FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany Post date
Westgate Substation PHASE 1 ARCHAEOLOGICAL/HERITAGE IMPACT ASSESSMENT FOR WESTGATE SUBSTATION EXTENSION IN THE KAKGISO AREA OF MOGALE CITY LOCAL MUNICIPALITY IN GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 30/03/2019 Trust Mlilo Integrated Specialist Services (Pty) Ltd Eskom - CROU 01/10/2020 - 20:43
HIA Badenhorst PV3 Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on De Aar 180/1 (Badenhorst Dam Farm), De Aar, Northern Cape Heritage Impact Assessment Specialist Reports 09/07/2013 Jayson Orton ACO Associates CC Aurecon - Cape Town 24/03/2015 - 09:32
Mpameni Road HIA & PIA PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MPAMENI ROAD UPGRADE, OKHAHLAMBA LOCAL MUNICIPALITY KWAZULU NATAL. & PALAEONTOLOGICAL IMPACT ASSESSMENT (PHASE 2) FOR THE MPAMENI ROAD UPGRADE, OKHAHLAMABA LOCAL MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 18/09/2018 20/09/2018 - 15:31
Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. Heritage Assessment Of The Ncome Museum Complex, Nquthu/Ndundee, kwaZulu-Natal, South Africa. Heritage Impact Assessment Specialist Reports 30/06/2006 eThembeni Cultural Heritage eThembeni Cultural Heritage 16/03/2021 - 12:54
HIA Ezingqungeni Gravel Road Proposed construction of 6.8 km gravel road in Ezingqungeni Village on the Farm Qamu Location 17484 Msinga LM, Mzinyathi District DM, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 31/03/2017 Len van Schalkwyk eThembeni Cultural Heritage Magalela & Associates (Pty) Ltd 12/04/2017 - 12:05
Integrated HIA: Humansrus Solar PV Facility 3 PROPOSED DEVELOPMENT OF HUMANSRUS SOLAR PV FACILITY 3 ON THE FARM HUMANSRUS 147, PRIESKA DISTRICT AND PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 22/04/2016 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 05/05/2016 - 15:20
243 Currie Road St Thomas Road Historical Impact Assessment Heritage Impact Assessment Specialist Reports 20/07/2012 Deborah Whelan 241 Currie Road (Pty) Ltd 16/05/2013 - 17:57
HIA Beaufort West Electrical Infrastructure HIA Proposed construction of two power lines and three substations for the Mainstream Wind Energy Facility Heritage Impact Assessment Specialist Reports 23/06/2016 Mary Patrick Cape Archaeological Survey CC Sivest - Gauteng 26/07/2016 - 16:23
HIA; Eskom Line Renewal and Substation Upgrades Bredasdorp -Arniston HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RENEWAL OF THE BREDASDORP –ARNISTON 66KV ESKOM LINE AND SUBSTATION UPGRADES Heritage Impact Assessment Specialist Reports 01/06/2011 Timothy Hart, Natalie Kendrick ACO Associates CC Landscape Dynamics - Cape Town 04/04/2018 - 12:05
50MW Khauta eNyane Heritage Assessment 50MW Khauta eNyane Heritage Assessment_Final Heritage Impact Assessment Specialist Reports 01/08/2022 Jonathan Kaplan Agency for Cultural Resources Management Enviroworks 07/03/2023 - 15:13
HIA Report Sutherland & Rietrug WEF Grid Infrastructure HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2021 Jayson Orton ASHA Consulting(Pty) Ltd 15/11/2021 - 08:26
258 Wakesleigh Road, Bellair Trevean HIA Heritage Impact Assessment Specialist Reports Robert J W Brusse, Deborah Whelan Bryan Lee Architect / BAT Bartle Arts Trust 11/10/2013 - 13:54
Nyathikazi Rural Housing Development HIA Nyathikazi Low Cost Housing Project, KwaDukuza Municipality, KwaZulu Natal Heritage Impact Assessment Specialist Reports 26/05/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 29/05/2015 - 16:07
Heritage Impact Assessment - PR11296 Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. Heritage Impact Assessment Specialist Reports 09/12/2015 Lloyd Rossouw Paleo Field Services Black Mountain Mining (PTY) LTD 10/12/2015 - 11:47
