Displaying 18151 - 18200 of 18975
ReportRef | ReportTitle | ReportType |
ReportDate![]() |
Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Walkthrough Report | Site Inspection Report | 03/01/2023 | 24/01/2023 - 16:11 | ||||
Heritage Walkthrough Report | Site Inspection Report | 03/01/2023 | 30/01/2023 - 17:34 | ||||
RBM 2022 | The Archaeological Surveys and Excavations of the Zulti North Mining Lease | Archaeological Permit Report | 03/01/2023 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 10/02/2023 - 12:31 |
Heritage Impact Assessment Mahikeng | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF STUDENT HOUSING ON ERF 1733 MMABATHO UNIT 6, MAHIKENG LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 05/01/2023 | Leonie Marais-Botes | Leonie Marais Botes | Environmental Consultants International (ECI) | 10/08/2023 - 09:05 |
HIA Gamma Gridline Corridor | HERITAGE IMPACT ASSESSMENT: PROPOSED GAMMA GRIDLINE CORRIDOR, WESTERN AND NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 05/01/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | Red Cap Hoogland 1 (Pty) Ltd | 01/03/2023 - 14:34 |
Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carletonville, Gauteng and North West Provinces Mopane Solar PV 4 | Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carletonville, Gauteng and North West Provinces Mopane Solar PV 4 | PIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 20/06/2023 - 11:37 |
Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces Mopane Solar PV 1 | Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces Mopane Solar PV 1 | PIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES LIMPOPO (PTY) LTD | 19/06/2023 - 12:13 |
Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng (and North West) Provinces | Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng (and North West) Provinces | PIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 19/06/2023 - 12:20 |
Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces Mopane Solar PV 5 | Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces Mopane Solar PV 5 | PIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES LIMPOPO (PTY) LTD | 20/06/2023 - 14:46 |
Palaeontological Impact Assessment for the proposed Grid connection for the five Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces | Palaeontological Impact Assessment for the proposed Grid connection for the five Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces | PIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 20/06/2023 - 14:55 |
Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces | Palaeontological Impact Assessment for the proposed Mopane Solar Energy Facilities near Carltonville, Gauteng and North West Provinces | HIA Phase 1 | 08/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 19/06/2023 - 20:52 |
HIA Upgrading of N11 Section 13 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADE OF SECTION 13 OF THE N11 NATIONAL ROUTE NORTH OF MOKOPANE, LIMPOPO PROVINCE | HIA Phase 1 | 10/01/2023 | JA VAN SCHALKWYK | JA van Schalkwyk Heritage Consultant | Chameleon Environmental | 31/05/2023 - 13:52 |
Belgrade Heritage Impact Assessment | Belgrade Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 10/01/2023 | 26/10/2023 - 16:13 | |||
Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC | Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC | AIA Phase 2 | 10/01/2023 | Karen Van Ryneveld | 10/01/2023 - 09:54 | ||
132 kV transmission line between Camel Thorn Solar and the Prieska Power Reserve Industrial Complex | Phase 1 Heritage Impact Assessment for a new 132 kV transmission line between Camel Thorn Solar and thePrieska Power Reserve Industrial Complex, Prieska, NC Province. | HIA Phase 1 | 10/01/2023 | Lloyd Rossouw | 06/02/2023 - 10:39 | ||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Elengabadi Construction & Projects Prospecting Right Application on Portion 1 and the Remaining Extent of the Farm Lymington 423, Kathu, Northern Cape | AIA Desktop | 11/01/2023 | Tobias Coetzee | 16/01/2023 - 13:32 | ||
