THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16151 - 16200 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Karee PV Heritage Scoping Report (Draft) | Project Name: Sibanye Stillwater Solar PV Cluster. Applicants: SRPM Pty Ltd, Karee Pty Ltd and Marikana Pty Ltd Proposed activity and location: The development of the proposed three photovoltaic solar energy facilities, grid connection and associated infrastructure, North West province. | Heritage Scoping | Dr Julius CC Pistorius | Savannah Environmental (Pty) Ltd | 20/06/2022 - 14:17 | |||
DIDIDI MULENZHE CROSSING | Project No THT476657495 Construction of 22KV 621 METERS at DIDIDI thohoyandou limpopo impacted area co-ordinates are Transformer constructed from MJJ191/96 23°01'03.96633"S 30°31'00.09930"E to TRANSFORMER MJJ191/97/9 23°01'08.67569"S :30°31'17.09739"E none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) | Non Impact Assessment Related Reports | 19/11/2021 | Eskom - LOU | Pro-Con Electrical (pty) Ltd | 03/09/2021 - 14:51 | ||
rampietziezfontein 598LS LINE COSTRUCTION | project no: MGL436903755 length1274.32m line construction at Ga-Sechaba village(RAMPIETZIESFONTEIN 598 LS) Limpopo. impacted area coordinates are(transformer constructed from23°44'18.65387"S 29°08'34.22875"E) pole no CNG84/19 on the span plan attached. new poles will be erected at 23°44'00.76317"S 29°08'04.79675"E-CNG84/1. 23°44'00.71283"S 29°08'07.32863"E CNG84/2. none environmental,burial or heritage site will be impacted during the construction | Non Impact Assessment Related Reports | 19/11/2021 | 30/11/2021 - 13:25 | ||||
borehole electrification mopani district | project no: TZA BJM B416436034 WL electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed fromBJM78/84A/4 23°30'46.04377"S 30°21'41.26162"E to borehole BJM78/84A/14 :23°30'48.48055"S 30°21'45.75737"E 536 meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) | Non Impact Assessment Related Reports | 17/09/2021 | Pro-Con Electrical (pty) Ltd | Pro-Con Electrical (pty) Ltd | 17/09/2021 - 07:29 | ||
borehole electrification mopani district | project no:B416436031 electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed from bjm78/84A/12 23°30'45.96151"S 30°21'48.22749"E to borehole bjm78/84A/12/1: 23°30'47.82506"S 30°21'50.43645"E 85meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) | Non Impact Assessment Related Reports | 03/09/2021 | Pro-Con Electrical (pty) Ltd | Pro-Con Electrical (pty) Ltd | 17/09/2021 - 07:15 | ||
PSC Meeting 1 | Proof of Participation Report 1 | 19/06/2023 | Busisiwe Ngidi | 19/06/2023 - 19:44 | ||||
PSC Meeting 2 | Proof of Public Participation | 19/06/2023 | Busisiwe Ngidi | 19/06/2023 - 19:48 | ||||
CMP_Mosselbaai_Natuurreservaat_Nilssen_PJ_Apr99 | Proposal for Cultural Resource Management of Mosselbaai Natuurreservaat, a Portion of Verlorenvlei Farm (Number 8), Elandsbaai, Piketberg District | AIA Phase 3 | 29/04/1999 | Peter Nilssen | Archaeological Exposures | MAPID_02979 | 16/06/2012 - 14:51 | |
Kitso Mine Brief Report on intention to rebury the human bones | PROPOSAL FOR REHABILITATION OF ACCIDENTALLY DISTURBED GRAVES AT KITSO MINE | Archaeological Monitoring | 13/09/2018 | Edward Matenga | AHSA | AHSA | 14/02/2019 - 10:22 | |
Brief Report of the disturbed burial ground, Kitso Mine November 2018 | PROPOSAL FOR REHABILITATION OF ACCIDENTALLY DISTURBED GRAVES AT KITSO MINE, POSTMASBURG, NORTHERN CAPE | Archaeological Monitoring | 13/09/2018 | Edward Matenga | Edward Matenga | AHSA | 14/02/2019 - 10:17 | |
AIA_Heritage_Park_Retirement_Kaplan_JM_Jul03 | Proposal for the development of Heritage Park Retirement village, on a portion of farm Onverwacht No. 811 and a portion of farm Die Bos No. 810, Somerset West. | AIA Phase 1 | 01/07/2003 | Jonathan Kaplan | Doug Jeffery Environmental Consultants | MAPID_03389 | 16/06/2012 - 14:46 | |
