Displaying 17951 - 18000 of 18365
ReportRef | ReportTitle | ReportType |
ReportDate![]() |
Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Report Ikomkhulu Solar Plant | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED IKOMKHULU’S SOLAR PLANT ESTABLISHMENT ON PORTION 5 OF THE FARM ZOELENS LAAGTE 158 NEAR WINDSORTON, WITHIN DIKGATLONG LOCAL MUNICIPALITY OF THE FRANCES BAARD DISTRICT, NORTHERN CAPE PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 01/12/2022 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | 30/01/2023 - 15:54 | |
Interim Report - Phase II excavations TCHR4 and TCHR5_updated | Interim Mitigation Report - Phase 2 archaeological mitigation on sites TCHR4 and TCHR5 (TFHM3 and TFHM4) for the Samancor Tubatse Ferrochrome Smelter Plant, Fetakgomo Local Municipality, Sekhukhune District Municipality, Limpopo Province | Archaeological Permit Report | 01/12/2022 | Wouter Fourie | Royal Haskoning DHV | 01/12/2022 - 23:12 | |
Springhaas to Artemis Line 1 PIA | Palaeontological Impact Assessment for the proposed Overhead Powerline from Springhaas Collector Substation A to the Authorised Artemis Substation, Near Dealesville, Bloemfontein, Free State (Line 1) | PIA Phase 1 | 01/12/2022 | Marion Bamford | Prof Marion Bamford | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:31 |
Mukondeleli HIA | Heritage Impact Assessment: Proposed Mukondeleli Wind Energy Facility Near Secunda, Mpumalanga | HIA Phase 1 | 02/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 12/01/2023 - 11:33 |
Mukondeleli 132kV HIA | Heritage Impact Assessment: Proposed Mukondeleli Grid Connection Near Secunda, Mpumalanga | Heritage Impact Assessment Specialist Reports | 02/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 09/02/2023 - 15:47 |
The Phase 1 Archaeological Impact Assessment for the Prospecting Right Application in Northern Cape Province | The Phase 1 Archaeological Impact Assessment for the Prospecting Right application for various minerals on the farms Erin 316, Aarpan 324, portion 1 of the Farm Lizbeth 325, Dorisdale, 323, MT Vera 319, Riries Mathavale 322, and the remaining extent of Farm Rooidam 326, situated in the Magisterial District of John Taolo Gaetswe (Kuruman), Northern Cape Province | HIA Phase 1 | 04/12/2022 | Trust Mlilo | 05/12/2022 - 11:50 | ||
Heritage and Palaeontological Comparative Assessment report for Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility and associated infrastructure | Heritage and Palaeontological Comparative Assessment report for Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility and associated infrastructure, Hantam Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 05/12/2022 | Jenna Lavin | CTS Heritage | Nala Environmental (Pty) Ltd | 24/01/2023 - 14:57 |
Heritage Report Fife 44KU | Phase 1 Archaeological and Heritage Impact Assessment on Portion 4 of the farm Fife 44 KU in respect of the proposed construction of an aircraft runway in the Klaserie Private Nature Reserve, Mpumalanga Province. | HIA Phase 1 | 05/12/2022 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 19/01/2023 - 11:40 |
Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection | Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection, Hantam Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 05/12/2022 | Jenna Lavin | CTS Heritage | Nala Environmental (Pty) Ltd | 24/01/2023 - 15:22 |
Amendment of Mine rights on Heuvelfontein 215 JR | Application for Amendment of Mine rights on portions of Heuvelfontein 215 JR, Mpumalanga | HIA Phase 1 | 05/12/2022 | Alexander Antonites | Amber Earth (Pty) Ltd | 07/12/2022 - 11:48 | |
Palaeontological Impact Assessment for Kendal plots | Palaeontological Impact Assessment for the Section 102 amendment for Kendal Plots expansion, north of Kendal, Mpumalanga Province | PIA Phase 2 | 05/12/2022 | Marion Bamford | Amber Earth (Pty) Ltd | 07/12/2022 - 13:20 | |
Later Stone Age charcoal from Bushman Rock Shelter | Report to SAHRA regarding the analysis of charcoal from the Later Stone Age deposits of Bushman Rock Shelter (Limpopo Province, South Africa) | Archaeological Specialist Reports | 05/12/2022 | 14/12/2022 - 18:31 | |||
