FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort descending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
Phase 1AIA - Simicept Abalone Aquaculture Development, Kouga, EC Phase 1 Archaeological Impact Assessment - The Simicept Abalone Aquaculture Development, Portion of Portion 4 of Brakkeduinen 719, Kouga Local Municipality, Eastern Cape AIA Phase 1 14/04/2015 Karen Van Ryneveld 14/04/2015 - 13:54
PHASE 1ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED 5, 5 KILOMETERS TWEEDRACHT 88kV POWER LINE PHASE 1ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED 5, 5 KILOMETERS TWEEDRACHT 88kV POWER LINE ESTABLISHMENT ON PORTION 17 OF FARM KLIEN ZONDERHOUT WITHIN CITY OF TSHWANE METROPOLITAN MUNICIPALITY GAUTENG PROVINCE HIA Phase 1 27/05/2016 Eric Ndivhuho Mathoho Vhufa Hashu Heritage Consultants Nsovo Environmental Consulting 18/01/2017 - 14:36
Phase 1b AM-Final Report-Cluster 9 BWSB, Tsomo, CHDM, EC Phase 1b Archaeological Monitoring - Final Report: Cluster 9 - Bulk Water Supply Backlog, near Tsomo, Chris Hani District Municipality, Eastern Cape, South Africa AIA Phase 1B 05/02/2014 Karen Van Ryneveld isi-Xwiba Consulting cc 05/02/2014 - 08:52
Phase 1_HIA_KZN ASP_Sewerline A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED SEWERLINE ROUTE FROM THE KZN ASP SITE TO THE EXISTING KINGSBURGH WASTEWATER TREATMENT WORKS (WWTW) AT ILLOVO, DURBAN SOUTH. WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL HIA Phase 1 20/07/2019 Trust Mlilo Sativa Travel and Environmental Consultants GIBB (Pty) Ltd 01/11/2019 - 08:55
Phase 2 AIA Drosty Hotel Precinct Graaff Reinet [Oct 2013] Phase 2 Archaeological Impact Assessment for the proposed refurbishment and development of the historic Drostdy Hotel Graaff Reinet. AIA Phase 2 14/10/2013 Lita Webley, Timothy Hart, Liesbet Schietecatte ACO Associates CC South African College of Tourism 21/10/2013 - 15:24
Phase 2 Archaeological Mitigation Report for the Voorspoed Mine Old Building Archaeological Mitigation undertaken at the Voorspoed Mine Old Building, De Beers Voorspoed Mine, Kroonstad, Free State Province. Archaeological Permit Report 05/02/2014 Polke Birkholtz, Joanna Behrens PGS Heritage and Grave Relocation Consultants De Beers Consolidated Mines (Pty) Ltd 08/03/2014 - 19:51
PHASE 2 ASSESSMENT FOR THE ERASMUS PARK MIXED USE DEVELOPMENT, CITY OF TSHWANE, GAUTENG PROVINCE PHASE 2 HERITAGE SITE ASSESSMENT OF SITES WITHIN AREAS DEMARACTED FOR THE ERASMUS PARK MIXED USE DEVELOPMENT ON ERVEN 1 AND 2 OF A PORTION OF THE REMAINING EXTENT OF THE FARM WATERKLOOF 378JR, AND ASSOCIATED UPGRADE OF SOLOMON MAHLANGU DRIVE, CITY OF TSHWANE, GAUTENG PROVINCE AIA Phase 2 28/05/2017 Neels Kruger Exigo Sustainability Atterbury Property Fund Managers (Pty) Ltd 26/06/2017 - 11:37
PHASE 2 BUILT ENVIRONMENT HERITAGE ASSESSMENT FOR THE DEMOLITION OF STRUCTURES ON 2 AND 4 RIDGE ROAD AND 70 NEW ENGLAND ROAD AND THE CONSTRUCTION OF HAYFIELDS FILLING STATION. PHASE 2 BUILT ENVIRONMENT HERITAGE ASSESSMENT FOR THE PROPOSED DEMOLITION OF 2 AND 4 RIDGE ROAD AND 70 NEW ENGLAND ROAD AND THE CONSTRUCTION OF HAYFIELDS FILLING STATION, PIETERMARITZBURG, KZN HIA Phase 2 01/10/2020 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Hanslab (Pty) Ltd 07/02/2022 - 11:06
Phase 2 for LIA01 Lydenburg Smelter THE ARCHAEOLOGICAL DOCUMENTATION OF A LATE IRON AGE STONE WALLED SITE NEAR LYDENBURG IN MPUMALANGA. AIA Phase 2 01/03/2014 Julius CC Pistorius 21/05/2014 - 11:16
