development Project Buffalo City Metropolitan Municipality, Eastern Cape Province | PIA Desktop | 03/07/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | ControLab South Africa (Pty) Ltd | 05/08/2020 - 15:06 |
AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA ON PORTIONS FOR THE PROPOSED NEW HOPE PEDESTRIAN WALKWAY PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 03/07/2020 | Neels Kruger | Exigo3 Sustainability | ControLab South Africa (Pty) Ltd | 05/08/2020 - 15:08 |