PIA_Water_Pipeline-Vereeniging_Rubidge_B_Aug07 | Proposal for the Installation and Operation of a New Drinking Water Supply Pipeline Between Langerant and Steel Park in Vereeniging | PIA Phase 1 | 20/08/2007 | Bruce Rubidge | Evolutionary Studies Institute | MAPID_02514 | 16/06/2012 - 14:54 | |
PIA_Water_Pipeline-Leeukuil_Rubidge_B_Aug07 | Proposal for the Installation and Operation of a New Sewage Pipeline from Kwaggafontein to the Leeukuil Sewage Treatment Works | PIA Phase 1 | 20/08/2007 | Bruce Rubidge | Evolutionary Studies Institute | MAPID_03260 | 16/06/2012 - 14:54 | |
Proposal for a PV Facility at East London Airport | proposal fro a PV facility at East London Airport to be located within ACSA land. | Heritage Scoping | 21/12/2020 | Tim Hart | ACO Associates CC | Delta Built Environment Consultants (Pty) Ltd | 21/12/2020 - 13:07 | |
9-2-042-0014-19951206-ISAM | Proposals for the Future of Langebaanweg "E" Quarry. the South African Museum: Division of Earth Sciences | 06/12/1995 | Hilary Deacon | Iziko: South African Museum | 16/06/2012 - 14:35 | |||
HIA D3 Power Line and Substation | Proposed construction of a 132kV power line, substation and the extension of Homestead substation associated with the 75mw Concentrating Photovoltaic (CPV) / Photovoltaic (PV) plant (PV3) on the farm Droogfontein in Kimberley, Northern Cape Province: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 25/04/2013 | Wouter Fourie | 22/05/2013 - 10:56 | |||
PALAEONTOLOGICAL HERITAGE REPORT: DESKTOP STUDY 11957 | Proposed Transnet Sishen Railway Line Link Project in Gamagara Local Municipality, Northern Cape Province | PIA Desktop | 10/04/2018 | John E. Almond | Natura Viva CC | Natura Viva CC | 19/07/2018 - 10:10 | |
PIA_Xun_and_Khwe_solar_2251_Almond_JE_Mar12 | Proposed !Xun & Khwe PV and CSP Solar Power Facilities on Farm Platfontein (Portion 68) near Kimberley, Northern Cape | PIA Phase 1 | 28/03/2012 | John E Almond | Natura Viva CC | 16/06/2012 - 14:54 | ||
Proposed 0.5 km tarring of new road in Thukela Ferry | Proposed 0.5 km tarring of new road in Thukela Ferry Village Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Archaeological Specialist Reports | 26/08/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Magalela & Associates (Pty) Ltd | 23/08/2017 - 17:20 | |
Mmatau HIA | Proposed 10 MW Solar Photovoltaic farm, Koedoesrand 158 JP, Mmatau, Northwest Province Version 1.0 DEA Reference: 14/12/16/3/3/1/498 8 May 2012 | Heritage Scoping | 08/05/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | PGS Heritage and Grave Relocation Consultants | 08/03/2013 - 09:50 | |
Esizayo 132kV PIA | PROPOSED 132 KV TRANSMISSION INTEGRATION PROJECT FOR THE AUTHORIZED ESIZAYO WIND ENERGY FACILITY NEAR LAINGSBURG, CENTRAL KAROO DISTRICT MUNICIPALITY, WESTERN CAPE & KAROO HOOGLAND DISTRICT MUNICIPALITY, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 01/10/2021 | John Almond | Natura Viva CC | WSP Group Africa (Pty) Ltd | 29/08/2022 - 09:14 | |
Palaeontological Report - Maralla 132kV OHPL | PROPOSED 132 KV TRANSMISSION INTEGRATION PROJECT FOR THE MARALLA WEST & MARALLA EAST WIND ENERGY FACILITIES NEAR SUTHERLAND, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 01/10/2021 | John Almond | Natura Viva CC | WSP Group Africa (Pty) Ltd | 27/06/2022 - 07:14 | |
Tweespruit_Welroux Heritage Specialist Report | PROPOSED 132kV POWER LINE AND ASSOCIATED SUBSTATIONS BETWEEN TWEESPRUIT AND WELROUX FREE-STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 20/04/2015 | Wouter Fourie | 30/04/2015 - 13:48 | |||
