THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17751 - 17800 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Thornhill Bulk Water - Nqadu Corridor | Archaeological and Heritage Impact Assessment Report for Proposed Thornhill Bulk Water Supply Project (Nqadu Corridor) within OR Tambo Local Municipality in the Eastern Cape Province | Heritage Impact Assessment Specialist Reports | 01/12/2013 | Steve K Kalule | 03/06/2014 - 14:11 | |||
HIA_Dynamite Coffee Co_Restaurant Building, Modderfontein | heritage Impact Assessment for the Dynamite Coffee Co, Restaurant Building, Modderfontein, Gauteng Province | Heritage Impact Assessment Specialist Reports | 01/05/2017 | Mauritz Naude | Mauritz Naude | 25/03/2019 - 16:52 | ||
Normandie DBAR Heritage Report | Cultural Heritage Impact Assessment Of The Proposed Normandie-Hlungwane, Coal-Link Project, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 16/01/2014 | Frans Prins | Sivest - Gauteng | 21/04/2015 - 10:54 | ||
De Rust PV1 HIA | Heritage Impact Assessment for the Proposed De Rust PV1 SEF | Heritage Impact Assessment Specialist Reports | 01/04/2023 | Jaco van der Walt | Beyond Heritage | Enviro-Insight CC | 09/06/2023 - 09:57 | |
Cultural heritage impact assessment | Cultural heritage impact assessment for THE DEVELOPMENT OF THE PROPOSED KAGISO SOLAR POWER PLANT ON THE REMAINING EXTENT OF THE FARM KAMEELAAR NO 315 REGISTRATION DIVISION KURUMAN, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/03/2016 | Johnny Van Schalkwyk | 30/05/2016 - 11:13 | |||
HIA Erf 8019, Cape Town | Heritage Impact Assessment submitted in terms of section 38(4) of the National Heritage Resources Act Report for comment Sir Lowry Square Erf 8019, Cape Town prepared for Errol Family Fall Trust 3 August 2020 | Heritage Impact Assessment Specialist Reports | 04/08/2020 | Vidamemoria | 05/08/2020 - 14:57 | |||
Boven PV1 report HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BOVEN SOLAR PV1 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 17/11/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Mulilo Renewable Project Developments (Pty) Ltd | 13/01/2015 - 15:09 | |
HIA, housing on Farms 475 & 476, Elandskloof, Clanwilliam | HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED HOUSING AND ASSOCIATED INFRASTRUCTURE DEVELOPMENT ELANDSKLOOF. CASE NO: 130530JW35E | Heritage Impact Assessment Specialist Reports | 01/02/2014 | Henry Aikman | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | CTS_503705 | 18/04/2018 - 11:06 | |
HIA: EZIKHUMBENI CAUSEWAY | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EZIKHUMBENI CAUSEWAY IN ULUNDI MUNICIPAL AREA, NORTERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/02/2014 | Frans Prins | Active Heritage CC | Green Door Environmental | 17/02/2014 - 12:11 | |
HIA-BlackwoodPowerline | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, South East of Kimblery, in the Tokologo Local Municipality, Free State: Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 25/08/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 24/03/2015 - 10:48 | |
Tlisitseng 1 132kV Substation and Power Line Heritage Report | TLISITSENG PROJECT - TLISITSENG 1 SUBSTATION AND POWER LINE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 29/06/2017 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 07/07/2017 - 11:46 | |
Mulilo Newcastle Wind Power 2 Heritage Impact Assessment | Mulilo Newcastle Wind Power 2 Heritage Impact Assessment near Newcastle, KZN for draft EIR submission | Heritage Impact Assessment Specialist Reports | 04/03/2023 | Gavin Anderson | Umlando: Archaeological Surveys and Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 17/03/2023 - 14:17 | |
The proposed reclamation of the Soweto Cluster Dumps | The proposed reclamation of the Soweto Cluster Dumps, Bramfischerville, City of Johannesburg Metropolitan Municipality, Gauteng Province. | Heritage Impact Assessment Specialist Reports | 16/10/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Kongiwe Environmental (Pty) Ltd | 10/01/2020 - 11:17 | |
Heritage amendment comparative study | Heritage Impact Assessment Specialist Reports | 09/03/2021 | Jenna Lavin | Cedar Tower Services | Savannah Environmental (Pty) Ltd | 11/03/2021 - 11:19 | ||
HIA for Hotazel Solar Park Transmission lines | HERITAGE IMPACT ASSESSMENT FOR PROPOSED POWER LINES NEAR HOTAZEL, KURUMAN MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 06/02/2017 | Jayson Orton | juwi Renewable Energies South Africa (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 06/04/2017 - 19:05 | |
