THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 16551 - 16600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Platsjambok East PV- Heritage letter | PART 1 ENVIRONMENTAL AUTHORISATION (EA) AMENDMENT PROCESS FOR EXTENDING THE VALIDITY OF THE EA BY AN ADDITIONAL 3 YEARS FOR THE AUTHORISED 75MW PLATSJAMBOK EAST PHOTOVOLTAIC (PV) SOLAR ENERGY FACILITY (SEF), LOCATED NEAR PRIESKA IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA – HERITAGE SPECIALIST OPINION | Heritage Statement | 14/10/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 21/10/2022 - 13:54 | |
Platsjambok West BESS HIA | PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED PLATSJAMBOK WEST SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 04/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 26/05/2021 - 16:36 | |
Platsjambok WestPV- Heritage letter | PART 1 ENVIRONMENTAL AUTHORISATION (EA) AMENDMENT PROCESS FOR EXTENDING THE VALIDITY OF THE EA BY AN ADDITIONAL 3 YEARS FOR THE AUTHORISED 75MW PLATSJAMBOK WEST PHOTOVOLTAIC (PV) SOLAR ENERGY FACILITY (SEF), LOCATED NEAR PRIESKA IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA – HERITAGE SPECIALIST OPINION | Heritage Statement | 14/10/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 21/10/2022 - 14:33 | |
Pluto-Mahikeng Line and Mahikeng Substation HIA | Phase 1 Archaeological and Heritage Impact Assessment Report for the proposed Mahikeng Main Transmission Substation and 1X400KV Pluto-Mahikeng Powerline within the Merafong City Local Municipality of the Gauteng Province and the Ditsobotla, Ramotshere Moiloa, B Marks and Mafikeng Local Municipality of the North West Province. | HIA Phase 1 | 25/05/2018 | Trust Mlilo | 26/09/2018 - 11:02 | |||
Pluto-Mahikeng Line and Mahikeng Substation PIA | Palaeontological Impact Assessment for Proposed construction of the Mahikeng Main Transmission Substation and 400KV Pluto-Mahikeng powerline, North West Province | PIA Phase 1 | 15/07/2018 | JF Durand | 26/09/2018 - 11:07 | |||
Pniel Johannesdal 1202/1 HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FARM 1202/1, NEAR PNIEL, PAARL MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 08/02/2019 | 07/03/2019 - 12:31 | ||||
Pniel Johannesdal 1202/1 HIA [final] | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF FARM 1202/1, NEAR PNIEL, PAARL MAGISTERIAL DISTRICT, WESTERN CAPE | HIA Phase 1 | 16/04/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Withers Environmental Consultants | 18/04/2019 - 08:00 | |
Pofadder 1 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 1, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 30/07/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 10:28 | |
Pofadder 2 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 2, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 11:18 | |
Pofadder 3 WEF Heritage Reports | PROPOSED POFADDER WIND ENERGY FACILITY 3, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | SiVEST SA (Pty) Ltd | 29/03/2022 - 11:30 | |
Pofadder Granite Prospecting HIA | HERITAGE IMPACT ASSESSMENT FOR PROPOSED GRANITE PROSPECTING NEAR POFADDER, NORTHERN CAPE | HIA Phase 1 | 28/01/2013 | Jayson Orton, Lita Webley | ACO Associates CC | Sizisa Ukhanyo Trading 830 cc | 11/02/2013 - 09:02 | |
Pofadder Granite Prospecting HIA | HERITAGE IMPACT ASSESSMENT FOR PROPOSED GRANITE PROSPECTING NEAR POFADDER, NORTHERN CAPE | HIA Phase 1 | 28/01/2013 | Jayson Orton, Lita Webley | ACO Associates CC | Sizisa Ukhanyo Trading 830 cc | 11/02/2013 - 09:11 | |
Pofadder Konkoonsies II mitigation | ARCHAEOLOGICAL MITIGATION FOR THE PROPOSED KONKOONSIES II SOLAR ENERGY FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE | Archaeological Permit Report | 18/07/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Ramizone (RF) Propriety Limited | 18/07/2016 - 18:06 | |
POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | POLOKWANE EMERGENCY PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT | Tsimba Archaeological Footprints (Pty) Ltd | 09/06/2022 - 10:16 | |||||
