HERITAGE IMPACT ASSESSMENT Proposed Grid Connection Infrastructure (GCI) on Konkoonsies 91/2/rem, 91/5, 91/6 and Scuit Klip 92/1 near Pofadder, in the Khaî-Ma Local Municipality.SAHRA Case No: 12583. Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). Heritage Impact Assessment Specialist Reports 28/02/2019 Jayson Orton ASHA Consulting(Pty) Ltd GAEA ENVIRO PTY LTD 04/03/2019 - 10:15
HIA for the Proposed Douglas Water Supply Scheme Cultural Heritage Impact Assessment of the Proposed Douglas Water Supply Scheme, Umzinyathi District Municipality Heritage Impact Assessment Specialist Reports 08/05/2014 Frans Prins EnviroPro 12/05/2014 - 15:35
Dealesville Edison Amendment letter 29 SOLAR DEALESVILLE - AMENDMENT OF ENVIRONMENTAL AUTHORISATION FOR EDISON PV Heritage Impact Assessment Specialist Reports 30/08/2018 Jayson Orton ASHA Consulting(Pty) Ltd Council for Scientific and Industrial Research 16/10/2018 - 10:57
HIA for Upgrade of Inner City Transportatino Hub, Strand Street, Cape Town Inner City Transportation Hub: Project A: Replacement of Pedestrian Bridge and Project B: Vehicular down ramp Site Name: Erven RE 14888, RE 4651 and 148638, Cape Town Location: Strand Street Cape, Town Heritage Impact Assessment Heritage Impact Assessment Specialist Reports Sarah Winter City of Cape Town Metropolitan Municipality 24/10/2016 - 13:48
HIA for filling station in Waterkloof Heritage Impact Assessment HIA for filling station in Waterkloof Heritage Impact Assessment Specialist Reports Archaetnos CC HydroScience 22/06/2020 - 02:49
HIA for MAhlathini Road CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF MAHLATHINI ROAD Heritage Impact Assessment Specialist Reports 06/05/2016 Frans Prins 09/05/2016 - 12:37
Hollingwood Subsidised Housing HIA Heritage Survey of the Proposed Hollingwood Low Cost Housing Project. Pietermaritzburg, KwaZulu Natal Heritage Impact Assessment Specialist Reports 26/06/2015 - 09:32
Augrabies Solar PV HIA HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED AUGRABIES SOLAR ENERGY FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 24/02/2012 Jayson Orton ACO Associates CC Rosenthal Environmental 29/10/2013 - 11:54
NID Jan Smuts Upgrade, Johannesburg, Gauteng. NOTIFICATION OF INTENT TO DEVELOP FOR THE PROPOSED UPGRADING OF JAN SMUTS ROAD TO DUAL CARRIAGE WAY FROM NORTHWORTH DRIVE TO BOLTON ROAD AND FROM 8TH AVENUE TO KENT ROAD, ROSEBANK, JOHANNESBURG, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 07/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 10/04/2017 - 18:57
Tshipi é Ntle Manganese Mining Tshipi é Ntle Manganese Mining: Prospecting on Remaining extent of the farm Wessels 227 and Portions 1 and 2 and the remaining extent of the farm Dibiaghomo 226, near Black Rock in the Northern Cape Province Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 22/07/2013 Wouter Fourie SLR Consulting (Africa) SLR Consulting (Africa) 22/07/2013 - 08:55
Integrated Cultural Resources Management Study for the proposed Mfolozi-Mbewu 765KV Transmission Line Integrated Cultural Resources Management Study and HIA for the proposed Mfolozi-Mbewu 765KV Transmission Line, Zululand and King Cetshwayo District Municipality, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 20/12/2018 Cherene de Bruyn NGT Infraco (Pty) Ltd MOKGOPE CONSULTING CC 20/12/2018 - 13:37
Heritage Management Plan Nov. 2011 Heritage Management Plan for Kolomela Mine in the Postmasburg District Municipality of the Northern Cape Province. November 2011 Heritage Impact Assessment Specialist Reports 01/11/2011 Udo Kusel African Heritage Consultants CC Kumba Iron Ore Kolomela Mine 08/04/2013 - 17:07