HIA for Delta solar PV | Heritage Impact Assessment for delta solar PV | Heritage Impact Assessment Specialist Reports | J van Schalkwyk | 28/05/2020 - 00:55 | ||||
Heritage Impact Assessment - PR11296 | Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. | Heritage Impact Assessment Specialist Reports | 09/12/2015 | Lloyd Rossouw | Paleo Field Services | Black Mountain Mining (PTY) LTD | 10/12/2015 - 11:47 | |
1469_HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED KAREERAND PIPELINES PROJECT FOR HARMONY MINE, BETWEEN KLERKSDORP AND POTCHEFSTROOM, NORTH WEST PROVINCE. | Heritage Impact Assessment Specialist Reports | 02/12/2021 | Nikki Mann | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 04/02/2022 - 12:19 | |
Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO | Phase 1 Heritage Resource Impact Assessment (Scoping & Evaluation) PROPOSED UPGRADING OF EXISTING LOW-LEVEL BRIDGE GA-MAWELA VILLAGE, STEELPOORT, LIMPOPO STATEMENT WITH REGARD TO HERITAGE RESOURCES MANAGEMENT | Heritage Impact Assessment Specialist Reports | 19/09/2012 | Liesl Stegmann | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 11/03/2016 - 09:08 | |
Rondekop Heritage Reports | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 325MW RONDEKOP WIND ENERGY FACILITY BETWEEN MATJIESFONTEIN SUTHERLAND IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 10/09/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 14/11/2018 - 17:30 | |
Heritage Impact Assessment - Proposed132kV Emoyeni Grid Infrastructure | HERITAGE IMPACT ASSESSMENT - THE PROPOSED 132kV POWERLINE ASSOCIATED WITH THE EMOYENI WIND ENERGY FACILITIES AND ASSOCIATED INFRASTRUCTURE, NEAR MURRAYSBURG, WESTERN AND NORTHERN CAPE PROVINCES. | Heritage Impact Assessment Specialist Reports | 01/09/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Nala Environmental (Pty) Ltd | 16/09/2022 - 08:05 | |
Heritage Impact Assessment | Heritage Impact Assessment Eskom Camden Power Station | Heritage Impact Assessment Specialist Reports | 04/07/2020 | Edward Matenga | Green Gold Consulting | Eskom Generation | 13/08/2020 - 14:21 | |
HIA and PIA for Skeerhok PV2 | Heritage Impact Assessment Specialist Reports | 21/02/2018 - 15:39 | ||||||
Pofadder 2 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 2, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 11:18 | |
Zandspruit Sewer HIA | SPECIALIST OPINION FOR THE CHANGE OF THE ALIGNMENT FOR THE PROPOSED BULK SEWER LINE ON PORTIONS OF THE FARM ZANDSPRUIT 191iq, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 19/07/2022 | J A van Schalkwyk | 23/01/2023 - 14:34 | |||
Heritage Comment Letter 11.10.18 | Heritage Comment Letter for the Splitting of Approved Sold Invictus 3, Out Taaibosmond 66/5, near Aggeneys into PV3 and PV5 | Heritage Impact Assessment Specialist Reports | 11/10/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/10/2018 - 08:30 | |
HIA Harmony Reclamation Project | THE PROPOSED HARMONY FSS6 RECLAMATION PIPELINE, WELKOM, FREE STATE PROVINCE: HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 28/10/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 26/11/2021 - 12:15 | |
ENNERDALE EXTENSION 6 ON ERF 4625 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ENNERDALE EXTENSION 6 ON ERF 4625 GAUTENG PROVINCE. | Heritage Impact Assessment Specialist Reports | 11/10/2022 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 25/10/2022 - 16:08 | |
Lindum TSF Heritage Assessment | Heritage impact assessment for the PROPOSED RECLAMATION OF THE HISTORICAL LINDUM TAILINGS FACILITYRANDFONTEIN, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 01/02/2013 | Johnny Van Schalkwyk | National Cultural History Museum | Prime Resources (Pty) Ltd | 24/07/2013 - 11:13 | |
Heritage preconstruction walthrough report for Sutherland WEF | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 01/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 15/12/2022 - 10:07 | |
VMC3049_Heritage Impact Assessment Report | Environmental Authorisation for the Pamish Magnetite Project: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 31/07/2015 | Justin du Piesanie, Tammy Hodgskiss (Reynard), Johan Nel | Digby Wells Environmental | Pamish Investments No. 39 (Pty) Ltd | 23/10/2015 - 08:56 | |
22142-HIA | For the proposed Borrow Pits and Quarries required for the SANRA (Trac N4) road upgrade of the Schoemnakloof (R539) Route, Mpumalanga | Heritage Impact Assessment Specialist Reports | 01/08/2022 | 10/10/2022 - 08:52 | ||||