Phase 2 Heritage Report of Rietvley 320 IS PHASE II: CULTURAL HERITAGE PROJECT OF THE FARM RIETVLEY 320 IS, SASOL FINE ASH DAM (FAD) 6 Investigation focussing on Site 1, Site 3 and Site 6 on the farm Rietvley 320 IS (Portions 3, 8, 9, 10 and Remaining Extent 2), Govan Mbeki Local Municipality, Gert Sibande District Municipality, Mpumalanga HIA Phase 2 23/04/2015 Francois P Coetzee, Joanna Behrens Sasol Synfuels Proprietary Limited, Sasol (Pty) Ltd 01/05/2015 - 07:24
Phase 2 HIA Comet Extension 17 (Comet Village) – Township Establishment GAUTENG Provincial Heritage Resources Agency Gauteng (PHRAG) HIA Phase 2 27/06/2018 Gwen Theron 27/06/2018 - 13:27
Phase 2 HIA Comet Extension 17 (Comet Village) – Township Establishment GAUTENG Provincial Heritage Resources Agency Gauteng (PHRAG) HIA Phase 2 27/06/2018 27/06/2018 - 13:31
Phase 2 HIA - PMB Eye Hospital HIA Phase 2 22/08/2014 Lindsay Napier Lindsay Napier Architect JANET EDMONDS CONSULTING cc. 01/10/2014 - 17:20
Phase 2 HIA Middelplaas Development Phase @ Heritage Impact Assessment, Proposed Middelplaas Development, Farm La Terra da Luc 1075 and Farm 1070, Franschhoek HIA Phase 2 22/03/2013 Ron Martin Ron Martin Heritage Consultancy Sharples Environmental Services cc 06/05/2013 - 13:22
Phase 2 HIA on the Meyer and Du Toit Farmsteads Phase 2 Heritage Impact Assessment on the Meyer and Du Toit Farmsteads HIA Phase 2 27/05/2020 Polke Birkholtz, Cherene de Bruyn PGS Heritage (Pty) Ltd Glencore Operations South Africa (Pty) Ltd 04/11/2020 - 03:42
PHASE 2 HIA: BRT PAUL KRUGER STREET TSHWANE INCLUDING CHURCH SQUARE PHASE 2 CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED BRT SERVICE, PAUL KRUGER STREET, PRETORIA, TSHWANE THIS IS FOR CHURCH SQUARE INCLUDING PARLIAMENT STREET, PALACE STREET, MUTUAL STREET, BANK STREET AND PAUL KRUGER STREET BETWEEN VERMEULEN AND PRETORIUS STREETS HIA Phase 2 20/02/2014 Udo Kusel AM Consulting Engineers AM Consulting Engineers CTS_157790 26/02/2014 - 10:58
Phase 2 investigation AN UPDATED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR X STRATA ALLOYS LYDENBURG NEW PROPOSED RESIDUE MANAGEMENT FACILITY (RMF) IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA HIA Phase 1 01/11/2013 Julius CC Pistorius 14/11/2013 - 15:57
Phase 2 Report: Proposed Expansion at Raumix Aggregates Rosslyn Quarry Phase 2 Investigation for a Proposed Expansion at Raumix Aggregates Rosslyn Quarry, Pretoria West, City of Tshwane Metropolitan Municipality, Gauteng Province HIA Phase 2 01/07/2022 Francois Coetzee Umhlaba Environmental Consulting CC 18/07/2022 - 12:18
Phase 2 Slovopark HIA Phase 1 Heritage Impact Assessment of the proposed Slovopark residential development. Brandfort, FS Province. Heritage Impact Assessment Specialist Reports 25/06/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 11/11/2020 - 20:52
Phase 2 Woon 469 PHASE 2 SPECIALIST STUDY OF AFFECTED STONE AGE LOCALITY AT SITE SA02, A DEMARCATED SURFACE AREA, ON THE FARM NOOITGEDACHT 469 (WOON 469) PROPOSED SISHEN WESTERN WASTE ROCK DUMPS SISHEN IRON ORE MINE KGALAGADI DISTRICT MUNICIPALITY NORTHERN CAPE PROVINCE HIA Phase 2 28/02/2013 Maria Van der Ryst, Siegwalt Kusel 30/04/2013 - 11:06
Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC Phase 2a - Archaeological Site Documentation / Sketch Plan: Sensitive Area 1 - Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, Nxamagele and Catshile, near Tsomo, CHDM, EC AIA Phase 2 10/01/2023 Karen Van Ryneveld 10/01/2023 - 09:54
Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape Phase 2a Heritage Monitoring (Interim Report 1) - Impofu North Wind Farm, Impofu West Wind Farm, and Impofu East Wind Farm, near Oyster Bay, Kouga Local Municipality, Sarah Baartman District Municipality, Eastern Cape Archaeological Monitoring 02/09/2023 Karen Van Ryneveld 02/09/2023 - 07:22