Cultural heritage impact assessment for the PROPOSED RESIDENTIAL DEVELOPMENT, PORTION 57, BENONI 77IR, EKURHULENI, GAUTENG PROVINCE Cultural heritage impact assessment for the PROPOSED RESIDENTIAL DEVELOPMENT, PORTION 57, BENONI 77IR, EKURHULENI, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 05/05/2014 Johnny Van Schalkwyk CTS_166098 09/06/2014 - 13:22
Ithemba Heritage Impact Assessment Report Itemba Wind Energy Facility (WEF) Heritage Impact Report Heritage Impact Assessment Specialist Reports 05/10/2017 Wouter Fourie PGS Heritage (Pty) Ltd Sivest - Gauteng 14/11/2017 - 10:08
Cultural Heritage Report for EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE Heritage Impact Assessment Specialist Reports 26/04/2012 Frans Prins Active Heritage CC Kerry Seppings Environmental Management 09/09/2013 - 16:34
Tafelkop 1154 Petrusburg FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED DIAMOND PROSPECTING AT TAFELKOP 1154, (PETRUSBURG), BLOEMFONTEIN DISTRICT Heritage Impact Assessment Specialist Reports 17/07/2014 Cobus Dreyer De Beers Consolidated Mines (Pty) Ltd De Beers Consolidated Mines (Pty) Ltd 18/09/2014 - 22:12
HIA for Namas Wind farm HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE FOR THE NAMAS WIND FARM, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 02/03/2019 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 28/05/2019 - 16:33
HIA for EGI to support the Sutherland, Sutherland 2 and Rietrug WEFs HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF A MAJOR TRANSMISSION SUBSTATION, 400 KV TRANSMISSION LINE AND 132 KV DISTRIBUTION LINE TO SUPPORT THE PROPOSED RIETRUG, SUTHERLAND AND SUTHERLAND 2 WEFs, SUTHERLAND AND LAINGSBURG MAGISTERIAL DISTRICTS, NORTHERN AND WESTERN CAPE Heritage Impact Assessment Specialist Reports 11/09/2019 Jayson Orton ASHA Consulting(Pty) Ltd CSIR 01/10/2019 - 21:25
NORVALSPONT WATERPIPELINE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED UPGRADING OF THE BULK WATER SUPPLY AT NORVALSPONT NEAR GARIEP DAM, EASTERN CAPE Heritage Impact Assessment Specialist Reports 29/09/2013 Cobus Dreyer MDA Town and Regional Planners MDA Town and Regional Planners 15/11/2013 - 20:05
musina housing development The Proposed Musina Housing Development on farm Messina 4MT Within Musina Local Municipality In The Vhembe District Municipality, Limpopo Province. Heritage Impact Assessment Specialist Reports 27/11/2018 Ndivhuwo Eric Mathoho Millennium Heritage Group Naledzi Environmental Consultants 07/03/2019 - 11:46
159 Smiso Nkwanyana Road Alteration to Pool at 159 Smiso Nkwanyana Road Heritage Impact Assessment Specialist Reports 20/08/2014 Richard Stretton KwaZulu-Natal Amafa and Research Institute Koop Design 21/08/2014 - 10:45
HIA Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports Ndivhuwo Eric Mathoho 25/10/2016 - 15:39
Public Participation Report _Section 37 Application of the Kwa Zulu Natal Heritage Act No 4 of 2008 Heritage Impact Assessment Building structures on Portion 3, of Erf 498 Scottsville Public Participation Report Section 37 Application of the KwaZulu Natal Heritage Act No 4 of 2008 for the Heritage Impact Assessment Report for Portion 3 of Erf 498 Scottsville Pietermaritzburg. Heritage Impact Assessment Specialist Reports 03/05/2021 Judith Muindisi Tsica Heritage Consultants ADOWA Property Developers 03/05/2021 - 17:37
HIA - Ilanga Solar Heritage Impact Assessment for the Proposed Establishment of the Ilanga Solar Thermal Power Plant near Upington, Northern Cape Province Heritage Impact Assessment Specialist Reports 31/05/2011 Johnny Van Schalkwyk Savannah Environmental (Pty) Ltd 16/04/2014 - 12:24