PIA - Merensky-Uchoba 132kV Deviation | Palaeontological Impact Assessment for the proposed Merensky-Uchoba 132kV powerline deviation, Limpopo Province | PIA Phase 1 | 11/01/2023 | Prof Marion Bamford | 29/03/2023 - 15:40 | ||
PIA - Merensky-Uchoba 132kV Deviation | Palaeontological Impact Assessment for the proposed Merensky-Uchoba 132kV powerline deviation, Limpopo Province Desktop Study (Phase 1) | PIA Phase 1 | 11/01/2023 | Marion Bamford | 29/03/2023 - 16:12 | ||
Hendrina South Heritage Impact Report | FOR THE PROPOSED CONSTRUCTION AND OPERATION OF THE HENDRINA SOUTH 132KV POWERLINE TO HENDRINA POWER STATION IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 11/01/2023 | Jaco van der Walt | Beyond Heritage | SiVEST SA (Pty) Ltd | 07/02/2023 - 17:13 |
Heritage Impact Assessment for the Proposed Mopane Solar PV1 Renewable Energy Generation Project on the Remainder of The Farm Douglasdale 95 IQ, Located Within The JB Marks Local Municipality, DR Kenneth Kaunda District Municipality, North West Province. | Heritage Impact Assessment for the Proposed Mopane Solar PV1 Renewable Energy Generation Project on the Remainder of The Farm Douglasdale 95 IQ, Located Within The JB Marks Local Municipality, DR Kenneth Kaunda District Municipality, North West Province. | HIA Phase 1 | 13/01/2023 | Jaco van der Walt | Beyond Heritage | AGES (PTY) Ltd - Limpopo | 19/06/2023 - 12:11 |
Heritage Impact Assessment for the Proposed Mopane Solar PV 4 Renewable Energy Generation Project on Portion 2 of the farm Rooidraai 85 IQ, located within the JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province | Heritage Impact Assessment for the Proposed Mopane Solar PV 4 Renewable Energy Generation Project on Portion 2 of the farm Rooidraai 85 IQ, located within the JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province | HIA Phase 1 | 13/01/2023 | Jaco van der Walt | Beyond Heritage | AGES (PTY) Ltd - Limpopo | 20/06/2023 - 11:40 |
Heritage Impact Assessment for the Proposed Renewable Energy Generation Projects on Portion 12 Of The Farm Blaauwbank 125 IQ, Located Within The Merafong Local Municipality, West Rand District Municipality, Gauteng Province. | Heritage Impact Assessment for the Proposed Renewable Energy Generation Projects on Portion 12 Of The Farm Blaauwbank 125 IQ, Located Within The Merafong Local Municipality, West Rand District Municipality, Gauteng Province. | HIA Phase 1 | 13/01/2023 | Jaco van der Walt | Beyond Heritage | AGES (PTY) Ltd - Limpopo | 19/06/2023 - 12:19 |
Heritage Impact Assessment for the Proposed Mopane Solar PV 5 Renewable Energy Generation Project on Portion 2 of the farm Rooidraai 85 IQ, located within the JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province | Heritage Impact Assessment for the Proposed Mopane Solar PV 5 Renewable Energy Generation Project on Portion 2 of the farm Rooidraai 85 IQ, located within the JB Marks Local Municipality, Dr Kenneth Kaunda District Municipality, North West Province | HIA Phase 1 | 13/01/2023 | AGES (PTY) Ltd - Limpopo | 20/06/2023 - 14:48 | ||
Heritage Impact Assessment for the connection of five (5) proposed renewable energy generation projects with the existing Eskom Carmel Main Transmission Substation (MTS) which is located on Portion 23 of the Farm Doornfontein 118 IQ, located within Merafo | Heritage Impact Assessment for the connection of five (5) proposed renewable energy generation projects with the existing Eskom Carmel Main Transmission Substation (MTS) which is located on Portion 23 of the Farm Doornfontein 118 IQ, located within Merafong City Local Municipality, West Rand District Municipality, Gauteng Province | HIA Phase 1 | 13/01/2023 | Jaco van der Walt | Beyond Heritage | AGES (PTY) Ltd - Limpopo | 20/06/2023 - 14:54 |