Proposed reclamation of the Marievale TSF The proposed reclamation of the Marievale Tailings Storage Facilities in Ekurhuleni, Gauteng Province Heritage Impact Assessment Specialist Reports 06/03/2020 Jennifer Kitto PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 02/04/2020 - 09:01
Heritage Impact Assessment for the Murray Road Mixed-Use Development HERITAGE IMPACT ASSESSMENT Assessment of Structures and proposed development at 220 Murray/ Gladys Manzi road, New England, Pietermaritzburg. Heritage Impact Assessment Specialist Reports 01/06/2022 Lindsay Napier 05/12/2022 - 11:17
HIA Application - replacement of Quay wall 3&4 and Ferry Landing in EL Port Heritage Impact Assessment Report IN TERMS OF SECTION 34 (1) OF NHRA FOR THE PROPOSED REPAIR AND PLACEMENT OF PORT STRUCTURES QUAY 3 & 4 AND FERRY LANDING IN THE PORT OF EAST LONDON IN THE EASTERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 01/11/2022 jennifer Mokakabye Setjo Sesho Consultants Transnet National Ports Authority - East London 12/09/2023 - 18:13
Cultural Heritage Impact Assessment, Erf 1 Upington Cultural Heritage Impact Assessment Proposed Township development of Erf 1, UPINGTON, //KHARA HAIS MUNICIPALITY Heritage Impact Assessment Specialist Reports 11/03/2014 Johnny Van Schalkwyk SAHRA Council MEG Environmental Impact Studies 11/03/2014 - 10:30
HIA for Solar-Ferrum 400kV Power Line Proposed Establishment of Several Electricity Distribution Lines Within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 17/09/2013 - 20:04
HIA for the proposed Umsinde Emoyeni Wind Energy Facility Heritage Impact Assessment for the proposed Umsinde Emoyeni Wind Energy Facility Heritage Impact Assessment Specialist Reports 13/10/2015 Timothy Hart Arcus Renewable Energy Consulting Limited 19/02/2016 - 13:09
Ndumo Project 3 FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF NDUMO ROAD (PROJECT 3) IN NORTHERN KWAZULU-NATAL. Heritage Impact Assessment Specialist Reports 15/12/2016 Frans Prins Active Heritage CC Terratest (Pty) Ltd 17/07/2017 - 10:22
HIA Vosloorus Ext 24, 41 and 43 Heritage Impact Assessment for Proposed Township Development: Vosloorus Extension 24, Vosloorus Extension 41 and Vosloorus Ext 43, Boksburg Local Municipality, Ekurhuleni Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 12/08/2014 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Enkanyini Projects 29/08/2014 - 16:50
Hendrina Heritage Report Heritage Impact Assessment FOR THE HENDRINA NORTH 132 KV POWERLINE, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2022 Jaco van der Walt Beyond Heritage SiVEST SA (Pty) Ltd 01/11/2022 - 15:30
HIA for the Du Plessis Dam PV1 and Du Plessis Dam PV2 GRID CONNECTION HERITAGE IMPACT ASSESSMENT: PROPOSED 132 kV POWERLINES FOR DU PLESSIS DAM PV1 & PV2 AT DE AAR, DE AAR MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 24/04/2022 Jayson Orton ASHA Consulting(Pty) Ltd Landscape Dynamics - Cape Town 17/06/2022 - 09:45
Old Bridge near Richmond Heritage Impact Assessment for the old bridge on Krysfontein and Weltevreden 826, near Richmond Heritage Impact Assessment Specialist Reports 12/10/2013 Deborah Whelan Archaic Consulting Umgeni Water 07/11/2013 - 21:07
Henela Solar Projects: Final Heritage Reports Heritage Impact Assessment Specialist Reports 31/07/2016 Wouter Fourie Department of Environmental Affairs PGS Heritage and Grave Relocation Consultants 28/11/2016 - 09:11
