Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18001 - 18050 of 18975
ReportRef | ReportTitle | ReportType |
ReportDate![]() |
Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA-Invest in Property126 (Pty) Ltd | PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 10/11/2022 | Alvord Nhundu | Biomental Services (Pty) Ltd | Biomental Services (Pty) Ltd | 20/09/2023 - 20:44 |
Form A | 10/11/2022 | 18/11/2022 - 11:23 | |||||
invest in Property Heritage Impact Assessment Phase I | PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 10/11/2022 | Alvord Nhundu | Biomental Services (Pty) Ltd | 12/04/2023 - 20:54 | |
Heritage Impact Assessment | MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON VARIOUS PORTIONS OF FOUR FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 HT AND KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA. | HIA Phase 1 | 10/11/2022 | 15/12/2022 - 07:51 | |||
Heritage Impact Assessment | MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON VARIOUS PORTIONS OF FOUR FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 HT AND KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA. | HIA Phase 1 | 10/11/2022 | 15/12/2022 - 07:53 | |||
Ezelsjacht SEF Archaeological and Cultural Heritage SSVR | Heritage Scoping | 11/11/2022 | Jayson Orton | 14/11/2022 - 16:28 | |||
HIA FOR THE SAMPOFU SUPPLY REGIONAL WATER SUPPLY SCHEME, PHASE 2, KZN | HIA FOR THE SAMPOFU SUPPLY REGIONAL WATER SUPPLY SCHEME, PHASE 2, KZN. | HIA Phase 2 | 11/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 15/08/2023 - 09:38 | |
Sutherland 2 WEF Palaeontological Pre-Construction Walkthrough Report | Sutherland 2 WEF Palaeontological Pre-Construction Walkthrough Report | Palaeontological Specialist Reports | 11/11/2022 | John Almond | Natura Viva CC | Nala Environmental (Pty) Ltd | 22/11/2022 - 13:46 |
Ezelsjacht WEF Archaeological and Cultural Heritage SSVR | Heritage Scoping | 11/11/2022 | Jayson Orton | 14/11/2022 - 20:42 | |||
Palaeontological Impact Assessment for the proposed Birdsong Vodacom Mast, NNE of Modimolle, Limpopo Province | Palaeontological Impact Assessment for the proposed Birdsong Vodacom Mast, NNE of Modimolle, Limpopo Province | PIA Desktop | 11/11/2022 | Marion Bamford | Prof Marion Bamford | Tekplan Environmental | 30/01/2023 - 12:37 |
EXEMPTION FROM ARCHAEOLOGICAL IMPACT ASSESSMENT | RECOMMENDED EXEMPTION FROM ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED EXPANSION OF THE NEW STYLE PORK (PTY) LTD LANGKUIL PIGGERY, MEYERTON, GAUTENG PROVINCE | Heritage Statement | 11/11/2022 | Tobias Coetzee | Tobias Coetzee | 15/11/2022 - 11:09 | |
TSHIKOTA CEMETERY SITE HIA | A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE TSHIKOTA CEMETERY EXTENSION PROJECT LOCATED IN THE MAKHADO LOCAL MUNICIPALITY OF THE LIMPOPO PROVINCE | HIA Phase 1 | 11/11/2022 | Anton Apelser | APELSER ARCHAELOGICAL CONSULTING | 18/11/2022 - 07:59 | |
LOE: Transalloys PV | LOE: Desktop Heritage Screening Assessment for the proposed development of the Transalloys Photovoltaic (PV) Solar Energy Facility, Emalahleni Local Municipality, Nkangala District Municipality, Mpumalanga province, South Africa. | HIA Letter of Exemption | 11/11/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 05/04/2023 - 10:53 |
Phase 1 HIA Prieska Power Reserve | Phase 1 HIA new wind energy facility on parts if farms Prieska A/A, Karabee 50, Prieskas Poort 51 and Keikams oort 71 near Prieska, Northern Cape Province | HIA Phase 1 | 14/11/2022 | Lloyd Rossouw | 30/11/2022 - 10:02 | ||
Addemdum: Vetlaagte Heritage | UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS - Heritage Impacts | Heritage Impact Assessment Specialist Reports | 14/11/2022 | Jenna Lavin | CTS Heritage | Landscape Dynamics Environmental Consultants | 15/11/2022 - 11:10 |
HIA Paradise Solar PV Project | Phase 1 Cultural Heritage Impact Assessment: PROPOSED PARADISE 100MW SOLAR PHOTOVOLTAIC (PV) & 40MW BATTERY ENERGY STORAGE SYSTEMS (BESS) PROJECT SOUTH OF BLOEMFONTEIN, FREE STATE PROVINCE | HIA Phase 1 | 14/11/2022 | JA VAN SCHALKWYK | JA van Schalkwyk Heritage Consultant | Nemai Consulting | 20/01/2023 - 13:13 |
Vetlaagte ADDENDUM TO THE HIA REPORT | ADDENDUM TO THE HIA REPORT UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS | Heritage Statement | 14/11/2022 | Jenna Lavin | CTS Heritage | Landscape Dynamics - Cape Town | 30/11/2022 - 08:49 |
