FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany Post date
Heritage Impact Assesment Heritage Impact Assessment for New Surface Infrastructure at United Manganese Kalahari, Hozatel Northern Cape Province Heritage Impact Assessment Specialist Reports 11/03/2022 Jaco van der Walt HCAC Heritage Consultants SLR Consulting (Africa) (Pty) Ltd 25/03/2022 - 11:07
Tlisitseng 1 132kV Substation and Power Line Heritage Report TLISITSENG PROJECT - TLISITSENG 1 SUBSTATION AND POWER LINE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 29/06/2017 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 07/07/2017 - 11:46
The proposed reclamation of the Soweto Cluster Dumps The proposed reclamation of the Soweto Cluster Dumps, Bramfischerville, City of Johannesburg Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 16/10/2019 Jennifer Kitto PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 10/01/2020 - 11:17
Heritage amendment comparative study Heritage Impact Assessment Specialist Reports 09/03/2021 Jenna Lavin Cedar Tower Services Savannah Environmental (Pty) Ltd 11/03/2021 - 11:19
NAM3428_IPP_HIA Heritage Impact Assessment: Namane Generation Independent Power Producer and Transmission Line Project, Lephalale, Limpopo Province Heritage Impact Assessment Specialist Reports 29/02/2016 Justin du Piesanie, Johan Nel Digby Wells Environmental Namane Generation (Pty) Ltd 12/05/2016 - 11:44
HIA for Delta solar PV Heritage Impact Assessment for delta solar PV Heritage Impact Assessment Specialist Reports J van Schalkwyk 28/05/2020 - 00:55
Heritage Impact Assessment for Lyra 1 Solar Park Heritage Impact Assessment for the Proposed Renewable Energy Generation Project by Lyra Energy (Pty) Ltd (Lyra 1 Solar Park) on Farm Welgelegen, 469-LQ with Overhead Powerlines to the Eskom Matimba Substation and/or to the Eskom Waterberg Distribution Substation, within the Lephalale Local Municipality, Waterberg District Municipality. Heritage Impact Assessment Specialist Reports 23/03/2023 Jaco van der Walt Beyond Heritage 19/05/2023 - 11:21
IDC Frankfort Paper Mill Heritage Report A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED THE FRANKFORT PAPER MILL PROJECT, FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 30/09/2013 Anton van Vollenhoven Industrial Development Corporation of Southern Africa 11/02/2016 - 13:07
Port Shepstone Gaol HIA Part 2014 12 07 Port Shepstone Gaol Heritage Impact Assessment Specialist Reports 05/12/2014 Robert J W Brusse Robert J W Brusse Robert J W Brusse 03/04/2017 - 11:18
BLAAUKRANTZ 144, DE AAR FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED PV SOLAR ENERGY FACILITIES ON THE FARM BLAAUKRANTZ 144, DE AAR IN THE NORTHERN CAPE Heritage Impact Assessment Specialist Reports 20/10/2014 Cobus Dreyer Eco-compliance Eco-compliance 27/10/2014 - 21:48
Integrated HIA: Klondike Echo SEF, Vryburg PROPOSED DEVELOPMENT OF THE AMDA ECHO PV (SOLAR ENERGY FACILITY) ON REMAINING EXTENT OF THE FARM KLONDIKE NO 670, AND OVERHEAD POWER LINE GRID CONNECTION TO THE MOOKODI MTS SUB-STATION ACROSS THE REMAINDER OF ERF 506 AND REMAINDER OF THE FARM ROSENDAL 673, VRYBURG DISTRICT, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 15/09/2016 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 16/09/2016 - 06:40
K4 Shaft PCD HIA Heritage Impact Assessment K4 Draft Final_1 Heritage Impact Assessment Specialist Reports 12/07/2023 Jaco van der Walt Beyond Heritage Alta van Dyk Environmental Consultants cc 04/09/2023 - 13:01
Rondekop Heritage Reports ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED 325MW RONDEKOP WIND ENERGY FACILITY BETWEEN MATJIESFONTEIN SUTHERLAND IN THE NORTHERN CAPE PROVINCE Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 10/09/2018 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 14/11/2018 - 17:30
KwaNobamba Heritage Impact Assessment Report Heritage Impact Assessment Specialist Reports 28/05/2014 Frans Prins Active Heritage CC Brousse-James & Associates 13/06/2014 - 12:18
Heritage Impact Assessment Heritage Impact Assessment Eskom Camden Power Station Heritage Impact Assessment Specialist Reports 04/07/2020 Edward Matenga Green Gold Consulting Eskom Generation 13/08/2020 - 14:21
Colborne Dairy HIA CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A 1000 HEAD DAIRY ON SUB 28 OF THE FARM WELGEVONDEN NO. 969, KARKLOOF, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 18/08/2013 Frans Prins Active Heritage CC Green Door Environmental 09/12/2013 - 15:32