Naturena - Devland Reservoir | Phase I Cultural Heritage Resources Impact Assessment for the Devland Naturena Reservoir and Bulk Pipeline Johannesburg Gauteng Province | Heritage Impact Assessment Specialist Reports | 04/06/2013 | Udo Kusel | African Heritage Consultants CC | LEAP - Lanscape Architect Environmental Planner | 27/06/2013 - 13:02 | |
Middledrift | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MIDDLEDRIFT WATER SUPPLY SCHEME NEAR NKANDLA ACTIVE HERITAGE cc. | Heritage Impact Assessment Specialist Reports | 09/01/2013 | Frans Prins | Active Heritage CC | EnviroPro | 12/06/2014 - 10:12 | |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:28 | |
HIA: Lidgetton West, KZN | CULTURAL HERITAGE IMPACT ASSESSMENT OF RIETVALLEI FARM, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 01/10/2011 | Frans Prins | Active Heritage CC | Green Door Environmental | 06/03/2014 - 07:07 | |
Springhaas LiLo 2 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:24 | |
Zelpy Mining Right Appliocation | Phase 1 Archaeological and Heritage Impact Assessment for Proposed Mining Right Application on the farm Kafferskraal 400 IP, Klerksdorp, in City of Matlosana Local Municipality, North West Province | Heritage Impact Assessment Specialist Reports | 20/05/2020 | Trust Mlilo | Integrated Specialist Services | Joan Construction and Projects (Pty) Ltd | 18/08/2020 - 13:06 | |
Onderstepoort Ext. 33, 34, A, B and C, Tshwane | Heritage Impact Assessment - Proposed Development of Portions 68, 69, 112, 113, 114, 115 and 116 of the farm Onderstepoort 266-JR, Tshwane Metropolitan Municipality, Gauteng Province | Heritage Impact Assessment Specialist Reports | 12/07/2012 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Abland (Pty) Ltd | 23/01/2015 - 13:15 | |
TOWNSHIP ESTABLISHMENT STEENBOKPAN - LIMPOPO | PHASE 1 - HERITAGE IMPACT ASSESSMENT REPORT | Heritage Impact Assessment Specialist Reports | 01/02/2009 | Frans Roodt | R & R Cultural Resource Consultants | Tekplan Environmental | 07/06/2013 - 11:49 | |
Updated Ithemba Grid Heritage Impact Assessment Report | Ithemba Wind Energy Facility (WEF) – 132kV Grid connection and substation: Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 27/02/2018 - 11:42 | |
De Beers Demolition Works HIA | Heritage Impact Assessment Kleinzee Mining Area, Heritage Management Plan for the Mining Structures within the Kleinzee Mining Rights Area, Kleinzee, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 07/03/2018 | Stephan Gaigher | South African Heritage Resources Agency | De Beers Consolidated Mines (Pty) Ltd | 16/05/2018 - 10:36 | |
HIA for the proposed 75MW PV Solar Facility on Mierdam Farm | Heritage impact assessment for the PROPOSED ESTABLISHMENT OF A PV SOLAR FACILITY BY SOUTH AFRICA MAINSTREAM RENEWABLE POWER MIERDAM (PTY) LTD ON THE FARM MIERDAM IN THE PRIESKA REGION NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 17/01/2013 | Sivest - Gauteng | Mainstream Renewable Power South Africa (Pty) Ltd | 14/02/2013 - 13:15 | ||
HIA - Zonnequa Wind Farm (26.09.18) | Heritage Impact Assessment: Proposed Zonnequa Wind Farm Near Kleinsee, Namakwaland Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 26/09/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 22/10/2018 - 16:51 | |
HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | HIA FOR THE PROPOSED KOMSBERG EAST AND WEST WIND ENERGY FACILITIES (SHARED) | Heritage Impact Assessment Specialist Reports | 15/11/2015 | Timothy Hart | ACO Associates CC | Arcus Consulting | 17/05/2016 - 13:46 | |
Heritage Impact Assessment | Heritage Impact Assessment for proposed iron and manganese ore prospecting activities | Heritage Impact Assessment Specialist Reports | 09/06/2021 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 10/06/2021 - 07:59 | ||
Erven 862, 863, 865 and 866 Mapleton X 10 Heritage Impact Assessment report | Erven 862, 863, 865 and 866 Mapleton Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 14/07/2017 - 12:47 | ||||
Klipkraal WEF 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 13/09/2023 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | SiVEST SA (Pty) Ltd | 24/09/2023 - 17:54 | |
Heritage Assessment For Boschendal Farmlands, Dwars River Valley Vol 2 | Heritage Assessment For Boschendal Farmlands, Dwars River Valley Vol 2 | Heritage Impact Assessment Specialist Reports | 16/01/2006 | Sarah Winter, Nicolas Baumann | Sarah Winter Heritage Practitioner | Boschendal (Pty) Ltd | 17/03/2021 - 11:17 | |
HIA for filling station in Waterkloof | Heritage Impact Assessment for filling station in Waterkloof | Heritage Impact Assessment Specialist Reports | Archaetnos CC | HydroScience | 22/06/2020 - 02:45 |