Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15101 - 15150 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA Buchuberg | Archaeological Impact Assessment Report for the Proposed re-use of a hard rock quarry on the Farm Buchuberg 296 in the Hay Magisterial District 24km East of Groblershoop | AIA Phase 1 | 12/12/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Site Plan Consulting | 28/01/2013 - 12:49 | |
AIA Report Dingwell EIA | Archaeological Impact Assessment Report for the proposed quarry on the farm Dingwell 276, JT, Rockys Drift, Mpumalanga Province | AIA Phase 1 | 06/03/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Greenmined Environmental | 18/03/2016 - 10:06 | |
AIA - Final | Archaeological Impact Assessment Report For The Proposed Orkney Solar Farm North West Province | Archaeological Specialist Reports | 31/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 24/02/2017 - 09:01 | |
AIA - Kuruman | Archaeological Impact Assessment Report for the Proposed Metals Industrial Cluster near Kuruman, Northern Cape Province | 20/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/11/2016 - 13:32 | ||
TsepongAIA-Jun15 | Archaeological Impact Assessment Report for the Proposed Harmony Gold Tsepong PV Facility in Welkom, Free State Province | Archaeological Specialist Reports | 17/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 01/07/2015 - 15:24 | |
Nyala_AIA_Jun15 | Archaeological Impact Assessment Report for the Proposed Harmony Gold NyalaPV Facility in Welk, Free State Province | Archaeological Specialist Reports | 17/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 01/07/2015 - 15:30 | |
Eland_AIA_Jun15 | Archaeological Impact Assessment Report for the Proposed Harmony Gold Eland PV Facility in Welk, Free State Province | Archaeological Specialist Reports | 17/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 01/07/2015 - 15:28 | |
Archaeological Impact Assessment - Gunstfontein WEF | Archaeological Impact Assessment Report for the Proposed Gunstfontein WEF near Sutherland, Karoo Hoogland Local Municipality, NC Province | Archaeological Specialist Reports | 21/12/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 25/02/2016 - 15:57 | |
AIA - Gunstfontein SS & PL (Jul16) | Archaeological impact assessment report for the proposed Gunstfontein 132 kV power line, switching station and ancillaries for the proposed Gunstfontein wind energy facility near Sutherland, Northern Cape | Archaeological Specialist Reports | 18/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 21/07/2016 - 15:08 | |
Garob Wind Farm AIA | Archaeological Impact Assessment Report for the proposed Garob Wind Energy Facility Project, located close to Copperton in the Northern Cape. | AIA Phase 1 | 14/09/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 14/09/2012 - 10:06 | |
Heritage Assessment - Ilanga CSP2 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 18/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 16:59 | |
Heritage Assessment - Ilanga CSP2 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 18/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 16:59 | |
Heritage Assessment - Ilanga CSP Tower 1 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga Tower 1 Project, near Upington, NC Province | Heritage Impact Assessment Specialist Reports | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 18:45 | |
Heritage Assessment - langa CSP 5 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga CSP 5 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 11/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 12:02 | |
Heritage Assessment - langa CSP 4 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilanga CSP 4 Project, near Upington, Northern Cape Province | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 12:08 | |||
Transnet Juno TFS AIA | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 5.7 KM 50KV POWER LINE FROM ESKOM JUNO SUBSTATION TO THE PROPOSED NEW TRANSNET JUNO TRACTION FEEDER SUBSTATION LOCATED WITHIN THE JURISDICTION OF MATIZKAMA LOCAL MUNICIPALITY, WEST COAST DISTRICT. WESTERN CAPE PROVINCE. | AIA Phase 1 | 15/09/2014 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Eskom - Megawatt Park | CTS_183116 | 01/12/2014 - 15:29 |
AIA - CastleWEF Oct14 | Archaeological Impact Assessment Report for the Proposed Castle Wind Energy Facility, De Aar, Northern Cape | Archaeological Specialist Reports | 30/10/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 01/12/2014 - 16:43 | |
AIA Report - Oryx | Archaeological Impact Assessment report for the Oryx Solar Energy Facility | Archaeological Specialist Reports | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 23/10/2013 - 16:20 | |
AIA Junction 21 | Archaeological Impact Assessment Report for the Junction 21 Township Development, Gauteng. | AIA Phase 1 | 13/04/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 23/08/2013 - 12:27 | ||