Klipkop-Wessels 132kV Powerline, Hotazel | Phase 1 Heritage Impact Assessment for the proposed new Klipkop-Wessels 132kV powerline near Hotazel, Northern Cape | HIA Phase 1 | 13/01/2023 | Lloyd Rossouw | Paleo Field Services | Marguerite Cronje | 18/01/2023 - 12:38 |
Heritage Impact Assessment for the Proposed Mopane Solar PV 3 Renewable Energy Generation Project on Portion 12 of the Farm Blaauwbank 125 IQ, located within the Merafong Local Municipality, West Rand District Municipality, Gauteng Province. | Heritage Impact Assessment for the Proposed Mopane Solar PV 3 Renewable Energy Generation Project on Portion 12 of the Farm Blaauwbank 125 IQ, located within the Merafong Local Municipality, West Rand District Municipality, Gauteng Province. | HIA Phase 1 | 13/01/2023 | Jaco van der Walt | Beyond Heritage | AGES (PTY) Ltd - Limpopo | 19/06/2023 - 20:48 |
Crown Hill Preliminary Archaeological Report | Crown Hill Preliminary Phase1 Archaeological Impact Assessment | HIA Phase 1 | 15/01/2023 | ETN Resources (Pty) LTD | ETN Resources (Pty) LTD | 28/03/2023 - 17:07 | |
HIA: Middelvlei Solar | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Middelvlei Solar, 120MW Solar PV Project, Gauteng Province | HIA Phase 1 | 15/01/2023 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/04/2023 - 11:15 |
Social and Labour Plan | Social and Labour Plan Of Invest in Property 126 (Pty) Ltd Boshof, Free State Province | 16/01/2023 | Peter de Bruin | Bruinbox Enterprise (Pty) Ltd | Biomental Services (Pty) Ltd | 21/09/2023 - 07:27 | |
Mulilo Newcastle Wind Power - Paleontological Impact Assessment Report | Paleontological Report for MNWP is included from page 72 | Palaeontological Specialist Reports | 16/01/2023 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal and Environmental Services | 08/05/2023 - 13:03 |
AIA - Merensky 132kV Deviation | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE ESKOM MERENSKY-UCHOBA DEVIATION ROUTE | AIA Phase 1 | 17/01/2023 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 29/03/2023 - 16:03 | |
HIA Sunshine View | Heritage Impact Assessment for The proposed Sunshine View Township on Portions 42, 43 and 47 of the farm Valschfontein 33 JS, Dr JS Moroka Local Municipality in Nkangala District Municipality, Mpumalanga Province. | HIA Phase 1 | 17/01/2023 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 23/02/2023 - 09:51 |
AIA - Merensky-Uchoba 132kV Deviation | REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE ESKOM MERENSKY-UCHOBA DEVIATION ROUTE | AIA Phase 1 | 17/01/2023 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 29/03/2023 - 15:38 | |
DKN-SUB | Submission plans Page 1 and Page 2 | 18/01/2023 | Darren Gregory Scott Clifton | DGSC Designs | DGSC Designs | 07/02/2023 - 16:34 | |
Bokoni Platinum mine Start-Up Project_Heritage Report | ARCHAEOLOGICAL IMPACT ASSESSMENT OF BOKONI PERMITTING PROJECT LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 19/01/2023 | Anton van Vollenhoven | 26/05/2023 - 12:44 | ||
Motivation for Exemption | Motivation for Exemption from a full Phase I Heritage Impact Assessment - Proposed development by Soventix SA of a 1.8MWp solar PV for Element Six, Nuffield, Springs, City of Ekurhuleni, Gauteng Province | HIA Letter of Exemption | 20/01/2023 | Anton Pelser | A Pelser Archaeological Consulting | A Pelser Archaeological Consulting | 29/03/2023 - 14:10 |
