THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15301 - 15350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 | PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 | PIA Phase 1 | 18/05/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 19/01/2021 - 16:39 | |
PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 | PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 | HIA Phase 1 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 19/01/2021 - 16:49 | ||
PHASE 1 HERITAGE DESKTOP STUDY REPORT GROOTFONTEIN RE/1/394 JR, GAUTENG PROVINCE | PHASE 1 HIA DESKTOP STUDY REPORT FOR THE PROPOSED CONSTRUCTION OF RESIDENTIAL UNITS, SCHOOLS AND BUSINESS FACILITIES, GROOTFONTEIN RE/1/394 JR, GAUTENG PROVINCE, CITY OF TSHWANE, GAUTENG PROVINCE. | Heritage Scoping | Sky-Lee Fairhurst, Heidi Fivaz, Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | GKM Environmental Consultants | 26/09/2023 - 17:59 | |
PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR GEMSTONE, COBALT, LEAD, GOLD, COPPER, NICKEL, SILVER AND ZINC ORE ON THE REMAINING EXTENT AND PORTION 1 OF THE FARM MAMAGHODI 654, MAGISTERIAL DISTRICT OF POSTM | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR GEMSTONE, COBALT, LEAD, GOLD, COPPER, NICKEL, SILVER AND ZINC ORE ON THE REMAINING EXTENT AND PORTION 1 OF THE FARM MAMAGHODI 654, MAGISTERIAL DISTRICT OF POSTMASBURG IN NORTHERN CAPE PROVINCE. | HIA Phase 1 | Trust Mlilo | 18/05/2023 - 15:51 | |||
Phase 1 Archaeological Impact Assessment for the Prospecting Right Application in Northern Cape Province | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION FOR THE PURPOSE OF PROSPECTING MANGANESE ORE ON PORTION 2 OF THE FARM EAST 270 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. | HIA Phase 1 | 30/03/2023 | Trust Mlilo | 17/04/2023 - 16:37 | ||
HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PROSPECTING RIGHT APPLICATION WITHIN REMAINING EXTENT AND PORTION 1 OF FARM HURLEY 688 FOR DIAMOND AND REMAINING EXTENT OF BRETBY 687 FARM FOR MANGANESE AND IRON ORE. IN THE ADMINISTRATIVE DISTRICT OF KURUMAN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 09/09/2022 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | 24/11/2022 - 15:40 | |
Prospecting for Manganese Ore on Portion 1 of the Farm Lizbeth 325, situated In the Magisterial District of John Taolo Gaetsewe (Kuruman) in Northern Cape Province. | PHASE 1 HIA FOR HIA/ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION FOR MANGANESE ORE ON PORTION 1 OF THE FARM LIZBETH 325 SITUATED IN THE MAGISTERIAL DISTRICT OF JOHN TAOLO GAETSEWE (KURUMAN) IN NORTHERN CAPE PROVINCE. | HIA Phase 1 | 30/03/2023 | Trust Mlilo | 17/04/2023 - 16:50 | ||
HIA for the Expansion of the Burgersdorp Correctional Facility | Phase 1 HIA for proposed Expansion of the Burgersdorp Correctional Facility | HIA Phase 1 | 05/09/2019 | Lloyd Rossouw | Palaeo Field Services | Terratest (Pty) Ltd | 01/10/2019 - 11:16 |
HIA for Middelburg Town & Townlands | Phase 1 HIA for proposed housing development on porion 27 of the farm Middelburg Town and Townlands, Middelburg Mpulmalanga | HIA Phase 1 | 21/08/2013 | Christine Van Wyk Rowe | Afrika Enviro & Biology | Afrika Enviro & Biology | 21/08/2013 - 14:55 |
Steve Tshwete HIA report | PHASE 1 HIA FOR PROPOSED MIXD DEVELOPMENTS ON PORTION 364 OF THE FARMS MIDDELBURG TOWN AND TOWNLANDS 287-JS, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. | HIA Phase 1 | 24/06/2020 | Trust Mlilo | Singo Consulting (Pty) Ltd | 26/07/2021 - 11:53 | |
Dassierand HIA | PHASE 1 HIA FOR PROPOSED SOCIAL HOUSING DASSIERAND TOWNSHIP APAC02136 | Heritage Impact Assessment Specialist Reports | 11/05/2021 | Anton Pelser | 17/05/2021 - 09:53 | ||
