THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 18351 - 18400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Leeuwpan HIA | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE EXXARRO LEEUWPAN COAL CONSOLIDATION OF EMPR’S, CLOSE TO DELMAS IN THE MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 01/04/2013 | Anton van Vollenhoven | Archaetnos CC | GCS Water and Environmental Consultants - Head Office JHB | 04/04/2013 - 10:34 | |
Updated Graskoppies Grid Heritage Impact Assessment Report | Graskoppies Wind Energy Facility (WEF) – 132kV Grid connection and substation: Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 20/02/2018 | Wouter Fourie | PGS Heritage (Pty) Ltd | Sivest - Gauteng | 27/02/2018 - 09:53 | |
HIA-Rippon | Rippon Wind Farm, between Makanda and Somerset East, Eastern Cape | Heritage Impact Assessment Specialist Reports | 29/08/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 10/09/2021 - 20:07 | |
INGLESBY 580 OLIFANTSHOEK, | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MINE PROSPECTING AT THE REMAINING EXTENT OF THE FARM INGLESBY 580 NEAR OLIFANTSHOEK, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 10/05/2014 | Cobus Dreyer | RE A Kgona General Services CC | RE A Kgona General Services CC | 27/09/2014 - 21:35 | |
Lakeside Sewer HIA | Basic cultural heritage assessment for the PROPOSED LAKESIDE SEWER UPGRADE, EVATON REGION, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 19/12/2013 | Johnny Van Schalkwyk | CTS_159131 | 10/03/2014 - 10:03 | ||
Umsobomvu WEF Heritage Walk Through | Heritage Impact Assessment Specialist Reports | 01/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 16/03/2023 - 11:19 | ||
Mulilo Newcastle Wind Power Heritage Impact Assessment | Mulilo Newcastle Wind Power Heritage Impact Assessment, near Newcastle, KZN for draft EIR submission | Heritage Impact Assessment Specialist Reports | 04/03/2023 | Gavin Anderson | Umlando: Archaeological Surveys and Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 17/03/2023 - 13:37 | |
South Germiston Extension 25 Heritage Impact Assessment Report | South Germiston Extension 25 Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 14/07/2017 - 11:20 | ||||
COP3706_NID | Notification of Intent to Develop: Environmental Authorisation Application for the 102 Amendment for the Copper Sunset Sand Mining Operation, Free State | Heritage Impact Assessment Specialist Reports | 27/11/2015 | Natasha Higgitt | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 04/12/2015 - 09:15 | |
HERITAGE IMPACT ASSESSMENT (HIA) REPORT ZEERUST SOLAR PV DEVELOPMENT | HERITAGE IMPACT ASSESSMENT (HIA) REPORT FOR THE RE CAPITAL 2 PROJECT GRID CONNECTION FOR A PROPOSED 75MW PHOTOVOLTAIC SOLAR FACILITY ON PORTIONS OF THE FARMS KAMEELDOORN 271JP & KRUISRIVIER 270JP, ZEERUST, NORTHWEST PROVINCE - APAC015/47B | Heritage Impact Assessment Specialist Reports | 05/10/2015 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | RE CAPITAL 2 (Pty) Ltd | 26/02/2016 - 12:10 | |
HIA Jikijiki Road Upgrade | Phase 1 Heritage Impact Assessment Report Jikijiki Road Upgrade Project, near Greytown, Kwa Zulu Natal Province | Heritage Impact Assessment Specialist Reports | 02/01/2013 | Stephan Gaigher | G & A Heritage | 11/06/2013 - 11:34 | ||
OVK Outspan HIA | Phase 1 Heritage Impact Assessment for the proposed Tempe Agrimark and Petrol Station development, Bloemfontein, Free State Province. | Heritage Impact Assessment Specialist Reports | 20/08/2019 | Paleo Field Services | 15/01/2020 - 08:39 | |||
Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities | Heritage Impact Assessment Report for the Proposed Haakdoorndrift Opencast Activities at the Anglo American Platinum’s Amandelbult Mine at Thabazimbi, Limpopo Province | Heritage Impact Assessment Specialist Reports | 26/05/2016 | Stephan Gaigher, JF Durand, Lynette Herbst | G&A Heritage Management Consultants | Aurecon South Africa (Pty) Ltd | 03/04/2017 - 09:13 | |
21659_HIA_1 | Heritage Impact Assessment for Heronbridge College Sports-Field Development | Heritage Impact Assessment Specialist Reports | 12/06/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 22/08/2017 - 15:53 | |
Upgrade of the N3 Toll Highway | Cultural heritage impact assessment for the PROPOSED UPGRADE OF A SECTION OF THE N3, CEDARA OFF-RAMP TO THE UMGENI AREA, KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 31/07/2013 | Johnny Van Schalkwyk | SANRAL | 05/02/2014 - 20:14 | ||
HIA, erf 354, Piketberg | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR ERF 354, PIKETBERG, WESTERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 01/05/2010 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bergrivier Municipality | CTS_503678 | 17/04/2018 - 17:13 |
Archaeological and Paleontological assessment report | PROPOSED UPGRADE OF THE KOMMAGAS WATER SUPPLY SYSTEM ON PORTION 5 AND REM. OF FARM KOMMAGAS 200 NORTHERN CAPE BRIEF PALAEONTOLOGICAL ASSESSMENT WITH CHANCE FOSSIL FINDS PROCEDURE UPGRADE OF THE KOMAGGAS WATER SUPPLY SYSTEM | Heritage Impact Assessment Specialist Reports | 14/03/2020 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 18/03/2020 - 13:25 | |
HIA Bien Venue Three Sisters Baberton | Heritage Impact Assessment for the proposed prospecting rights application and environmental authorisation for the Bien Venue 255 JU (Portion 0, 2 And 3); Three Sisters 254 JU (Remaining Extent); Three Sisters 254 JU (Remaining Extent); and Three Sisters 256 JU (Portion 1) farms near Barberton, within the city of Mbombela Local District, Mpumalanga, South Africa. | Heritage Impact Assessment Specialist Reports | Cherene de Bruyn | NGT ESHS Solutions | 29/07/2019 - 10:16 | |||
Heritage Impact Assessment of the proposed Cement Grinding Mill | Desktop Heritage Impact Assessment (including a Phase 1 Paleontological Assessment) of the proposed Cement Grinding Mill, on Remainder of Portion 2108 of Umlazi Native Location No 4676, Umbogintwini, eThekwini Municipality | Heritage Impact Assessment Specialist Reports | 20/05/2021 | Frans Prins | Active Heritage CC | Mondli Consulting | 06/06/2021 - 07:08 | |
HIA Report For EA for High-level Bridge and Culvert on D1724 | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED CONSTRUCTION OF A HIGH-LEVEL BRIDGE AND CULVERT OVER THE VUNGU RIVER, ON ROAD D1724, KWACEZA, KZN | Heritage Impact Assessment Specialist Reports | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 23/01/2023 - 12:49 | ||
HIA - Kruisvallei Hydro (Feb'18) | Heritage Impact Assessment for the Proposed New Kruisvallei Hydroelectric Power Generation Scheme | Heritage Impact Assessment Specialist Reports | 21/02/2018 | Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 07/03/2018 - 11:52 | |
Taunus Diepkloof | Cultural heritage impact assessment for the CONSTRUCTION OF THE PROPOSED TAUNUS-DIEPKLOOF 132KV POWER LINE, SOUTH OF SOWETO, CITY OF JOHANNESBURG MUNICIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 18/11/2015 | 13/01/2016 - 16:42 | ||||
SAR6105 - HIA Update Memo | Memorandum regarding Updates to Infrastructure Layout for the South African Radio Astronomy Observatory Square Kilometre Array Project | Heritage Impact Assessment Specialist Reports | 27/07/2021 | Shannon Hardwick | Digby Wells Environmental | South African Radio Astronomy Observatory | 30/07/2021 - 16:37 | |
HIA Report Jacaranda Boardroom | Heritage Impact Assessment Specialist Reports | 21/02/2020 | 21/02/2020 - 10:06 | |||||