Klipkraal WEF 2 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 2, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 19/08/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:42
HIA and PIA for Skeerhok PV2 Heritage Impact Assessment Specialist Reports 21/02/2018 - 15:39
St James CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE Heritage Impact Assessment Specialist Reports 26/04/2012 Frans Prins Active Heritage CC Kerry Seppings Environmental Management 11/09/2013 - 13:53
HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION The proposed construction of a 44 kV substation and power line north of the town of Delmas, Gauteng province Heritage Impact Assessment Specialist Reports 25/06/2015 Johnny Van Schalkwyk Royal Haskoning DHV 29/01/2015 - 10:44
Tongaat Desalination Plant HIA Proposed Umgeni Water Desalination Plant and associated infrastructure at Tongaat, eThekweni Municipality, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 30/10/2015 Len van Schalkwyk eThembeni Cultural Heritage Council for Scientific and Industrial Research 03/12/2015 - 03:23
Heritage Impact Assessment Report (Jan'22) Sun Garden App I - HIA Heritage Impact Assessment Specialist Reports 11/01/2022 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/01/2022 - 13:41
Heritage Comment Letter 11.10.18 Heritage Comment Letter for the Splitting of Approved Sold Invictus 3, Out Taaibosmond 66/5, near Aggeneys into PV3 and PV5 Heritage Impact Assessment Specialist Reports 11/10/2018 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 18/10/2018 - 08:30
KwaMashu Crossroads Heritage and Cultural Impact Assessment KwaMashu Crossroads Heritage and Cultural Impact Assessment Heritage Impact Assessment Specialist Reports 02/07/2012 Frans Prins Active Heritage CC ECA CONSULTING 10/06/2013 - 20:31
243 Currie Road St Thomas Road Historical Impact Assessment Heritage Impact Assessment Specialist Reports 20/07/2012 Deborah Whelan 241 Currie Road (Pty) Ltd 16/05/2013 - 17:57
HIA 250 000m3 Loskop Dam, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF THE 250 00 mᵌ DAM, ON THE FARM DRANKENSBERG LOCATION NO. 9605, NEAR LOSKOP. FOR THE AUTHORISED BHEKUZULU-EMPANGENI WATER SUPPLY SCHEME, LOCATED NEAR WINTERTON, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Green Door Environmental 21/04/2017 - 14:30
GGV Amendment HIA Report HIA Report for new incline shafts and P53-1 Road Alignment Development Goedgevonden Colliery, Near Ogies Mpumalanga Heritage Impact Assessment Specialist Reports 01/03/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Jacana Environmental cc 11/08/2022 - 09:19
258 Wakesleigh Road, Bellair Trevean HIA Heritage Impact Assessment Specialist Reports Robert J W Brusse, Deborah Whelan Bryan Lee Architect / BAT Bartle Arts Trust 11/10/2013 - 13:54
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:28
Sani Pass Phase 1 HIA Phase 1 Heritage Impact Assessment Report of the Proposed Relocation of the Sani Pass Port of Entry, KwaSani Local Municipality,Sisonke District, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 21/10/2013 Len van Schalkwyk eThembeni Cultural Heritage Mpumalanga - Department of Public Works, Roads & Transport 13/02/2015 - 10:50
Braklaagte Heritage and Palaeontogy walkdown reports PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (BRAKLAAGTE), DEALESVILLE, FREE STATE Heritage Impact Assessment Specialist Reports 13/08/2022 Jayson Orton, Elize Butler ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 01/12/2022 - 02:53
Zelpy Mining Right Appliocation Phase 1 Archaeological and Heritage Impact Assessment for Proposed Mining Right Application on the farm Kafferskraal 400 IP, Klerksdorp, in City of Matlosana Local Municipality, North West Province Heritage Impact Assessment Specialist Reports 20/05/2020 Trust Mlilo Integrated Specialist Services Joan Construction and Projects (Pty) Ltd 18/08/2020 - 13:06
Springhaas Line 2 Heritage Impact Assessment: Proposed Powerline Line 2 from Springhaas Solar Facility 3 to Collector Substation B within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:07
Cultural Heritage Impact Assessment, Erf 1 Upington Cultural Heritage Impact Assessment Proposed Township development of Erf 1, UPINGTON, //KHARA HAIS MUNICIPALITY Heritage Impact Assessment Specialist Reports 11/03/2014 Johnny Van Schalkwyk SAHRA Council MEG Environmental Impact Studies 11/03/2014 - 10:30