HIA-Moorreesburg_Mar15 Heritage Impact Assessment: Proposed INCA Juwi Wind Energy Facility at Moorreesburg, WC Province Heritage Impact Assessment Specialist Reports 13/03/2015 Timothy Hart, Natalie Kendrick ACO Associates CC Savannah Environmental (Pty) Ltd 03/06/2015 - 14:34
Lesaka SEF 2 Heritage Impact Assessment PROPOSED LESAKA 2 SOLAR ENERGY FACILITY NEAR LOERIESFONTEIN, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT Heritage Impact Assessment Specialist Reports 31/01/2023 Jenna Lavin CTS Heritage SiVEST SA (Pty) Ltd 13/03/2023 - 11:01
Heritage Impact Assessment for Botshabelo West Heritage Impact Assessment Specialist Reports 27/09/2016 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 27/09/2016 - 10:32
KZN ASP Heritage Reports A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED ILLOVO AUTOMOTIVE SUPPLIER PARK (ASP) AND INDUSTRIAL DEVELOPMENT ON THE REMAINDER OF THE FARM NOGI NO. 17469, ILLOVO, WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED 11KV AND 132KV TRANSMISSION POWERLINES FROM THE EXISTING KINGSBURGH SUBSTATION TO THE PROPOSED SUBSTATION AT THE KZN AUTOMOTIVE SUPPLIER PARK AT ILLOVO, DURBAN SOUTH, WITHIN ETHEKWINI MUNICIPALITY. A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED SEWERLINE ROUTE FROM THE KZN ASP SITE TO THE EXISTING KINGSBURGH WASTEWATER TREATMENT WORKS (WWTW) AT ILLOVO, DURBAN SOUTH. WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. Heritage Impact Assessment Specialist Reports 06/07/2022 Trust Mlilo Sativa Travel and Environmental Consultants Sativa Travel and Environmental Consultants 17/10/2022 - 11:22
Proposed Capacity Improvements to National Route 2 (N2) and National Route 3 (N3), 1. Capacity Upgrades to the N2 (Solomon Mahlangu IC to south of Umgeni Rd I/C), including expansion of EB Cloete and Solomon Mahlangu Interchanges, and the N3 (EB Cloete to Paradise Valley) including provision of temporary access for construction below Westville and Paradise Valley viaducts. 2. CAPACITY UPGRADES TO THE N3 HAMMARSDALE TO CATO RIDGE. 3. CAPACITY UPGRADES TO THE N3 CATO RIDGE INTERCHANGE TO LYNNFIELD PARK/LION PARK INTERCHANGE. 4. CAPACITY UPGRADES TO THE N3 LYNNFIELD PARK/LION PARK TO GLADYS MANZI ROAD 5. CAPACITY UPGRADES TO THE N3 Heritage Impact Assessment Specialist Reports 30/08/2018 Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 03/12/2018 - 01:08
Brookdale Assessment Centre Housing Heritage Impact Assessment Report Brookdale Assessment Centre Housing Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports 28/06/2011 eThembeni Cultural Heritage 19/05/2017 - 14:19
Nokukhanya Solar Facility: HIAR Nokukhanya Solar Facility: Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports 20/03/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 07/07/2015 - 11:57
HIA DEIR Heritage Impact Assessment Specialist Reports 21/08/2012 13/12/2012 - 15:04
HIA Underwater Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 17/08/2017 09/03/2018 - 12:31
Elandsfontein Quarry MRA A DESKTOP HERITAGE IMPACT ASSESSMENT REPORT FOR THE HIGHLY BLUE TRADING (PTY) LTD MINING RIGHTS APPLICATION ON VARIOUS PORTIONS OF THE FARM ROODEKOPJES OR ZWARTKOPJES 427JQ MAGISTERIAL DISTRICT OF BRITS, NORTHWEST PROVINCE - APAC022/65 Heritage Impact Assessment Specialist Reports 12/07/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Gudani Consulting 13/07/2022 - 13:15
CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR PROPOSED QUARRIES ON THE FARM HARRIET’S WISH 393 LR, PORTION 3, FORMING PART OF THE PLATINUM GROUP METALS WATERBERG PROSPECTING AREA, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 26/09/2022 Prof. Anton van Vollenhoven Archaetnos CC 26/04/2023 - 09:38