Heritage Impact Assessment- Bakgatla VTM Mine | HERITAGE IMPACT ASSESSMENT - Input for Environmental Impact Assessment report undertaken in terms of the National Environmental Management Act 107 of 1998 | Heritage Impact Assessment Specialist Reports | 21/09/2016 | Prof. Anton van Vollenhoven | Zone Land Solutions | EcoPartners | 21/09/2016 - 07:49 | |
Clairwood Heritage Impact Assessment | Phase II Heritage Impact Assessment for the properties constituting Clairwood Turf Club on portions of the farms Dunns Grant 859 and Umlaas 873, southern Durban Region | Heritage Impact Assessment Specialist Reports | 01/10/2012 | Deborah Whelan | Archaic Consulting | Kerry Seppings Environmental Management | 13/12/2013 - 08:23 | |
Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure | Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure within the jurisdiction of Dipaleseng Local Municipality in the Mpumalanga Province. | Heritage Impact Assessment Specialist Reports | 01/05/2018 | M Mabuda | Mulaifa Development Projects cc | Nsovo Environmental Consulting | 17/09/2019 - 16:49 | |
Kokerboom 2 Heritage | Heritage impact assessment for the proposed Kokerboom 2 Wind Energy Facility on Farm 215/REM and 1164, north of Loeriesfontein, Calvinia Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/01/2017 | Jayson Orton | ASHA Consulting(Pty) Ltd | Aurecon South Africa (Pty) Ltd | 18/07/2017 - 11:33 | |
Middeldrift WSS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MIDDLEDRIFT WATER SUPPLY SCHEME NEAR NKANDLA | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Active Heritage CC | 24/06/2019 - 14:54 | ||
HIA Alternatives site for relocation of Devon Landfill Site | HIA for three Alternative sites for the Relocation of the Devon Landfill Site | Heritage Impact Assessment Specialist Reports | 28/02/2013 | Stephan Gaigher | Lesedi Local Municipality | 18/09/2013 - 07:40 | ||
Naledi PV | Proposed development of Naledi, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453, near Upington in the Northern Cape Province | Heritage Impact Assessment Specialist Reports | 16/03/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 23/07/2020 - 07:11 | |
Skeerhok | Heritage Impact Assessment Specialist Reports | 01/03/2021 - 14:53 | ||||||
Riverside Cemetery HIA | Riverside Cemetery Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 01/01/2014 | Jean Beater | Active Heritage CC | Enviroedge | 16/04/2015 - 14:42 | |
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE | AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 06/03/2018 | Johan van Schalkwyk, Cobus Dreyer | 16/03/2018 - 16:30 | |||
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:26 | ||||
Taung Skull Fossil Site Heritage Impact Assessment Report | Taung Skull Fossil Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 01/12/2015 | EcoAfrica Environmental Consultants | EcoAfrica Environmental Consultants | EcoAfrica Environmental Consultants | 13/11/2018 - 08:20 | |
HIA Klipdam | HIA Klipdam | Heritage Impact Assessment Specialist Reports | 23/08/2013 | Andrew B Smith | FOOTPRINT Environmental Services | FOOTPRINT Environmental Services | 27/08/2013 - 08:32 | |
Heritage Report | PROPOSED NEW TOWNSHIP DEVELOPMENT AT MANGAUNG | Heritage Impact Assessment Specialist Reports | 19/07/2019 | Stephan Gaigher | G&A Heritage Management Consultants | INALUK Consulting services | 11/06/2020 - 14:03 | |