HIA | PHASE 1 HIA FOR PROSPECTING RIGHT APPLICATION FOR PROPOSED DEVELOPMENT OF SAMARA OPENCAST ALLUVIAL DIAMOND MINE AND ASSOCIATED INFRASTRUCTURE, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 07/08/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 23/02/2021 - 20:29 |
Phase 1 HIA for the development of a new irrigation pivot on portion 34 of the Farm Doorns No. 131 near Ritchie, NC Province. | Phase 1 HIA for the development of a new irrigation pivot on portion 34 of the Farm Doorns No. 131 near Ritchie, NC Province. | HIA Phase 1 | 27/11/2018 | Lloyd Rossouw | Paleo Field Services | 14/03/2019 - 08:49 | |
Phase 1 HIA - Erf 12827, Kimberley, Northern Cape Province | Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Erf 12827, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 12:18 |
Phase 1 HIA - Erf 14499, Kimberley, Northern Cape Province | Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Erf 14499, Kimberley, Northern Cape Province. | HIA Phase 1 | 19/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 14:08 |
Phase 1 HIA - Erf 6530, Kimberley, Northern Cape Province | Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Erf 6530, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 12:54 |
Phase 1 HIA - Portion 3 of the Farm 187, Kimberley | Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Portion 3 of the Farm No. 187, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 22/10/2018 - 08:19 |
Phase 1 HIA - Portion 55 of the Farm No. 123, Kimberley | Phase 1 HIA for the Development of a new Lattice Telecommunication Mast with Base Station on Portion 55 of the Farm No. 123, Kimberley, Northern Cape Province | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 22/10/2018 - 09:20 |
Phase 1 HIA - Erf 32174, Kimberley, Northern Cape Province | Phase 1 HIA for the Development of a new Monopole Telecommunication Mast with Base Station on Erf 32174, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 15:11 |
Phase 1 HIA - Erf 32317, Kimberley, Northern Cape Province | Phase 1 HIA for the Development of a new Monopole Telecommunication Mast with Base Station on Erf 32317, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 15:59 |
Phase 1 HIA | Phase 1 HIA for the establishment of a landfill site on the remainder of the farm Northleigh 422 | HIA Phase 1 | 14/06/2017 | Lloyd Rossouw | National Museum Bloemfontein | National Museum Bloemfontein | 04/08/2017 - 10:31 |
Magong Primary School upgrade | PHASE 1 HIA FOR THE FOR THE PROPOSED UPGRADING OF MAGONG PRIMARY SCHOO ON THE REMAINING PORTION OF THE FARM RHENOSTERKRAAL132 JP, WITHIN MOSES KOTANE LOCAL MUNICIPALITY, NORTH-WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 24/07/2023 | Trust Mlilo | Sativa Travel and Environmental Consultants | Sativa Travel and Environmental Consultants | 12/09/2023 - 13:28 |
HIA for the establishment of 132kV loop-in and loop-out power line from the existing 132kV Jane Furse/Merensky power line to the proposed Grootboom Substation | Phase 1 HIA for the proposed construction of 1X 20MVA 132/11kV Grootboom substation and + 5,5km 132kV Bersfort Loop In – Loop Out power line, within the jurisdiction of Greater Tubatse Local Municipality, Sekhukhune District, Limpopo Province. | HIA Phase 1 | 29/04/2013 | Julius CC Pistorius | Mbofho Consulting and Project Managers | 29/04/2013 - 15:57 | |
PHASE 1 HIA AGRI-INDUSTRIAL FACILITY VAAL KOPPIES UPINGTON V2 | PHASE 1 HIA FOR THE PROPOSED CONSTRUCTION OF AN AGRI-INDUSTRIAL FACILITY ON PORTION 64 OF VAAL KOPPIES NO 40, UPINGTON, KENHARDT, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE VERSION 2 | HIA Phase 1 | 23/01/2023 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 24/01/2023 - 11:46 |