Heritage Screener: Limestone PV 2 | Desktop Heritage Screening Assessment: Limestone PV 2 Solar Energy Facility, Northern Cape Province | Heritage Scoping | 15/11/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 16/01/2023 - 16:25 |
Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report | Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report | Heritage Study | 15/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:34 |
Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF | Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF | Palaeontological Specialist Reports | 15/11/2022 | Elize Butler | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:38 |
Khangela Emoyeni WEF - Heritage Pre-Construction Walkthrough Report | Khangela Emoyeni WEF - Heritage Pre-Construction Walkthrough Report | Heritage Impact Assessment Specialist Reports | 15/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:43 |
Palaeontological Pre-construction Walkthrough Report - Khangela Emoyeni WEF | Palaeontological Pre-construction Walkthrough Report - Khangela Emoyeni WEF | Palaeontological Specialist Reports | 15/11/2022 | Elize Butler | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 15/11/2022 - 12:46 |
Stella Road, Memorial Park Church | Motivation for Demolition Permit Application | Significance Report | 15/11/2022 | Andile Gwala | Deep Thought Architecture | 18/11/2022 - 07:32 | |
Heritage Screener: Limestone PV 1 | Desktop Heritage Screening Assessment: Limestone PV 1 Solar Energy Facility, Northern Cape Province | Heritage Scoping | 15/11/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 16/01/2023 - 16:22 |
NAMBITI GAME RESERVE SURVEY AND MANAGEMENT PLAN | NAMBITI GAME RESERVE SURVEY AND MANAGEMENT PLAN | Conservation Management Plan | 16/11/2022 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 23/11/2022 - 10:28 |
Preliminary Report on Chance Discoveries of Human Remains | Preliminary Report on Chance Discoveries of Human Remains at Two Rivers Platinum Mine, October-November 2022 | Archaeological Permit Report | 16/11/2022 | Edward Matenga | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 16/11/2022 - 11:02 |
Leeumax PV Heritage Impact Report | DEVELOPMENT OF THE LEEUMAX 1 SOLAR PV FACILITY, 15MW AND ASSOCIATED INFRA-STRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/11/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 25/11/2022 - 15:33 |
Leemax 1 Solar PV Heritage Impact Assessment | DEVELOPMENT OF THE LEEUMAX 1 SOLAR PV FACILITY, 15MW AND ASSOCIATED INFRA-STRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 17/11/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 10/01/2023 - 16:23 |
Nkambeni Substation HIA | PHASE 1 HIA REPORT FOR THE ESKOM NKAMBENI SUBSTATION LOCATED ON PORTION 115 OF THE FARM BURGERS HALL 21JU MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA | HIA Phase 1 | 17/11/2022 | Anton Apelser | APELSER ARCHAEOLOGICAL CONSULTING | 12/05/2023 - 11:27 | |
PROPOSED WATERKLOOF EXTENSION 74 DEVELOPMENT ON PORTIONS 60, 214 & 269 OF THE FARM WATERKLOOF 305JQ | PHASE 1 HIA REPORT FOR THE PROPOSED WATERKLOOF EXTENSION 74 DEVELOPMENT ON PORTIONS 60, 214 & 269 OF THE FARM WATERKLOOF 305JQ NEAR RUSTENBURG IN THE RUSTENBURG LOCAL MUNICIPALITY OF NORTHWEST | HIA Phase 1 | 17/11/2022 | Anton Pelser | A Pelser Archaeological Consulting | AB Enviro Consult CC | 16/01/2023 - 12:27 |
Nkambeni Substation HIA | PHASE 1 HIA REPORT FOR THE ESKOM NKAMBENI SUBSTATION LOCATED ON PORTION 115 OF THE FARM BURGERS HALL 21JU MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA | HIA Phase 1 | 17/11/2022 | Anton Apelser | APELSER ARCHAEOLOGICAL CONSULTING | 12/05/2023 - 11:45 | |
Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality | Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality | HIA Phase 1 | 18/11/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 07/02/2023 - 21:49 |
Heritage Report | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED MINING PERMIT APPLICATION ON PORTION OF PORTION 2 OF THE FARM COUWENBURG 300 IR UNDER THE MAGISTERIAL DISTRICT OF VICTOR KHANYE, MPUMALANGA PROVINCE. | HIA Phase 1 | 18/11/2022 | Trust Mlilo | 13/12/2022 - 15:55 | ||
AIA Portion 13 of the Farm 328 | AIA Portion 13 of the Farm 328 | AIA Phase 1 | 18/11/2022 | Kobus Reichert | 21/07/2023 - 10:35 | ||
Sutherland 2 WEF Archaeological Pre-Construction Walkthrough Report | Sutherland 2 WEF Archaeological Pre-Construction Walkthrough Report | Archaeological Specialist Reports | 18/11/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | Nala Environmental (Pty) Ltd | 22/11/2022 - 13:44 |
