Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16551 - 16600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA_Exxaro_Manganese_Project_Coega_Kaplan_JM_Oct08 | Proposed Exxaro Alloystream Manganese Project in the Coega Industrial Development Zone: Heritage Impact Assessment | AIA Phase 1 | 01/10/2008 | Jonathan Kaplan | Agency for Cultural Resources Management | MAPID_02215 | 16/06/2012 - 14:45 | |
PIA_Exxaro_Manganese_Project_Coega_Almond_JE_Feb09 | Proposed Exxaro Alloystream Manganese Project in the Coega Industrial Development Zone: Palaeontological Impact Assessment | PIA Phase 1 | 01/02/2009 | John E Almond | Natura Viva CC | MAPID_03024 | 16/06/2012 - 14:54 | |
Ezakheni-Pomeroy 132kV Transmission Line | Proposed Ezakheni-Pomeroy 132kV Kingbird line Establishment Mzinyathi and Uthukela District Municipalities, KwaZulu-Natal | Heritage Scoping | 20/10/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | Eskom - ECOU | 24/10/2016 - 09:05 | |
PROPOSED FARMING ACTIVITIES, PORTION 1090 AND 1091 OF THE FARM | PROPOSED FARMING ACTIVITIES, PORTION 1090 AND 1091 OF THE FARM HARTEBEESTPOORT C419 JQ, LETHLABILE, MADIBENG LOCAL MUNICIPALITY, NORTHWEST PROVINCE | Heritage Impact Assessment Specialist Reports | 27/09/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | 30/09/2022 - 07:38 | ||
PROPOSED FARMING ACTIVITIES, PORTION 39 & 40 OF THE FARM BLAAUWBANK 241 JQ | PROPOSED FARMING ACTIVITIES, PORTION 39 & 40 OF THE FARM BLAAUWBANK 241 JQ, LETHLABILE, MADIBENG LOCAL MUNICIPALITY, NORTHWEST PROVINCE | HIA Phase 1 | 27/09/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | PGS Heritage (Pty) Ltd | 16/03/2022 - 15:31 | |
PHASE 1 HIA REPORT FELDSPAR MINING, FARM ROZYNEN BOSCH NO. 104, PORTIONS 4 AND 5, KAKAMAS SOUTH, NORTHERN CAPE | PROPOSED FELDSPAR PROSPECTING RIGHTS AND MINING PERMIT APPLICATION, FARM ROZYNEN BOSCH NO. 104, PORTION 4 AND 5, KAKAMAS SOUTH SETTLEMENT, KAI !GARIB MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. | HIA Phase 1 | 07/11/2019 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 11/02/2020 - 08:33 | |
Development of a filling station and shopping complex at Bakenberg | Proposed filling station and shopping complex at Bakenberg. Mogalakwena Local Municipality. Waterberg District. Limpopo Province | HIA Phase 1 | 09/07/2017 | Frans Roodt | Phakanani Strategies | 09/07/2017 - 10:53 | ||
PHASE 1 HIA REPORT, BLAAUWSKOP SETTLEMENT LOW-COST HOUSING DEVELOPMENT, NORTHERN CAPE | PROPOSED FORMALISATION OF BLAAUWSKOP SETTLEMENT LOW-COST HOUSING DEVELOPMENT ON PORTION 30 OF FARM BLAAUWSKOP NO. 36, BLAAUWSKOP SETTLEMENT, KENHARDT ROAD, KAI !GARIB LOCAL MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 12/03/2019 | Jan Engelbrecht, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd | Enviroafrica CC | 13/05/2019 - 17:45 | |
PHASE 1 HIA REPORT, GAMAKOR AND NOODKAMP LOW-COST HOUSING DEVELOPMENT, KEIMOES, NORTHERN CAPE | PROPOSED FORMALISATION OF GAMAKOR AND NOODKAMP LOW-COST HOUSING DEVELOPMENT ON PORTIONS 0 AND 128 OF FARM KOUSAS NO. 459, AND ERVEN 1470, 1474 AND 1480, KEIMOES, GORDONIA RD, KAI !GARIB LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 12/03/2019 | Jan Engelbrecht, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 13/05/2019 - 17:53 | |
PROPOSED FORMALIZATION OF SOSHANGUVE MAZAMBANENG EXT. 30 AND EXT. 31 | PROPOSED FORMALIZATION OF SOSHANGUVE MAZAMBANENG EXT. 30 AND EXT. 31 ON PART OF THE REMAINING EXTENT OF THE FARM RIETGAT 611-JR, CITY OF TSHWANE, GAUTENG PROVINCE. | Heritage Study | 01/02/2022 | STEPHAN GAIGHER | Noksa23 Development Planner | City of Tshwane Metropolitan Municipality | 12/06/2023 - 12:13 | |