82 MAZISI KUNENE ROAD Proposed Internal Alterations to Life St Joseph's Psychology Facility. Heritage Impact Assessment Specialist Reports 13/02/2023 Wayne Allen BVA Architects BVA Architects 13/02/2023 - 16:25
Updated Ithemba Grid Heritage Impact Assessment Report Ithemba Wind Energy Facility (WEF) – 132kV Grid connection and substation: Heritage Impact Report Heritage Impact Assessment Specialist Reports 20/02/2018 Wouter Fourie PGS Heritage (Pty) Ltd Sivest - Gauteng 27/02/2018 - 11:42
HIA for Solar-Ferrum 400kV Power Line Proposed Establishment of Several Electricity Distribution Lines Within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 17/09/2013 - 20:04
COP3706 HBAR Rietfontein Heritage Basic Assessment Report: Environmental Authorisation Application in support of the Section 102 Amendment for the Copper Sunset Sand Mining Operation, Free State Province Heritage Impact Assessment Specialist Reports 29/04/2016 Natasha Higgitt, Justin du Piesanie, Johan Nel Digby Wells Environmental Copper Sunset Sand (Pty) Ltd 10/06/2016 - 06:30
De Beers Demolition Works HIA Heritage Impact Assessment Kleinzee Mining Area, Heritage Management Plan for the Mining Structures within the Kleinzee Mining Rights Area, Kleinzee, Northern Cape Province Heritage Impact Assessment Specialist Reports 07/03/2018 Stephan Gaigher South African Heritage Resources Agency De Beers Consolidated Mines (Pty) Ltd 16/05/2018 - 10:36
HIA - Zonnequa Wind Farm (26.09.18) Heritage Impact Assessment: Proposed Zonnequa Wind Farm Near Kleinsee, Namakwaland Magisterial District, Northern Cape Heritage Impact Assessment Specialist Reports 26/09/2018 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 22/10/2018 - 16:51
Uitkoms DBAR Heritage Report Cultural Heritage Impact Assessment Of The Proposed Uitkoms Antra, Coal-Link Project, Mpumalanga Province Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Active Heritage CC Sivest - Gauteng 14/04/2015 - 13:54
Heritage Impact Assessment Heritage Impact Assessment for proposed iron and manganese ore prospecting activities Heritage Impact Assessment Specialist Reports 09/06/2021 Joseph Chikumbirike Pulafel 4D Consulting (Pty) Ltd 10/06/2021 - 07:59
HIA Vosloorus Ext 24, 41 and 43 Heritage Impact Assessment for Proposed Township Development: Vosloorus Extension 24, Vosloorus Extension 41 and Vosloorus Ext 43, Boksburg Local Municipality, Ekurhuleni Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 12/08/2014 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Enkanyini Projects 29/08/2014 - 16:50
Erven 862, 863, 865 and 866 Mapleton X 10 Heritage Impact Assessment report Erven 862, 863, 865 and 866 Mapleton Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 05/04/2017 14/07/2017 - 12:47
Heritage Assessment For Boschendal Farmlands, Dwars River Valley Vol 2 Heritage Assessment For Boschendal Farmlands, Dwars River Valley Vol 2 Heritage Impact Assessment Specialist Reports 16/01/2006 Sarah Winter, Nicolas Baumann Sarah Winter Heritage Practitioner Boschendal (Pty) Ltd 17/03/2021 - 11:17
HIA for filling station in Waterkloof Heritage Impact Assessment for filling station in Waterkloof Heritage Impact Assessment Specialist Reports Archaetnos CC HydroScience 22/06/2020 - 02:45
Droogfontein 3 BESS PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DROOGFONTEIN 3 SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY LOCATED NEAR KIMBERLEY IN THE SOL PLAATJE LOCAL MUNICIPALITY, FRANCIS BAARD DISTRICT MUNICIPALITY, IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 02/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 19/05/2021 - 17:01
Old Bridge near Richmond Heritage Impact Assessment for the old bridge on Krysfontein and Weltevreden 826, near Richmond Heritage Impact Assessment Specialist Reports 12/10/2013 Deborah Whelan Archaic Consulting Umgeni Water 07/11/2013 - 21:07
Fibre Optic Cable JOhannesburg-Yzerfontein SPECIALIST STUDY: HERITAGE IMPACT ASSESSMENT FOR THE INSTALLATION OF THE SIRIUS FIBRE OPTIC CABLE BETWEEN JOHANNESBURG AND YZERFONTEIN, GAUTENG, FREE STATE, EASTERN AND WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 08/03/2015 Dr J de Jongh JG AFRIKA 27/08/2015 - 13:19
Heritage Assessment - Ilanga CSP2 Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province Heritage Impact Assessment Specialist Reports 18/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 22/04/2016 - 16:59

Pages

CSV
 
 

Search form