HIA: Xhariep Export Programme (XEP) Agricultural Development and associated infrastructure | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Xhariep Export Programme (XEP) Agricultural Development and associated infrastructure near Luckhoff, Free State Province | HIA Phase 1 | 05/12/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 06/01/2023 - 11:38 |
Litchenburg solar energy fascility development | Heritage Impact Assessment for the proposed development of the Lichtenburg 1 PV solar energy facility and associated infrastructure at a site near Lichtenburg under the local municipality of Ditsobotla of Ngaka Modiri Molema in the North West Province | HIA Phase 1 | 06/12/2022 | Jennifer Mokakabye | Setjo Sesho Consultants | ABO Wind Lichtenburg 1 PV (Pty) Ltd | 07/12/2022 - 23:15 |
Heritage Impact Assessment Buffelspoort Solar | Heritage Impact Assessment Specialist Reports | 06/12/2022 | Michelle | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 06/12/2022 - 13:09 | |
Letaba Six Dams Phase 1 HIA | Heritage Scoping report for the construction of 6 in-stream dams on Letaba Estate 525 LT (dam 1-5) and Portion 0 of the Farm Beaconsfield 530 LT (dam 6), Mopani District, Limpopo | HIA Phase 1 | 07/12/2022 | Frans Roodt | Shasa Heritage Consultants CC | Environmental Consultants International (ECI) | 13/01/2023 - 11:07 |
Heritage Scoping Report Driekuil, North West Province | Heritage Scoping Report Driekuil, North West Province | Heritage Scoping | 07/12/2022 | Jaco van der Walt | Beyond Heritage | Envirogistics (Pty) Ltd | 08/02/2023 - 12:30 |
Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses | Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses on Portion 36 (a Portion of Portion 19) of the Farm Tweerivier 197-JQ Madibeng Local Municipality, North-West Province. | HIA Phase 1 | 08/12/2022 | Makhosazana Mngomezulu | Vungandze Projects | 12/03/2023 - 20:59 | |
Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses | Phase 1 Heritage Impact Assessment for Section 24G Application, expansion and related operation of 4 additional broiler poultry houses on Portion 36 (a Portion of Portion 19) of the Farm Tweerivier 197-JQ Madibeng Local Municipality, North-West Province | HIA Phase 1 | 08/12/2022 | Makhosazana Mngomezulu | Vungandze Projects | Vungandze Projects | 12/03/2023 - 20:15 |
Palaeontological Impact Assessment for the proposed BWS for Bonaero Park and ORTIA, Gauteng Province | Palaeontological Impact Assessment for the proposed BWS for Bonaero Park and ORTIA, Gauteng Province | PIA Phase 2 | 09/12/2022 | Marion Bamford | Prof Marion Bamford | Lokisa Environmental Consulting CC | 01/02/2023 - 12:57 |
HIA for the Proposed Residential Township Development Montana X191 & X192 On Portions 590 & 591 on The Farm Hartebeestfontein 324-JR | HIA for the Proposed Residential Township Development Montana X191 & X192 On Portions 590 & 591 on The Farm Hartebeestfontein 324-JR, Gauteng Province | HIA Phase 1 | 09/12/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 16/01/2023 - 09:56 |
Taylor's Halt HIA | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED 132 KV TAYLORS HALT POWERLINE AND SUBSTATION IN MSUNDUZI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT KWAZULU NATAL PROVINCE | AIA Phase 1 | 10/12/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Setala Environmental | 05/04/2023 - 20:31 |
Newcastle Coal Project Palaeontological Impact Assessment | Palaeontological Impact Assessment for the Newcastle Coal Mine Project, KwaZulu Natal Province Site Visit Report (Phase 2) | PIA Phase 1 | 10/12/2022 | Marion Bamford | Prof Marion Bamford | Cabanga Environmental | 09/05/2023 - 12:20 |
Mulilo Newcastle Wind Power Gridlines HIA/PIA | Mulilo Newcastle Wind Power Gridlines HIA/PIA desktop analysis | 10/12/2022 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal and Environmental Services | 08/05/2023 - 13:13 | |