Heritage Assessment - langa CSP3 | Archaeological Impact Assessment Report for the Ilanga CSP 3 Project, near Upington, Northern Cape Province | Archaeological Specialist Reports | 12/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/05/2016 - 11:49 | |
Archaeological Impact Assessment Report for the Garob to Kronos Power Line | Archaeological Impact Assessment Report for the Garob to Kronos Power Line, near Copperton in the Northern Cape Province | AIA Phase 1 | 23/01/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 02/04/2013 - 15:25 | |
Archaeological Impact Assessment - Ilanga CSP 5 | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT - PROPOSED ESTABLISHMENT OF THE ILANGA CSP 5 PROJECT, NEAR UPINGTON, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 13/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 25/04/2016 - 13:54 | |
Heritage Report - Watershed Solar Facility | Archaeological Impact Assessment Report | Heritage Scoping | 12/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/06/2013 - 16:23 | |
Archaeology | Archaeological Impact Assessment Report | AIA Phase 1 | 20/03/2016 | Karen Van Ryneveld | ArchaeoMaps | ArchaeoMaps | 13/04/2016 - 16:18 | |
Archaeology | Archaeological Impact Assessment Report | AIA Phase 1 | 20/03/2016 | Karen Van Ryneveld | ArchaeoMaps | ArchaeoMaps | 13/04/2016 - 16:18 | |
Archaeology | Archaeological Impact Assessment Report | AIA Phase 1 | 31/01/2016 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 14/04/2016 - 09:09 | |
Archaeology | Archaeological Impact Assessment Report | AIA Phase 1 | 31/01/2016 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 14/04/2016 - 10:31 | |
Heritage report - Draft EIA | Archaeological Impact Assessment Report | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 08/07/2016 - 14:09 | |||
AIA_Ptn_7_ORANJE_1385_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment Remainder of Portion 7 of the Farm Oranje 1385, District Oranjeville, Free State Province | AIA Phase 1 | 13/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02495 | 16/06/2012 - 14:49 | |
HIA for Reatlegile Lodge | Archaeological Impact Assessment Relating to the Proposed Reatlegile Lodge Near Jane Furse, within the Makhuduthamaga Local Municipality of the Sekhukhune, Limpopo Province, South Africa | Archaeological Specialist Reports | 06/02/2021 | Eric Ndivhuho Mathoho | Millennium Heritage Group (PTY) LTD | 17/05/2021 - 15:34 | ||
HIA | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED PROSPECTING RIGHTS ON A PORTION OF PORTION L3 (SWARTKOPPES) 39 AND A PORTION OF REMAINDER PELLA MISSION 39 WITHIN THE NAMAQUALAND DISTRICT OF THE NORTHERN CAPE PROVINCE, SOUTH AFRICA | AIA Phase 1 | 18/07/2018 | Eric Ndivhuho Mathoho | SAHRA Council | Millennium Heritage Group | 26/11/2018 - 16:55 | |
Orange Farm AIA Reoprt | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED POULTRY FARM (50000-CHICKEN BROILER HOUSES) ON PORTION 119 (PORTION OF PORTION 7) OF THE FARM DOORNKUIL 369 IQ NEAR ORANGE FARM WITHIN MIDVAAL LOCAL MUNICIPALITY OF THE SEDIBENG DISTRICT, GAUTENG PROVINCE, SOUTH AFRICA | AIA Desktop | 01/10/2019 | Ndivhuho Eric Mathoho | Millennium Heritage Group | Millennium Heritage Group | 08/10/2019 - 14:54 | |
Proposed (8 Broiler houses) on portion 42 of the farm Zandfontein 386 JQ. | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED POULTRY FARM ( 8 BROILER HOUSES) ON PORTION 42 OF THE FARM ZANDFONTEIN 386 JQ NEAR MAGALIESBURG WITHIN RUSTENBURG LOCAL MUNICIPALITY OF THE BOJANALA DISTRICT, NORTH WESTPROVINCE, SOUTH AFFRICA | AIA Phase 1 | 07/11/2019 | Ndivhuho Eric Mathoho | North West Provincial Heritage Resources Authority | Tholoana Sustainable Development and Environmental Consultants | 30/01/2020 - 16:56 | |
Blydeville X4 Archaeological Impact Assessment | Archaeological Impact Assessment relating to the proposed demacation of mixed developments project on farm Rietdraai 51 IP at Blydeville Extension 4 near Lichtenburg, within Ditsobotla Local Municipality of Ngaka Modiri Moleme District Municipality | AIA Phase 1 | 03/07/2017 | Ndivhuho Eric Mathoho | Vhufa Hashu Heritage Consultants | Tholoana Sustainable Development and Environmental Consultants | 15/12/2017 - 16:48 | |
Rietfontein-Rietspruit Mixed Residential Development | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE DEMACATION OF RIETFONTEIN-REITSPRUIT MIXED RESIDENTIAL DEVELOPMENT ON FARMS RIETFONTEIN 152IR AND RIETSPRUIT 153 IR NEAR PALM RIDGE WITHIN EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE: GDARD Ref: Gaut (002/13-14/e0038) | AIA Phase 1 | 17/06/2015 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 10/07/2015 - 10:35 | |