PHASE 1 HIA AGRI-INDUSTRIAL FACILITY VAAL KOPPIES UPINGTON | PHASE 1 HIA FOR THE PROPOSED CONSTRUCTION OF AN AGRI-INDUSTRIAL FACILITY ON PORTION 64 OF VAAL KOPPIES NO 40, UPINGTON, KENHARDT, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 31/10/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 14/12/2022 - 17:01 |
Phase 1 HIA - Erf 19840, Kimberley, Northern Cape Province | Phase 1 HIA for the Proposed Development of a new Lattice Telecommunication Mast with Base Station on Erf 19840, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 14:30 |
Phase 1 HIA - Erf 4002, Kimberley, Northern Cape Province | Phase 1 HIA for the Proposed Development of a new Monopole Telecommunication Mast with Base Station on Erf 4002, Kimberley, Northern Cape Province. | HIA Phase 1 | 18/10/2018 | Lloyd Rossouw | Enviroworks | Enviroworks | 19/10/2018 - 09:57 |
PHASE 1 HIA HARVARD 2 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 5 (HARVARD 2), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:19 |
PHASE 1 HIA HARVARD 1 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 8 (HARVARD 1), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:16 |
PHASE 1 HIA SOLAR PHOTOVOLTAIC (PV) FACILITY DEVELOPMENT KOEDOESKOP | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF UP TO 480MW SOLAR PHOTOVOLTAIC (PV) FACILITY BY ALLIED GREEN ENERGY (PTY) LTD ON PORTION 1 OF THE FARM ZWARTWITPENSBOKFONTEIN 434-KQ, KOEDOESKOP, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT, LIMPOPO PROVINCE | HIA Phase 1 | 08/09/2023 | Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Conserva Environmental Management Services | 18/09/2023 - 10:11 |
HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) | PHASE 1 HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) ON THE REMAINING EXTENT OF THE FARM VETLAAGTE 4 WITHIN EMTHANJENI LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 15/10/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Sativa Travel and Environmental Consultants | 17/11/2020 - 00:10 |
Phase 1 HIA Kokstad CRU Housing Project | Phase 1 HIA for the proposed Kokstad CRU Housing Project, Greater Kokstad Municipality, KwaZulu-Natal | HIA Phase 1 | 30/11/2016 | Jean Beater | JLB Consulting | Fuze Environmental Services | 01/02/2017 - 15:35 |
HIA Doornpan | PHASE 1 HIA FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON PORTION 3 OF THE FARM DOORNPAN 193 IP, SITUATED OUTSIDE VENTERSDORP, JB MARKS LOCAL MUNICIPALITY, DR KENNETH KAUNDA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | PGS Heritage Pty Ltd | 22/11/2021 - 11:39 | |||
PHASE 1 EXPANSION AND UPGRADE OF PABALLELO JUPITER CEMETERY, UPINGTON | PHASE 1 HIA FOR THE PROPOSED UPGRADE AND EXPANSION OF THE PABALLELO JUPITER CEMETERY, UPINGTON, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Sky-Lee Fairhurst, Jan Engelbrecht, Elize Butler, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 17/07/2023 - 14:38 | |
PHASE 1 EXPANSION AND UPGRADE OF RIETFONTEIN CEMETERY, UPINGTON | PHASE 1 HIA FOR THE PROPOSED UPGRADE AND EXPANSION OF THE RIETFONTEIN CEMETERY, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Sky-Lee Fairhurst, Jan Engelbrecht, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 17/07/2023 - 14:35 | |
VRYHEID MALL | PHASE 1 HIA FOR THE PROPOSED VRYHEID MALL, KZN | HIA Phase 1 | 27/02/2023 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | LEAP -Landscape Architectural and Environmental Planning | 14/03/2023 - 16:05 |