PIA report ReitzPetsana | Proposed development of Petsana, Reitz Free State: Paleontological Impact Assessment | PIA Phase 2 | 11/12/2022 | Jacobus Francois Durand | Vhubvo Archaeo-Heritage Consultants | Eskom - FSOU | 18/01/2023 - 14:38 |
ReitzPetsana: Burial Ground demarcation report | BURIAL GROUND DEMARCATION SPECIALIST REPORT FOR THE PROPOSED REITZ-PETSANA POWER LINE IN PETSANA AREA WITHIN THE JURISDICTION OF NKETOANA MUNICIPALITY OF THABO MOFUTSANYANE DISTRICT IN FREE STATE PROVINCE | Archaeological Monitoring | 11/12/2022 | Alvord Nhundu | Vhubvo Archaeo-Heritage Consultance Cc | Eskom - FSOU | 18/01/2023 - 14:45 |
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED LIQUEFIED PETROLEUM GAS (LPG) STORAGE FACILITY ON ERF 79 MARELDEN EXTENSION 5 TOWNSHIP WITHIN EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 12/12/2022 | Trust Mlilo | 26/01/2023 - 11:31 | ||
palaeontology | Palaeontological Impact Assessment for a mining right application on various portions of the farm Mooihoek 168-HT, Klipspruit 136-HT, Klipspruit 137-HT, Klipspruit 138-HT Located in the Magisterial District of Piet Retief, Mpumalanga Province. | PIA Phase 1 | 12/12/2022 | 15/12/2022 - 08:00 | |||
Ga-Rankuwa Unit 23 Stand 1719 and Unit 25 Stand 1427 | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR PROPOSED GA RANKUWA UNIT 23 STAND 1719 AND UNIT 25 NUMBER 1427 RESIDENTIAL DEVELOPMENT PROJECT IN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY IN THE GAUTENG PROVINCE | AIA Phase 1 | 13/12/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Setala Environmental | 15/03/2023 - 10:42 |
Later Stone Age bone tools from Bushman Rock Shelter | "Étude typo-technologique des industries osseuses Later Stone Age de Bushman Rock Shelter (Limpopo, Afrique du Sud)" Typo-technological study of the osseous Later Stone Age industries from Bushman Rock Shelter (Limpopo, South Africa). | Archaeological Specialist Reports | 13/12/2022 | Aurore Val | 13/12/2022 - 18:45 | ||
Aries – Upington 400kV Line, Northern Cape Province | Heritage walk-down for the approved Aries – Upington 400kV Line, Northern Cape Province | HIA Phase 2 | 13/12/2022 | Jaco van der Walt | Beyond Heritage | Eskom | 28/03/2023 - 06:42 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: S24G PROCESS:CONSTRUCTION AND INFILLING OF WATERCOURSE ON TIEGERPOORT FARM, GAUTENG | PIA Desktop | 14/12/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | 02/03/2023 - 13:32 | |
HIA report Road D1480 Borrow Pits at Mafiyane, Mogabane & Pashaskraal | Phase 1 Heritage Impact Assessment Report. Road D1480: Borrow Pits at Mafiyane, Mogabane & Pashaskraal. Greater Sekhukhune District Municipality. | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Frans Roodt | Gudani Consulting | 14/12/2022 - 17:24 | |
Heuweltjies WEF Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE HEUWELTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 10/01/2023 - 15:25 |
Kraaltjies WEF Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE KRAALTJIES WIND ENERGY FACILITY, NEAR BEAUFORT WEST, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 14/12/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 10/01/2023 - 15:37 |
Bojanala HIA | Cultural Heritage Impact Assessment: THE DEVELOPMENT OF THE PROPOSED BOJANALA SEZ AND ASSOCIATED POWER LINE AND WATER PIPELINE IN THE BOJANALA DISTRICT MUNICIPALITY OF NORTH WEST PROVINCE | HIA Phase 1 | 15/12/2022 | J A van Schalkwyk | 06/02/2023 - 15:47 | ||
HIA for the proposed township establishment extension 42 on Portion 11 of the farm Tweefontein 915 LS | Proposed Township Establishment Extension 42 on Portion 11 of the Farm Tweefontein 915 LS within Polokwane Local Municipality of the Capricorn District, Limpopo Province | 15/12/2022 | Frans Roodt | Phaki Phakanani | 15/12/2022 - 11:56 | ||
Debushing of land for agricultural purposes on the farm Naude's Rust, Lows Creek area | A Phase 1 AIA & HIA for the proposed Naude's Rust debushing project on portions 17 & 21 of the farm Naude's Rust, Kaapmuiden, Mpumalanga Province | AIA Phase 1 | 15/12/2022 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 15/12/2022 - 12:28 |