Leeuwbosch 1 Solar Plant Heritage Impact Report DEVELOPMENT OF THE 9.9MW LEEUWBOSCH 1 SOLAR PV PLANT, 9.9MW LEEUWBOSCH 2 SOLAR PV PLANT AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 05/05/2021 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 18/06/2021 - 13:42
HIA Georgedale, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED 11HA MIXED-USE DEVELOPMENT ON PORTION 361 (OF 25) OFTHE FARM UITKOMST AND DOORNRUG NO 852, NEAR HAMMARSDALE, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 12/12/2012 Frans Prins Active Heritage CC Green Door Environmental 01/06/2014 - 16:49
10928MP HIA HERITAGE IMPACT ASSESSMENT: PROPOSED SALT MINE ON FARM KONGA 250/REM, GORDONIA MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/01/2022 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 24/01/2022 - 20:02
HIA for Mthunzi Chicken Supplier Heritage Impact Assessment For the Proposed Mthunzi Chicken Supplier, Gauteng Province Heritage Impact Assessment Specialist Reports 20/11/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Council for Scientific and Industrial Research 16/04/2018 - 12:36
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF A TOWNSHIP, TO BE KNOWN AS AMOROSA EXTENSION 57, ON PORTION 1 OF HOLDING 25, AMOROSA AGRICULTURAL HOLDINGS, CITY OF JOHANNESBURG METROPOLITAN MUNCIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports J.A. van Schalkwyk Greenworx Environmental (Pty) Ltd 12/08/2021 - 10:04
HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT HIA FOR THE ENHLALAKAHLE PHASE 2 SUBSIDISED HOUSING DEVELOPMENT Heritage Impact Assessment Specialist Reports 20/10/2022 Gavin Anderson Umlando: Archaeological Surveys and Heritage Management 05/04/2023 - 15:48
Specialist report for Heritage studies Heritage Studies for the proposed township development on Rhenostersptiut Farm Heritage Impact Assessment Specialist Reports 08/10/2018 Auditors African Conservation Trust Bopa Lesedi 05/10/2018 - 11:05
Heritage Report for SASA 4c-6c Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa Heritage Impact Assessment Specialist Reports 12/12/2017 Vanessa Maitland De Beers Marine (Pty) Ltd 21/12/2017 - 15:00
Platsjambok West BESS HIA PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED PLATSJAMBOK WEST SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 04/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 26/05/2021 - 16:36
Assessment of Firearms in North West 200 firearms were assessed in Potchefstroom (North West). Total of 7 have been identified as having heritage value. The serial numbers are as follow: AO7100 A6930 147728 S101206 BBK449 SP02711 WR319458 Heritage Impact Assessment Specialist Reports 08/07/2013 SAHRA HOU SAHRA HOU 05/08/2013 - 12:01
10429PR HERITAGE IMPACT ASSESSMENT HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON PORTION 1 & REMAINDER OF KAROETJIES KOP 150, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE (10429PR) Heritage Impact Assessment Specialist Reports 01/07/2023 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 12/07/2023 - 10:59
Soyuz 4 WEF Draft EIR - HIA HERITAGE IMPACT ASSESSMENT REPORT FOR THE SOYUZ 4 WIND ENERGY FACILITY PROJECT, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 01/02/2023 Nelius Kruger EOH Coastal and Environmental Services Soyuz 4 (Pty) Ltd 14/03/2023 - 16:39
Development of a citrus orchard on farm Nooitgedacht 338 KQ The development of a citrus orchard and associated facilities on portions of the farm Nooitgedacht 338KQ in the Thabazimbi local municipality of Limpopo Province Heritage Impact Assessment Specialist Reports 30/04/2021 Johan van Schalkwyk Limpopo Department of Economic Development, Environmental and Tourism Jonk Begin Omgewings Dienste 21/11/2021 - 22:01