Impumelelo PIA | Palaeontological Impact Assessment for the proposed Impumelelo WEF, between Greylingstad and Secunda, Mpumalanga Province | PIA Phase 1 | 21/01/2023 | Marion Bamford | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 24/02/2023 - 10:02 |
PIA Report, Sunshine View | PIA Report, Sunshine View residential development on portions of Farm Valschfontein 33, Mpumalanga Province | PIA Desktop | 23/01/2023 | Marion Bamford | Prof Marion Bamford | Setala Environmental | 23/02/2023 - 09:48 |
Palaeontological Impact Assessment for the Corona Solar Park, Virginia, Free State Province | Palaeontological Impact Assessment for the proposed Virginia Solar Park, SE of Virginia, Free State Province: Corona Solar Park Site Visit Report (Phase 2) | PIA Phase 1 | 23/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 23/10/2023 - 10:34 |
Palaeontological Impact Assessment for the Quagga Solar Park, Virginia, Free State Province | Palaeontological Impact Assessment for the proposed Virginia Solar Park, SE of Virginia, Free State Province: Quagga Solar Park Site Visit Report (Phase 2) | PIA Phase 1 | 23/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 23/10/2023 - 10:43 |
HIA Report for the Virginia 4 Solar Park Project, Lejweleputswa District Municipality, Free State Province | Heritage Impact Assessment Report for the Virginia 4 Solar Park Project, Lejweleputswa District Municipality, Free State Province | HIA Phase 1 | 23/01/2023 | Neels Kruger | Coastal & Environmental Services - East London | AGES (PTY) Ltd - Limpopo | 23/10/2023 - 10:53 |
PHASE 1 HIA AGRI-INDUSTRIAL FACILITY VAAL KOPPIES UPINGTON V2 | PHASE 1 HIA FOR THE PROPOSED CONSTRUCTION OF AN AGRI-INDUSTRIAL FACILITY ON PORTION 64 OF VAAL KOPPIES NO 40, UPINGTON, KENHARDT, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE VERSION 2 | HIA Phase 1 | 23/01/2023 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 24/01/2023 - 11:46 |
IA for the proposed Virginia Solar Park: Florida 1 & 2 Solar Park | PIA for the proposed Virginia Solar Park, SE of Virginia, Free State Province: Florida 1 & 2 Solar Parks | PIA Phase 1 | 23/01/2023 | Marion Bamford | Prof Marion Bamford | AGES (PTY) Ltd - Limpopo | 18/09/2023 - 10:21 |
Lady Grey and Sterkfontein HIA | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF INTERNAL ROADS AND DAMS ON NEW SECTIONS OF THE LARGER NYATI WILDERNESS, LADY GREY AND STERKFONTEIN, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 24/01/2023 | J.A. van Schalkwyk | 12/05/2023 - 12:42 | ||
Lady Grey | Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF INTERNAL ROADS AND DAMS ON NEW SECTIONS OF THE LARGER NYATI WILDERNESS, LADY GREY AND STERKFONTEIN, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 24/01/2023 | J A van Schalkwyk | 12/05/2023 - 12:47 | ||
Application Form A | APPLICATION FORM A | 24/01/2023 | Darren Gregory Scott Clifton | DGSC Designs | 07/02/2023 - 16:20 | ||
Daniel Gene Donkin letter of permission | 24/01/2023 | Darren Gregory Scott Clifton | DGSC Designs | DGSC Designs | 07/02/2023 - 16:27 | ||
Application-form-A-Structures (AMAFA) Picture Report | Application-form-A-Structures (AMAFA) Picture Report | 24/01/2023 | Darren Gregory Scott Clifton | DGSC Designs | DGSC Designs | 07/02/2023 - 16:29 | |
Heritage Screener: Claire 03 PV | Desktop Heritage Screening Assessment for the Proposed development of Claire PV 3 in Clayville, Gauteng | Heritage Scoping | 24/01/2023 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 24/01/2023 - 15:00 |
Agricultural development on the farm Scherp Arabie, Marble Hall area | Phase 1 AIA / HIA for an agricultural development on portion 18 and the remaining extent of of portion 19 of the farm Scherp Arabie 743KS, Marble Hall area, Limpopo Province | AIA Phase 1 | 24/01/2023 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | ESZRO Environmental Consulting (Pty) Ltd | 24/01/2023 - 17:25 |