HIA_Siyathuthuka Road Upgrade | PHASE 1 HIA FOR THE SIYATHUTHUKA ROAD UPGRADE, BELFAST, MPUMALANGA | HIA Phase 1 | 01/09/2012 | Makhosazana Mngomezulu | Nemai Consulting | Nemai Consulting | 06/02/2013 - 11:26 |
Phase 1 HIA Desktop Study Menar Capital | PHASE 1 HIA HERITAGE DESKTOP STUDY MENAR CAPITAL PROSPECTING RIGHT NORTHERN CAPE PROPOSED PROSPECTING RIGHT APPLICATION FOR IRON ORE AND MANGANESE ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, LOCATED 41 KM NORTH-WEST OF KATHU WITHIN THE TSANTSABANE AND JOE MOROLONG LOCAL MUNICIPALITIES, NORTHERN CAPE PROVINCE. CaseID: 16605 (NC 30/5/1/1/2/12769 PR) | HIA Phase 1 | 10/08/2021 | Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Menar Capital (Pty) Lrd | 10/08/2021 - 15:04 |
Phase 1 HIA - Erf 22011 BFN | Phase 1 HIA Hospital and Heritage Lifestyle Centre Bloemfontein | HIA Phase 1 | 30/10/2017 | Loudine Philip | MPC Developers (Pty) Ltd | 05/12/2017 - 10:26 | |
HIA KOLOMELA AIRFIELD | PHASE 1 HIA IN SUPPORT OF THE EIA FOR THE KOLOMELA AIRFIELD | HIA Phase 1 | 21/08/2020 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 23/02/2021 - 13:44 |
PHASE 1 HIA K54-M31 ROAD CONSTRUCTION UPGRADE APAC02089 | PHASE 1 HIA K54-M31 ROAD CONSTRUCTION UPGRADE APAC02089 | HIA Phase 1 | 01/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 20/01/2021 - 13:30 | |
Phase 1 HIA report for the proposed Klerksoord filling station | Phase 1 HIA Klerksoord Filling Station | HIA Phase 1 | 22/01/2021 | Anton Pelser | Bokamoso Landscape Architects and Environmental Consultants CC | Bokamoso Landscape Architects and Environmental Consultants CC | 06/04/2021 - 13:41 |
Phase 1 HIA Klerksoord Filling Station | Phase 1 HIA Klerksoord Filling Station | HIA Phase 1 | 22/01/2021 | Anton Pelser | Bokamoso Landscape Architects and Environmental Consultants CC | APELSER ARCHAEOLOGICAL CONSULTING | 29/06/2021 - 16:29 |
Phase 1 HIA Lenasia Ext 13 | Phase 1 HIA Lenasia Ext 13 | Heritage Impact Assessment Specialist Reports | 25/02/2022 | Anton Pelser | A Pelser Archaeological Consulting | 01/03/2022 - 01:39 | |
Phase 1 HIA Naudesbank | Phase 1 HIA Naudesbank Final Draft | HIA Phase 1 | 31/05/2023 | APELSER ARCHAEOLOGICAL CONSULTING | 19/06/2023 - 12:02 | ||
Phase 1 HIA Prieska Power Reserve | Phase 1 HIA new wind energy facility on parts if farms Prieska A/A, Karabee 50, Prieskas Poort 51 and Keikams oort 71 near Prieska, Northern Cape Province | HIA Phase 1 | 14/11/2022 | Lloyd Rossouw | 30/11/2022 - 10:02 | ||
CDR WWEP Phase 1 HIA | Phase 1 HIA of a proposed 5.5ha development on the farm Vaalkoppies 40, Upington, NC Province | HIA Phase 1 | 11/08/2021 | Lloyd Rossouw | Paleo Field Services | Carpe Diem Raisins (Pty) Ltd | 24/01/2023 - 11:35 |
AIA_Melkspruit-Riebeek_132_kV_power_line_Van_Schalkwyk_LO_Oct11 | Phase 1 HIA of construction of 132kV overhead line from Melkspruit to Riebeek substations and the installation of transformers at the Riebeek and Sterkspruit substations, Maletswai local municipality, Eastern Cape Province, South Africa | AIA Desktop | 31/10/2011 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | 16/06/2012 - 14:47 | |
AIA_Ruigtevallei-Dreunberg_power_line_Van_Schalkwyk_JA_Oct11 | Phase 1 HIA of proposed network strengthening of the Ruigtevallei-Dreunberg 132kV power line, local municipality (sic), Eastern Cape Province, South Africa | AIA Desktop | 31/10/2011 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | 16/06/2012 - 14:49 | |
Construction of Mtwalume Dam, Harry Gwala District Municipality | Phase 1 HIA of the proposed construction of the Mtwalume Dam, Harry Gwala District Municipality, KwaZulu-Natal | HIA Phase 1 | 31/03/2016 | Jean Beater | Nemai Consulting | Ugu District Municipality | 11/06/2016 - 18:36 |