Gamma Kappa 2 Scoping BE and CL | PROPOSED GAMMA KAPPA 2ND 765KV ESKOM POWERLINE NORTHERN & WESTERN CAPE Heritage Impact Assessment specialist component Built Environment, Spatial History and Cultural Landscape SCOPING AND ASSESSMENT REPORT | BE & CL Scoping Report | 01/11/2013 | Bridget O'Donoghue, Sally Titlestad | Nzumbululo Heritage Solutions | 20/01/2015 - 12:21 | ||
Gamma Kappa 2 Scoping HIA | Proposed Gamma-Kappa 2nd 765kV Eskom Transmission Powerline and Substations Upgrade Development in Western Cape PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY REPORT | HIA Phase 1 | 01/08/2014 | McEdward Murimbika | Nzumbululo Heritage Solutions | 20/01/2015 - 11:57 | ||
Scoping Report Garob Wind | Proposed Garob Wind Energy Facility Project, Northern Cape Province (DEA Ref No. 14/12/16/3/3/2/279) | Heritage Statement | 11/06/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 11/06/2012 - 08:47 | ||
Desktop PIA Gemsbok Solar PV1 | PROPOSED GEMSBOK SOLAR PV1 SOLAR ENERGY FACILITY NEAR KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 19/09/2014 | John E Almond | Natura Viva CC | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:50 | |
Desktop PIA Gemsbok Solar PV2 | PROPOSED GEMSBOK SOLAR PV2 SOLAR ENERGY FACILITY NEAR KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 19/09/2014 | John E Almond | Natura Viva CC | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:55 | |
Desktop PIA Gemsbok Solar PV2 | PROPOSED GEMSBOK SOLAR PV2 SOLAR ENERGY FACILITY NEAR KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 19/09/2014 | John E Almond | Natura Viva CC | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:56 | |
MetCon JMP Refinery Facility Heritage Screening Assessment Report | Proposed GIDZ Jewellery Manufacturing Precinct, OR Tambo International Airport, Ekurhuleni Metropolitan Municipality, Gauteng Province - Heritage Screening Assessment – Final Report | Heritage Study | 11/09/2018 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Marang Environmental and Associates (Pty) Ltd | 21/09/2018 - 12:30 | |
Palaeontology Report for Gilmer Solar Energy Facility 735 | Proposed Gilmer Solar Energy Facility, Noupoort, Northern Cape Province. Basic Assessment Report Palaeontology | PIA Phase 1 | 30/10/2012 | JF Durand | 31/01/2013 - 14:12 | |||
Auwal Masjid 39 Dorp Street Bo - Kaap | Proposed Grade 2 declaration of Auwal Masjd | Heritage Study | 07/04/2017 | Vidamemoria Heritage Consultants | Heritage Western Cape | Vidamemoria Heritage Consultants | 07/04/2017 - 17:05 | |
HIA_Gravenhage_Manganese_Project_Van_Schalkwyk_JA_Aug10 | Proposed Gravenhage manganese Project, John Taolo Gaetsewe District Myunicipality, Northern Cape Province | HIA Phase 1 | 06/08/2010 | Johnny Van Schalkwyk | 16/06/2012 - 14:52 | |||
Paleontological Phase 1 Field Study - Updated | Proposed Greenfields Rietvlei Opencast Coal Mining Operation - Paleontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 25/03/2017 | Heidi Fourie | WSP | 06/04/2017 - 10:51 | ||
Paleontological Phase 1 Field Study | Proposed Greenfields Rietvlei Opencast Coal Mining Operation Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 28/10/2016 | WSP Environmental Pty Ltd - Johannesburg | 22/11/2016 - 12:34 | |||
Paleontological Phase 1 Field Study | Proposed Greenfields Rietvlei Opencast Coal Mining Operation Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 28/10/2016 | WSP Environmental Pty Ltd - Johannesburg | 22/11/2016 - 12:34 | |||