PIA - PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE | PROPOSED 132KV/400KV ON-SITE MAIN TRANSMISSION SUBSTATION (MTS) AND ASSOCIATED INFRASTRUCTURE PROJECT NEAR DEALESVILLE PALAEONTOLOGICAL IMPACT ASSESSMENT | Palaeontological Specialist Reports | 27/10/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 23/11/2021 - 10:30 | |
Ngqura 16 Mtpa Kimberley to De Aar Palaeontological Report | Proposed 16 Mtpa expansion of Transnet's existing manganese ore export railway line and associated infrastructure between Hotazel and the Port of Ngqura, Northern and Eastern Cape. Part 3: Kimberley to De Aar, Northern Cape | PIA Phase 1 | 01/02/2013 | John E Almond | Hatch | Transnet SOC Ltd | 25/03/2013 - 09:55 | |
Proposed Eskom Power line on Nkomazi Game Reserve | Proposed 1km ESKOM Power line on the farm Boekenhoutstrand 722JT on the Nkomazi Game Reserve, near Tjakastad, Mpumalanga Province | HIA Phase 1 | 04/01/2021 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | 07/01/2021 - 10:39 | ||
Lion Thorn PV Heritage Impact Assessment | PROPOSED 200MWac LION THORN SOLAR PHOTOVOLTAIC FACILITY PROJECT, NORTH WEST PROVINCE, SOUTH AFRICA Heritage Scoping Assessment | Heritage Scoping | 20/06/2023 | Jessica Angel | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 14/08/2023 - 12:40 | |
Mooivlei Solar 1 PV HIA Report | PROPOSED 240MW MOOIVLEI SOLAR 1 PHOTOVOLTAIC PROJECT WEST OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESMENT | HIA Phase 1 | 31/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 29/06/2023 - 15:10 | |
Mooivlei Solar 2 PV HIA Report | PROPOSED 240MW MOOIVLEI SOLAR 2 PHOTOVOLTAIC PROJECT WEST OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 31/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 30/06/2023 - 13:01 | |
Onderstepoort Solar 1 PV HIA Report | PROPOSED 240MW ONDERSTEPOORT SOLAR 1 PHOTOVOLTAIC PROJECT, NORTHWEST OF RUSTENBURG, NORTH-WEST PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 09/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 30/06/2023 - 16:22 | |
Onderstepoort Solar 2 PV HIA Report | PROPOSED 240MW ONDERSTEPOORT SOLAR 2 PHOTOVOLTAIC PROJECT, NORTH WEST OF RUSTENBURG, NORTH-WEST PROVINCE HERITAGE IMPACT ASSESSMENT | PIA Phase 1 | 09/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 30/06/2023 - 16:42 | |
Oslaagte Solar 1 PV HIA Report | PROPOSED 240MW OSLAAGTE SOLAR 1 PHOTOVOLTAIC PROJECT SOUTH EAST OF KROONSTAD, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 26/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/06/2023 - 14:36 | |
PROPOSED 25M HIGH TELECOMMUNICATIONS MAST ON ERF 1644, CALVINIA SPORTSGROUND, DORP STREET, CALVINIA, NORTHERN CAPE | PROPOSED 25M HIGH TELECOMMUNICATION S MAST ON ERF 1644, CALVINIA SPORTSGROUND, DORP STREET, CALVINIA, | Heritage Impact Assessment Specialist Reports | Cedar Tower Services | Enviroafrica CC | 11/07/2018 - 10:44 | |||
PROPOSED 25M HIGH TELECOMMUNICATION S MAST ON ERF 435, NIEUWOUDTVILLE SPORTSGROUNDS, DU TOIT STREET, NIEUWOUDTVILLE, NORTHERN CAPE | PROPOSED 25M HIGH TELECOMMUNICATION S MAST ON ERF 435, NIEUWOUDTVILLE SPORTSGROUNDS, DU TOIT STREET, NIEUWOUDTVILLE, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | Cedar Tower Services | Enviroafrica CC | 11/07/2018 - 11:11 | |||
Leeuwspruit Solar 2 PV HIA Report | PROPOSED 300MW LEEUSPRUIT SOLAR 2 PHOTOVOLTAIC PROJECT SOUTH OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 12/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 03/07/2023 - 16:33 | |
HIA Report Leeuwspruit Solar 1 PV | PROPOSED 320MW LEEUSPRUIT SOLAR 1 PHOTOVOLTAIC PROJECT SOUTH OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 12/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 29/06/2023 - 11:37 | |
