FindReports

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
HIA-Invest in Property126 (Pty) Ltd PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd Biomental Services (Pty) Ltd 20/09/2023 - 20:44
Form A 10/11/2022 18/11/2022 - 11:23
invest in Property Heritage Impact Assessment Phase I PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED MINING RIGHT ON THE FARM VILJOENSHOF 1655 IN BOSHOF WITHIN THE JURISDICTION OF TOKOLOGO LOCAL MUNICIPALITY OF LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 10/11/2022 Alvord Nhundu Biomental Services (Pty) Ltd 12/04/2023 - 20:54
Heritage Impact Assessment MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON VARIOUS PORTIONS OF FOUR FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 HT AND KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA. HIA Phase 1 10/11/2022 15/12/2022 - 07:51
Heritage Impact Assessment MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON VARIOUS PORTIONS OF FOUR FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 HT AND KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA. HIA Phase 1 10/11/2022 15/12/2022 - 07:53
Ezelsjacht SEF Archaeological and Cultural Heritage SSVR Heritage Scoping 11/11/2022 Jayson Orton 14/11/2022 - 16:28
HIA FOR THE SAMPOFU SUPPLY REGIONAL WATER SUPPLY SCHEME, PHASE 2, KZN HIA FOR THE SAMPOFU SUPPLY REGIONAL WATER SUPPLY SCHEME, PHASE 2, KZN. HIA Phase 2 11/11/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 15/08/2023 - 09:38
Sutherland 2 WEF Palaeontological Pre-Construction Walkthrough Report Sutherland 2 WEF Palaeontological Pre-Construction Walkthrough Report Palaeontological Specialist Reports 11/11/2022 John Almond Natura Viva CC Nala Environmental (Pty) Ltd 22/11/2022 - 13:46
Ezelsjacht WEF Archaeological and Cultural Heritage SSVR Heritage Scoping 11/11/2022 Jayson Orton 14/11/2022 - 20:42
Palaeontological Impact Assessment for the proposed Birdsong Vodacom Mast, NNE of Modimolle, Limpopo Province Palaeontological Impact Assessment for the proposed Birdsong Vodacom Mast, NNE of Modimolle, Limpopo Province PIA Desktop 11/11/2022 Marion Bamford Prof Marion Bamford Tekplan Environmental 30/01/2023 - 12:37
EXEMPTION FROM ARCHAEOLOGICAL IMPACT ASSESSMENT RECOMMENDED EXEMPTION FROM ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED EXPANSION OF THE NEW STYLE PORK (PTY) LTD LANGKUIL PIGGERY, MEYERTON, GAUTENG PROVINCE Heritage Statement 11/11/2022 Tobias Coetzee Tobias Coetzee 15/11/2022 - 11:09
TSHIKOTA CEMETERY SITE HIA A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE TSHIKOTA CEMETERY EXTENSION PROJECT LOCATED IN THE MAKHADO LOCAL MUNICIPALITY OF THE LIMPOPO PROVINCE HIA Phase 1 11/11/2022 Anton Apelser APELSER ARCHAELOGICAL CONSULTING 18/11/2022 - 07:59
LOE: Transalloys PV LOE: Desktop Heritage Screening Assessment for the proposed development of the Transalloys Photovoltaic (PV) Solar Energy Facility, Emalahleni Local Municipality, Nkangala District Municipality, Mpumalanga province, South Africa. HIA Letter of Exemption 11/11/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 05/04/2023 - 10:53
Phase 1 HIA Prieska Power Reserve Phase 1 HIA new wind energy facility on parts if farms Prieska A/A, Karabee 50, Prieskas Poort 51 and Keikams oort 71 near Prieska, Northern Cape Province HIA Phase 1 14/11/2022 Lloyd Rossouw 30/11/2022 - 10:02
Addemdum: Vetlaagte Heritage UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS - Heritage Impacts Heritage Impact Assessment Specialist Reports 14/11/2022 Jenna Lavin CTS Heritage Landscape Dynamics Environmental Consultants 15/11/2022 - 11:10
HIA Paradise Solar PV Project Phase 1 Cultural Heritage Impact Assessment: PROPOSED PARADISE 100MW SOLAR PHOTOVOLTAIC (PV) & 40MW BATTERY ENERGY STORAGE SYSTEMS (BESS) PROJECT SOUTH OF BLOEMFONTEIN, FREE STATE PROVINCE HIA Phase 1 14/11/2022 JA VAN SCHALKWYK JA van Schalkwyk Heritage Consultant Nemai Consulting 20/01/2023 - 13:13
Vetlaagte ADDENDUM TO THE HIA REPORT ADDENDUM TO THE HIA REPORT UKUQALA GRID CONNECTION PROJECT: CHANGES TO PROJECT COMPONENTS Heritage Statement 14/11/2022 Jenna Lavin CTS Heritage Landscape Dynamics - Cape Town 30/11/2022 - 08:49
Heritage Screener: Limestone PV 2 Desktop Heritage Screening Assessment: Limestone PV 2 Solar Energy Facility, Northern Cape Province Heritage Scoping 15/11/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 16/01/2023 - 16:25
Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report Umsinde Emoyeni WEF Heritage Pre-Construction Walkthrough Report Heritage Study 15/11/2022 Nikki Mann PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 15/11/2022 - 12:34
Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF Palaeontological Pre-Construction Walkthrough Report- Umsinde WEF Palaeontological Specialist Reports 15/11/2022 Elize Butler PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 15/11/2022 - 12:38
Khangela Emoyeni WEF - Heritage Pre-Construction Walkthrough Report Khangela Emoyeni WEF - Heritage Pre-Construction Walkthrough Report Heritage Impact Assessment Specialist Reports 15/11/2022 Nikki Mann PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 15/11/2022 - 12:43
Palaeontological Pre-construction Walkthrough Report - Khangela Emoyeni WEF Palaeontological Pre-construction Walkthrough Report - Khangela Emoyeni WEF Palaeontological Specialist Reports 15/11/2022 Elize Butler PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 15/11/2022 - 12:46
Stella Road, Memorial Park Church Motivation for Demolition Permit Application Significance Report 15/11/2022 Andile Gwala Deep Thought Architecture 18/11/2022 - 07:32
Heritage Screener: Limestone PV 1 Desktop Heritage Screening Assessment: Limestone PV 1 Solar Energy Facility, Northern Cape Province Heritage Scoping 15/11/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 16/01/2023 - 16:22
NAMBITI GAME RESERVE SURVEY AND MANAGEMENT PLAN NAMBITI GAME RESERVE SURVEY AND MANAGEMENT PLAN Conservation Management Plan 16/11/2022 Celeste Rossouw KwaZulu-Natal Amafa and Research Institute KwaZulu-Natal Amafa and Research Institute 23/11/2022 - 10:28
Preliminary Report on Chance Discoveries of Human Remains Preliminary Report on Chance Discoveries of Human Remains at Two Rivers Platinum Mine, October-November 2022 Archaeological Permit Report 16/11/2022 Edward Matenga Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 16/11/2022 - 11:02
Leeumax PV Heritage Impact Report DEVELOPMENT OF THE LEEUMAX 1 SOLAR PV FACILITY, 15MW AND ASSOCIATED INFRA-STRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 17/11/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 25/11/2022 - 15:33
Leemax 1 Solar PV Heritage Impact Assessment DEVELOPMENT OF THE LEEUMAX 1 SOLAR PV FACILITY, 15MW AND ASSOCIATED INFRA-STRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 17/11/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 10/01/2023 - 16:23
Nkambeni Substation HIA PHASE 1 HIA REPORT FOR THE ESKOM NKAMBENI SUBSTATION LOCATED ON PORTION 115 OF THE FARM BURGERS HALL 21JU MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA HIA Phase 1 17/11/2022 Anton Apelser APELSER ARCHAEOLOGICAL CONSULTING 12/05/2023 - 11:27
PROPOSED WATERKLOOF EXTENSION 74 DEVELOPMENT ON PORTIONS 60, 214 & 269 OF THE FARM WATERKLOOF 305JQ PHASE 1 HIA REPORT FOR THE PROPOSED WATERKLOOF EXTENSION 74 DEVELOPMENT ON PORTIONS 60, 214 & 269 OF THE FARM WATERKLOOF 305JQ NEAR RUSTENBURG IN THE RUSTENBURG LOCAL MUNICIPALITY OF NORTHWEST HIA Phase 1 17/11/2022 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 16/01/2023 - 12:27
Nkambeni Substation HIA PHASE 1 HIA REPORT FOR THE ESKOM NKAMBENI SUBSTATION LOCATED ON PORTION 115 OF THE FARM BURGERS HALL 21JU MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA HIA Phase 1 17/11/2022 Anton Apelser APELSER ARCHAEOLOGICAL CONSULTING 12/05/2023 - 11:45
Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality Heritage Impact Assessment for the proposed residential township development on Portion 34 of the Farm Rietspruit 152-IR, Ekurhuleni Metropolitan Municipality HIA Phase 1 18/11/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 07/02/2023 - 21:49
Heritage Report PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED MINING PERMIT APPLICATION ON PORTION OF PORTION 2 OF THE FARM COUWENBURG 300 IR UNDER THE MAGISTERIAL DISTRICT OF VICTOR KHANYE, MPUMALANGA PROVINCE. HIA Phase 1 18/11/2022 Trust Mlilo 13/12/2022 - 15:55
AIA Portion 13 of the Farm 328 AIA Portion 13 of the Farm 328 AIA Phase 1 18/11/2022 Kobus Reichert 21/07/2023 - 10:35
Sutherland 2 WEF Archaeological Pre-Construction Walkthrough Report Sutherland 2 WEF Archaeological Pre-Construction Walkthrough Report Archaeological Specialist Reports 18/11/2022 Jayson Orton ASHA Consulting(Pty) Ltd Nala Environmental (Pty) Ltd 22/11/2022 - 13:44