Paleontological Phase 1 Field Study | Proposed Greenfields Rietvlei Opencast Coal Mining Operation Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 28/10/2016 | WSP Environmental Pty Ltd - Johannesburg | 22/11/2016 - 12:35 | |||
Archaeological Impact Assessment Grid conection | Proposed Grid Conection for the Impfou Wind Farms from Kouga area to San Souci and Chatty Substation near Port Elizabeth, Eastern Cape Province | Archaeological Specialist Reports | 21/08/2019 | Peter Nilssen | 22/04/2019 - 13:29 | |||
Bonsmara Powerline Heritage Impact Assessment | PROPOSED GRID CONNECTION FOR THE BONSMARA SOLAR PHOTOVOLTAIC (PV) RENEWABLE ENERGY FACILITY NEAR KROONSTAD, FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 28/02/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 05/05/2023 - 09:52 | |
HERITAGE IMPACT ASSESSMENT | Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality.SAHRA Case No: 12583. Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 28/02/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | GAEA ENVIRO PTY LTD | 04/03/2019 - 10:15 | |
HIA for KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 | PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 WIND ENERGY FACILITIES, CALVINIA MAGISTERIAL DISTRICT, ORTHERN CAPE | 03/07/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 09/07/2021 - 16:02 | |||
HIA: GRID CONNECTION K1, K2 and K3 | PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 WIND ENERGY FACILITIES, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | 03/07/2021 | 09/07/2021 - 15:45 | |||||
HIA for the Kokerboom 4 Grid connection | PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 4 WIND ENERGY FACILITY, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE | Jayson Orton | ASHA Consulting(Pty) Ltd | 09/07/2021 - 16:33 | ||||
Groblersdal Ext 34 | PROPOSED GROBLERSDAL EXT 34, GROBLERSDAL, LIMPOPO PROVINCE | AIA Phase 1 | 13/05/2011 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Rinus Brits Town Planning Solutions | 09/11/2012 - 10:30 | |
GWALA FARM | PROPOSED GWALA FARM SEWERAGE INFRASTRUCTURE PROJECT, TONGAAT, KWAZULU-NATAL | HIA Phase 1 | 30/06/2017 | Jean Beater | JLB Consulting | ECA CONSULTING | 24/05/2018 - 09:38 | |
PIA_Haverfontein_Wind_Farm_Almond_JE_May11 | Proposed haverfontein Wind Energy Project near Carolina, Albert Luthuli Local Municipality, Mpumalanga Province | PIA Phase 1 | 01/05/2011 | John E Almond | Natura Viva CC | 16/06/2012 - 14:54 | ||
Proposed Hillside Desalination Plant to be established at the Hillside Aluminium smelter site, Richards Bay, KwaZulu-Natal. | Proposed Hillside Desalination Plant to be established at the Hillside Aluminium smelter site, Richards Bay, KwaZulu-Natal. | HIA Letter of Exemption | 20/05/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | SE Solutions | 25/05/2016 - 08:47 | |
Hotazel Solar Farm & Transmission lines (Paleontology exemption rec.) | PROPOSED HOTAZEL SOLAR PARK ON THE FARM HOTAZEL ANNEX LANGDON (F278/0), JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 27/10/2016 | John E Almond | Natura Viva CC | Aurecon South Africa (Pty) Ltd | 08/05/2017 - 13:33 | |
Proposed Hotel & Conference Centre, Ba-Phalaborwa Local Municipality | Proposed Hotel & Conference Centre, Portion 24 & 42 (a portion of Portion 38) of the farm Laaste 24 LU, Ba-Phalaborwa Local Municipality, Limpopo | HIA Phase 1 | 02/09/2013 | Hester Marie Roodt, Frans Roodt | Idada Environmental Consultants | CTS_145811 | 22/11/2013 - 22:45 | |
PIA_Cenyu_Village_Almond_JE_Jan12 | PROPOSED HOUSING DEVELOPMENT IN CENYU VILLAGE / CENYULANDS AREA, STUTTERHEIM, EASTERN CAPE | PIA Phase 1 | 02/01/2012 | John E Almond | Natura Viva CC | 16/06/2012 - 14:54 | ||