Mooivlei Solar 3 PV HIA Report | PROPOSED 330MW MOOIVLEI SOLAR 3 PHOTOVOLTAIC PROJECT WEST OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 31/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 30/06/2023 - 14:50 | |
Esizayo Powerline Paleontological Report | PROPOSED 400 KV POWERLINE CONNECTION FOR THE ESIZAYO WIND ENERGY FACILITY NEAR LAINGSBURG, CENTRAL KAROO DISTRICT MUNICIPALITY, WESTERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 20/12/2016 | John E Almond | Natura Viva CC | WSP Environmental Pty Ltd - Johannesburg | 04/08/2017 - 10:14 | |
Maralla Transmission Line Palaeontological Report | PROPOSED 400 KV POWERLINE CONNECTION FOR THE MARALLA WEST & MARALLA EAST WIND ENERGY FACILITIES NEAR SUTHERLAND, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 15/12/2016 | John E Almond | Natura Viva CC | WSP Environmental Pty Ltd - Johannesburg | 24/07/2017 - 16:03 | |
Maralla Transmission Palaeontological Report | PROPOSED 400 KV POWERLINE CONNECTION FOR THE MARALLA WEST & MARALLA EAST WIND ENERGY FACILITIES NEAR SUTHERLAND, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 15/12/2016 | John E Almond | Natura Viva CC | WSP Environmental Pty Ltd - Johannesburg | 24/07/2017 - 15:46 | |
Heritage Scoping Report | Proposed 45 km 132kv power line from the proposed 132kv feeder bay at Gingindlovu Substation to the proposed 132/22kv Mbongolwane Substation KwaZulu-Natal, South Africa | Heritage Scoping | 28/02/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | KwaZulu-Natal Amafa and Research Institute | 11/12/2017 - 10:24 | |
HIA Report Oslaagte Solar 2 PV | PROPOSED 460MW OSLAAGTE SOLAR 2 PHOTOVOLTAIC PROJECT, SOUTHEAST OF KROONSTAD, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 26/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/06/2023 - 16:12 | |
Oslaagte Solar 3 PV HIA Report | PROPOSED 480MW OSLAAGTE SOLAR 3 PHOTOVOLTAIC PROJECT, SOUTHEAST OF KROONSTAD, FREE STATE PROVINCE - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 26/05/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 14/06/2023 - 16:42 | |
HIA FOR THE PROPOSED 60MW PV PLANT AT THE SAMANCOR CHROME’S TUBATSE FERROCHROME SMELTER, STEELPOORT, LIMPOPO | PROPOSED 60MW PV PLANT AT THE SAMANCOR CHROME’S TUBATSE FERROCHROME SMELTER, STEELPOORT, LIMPOPO | Heritage Scoping | 20/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Royal Haskoning DHV | 25/06/2021 - 13:16 | |
HIA Report Rhino Solar PV | PROPOSED 65MW RHINO SOLAR PHOTOVOLTAIC PROJECT, NORTH WEST OF RUSTENBURG, NORTH-WEST PROVINCE HERITAGE IMPACT ASSESMENT | HIA Phase 1 | 09/06/2023 | Jennifer Kitto | Nitai Consulting | Nemai Consulting | 03/07/2023 - 14:18 | |
Amersfoort Piggery | PROPOSED 9600 SOW UNIT PIGGERY AND AN ABATTOIR TO BE ESTABLISHED 20 KM EAST OF AMERSFOORT MPUMALANGA PROVINCE | HIA Phase 1 | 01/08/2017 | Leonie Marais-Botes | 15/11/2017 - 10:16 | |||
Desktop Heritage Assessment | PROPOSED ABATTOIR AND ASSOCIATED PROCESSING PLANT, P107 ROAD TO NONOTI, ILEMBE DISTRICT MUNICIPALITY KWAZULU-NATAL | 07/07/2017 | Jean Beater | JLB Consulting | 24/11/2017 - 12:12 | |||
Aberdeen Solar Archaeology | Proposed Aberdeen Photovoltaic Plant - Eastern Cape Province | AIA Phase 1 | 04/05/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 16/07/2012 - 16:54 | |
CMSA | Proposed addition and alterations to current buildings situated on 10/12/14/16 Lichfield road Umbilo Durban | Site Inspection Report | 31/01/2014 | Llewellyn Cronje | COLLEGES OF MEDICINE SOUTH AFRICA DURBAN | 14/01/2014 - 15:31 | ||
227 RETIEF STREET , Additions and Alterations | Proposed additions and alterations at 227 Retief street. | 23/07/2023 | Thegaraj Naicker | KGC Architectural consultants | KGC Architetural consultants | 24/07/2023 - 08:56 |