Rietfontein-Rietspruit Mixed Residential Development | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE DEMACATION OF RIETFONTEIN-REITSPRUIT MIXED RESIDENTIAL DEVELOPMENT ON FARMS RIETFONTEIN 152IR AND RIETSPRUIT 153 IR NEAR PALM RIDGE WITHIN EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE: GDARD Ref: Gaut (002/13-14/e0038) | AIA Phase 1 | 17/06/2015 | Ndivhuwo Eric Mathoho | Millennium Heritage Group | Naledzi Environmental Consultants | 10/07/2015 - 10:35 | |
Blydeville X4 Archaeological Impact Assessment | Archaeological Impact Assessment relating to the demacation of mixed development project on farm Rietdraai 51 IP at Blydeville Extension 4 near Lichtenburg, within Ditsobotla Local Municipality of Ngaka Modiri Moleme District, North West Province | AIA Phase 1 | 01/07/2016 | Ndivhuho Eric Mathoho | Vhufa Hashu Heritage Consultancy CC | Tholoana Sustainable Development and Environmental Consultants | 24/11/2017 - 21:14 | |
HIA | ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO MINING PERMIT APPLICATION ON FARM KANGKURU NEAR KURUMAN, | AIA Phase 1 | 31/10/2016 | Eric Ndivhuho Mathoho | Department of Mineral Resources | Department of Minerals and Energy | 01/12/2016 - 15:37 | |
Phase 1 AIA Proposed Visserspan Grid Connection | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED VISSERSPAN GRID CONNECTION ON THE FARMS VISSERSPAN NO. 40, MOOIHOEK NO. 1547, VASTEVELD NO. 1548 AND KINDERDAM NO. 1685, NEAR DEALESVILLE, TOKOLOGO LOCAL MUNICIPALITY,FREE STATE PROVINCE | AIA Phase 1 | 20/09/2021 | Jonathan Kaplan | ACRM | Enviroafrica CC | 17/02/2022 - 13:06 | |
AIA; Sand Mine Modder River | Archaeological Impact Assessment Proposed Sand Mine on the Remainder of Portion 9 of the Farm Modder River 634, Western Cape | AIA Phase 1 | 01/01/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | Site Plan Consulting | 09/04/2018 - 08:59 | |
AIA: PROPOSED SAND MINE ON THE FARM BRAKKE KUYL NO. 38 AND NO. 39 BLOUBERG WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED SAND MINE ON THE FARM BRAKKE KUYL NO. 38 AND NO. 39 BLOUBERG WESTERN CAPE | AIA Phase 1 | 01/10/2016 | Jonathan Kaplan | Agency for Cultural Resources Management | Leap Sustainable Development | CTS_375970 | 29/11/2016 - 16:19 |
AIA: SAND MINE BLAAUWBERG Cape Farm 91 & Remainder of Cape Farm 88 | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED SAND MINE ON BLAAUWBERG FARM NEAR MELKBOSSTRAND (Remainder of Cape Farm 91 & Remainder of Cape Farm 88) | AIA Phase 1 | 01/02/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | Amathemba Environmental Management Consulting CC | CTS_406590 | 04/08/2017 - 10:49 |
AIA; PROPOSED SAND MINE ON BLAAUWBERG FARM | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED SAND MINE ON BLAAUWBERG FARM NEAR MELKBOSSTRAND | AIA Phase 1 | 01/02/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | Amathemba Environmental Management Consulting CC | 16/07/2018 - 14:34 | |
AIA: Proposed residential development, Portion 52 Kraaibosch Farm 195, George, Western Cape Province | Archaeological Impact Assessment Proposed residential development, Portion 52 Kraaibosch Farm 195, George, Western Cape Province | AIA Phase 1 | 15/03/2011 | Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | Cape Environmental Assessment Practitioners | CTS_357438 | 26/02/2016 - 10:26 |
AIA: Onseepkrans Water Supply | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED REPAIR AND UPGRADE OF THE ONSEEPKANS WATER SUPPLY AND FLOOD PROTECTION INFRASTRUCTURE NORTHERN CAPE PROVINCE | AIA Phase 1 | 01/08/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 10/10/2013 - 10:59 | |
AIA: Proposed Port Nolloth Oxidation Ponds & Sewer Pipeline | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED PORT NOLLOTH OXIDATION PONDS AND SEWER PIPELINE NORTHERN CAPE | AIA Phase 1 | 01/08/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | BVi Consulting Engineers | CTS_396817 | 28/03/2017 - 07:50 |
AIA_Port_Nolloth_Oxidation_Ponds_Kaplan_JM_Aug11 | Archaeological Impact Assessment proposed Port Nollith Oxidation Ponds and Sewer Pipeline, Northern Cape | AIA Phase 1 | 01/08/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:49 | ||
AIA_Photovoltaic_De_Aar_Kaplan_JM_Apr10 | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED PHOTOVOLTAIC POWER GENERATION FACILITY IN DE AAR NORTHERN CAPE | AIA Phase 1 | 08/04/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:48 | ||
AIA Proposed Photovoltaic facility DE AAR | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED PHOTOVOLTAIC POWER GENERATION FACILITY IN DE AAR NORTHERN CAPE | AIA Phase 1 | 01/04/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | Mulilo Renewable Energy (Pty) Ltd | 06/10/2014 - 09:48 | |
AIA_Spitzkop_Mine_v2_Fourie_W_Feb08 | Archaeological Impact Assessment Proposed Mining Development for Xstrata Group - Spitzkop Mine, Breyten - Ermelo Region, Mpumalanga Province Version 2.0 | AIA Phase 1 | 23/05/2008 | Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01700 | 16/06/2012 - 14:50 |