Phase 2a Heritage Monitoring (Interim Report 1) - Umoyilanga-Dassiesridge WEF Phase 2a Heritage Monitoring (Interim Report 1) - Umoyilanga-Dassiesridge WEF AIA Phase 2 12/10/2023 Karen Van Ryneveld 12/10/2023 - 21:05
Phase HIA for Luckhoff SWS Phase 1 Heritage Impact Assessment of a Proposed New Landfill Site in Luckhoff, Free State Province HIA Phase 1 10/07/2018 Lloyd Rossouw Palaeo Field Services NSVT Consultants 03/09/2018 - 11:14
Phase HIA Klofendal Nature Reserve PROPOSED INTERPRETATION CENTRE, PARKING AND STAFF QUARTERS FOR KLOOFENDAL NATURE RESERVE IN ROODEPOORT, WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE, SOUTH AFRICA. HIA Phase 1 04/02/2020 Nkosinathi Godfrey Tomose IKAMVA Consulting 30/06/2021 - 19:55
PHASE I (HIA) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR TAUNG GOLD (SECUNDA) (PROPRIETARY) LIMITED (TAUNG GOLD’S) PROPOSED CONSTRUCTION OF DEWATERING INFRASTRUCTURE AND A DECANT WATER PIPELINE NEAR SECUNDA ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE HIA Phase 1 30/04/2014 Julius CC Pistorius 03/09/2014 - 12:52
PHASE I AHIA FOR THE HYPERAMA PIPELINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF HYPERAMA PIPELINE LOCATED ON REIGER PARK WITHIN CITY OF EKURHULENI MUNICIPALITY IN GAUTENG PROVINCE SOUTH AFRICA. AIA Phase 1 22/03/2019 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants DIGES Group 11/04/2019 - 18:36
Phase I AHIA for Vryburg Agrihub PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF VRYBURG AGRI HUB IN NALEDI LOCAL MUNICIPALITY OF DR RUTH SEGOMOTSE MOMPATI DISTRICT WITHIN NORTH WEST PROVINCE AIA Phase 1 01/08/2018 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants DIGES Group CC 19/11/2019 - 10:43
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE FOR TSHILAMBA 132KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 132 KV LOOP IN LOOP OUT POWERLINE FROM MAKONDE T-OFF POINT TO THE PROPOSED MUTSHIKILI SUBSTATION AT THENGWE WITHIN THULAMELA LOCAL MUNICIPALITY, VHEMBE DISTRICT MUNICIPALITY AIA Phase 1 07/07/2023 Munyadziwa Magoma, Marion Bamford Vhubvo Archaeo-Heritage Consultants , Prof Marion Bamford DIGES Group 14/09/2023 - 10:02
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE HIA Phase 1 30/11/2017 Munyadziwa Magoma Nsovo Environmental Consulting Nsovo Environmental Consulting 09/02/2018 - 12:18
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE HIA Phase 1 28/02/2019 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 09/02/2018 - 12:25
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT REPORT PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE AIA Phase 1 Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 03/08/2018 - 15:55
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE AIA Phase 1 04/04/2018 Munyadziwa Magoma Nsovo Environmental Consulting Nsovo Environmental Consulting 03/08/2018 - 12:24
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE AIA Phase 1 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 03/08/2018 - 12:33
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE Archaeological Specialist Reports Nsovo Environmental Consulting Vhubvo Archaeo-Heritage Consultants 17/09/2018 - 13:40
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF VRYHEID NETWORK STRENGTHENING PROJECT WITHIN SWELLENDAM LOCAL MUNICIPALITY AIA Phase 1 01/12/2016 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 01/11/2016 - 10:25