Manogeng Brief Heritage Report | Manogeng Switching Station development - Archaeological Rescue of Human Remains and Artefacts from the site of the Construction of the Manogeng Switching Station Near Roossenekal, Elias Motsoaledi Local Municipality, Limpopo Province | 15/12/2022 | Edward Matenga | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 01/02/2023 - 15:11 | |
Silos on Portions 13, 14 and the Remaining Extent of Portion 4 of the farm Waagkraal 374IO | Motivation for Exemption from a full Phase I Heritage Impact Assessment – Development of Silos on various portions of the farm Waagkraal 374IO, near Ottosdal in the Northwest Province | HIA Letter of Exemption | 15/12/2022 | Anton Pelser | A Pelser Archaeological Consulting | AB Enviro Consult CC | 10/01/2023 - 14:10 |
Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Combined with Waste License Application to Prospect for Chrome Ore (Cr), LG & MG Seams Together with Platinum Group Metals (PGM) on a certain Portion of the Remaining Extent and a certain Portion of Portion 2 of the Farm Uitvalgrond 105 JQ, Rustenburg Local Municipality, Bojanala Platinum District Municipality North West Province | HIA Phase 1 | 15/12/2022 | Francois Coetzee | Francois P Coetzee | Milnex 189 CC | 26/02/2023 - 18:52 |
Paleontological Exemption letter | PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR CHROME ORE (CR), LG & MG SEAMS TOGETHER WITH PLATINUM GROUP METALS (PGM), NEAR RUSTENBURG ON A CERTAIN PORTION OF THE REMAINING EXTENT, A CERTAIN PORTION OF PORTION 1 & A CERTAIN PORTION OF PORTION 2 OF THE FARM UITVALGROND 105, REGISTRATION DIVISION JQ, NORTH WEST PROVINCE. THE PROPERTY IS LOCATED APPROXIMATELY 18KM NORTH WEST OF RUSTENBURG. NW30/5/1/3/3/2/1/13418PR | Palaeontological Specialist Reports | 15/12/2022 | Elize Butler | BANZAI ENVIRONMENTAL (PTY) LTD. | Milnex 189 CC | 26/02/2023 - 18:54 |
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, WESTERN CAPE AND NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 13:08 |
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, WESTERN CAPE AND NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 13:11 |
Heritage Impact Assessment for Mura 1-4 PV | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA 1-4 PV FACILITIES, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND VICTORIA WEST MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 15:23 |
Heritage Impact Assessment for Mura EGI | HERITAGE IMPACT ASSESSMENT: PROPOSED MURA ELECTRICAL GRID INFRASTRUCTURE, BEAUFORT WEST MAGISTERIAL DISTRICT, WESTERN CAPE AND VICTORIA WEST MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 15/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 06/03/2023 - 16:30 |
Cape Lime EMPR Upgrade HIA Report | Phase 1 Archaeological Impact Assessment of the proposed upgrade of Afrimat Limited’s Cape Lime mining right and internal road near Vredendal in Vredendal Magisterial District, Western Cape Province | AIA Phase 1 | 18/12/2022 | Trust Mlilo | Sativa Travel and Environmental Consultants | Cape Lime | 19/01/2022 - 21:37 |
Gloria Paleo Exemption letter | Exemption Letter – Basic Assessment Report for the Proposed Prospecting Activities on Various Properties in the Magisterial District of Kuruman, Northern Cape for Salene Manganese (Pty) Ltd | Palaeontological Specialist Reports | 19/12/2022 | Heidi Fourie | 23/12/2022 - 08:49 | ||
Springhaas to Artemis Line 2 HIA | HERITAGE IMPACT ASSESSMENT: PROPOSED POWERLINE FROM THE SPRINGHAAS COLLECTOR SUBSTATION B TO THE AUTHORISED ARTEMIS SUBSTATION NEAR DEALESVILLE, FREE STATE Heritage Impact Assessment: Proposed powerline from the Springhaas Collector Substation B to the authorised Artemis substation near Dealesville, Free State | HIA Phase 2 | 20/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:52 |
Paleontological Desktop Assessment | ESTABLISHMENT OF BLACK ROCK SOLAR PV FACILITY, HOTAZEL, NORTHEN CAPE PROVINCE | PIA Desktop | 20/12/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EScience Associates (Pty) Ltd | 02/03/2023 - 07:16 |