Archaeological, Heritage and Paleontological Specialist Report.:Proposed Witberg Wind Farm | Proposed Witberg Wind Farm (Alternative Layout 3) Jantjesfontein (Farm RE/164), Besten Weg (Farm 1/150 and Farm RE/150), Tweedside (Farm RE/151), and Elandskrag (Farm RE/269 and Farm 1/269) , Laingsburg, Western Cape Province. | Heritage Impact Assessment Specialist Reports | 25/03/2011 | Tim Hart , Duncan Miller | ACO Associates CC | Emross Consulting (Pty) Ltd | 28/04/2021 - 14:16 | |
TGME MINE DEVELOPMENT PROJECT (10167) HIA | PROPOSED “TGME MINE DEVELOPMENT PROJECT (10167)”: GOLD MINING PROJECTS IN TERMS OF PRE-MINED RESIDUE AND HARD ROCK MINING, PILGRIM’S REST REGION, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | J.A. van Schalkwyk | 15/12/2017 - 14:57 | ||||
Heritage Assessment | Queensburgh Congregational Church | Heritage Impact Assessment Specialist Reports | 31/08/2017 | Lindsay Napier | Lindsay Napier Architect | The Congregational Church of Queensburgh | 20/07/2022 - 14:20 | |
Belgrade Heritage Impact Assessment | Belgrade Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 10/01/2023 | 26/10/2023 - 16:13 | ||||
Heritage impact Assessment PV 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/04/2017 - 17:36 | |
HERITAGE IMPACT ASSESSMENT: Of Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder. | HERITAGE IMPACT ASSESSMENT: Scoping and Environmental Impact Assessment For the Proposed Development of the 300 MW Paulputs Solar PV Energy Facility on Konkoonsies 91/2/rem and 91/5 near Pofadder, in the Khaî-Ma Local Municipality (Kenhardt Magisterial District, Northern Cape Province). SAHRA Case Nos: 12580 (Paulputs PV1), 12581 (Paulputs PV2) & 12582 (Paulputs PV3) Required under Section 38 (8) of the National Heritage Resources Act (No. 25 of 1999). | Heritage Impact Assessment Specialist Reports | 21/01/2019 | Jayson Orton, John E Almond | South African Heritage Resources Agency | GAEA ENVIRO PTY LTD | 21/01/2019 - 13:37 | |
HIA_Sub Precinct 1_WCFP | Impact Assessment Report and Permit Application: Site Development Plan: Sub Precinct 1, including the visitors centre, fossil dig site and related infrastructure: (NHRA Section 27 [16, 18] & comment in terms of NEMA Section 24) for Farm 1223, Saldanha Bay | Heritage Impact Assessment Specialist Reports | 01/03/2013 | Melanie Attwell | Melanie Attwell & Associates | West Coast Fossil Park Trust | 22/05/2013 - 15:47 | |
Springhaas LiLo 1 Heritage Impact Assessment | Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation A to the Beta/Hydra 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 12:11 | |
HIA - EWOC Dinokeng | Heritage Impact Assessment for the Endangered Wildlife Operational Centre on Portion 6 of Farm Ruimte-74 in the Dinokeng Game Reserve, Limpopo Province | Heritage Impact Assessment Specialist Reports | 12/08/2022 | Jaco van der Walt | Beyond Heritage | Endangered Wildlife Operational Centre NPC | 10/02/2023 - 18:31 | |
HIA, borrow pit (DR2196/22.74/L/50) extension on portion 1, Farm no. 643, Clanwilliam | Heritage Impact Assessment: DR 2196 West Coast Clanwilliam - West Coast District Municipality, Western Cape | Heritage Impact Assessment Specialist Reports | 26/06/2013 | Vidamemoria Heritage Consultants | Nadeson Consulting Services | CTS_503751 | 18/04/2018 - 15:13 | |
HIA DA2S WEF Substation and BESS | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION AND OPERATION OF A 132KV SUBSTATION FOR THE DE AAR 2 SOUTH WIND ENERGY FACILITY, DE AAR, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 31/08/2020 | John Gribble | 20/10/2020 - 10:29 | |||
Amended HIA Report | Cultural heritage impact assessment for THE CONSTRUCTION OF THE PROPOSED SHANGONI GATE AND ASSOCIATED INFRASTRUCTURE IN THE KRUGER NATIONAL PARK, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 22/05/2017 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Envirolution Consulting (Pty) Ltd | 22/05/2017 - 16:54 |