Phase I Cultural Heritage Impact Assessment for the Proposed Upgrading of Road 231 Richards Bay, Kwazulu-Natal Phase I Cultural Heritage Impact Assessment for the Proposed Upgrading of Road 231 Richards Bay, Kwazulu-Natal Heritage Impact Assessment Specialist Reports 06/04/2016 Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC 10/08/2016 - 12:13
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal HIA Phase 1 24/05/2016 Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC HENWOOD & NXUMALO CONSULTING ENGINEERS CC 28/05/2016 - 20:51
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal HIA Phase 1 24/05/2016 Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC HENWOOD & NXUMALO CONSULTING ENGINEERS CC 28/05/2016 - 20:52
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal HIA Phase 1 24/05/2016 Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC HENWOOD & NXUMALO CONSULTING ENGINEERS CC 28/05/2016 - 20:52
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC HENWOOD & NXUMALO CONSULTING ENGINEERS CC 28/05/2016 - 21:15
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT HIA Phase 1 12/06/2017 Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 01/12/2017 - 12:51
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT HIA Phase 1 20/02/2015 Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 07/10/2019 - 13:10
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE EXPROPOSED NEW TYGERKLOOF MINE AN EXTENSION OF THE EXISTING RHINO ANDALUSITE MINE ON PORTION 5 OF THE FARM TYGERKLOOF 354 KQ THABAZIMBE DISTRICT LIMPOPO PROVINCE HIA Phase 1 20/02/2015 African Heritage Consultants CC African Heritage Consultants CC 01/06/2015 - 14:43
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT HIA Phase 1 20/02/2015 Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 21/08/2017 - 12:18
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR SECTION 102 PORTION 61 AND 62 OF THE FARM CYFERFONTEIN 457 KR, MODIMOLLE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 10/10/2019 Udo Kusel African Heritage Consultants CC 01/03/2021 - 10:38
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE REMAINDER OF PORTION 89 OF THE FARM NOOITGEDACHT 268 IT ERMELO MPUMALANGA PROVINCE HIA Phase 1 24/02/2014 Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 14/05/2014 - 15:47
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE PROPOSED ADJOINING VILLAGES AS INDICATED IN ALLOTMENT NO 72 WALMAN VILLAGES PORTION ON REMAINDER OF PORTION 4 OF THE FARM SIJFERKUIL 15 JR NORTH WEST PROVINCE PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE PROPOSED ADJOINING VILLAGES AS INDICATED IN ALLOTMENT NO 72 WALMAN VILLAGES PORTION ON REMAINDER OF PORTION 4 OF THE FARM SIJFERKUIL 15 JR NORTH WEST PROVINCE HIA Phase 1 03/03/2021 Udo Kusel African Heritage Consultants CC Private 15/04/2021 - 17:48
Phase I Desktop HIA for the proposed Prospecting Activities on a certain piece of land on the Remainder of Farm Nchwaning 267, near Hotazel, Northern Cape. Phase 1 Desktop Heritage Impact Assessment & Palaeontological Desktop Assessment for a Mine Prospecting Application on A portion of a Remainder of the Farm Nchwaning 267 near Hotazel in the Joe Morolong Local Municipality, Northern Cape HIA Phase 1 09/02/2023 Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd Bidhaa Resources (Pty) Ltd 09/01/2023 - 22:41
Phase I Field Study Landau Dragline Relocation Landau Dragline: Proposed dragline road from Kromdraai Section to Navigation Section of the Landau Mine Nkangala District Municipality, eMalahleni Local Municipality, Mpumalanga Province PIA Phase 1 06/04/2016 Heidi Fourie Aurecon - Head Office 17/10/2016 - 15:15

Pages

CSV
 
 

Search form