Clayville Bulk Services and Mix Use development Proposed Mixed Use development and associated infrastructure on the Remainder of Erf 6138 Clayville Extension 45, Portion 41 (a Portion of Portion 7) and Portion 179 (a Portion of Portion 7) of the Farm Olifantsfontein 410-JR, within the City of Ekurhuleni Metropolitan Municipality, Gauteng Province Heritage Impact Assessment Specialist Reports 01/05/2017 Jaco van der Walt Gauteng - Department of Agriculture and Rural Development LEAP -Landscape Architectural and Environmental Planning 03/05/2019 - 10:45
HIA and PIA_L20 EXT_Geluksburg_Near Bergville L20 EXT_Geluksburg_Near Bergville_HIA&PIA Heritage Impact Assessment Specialist Reports 09/07/2017 Frans Prins Active Heritage CC Active Heritage CC 13/07/2017 - 09:44
Paarde Valley PV2 OHPL Heritage Impact Assessment HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINE FOR PAARDE VALLEY PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 16/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd Holland & Associates Environmental Consultants 12/07/2022 - 15:12
Berenice HIA Berenice Heritage Impact Assessmnet Heritage Impact Assessment Specialist Reports 28/08/2016 Francois P Coetzee 03/08/2016 - 15:52
Heritage Impact Assessment - Rheboksfontein PL Heritage Impact Assessment: Proposed Construction of a 132 kV Power Line from the Rheboksfontein Wind Energy Facility to the Aurora Substation, Western Cape Province Heritage Impact Assessment Specialist Reports 16/11/2015 Lita Webley ACO Associates CC Savannah Environmental (Pty) Ltd 11/02/2016 - 16:46
Proposed reconstruction Station Street to Fitzpatrick Street Fleet Street East London - Proposed reconstruction Station Street to Fitzpatrick Street Heritage Impact Assessment Specialist Reports 01/05/2012 Gillian Vernon Environmental Impact Management Services (Pty) Ltd 14/06/2012 - 11:25
HIA Obisini Gravel Road Proposed construction of 7.6 km gravel road in Obisini Village on the Farm Qamu Location 17484 Msinga LM, Mzinyathi District DM, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 31/03/2017 Len van Schalkwyk eThembeni Cultural Heritage Magalela & Associates (Pty) Ltd 12/04/2017 - 12:18
Zonnebloem HIA - Mar'18 Heritage Impact Assessment Report for the Construction of the Zonnebloem Switching Station (132/22kv) and Two Loop-In Loop-Out Power Lines (132kV), Middelburg, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 27/03/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 13/04/2018 - 11:40
Proposed Ezakheni AutoHub Proposed Construction of Ezakheni AutoHub on Erf 1923 Ezakheni D Section, Emnambithi-Ladysmith Municipality, UThukela District, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 27/05/2015 Frans Prins Active Heritage CC Active Heritage CC 08/06/2015 - 09:23
JAKHALSFONTEIN 146, DE AAR FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PV SOLAR ENERGY FACILITIES ON THE FARM JAKHALSFONTEIN 146, DE AAR, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 24/10/2014 Cobus Dreyer Eco-compliance Eco-compliance 27/10/2014 - 22:02
DUT Ritson Rd Campus - Visual Impact Assessment DUT Ritson Rd Campus - Visual Impact Assessment Heritage Impact Assessment Specialist Reports 20/06/2022 - 10:34
Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1 Heritage Impact Assessment for the Proposed Installation of Four Underground Tanks on Erf 854 in Thohoyandou-P Ext 1, Thulamela Local Municipality, Limpopo Province. Heritage Impact Assessment Specialist Reports 27/06/2016 Marko Hutten Hutten Heritage Consultants Tekplan Environmental 07/07/2016 - 18:01
Palmietkuilen 241 IR MRA HIA Heritage Impact Assessment: Application for a Mining Right and Environmental Authorisation of the proposed Palmietkuilen Mine, Gauteng Province Heritage Impact Assessment Specialist Reports 31/10/2017 Justin du Piesanie Digby Wells Environmental Anglo Operations (Pty) Ltd 31/03/2017 - 11:28