Heritage report for house at 3 Monmouth Crescent, Durban North | Heritage report for house and garage at 3 Monmouth Crescent, Erf 2701, Durban North, eThekwini Municipality, Durban | Heritage Statement | 18/11/2022 | Amanda Lead | 18/11/2022 - 15:20 | ||
Stilfontein Truck Stop and Filling Station | Phase 1 Heritage Impact Assessment (HIA) for Stilfontein Truck Stop and Filling Station | HIA Phase 1 | 18/11/2022 | Ane Agenbacht | Sapphire Environmental Consulting | Sapphire Environmental Consulting | 16/08/2022 - 14:29 |
Palaeontological Impact Assessment for the proposed Palm Ridge X43 township development on Farm Rietspruit 152-IR, Midvaal, Gauteng Province | Palaeontological Impact Assessment for the proposed Palm Ridge X43 township development on Farm Rietspruit 152-IR, Midvaal, Gauteng Province | PIA Desktop | 18/11/2022 | Marion Bamford | Prof Marion Bamford | Isquare Environmental Planning and GIS | 07/02/2023 - 21:46 |
Heritage Impact Assessment | A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 21/11/2022 | Anton van Vollenhoven | Archaetnos CC | EScience Associates (Pty) Ltd | 02/03/2023 - 07:13 |
DBG6952 - DBAR - Appendix E.1 - Heritage | Integrated Regulatory Process for the De Beers Group Venetia Mine near Alldays, Limpopo Province: Consolidated Heritage Impact Assessment | HIA Phase 1 | 21/11/2022 | Shannon Hardwick, Johan Nel | Digby Wells Environmental | De Beers Consolidated Mines - Venetia Mine | 05/12/2022 - 14:54 |
Pietermaritzburg Pedestrian bridge | Inspection Report | Site Inspection Report | 21/11/2022 | 24/11/2022 - 15:58 | |||
The proposed “Gem Valley X17-X27” within the jurisdiction of City of Tshwane Metropolitan Municipality, Gauteng Province | HIA for the proposed “Gem Valley X17-X27” within the jurisdiction of City of Tshwane Metropolitan Municipality, Gauteng Province | HIA Phase 1 | 21/11/2022 | Jaco van der Walt | Beyond Heritage | Isquare Environmental Planning and GIS | 20/12/2022 - 13:40 |
AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | AIA Phase 1 | 21/11/2022 | Karen Van Ryneveld | 21/11/2022 - 06:27 | ||
PIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | PIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | PIA Phase 1 | 21/11/2022 | Elize Butler | 21/11/2022 - 06:32 | ||
1477 HIA_Glencore Rhovan | Heritage Impact Assessment report for the proposed Glencore Rhovan Solar Photovoltaic Facility. | Heritage Impact Assessment Specialist Reports | 22/11/2022 | 22/11/2022 - 10:31 | |||
Desktop PIA, Application for Exemption Phase 1 PIA Kendal Power Station | Application letter for exemption from Phase 1 site visit PROPOSED DEVELOPMENT OF A LOW PRESSURE SYSTEM (LPS) PIPELINE AND 11KV POWERLINE IN ASSOCIATION WITH AN EXISTING AUTHORISED (EA DATED 28 JULY 2015) ASH DISPOSAL FACILITY (ADF) AT THE KENDAL POWER STATION, EMALAHLENI AND DELMAS LOCAL MUNICIPALITIES, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | PIA Desktop | 22/11/2022 | Gideon Groenewald | Vungandze Projects | 29/11/2022 - 10:17 | |
KANANA HIA | a Phase 1 Heritage Impact Assessment for the proposed township establishment on Portion 100 of Farm Nooitgedacht 434-IP within the jurisdiction of City of Matlosana LM in the North West Province | HIA Phase 1 | 22/11/2022 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Ditsamai Investments & Projects (Pty) Ltd | 23/08/2023 - 13:01 |
Graves at Zithulele hospital | FINAL ARCHAEOLOGICAL REPORT A REPORT ON THE A REPORT ON THE ASSESSMENT OF POSSIBLE GRAVES AT ZITHULELE HOSPITAL, EASTERN CAPE PROVINCE | BGG Phase 2 | 23/11/2022 | Anton van Vollenhoven | Archaetnos CC | WSP Group Africa (Pty) Ltd | 14/12/2022 - 07:48 |
Karee WEF&Grid Heritage Impact Assessment Report | PROPOSED CONSTRUCTION OF THE KAREE WIND ENERGY FACILITY, BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED GRID INFRASTRUCTURE, NEAR TOUWSRIVIER, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/11/2022 | John E. Almond | Natura Viva CC | SiVEST SA (Pty) Ltd | 07/12/2022 - 14:29 |
Patatskloof WEF&Grid Heritage Impact Assessment | PROPOSED CONSTRUCTION OF THE PATATSKLOOF WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR CERES, WESTERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 23/11/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 07/12/2022 - 15:18 |