Heritage report for house at 3 Monmouth Crescent, Durban North Heritage report for house and garage at 3 Monmouth Crescent, Erf 2701, Durban North, eThekwini Municipality, Durban Heritage Statement 18/11/2022 Amanda Lead 18/11/2022 - 15:20
Stilfontein Truck Stop and Filling Station Phase 1 Heritage Impact Assessment (HIA) for Stilfontein Truck Stop and Filling Station HIA Phase 1 18/11/2022 Ane Agenbacht Sapphire Environmental Consulting Sapphire Environmental Consulting 16/08/2022 - 14:29
Palaeontological Impact Assessment for the proposed Palm Ridge X43 township development on Farm Rietspruit 152-IR, Midvaal, Gauteng Province Palaeontological Impact Assessment for the proposed Palm Ridge X43 township development on Farm Rietspruit 152-IR, Midvaal, Gauteng Province PIA Desktop 18/11/2022 Marion Bamford Prof Marion Bamford Isquare Environmental Planning and GIS 07/02/2023 - 21:46
Heritage Impact Assessment A Report on a Heritage Impact Assessment for a Proposed Solar Plant and Infrastructure on the Farm Kipling, Black Rock Mining Operations, Close to Hotazel, Northern Cape Province Heritage Impact Assessment Specialist Reports 21/11/2022 Anton van Vollenhoven Archaetnos CC EScience Associates (Pty) Ltd 02/03/2023 - 07:13
DBG6952 - DBAR - Appendix E.1 - Heritage Integrated Regulatory Process for the De Beers Group Venetia Mine near Alldays, Limpopo Province: Consolidated Heritage Impact Assessment HIA Phase 1 21/11/2022 Shannon Hardwick, Johan Nel Digby Wells Environmental De Beers Consolidated Mines - Venetia Mine 05/12/2022 - 14:54
Pietermaritzburg Pedestrian bridge Inspection Report Site Inspection Report 21/11/2022 24/11/2022 - 15:58
The proposed “Gem Valley X17-X27” within the jurisdiction of City of Tshwane Metropolitan Municipality, Gauteng Province HIA for the proposed “Gem Valley X17-X27” within the jurisdiction of City of Tshwane Metropolitan Municipality, Gauteng Province HIA Phase 1 21/11/2022 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 20/12/2022 - 13:40
AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape AIA Phase 1 21/11/2022 Karen Van Ryneveld 21/11/2022 - 06:27
PIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape PIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape PIA Phase 1 21/11/2022 Elize Butler 21/11/2022 - 06:32
1477 HIA_Glencore Rhovan Heritage Impact Assessment report for the proposed Glencore Rhovan Solar Photovoltaic Facility. Heritage Impact Assessment Specialist Reports 22/11/2022 22/11/2022 - 10:31
Desktop PIA, Application for Exemption Phase 1 PIA Kendal Power Station Application letter for exemption from Phase 1 site visit PROPOSED DEVELOPMENT OF A LOW PRESSURE SYSTEM (LPS) PIPELINE AND 11KV POWERLINE IN ASSOCIATION WITH AN EXISTING AUTHORISED (EA DATED 28 JULY 2015) ASH DISPOSAL FACILITY (ADF) AT THE KENDAL POWER STATION, EMALAHLENI AND DELMAS LOCAL MUNICIPALITIES, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. PIA Desktop 22/11/2022 Gideon Groenewald Vungandze Projects 29/11/2022 - 10:17
KANANA HIA a Phase 1 Heritage Impact Assessment for the proposed township establishment on Portion 100 of Farm Nooitgedacht 434-IP within the jurisdiction of City of Matlosana LM in the North West Province HIA Phase 1 22/11/2022 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Ditsamai Investments & Projects (Pty) Ltd 23/08/2023 - 13:01
Graves at Zithulele hospital FINAL ARCHAEOLOGICAL REPORT A REPORT ON THE A REPORT ON THE ASSESSMENT OF POSSIBLE GRAVES AT ZITHULELE HOSPITAL, EASTERN CAPE PROVINCE BGG Phase 2 23/11/2022 Anton van Vollenhoven Archaetnos CC WSP Group Africa (Pty) Ltd 14/12/2022 - 07:48
Karee WEF&Grid Heritage Impact Assessment Report PROPOSED CONSTRUCTION OF THE KAREE WIND ENERGY FACILITY, BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED GRID INFRASTRUCTURE, NEAR TOUWSRIVIER, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/11/2022 John E. Almond Natura Viva CC SiVEST SA (Pty) Ltd 07/12/2022 - 14:29
Patatskloof WEF&Grid Heritage Impact Assessment PROPOSED CONSTRUCTION OF THE PATATSKLOOF WIND ENERGY FACILITY AND ASSOCIATED GRID INFRASTRUCTURE, NEAR CERES, WESTERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 23/11/2022 Nikki Mann PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 07/12/2022 - 15:18

Pages

CSV
 
 