INGLESBY 580 OLIFANTSHOEK FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 10/05/2014 Cobus Dreyer 15/06/2014 - 16:23
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. Heritage Impact Assessment Specialist Reports 06/08/2021 06/08/2021 - 11:40
HIA for Proposed upgrades to Maropeng Basic Heritage Impact Assessment for the proposed upgrades to the Maropeng Interpretive Centre Heritage Impact Assessment Specialist Reports 20/11/2014 Dominic Stratford 08/05/2015 - 14:17
BRMO - New Railway Bridge Heritage Report A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE. Heritage Impact Assessment Specialist Reports 01/03/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Assmang Black Rock Mining Operations 30/05/2019 - 12:12
ARCHAEOLOGICAL IMPACT ASSESSMENT FOR MURALENI SPORTS ARENA ON PORTION OF THE REMAINDER OF THE FARM SENTIMULAS LOCATION 291LS PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED MURALENI SPORTS ARENA ON PORTION OF THE REMAINDER OF THE FARM SENTIMULAS LOCATION 291LS, MURALENI-HAMANTSHA, MAKHADO LOCAL MUNICIPALITY OF THE VHEMBE DISTRICT, LIMPOPO PROVINCE, SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 20/04/2021 Ndivhuho Eric Mathoho 23/07/2021 - 14:39
Heritage Impact Assessment for the proposed Mapungubwe Orientation Centers and Overnight Facilities, Limpopo Province Heritage and Palaeontological Impact Assessment for the Overnight Youth Facility (Dormitories) & Mapungubwe Valley Orientation Centers, Mapungubwe National Park and WHS Heritage Impact Assessment Specialist Reports 05/09/2022 Stephan Gaigher, John E Almond G&A Heritage Management Consultants SANParks 03/10/2022 - 22:30
Heritage Impact Assessment (Summerpride) Heritage Impact Assessment Specialist Reports Gary Minkley 09/04/2015 - 09:23
HIA Telkom Underground Cables, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A NEW UNDERGROUND CABLE, CROSSING TWO WATERCOURSES, ON THE FARM LOT K 52 NO. 16721 AND PORTION 1 (REMAINING EXTENT) OF THE FARM COMBINE NO. 13220, LOCATED NEAR KWAMBONAMBI, UTHUNGULU DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 30/04/2015 Frans Prins Active Heritage CC 08/09/2015 - 14:54
EC-KZN Group 2 Heritage Report Heritate assessment of Group 2 Sites of the proposed EC-KZN Afforestation EIA Heritage Impact Assessment Specialist Reports 20/07/2017 Len van Schalkwyk eThembeni Cultural Heritage Sigwela and Associates 17/02/2019 - 02:18
Residential Developemnt at the Old Dairy Site, Hilton College Cultural Heritage Impact Assessment of the Proposed Establishment of a Residential Development atht he Old Dairy Site, Hilton College, Umngeni Local Municipality, KZN Heritage Impact Assessment Specialist Reports 12/10/2016 Frans Prins Active Heritage CC Terratest (Pty) Ltd 17/07/2017 - 11:02
Goedgedacht Piggery Expansion HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE ONE PALEONTOLOGY DESKTOP ASSESSMENT) OF THE PROPOSED GOEDGEDACT PIGGERY EXPANSION, FOCHVILLE GAUTENG Heritage Impact Assessment Specialist Reports 22/04/2019 Frans Prins Active Heritage CC Green Door Environmental 13/08/2019 - 10:44
EXX3666 - NID Notification of Intent to Develop: EXXARO COAL (PTY) LTD GROOTEGELUK COAL MINE SHORT-TERM STOCKPILE AMENDMENT PROJECT Heritage Impact Assessment Specialist Reports 06/10/2016 Justin du Piesanie Digby Wells Environmental Exxaro Resources 06/10/2016 - 13:59
Maverick Trading 919 cc Prospecting right application on all the portions of Klipfontein 442 IS, Drinkwater 443 IS and Kroomdraai 441 IS situated under magisterial district of Emerlo, Mpumalanga Province Heritage Impact Assessment Specialist Reports 13/04/2022 13/04/2022 - 17:28

Pages

CSV
 
 

Search form