HIA report - Eloffspark | PROPOSED HOUSING DEVELOPMENT ON ELOFFSPARK 772JR, BETWEEN CAPITAL PARK AND ELOFFSDAL, CITY OF TSHWANE DISTRICT MUNICIPALITY, GAUTENG PROVINCE. | HIA Phase 1 | 28/06/2018 | Johnny van Schalkwyk | Envirolution Consulting (Pty) Ltd | 20/06/2018 - 13:06 | ||
PHASE 1 HIA REPORT HOUSING DEVELOPMENT, PELLA, NORTHERN CAPE | PROPOSED HOUSING DEVELOPMENT ON REMAINDER OF ERF 1077, LOCATED BETWEEN SWARTKOPPIES STREET AND PELLA ROAD, PELLA, KHAI-MA LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 24/04/2019 | Heidi Fivaz, Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 13/05/2019 - 18:12 | |
Capital Park X5 | PROPOSED HOUSING DEVELOPMENT TO BE KNOWN AS CAPITAL PARK EXTENSION 5, CITY OF TSHWANE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 01/02/2016 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | LEAP - Lanscape Architect Environmental Planner | 26/01/2016 - 14:01 | |
PIA Boegoeberg EIR | PROPOSED HYDROPOWER STATION AND ASSOCIATED INFRASTRUCTURE AT BOEGOEBERG DAM ON THE ORANGE RIVER NEAR GROBLERSHOOP, KHEIS, SIYATHEMBA & SIYANCUMA LOCAL MUNICIPALITIES, NORTHERN CAPE | PIA Desktop | 27/09/2013 | John E Almond | Natura Viva CC | Aurecon - Cape Town | 17/03/2014 - 16:23 | |
PROPOSED IBISI INFILL HOUSING PROJECT, UMZIMKHULU LOCAL MUNICIPALITY KWAZULU-NATAL | PROPOSED IBISI INFILL HOUSING PROJECT, UMZIMKHULU LOCAL MUNICIPALITY KWAZULU-NATAL | HIA Phase 1 | 01/12/2019 | Jean Beater | JLB Consulting | Enviroedge | 31/01/2020 - 10:44 | |
Phase I HIA Ikhuhu Farm | PROPOSED IKHUHU POULTRY FARM ON 154 KATLAGTER IN KUTUMBA ESTATE, PRETORIA RURAL WITHIN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 23/02/2020 | Nkosinathi Godfrey Tomose | MOKGOPE CONSULTING CC | 01/07/2021 - 14:39 | ||
Palaeontological Scoping Assessment | Proposed Impofu East Wind Farm near Humansdorp, Sarah Baartman District Municipality, Eastern Cape | Palaeontological Specialist Reports | 01/03/2018 | John E Almond | Natura Viva CC | 10/10/2018 - 13:31 | ||
Archaeological Impact Assessment | Proposed Impofu East Wind Farm, Kouga Local Municipality, Sarah Baartman Ditrict Municipality, Eastern Province | Archaeological Specialist Reports | 22/06/2018 | Peter Nilssen | 10/10/2018 - 13:37 | |||
Impofu North Palaeontology | Proposed Impofu North Wind Farm near Humansdorp, Sarah Baartman District Municipality, Eastern Cape | Palaeontological Specialist Reports | 01/03/2018 | John E Almond | Natura Viva CC | 10/10/2018 - 10:58 | ||
Cottonlands in-situ housing development | Proposed in-situ housing development, Cottonlands, eThekwini Municipality | HIA Phase 1 | 30/04/2021 | Jean Beater | JLB Consulting | EnviroPro | 14/06/2021 - 09:54 | |
HAR6981 - Kalgold Prospecting HBAR | Proposed Incorporation of Prospecting Rights into the Existing Mining Right for Kalgold Mine in the North West Province: Heritage Basic Assessment Report | HIA Phase 1 | 21/04/2021 | Shannon Hardwick, Johan Nel | Digby Wells Environmental | Kalahari Goldridge Mining Company Ltd | 10/06/2021 - 15:14 | |
AIA_Lydenburg_31_JT_MPL_Jul07 | Proposed Industrial development on portions 136, 39 and 59 of the farm Lydenburg 31 JT, Thaba Chweu, Mpumalanga | AIA Phase 1 | 30/07/2007 | Matakoma Heritage Consultants (Pty) Ltd | MAPID_03405 | 16/06/2012 - 14:47 | ||
Martinus Rass | PROPOSED INSTALLATION OF A STORMWATER OUTLET IN THE KAALPLAAS SPRUIT, MARTINUS RASS AVENUE, ROSSLYN, TSHWANE. | Heritage Impact Assessment Specialist Reports | 31/03/2014 | Johnny Van Schalkwyk | National Cultural History Museum | Interdesign Landscape Architects | 06/05/2014 - 12:59 |