Polokwane Heritage Assessment | A Report on Cultural Heritage Impact Assessment for the Proposed Polokwane Smelter SO2 Abatement Project, Limpopo Province | HIA Phase 1 | 24/04/2017 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | WSP Environmental Pty Ltd - Johannesburg | 13/07/2017 - 12:45 | |
Polokwane Motor City | ESTABLISHMENT OF A MOTORCITY AND ASSOCIATED 11kV UNDERGROUND POWER CABLE AT POLOKWANE, LIMPOPO | HIA Phase 1 | 30/07/2012 | Liesl Stegmann | South African Heritage Resources Agency | Shasa Heritage Consultants CC | 06/12/2012 - 08:52 | |
Polokwane Residential Development | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) proposed new Residential Development Polokwane, Limpopo | AIA Phase 1 | 13/12/2011 | R & R Cultural Resource Consultants | AGES (PTY) Ltd - Limpopo | 12/06/2012 - 09:36 | ||
Polokwane Solar Park | Proposed Polokwane Solar Park. Polokwane Local Municipality. Capricorn District. Limpopo Province. | Heritage Impact Assessment Specialist Reports | 11/04/2018 | Frans Roodt | Department of Environmental Affairs | Phaki Phakanani | 11/04/2018 - 16:14 | |
Polokwane Solar Park REVISED | Proposed Polokwane Solar Park. Polokwane Local Municipality. Capricorn District. Limpopo Province. | HIA Phase 1 | 08/05/2018 | Frans Roodt | Phaki Phakanani | 15/05/2018 - 20:16 | ||
pongola to mpumalanga n2 upgrade | HERITAGE SURVEY OF THE PROPOSED N2 UPGRADE BETWEN PONGOLA AND MPUMALANGA BORDER | HIA Phase 1 | 18/06/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SPM Environmental Consulting | 06/09/2017 - 10:10 | |
Pongola-Ca dover 132kV Power Line and Golela 132/22kV BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation | HIA Phase 1 | 01/11/2012 | Wouter Fourie | Zitholele Consulting | Zitholele Consulting | 30/10/2013 - 09:01 | |
Pongola-Candover 132kV Turn-in Lines BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation DBAR2 | HIA Phase 1 | 15/04/2014 | Wouter Fourie | Zitholele Consulting | CTS_137535 | 29/10/2013 - 21:32 | |
Pongola-Candover 132kV Turn-in Lines BAR2 | Pongola-Candover 132kV power line, upgrades to the Pongola Substation and Candover switching station, development of the Golela 132/22kV substation DBAR2 | HIA Phase 1 | 29/11/2013 | Wouter Fourie | Zitholele Consulting | 29/10/2013 - 21:32 | ||
Poortjie (Dark City) | Poortjie (Dark City) – upgrading of informal settlement and township establishment, Extent of the Farm Poortjie 338 IQ and Portion 143 of the Farm Rietfontein 336 IQ, City of Johannesburg Metropolitan Municipality, Gauteng Province | PIA Desktop | 30/08/2016 | 30/09/2016 - 13:28 | ||||
Popo heritage | Popo heritage | HIA Phase 1 | 09/10/2019 | A Abzhanov | Maropeng 'a Afrika | Maropeng 'a Afrika | 14/08/2020 - 15:48 | |
Popo Molefe | Heritage Report for Popo Mofele | HIA Phase 1 | 09/10/2019 | Adrian Hallam | //Khara Hais Municipality | Spinninghead Wind Farm (Pty) Ltd | 02/12/2019 - 16:12 | |
Popo Molefe heritage | Popo Molefe heritage | HIA Phase 1 | 09/10/2019 | A Stone | Newshelf 1282 (Pty) Ltd | Newshelf 1282 (Pty) Ltd | 28/07/2020 - 11:24 | |
Port Nolloth oxidation ponds mitigation report | PERMIT REPORT: MITIGATION OF PN2011/001 AT PORT NOLLOTH, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Archaeological Permit Report | 06/01/2017 | Jayson Orton | ASHA Consulting(Pty) Ltd | BVi Consulting Engineers | 20/01/2017 - 09:10 | |
Port Nolloth shell export | RE: EXPORT OF SHELL SAMPLES FROM PORT NOLLOTH (CASE: 10978; PERMITID: 2533) | Archaeological Permit Report | 25/05/2019 | 25/05/2019 - 21:22 | ||||
Port of Ngqura Power Barge | Ngqura Port Power Barge (CTS15_036) | 11/11/2015 | Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire | CTS Heritage | EOH Coastal & Environmental Services (CES) - Cape Town | 11/11/2015 - 12:17 | ||
Port Shepstone Gaol HIA Part 2014 12 07 | Port Shepstone Gaol | Heritage Impact Assessment Specialist Reports | 05/12/2014 | Robert J W Brusse | Robert J W Brusse | Robert J W Brusse | 03/04/2017 - 11:18 | |
Port St Johns WWTW | HERITAGE SURVEY OF THE PORT ST JOHNS WASTE WATER TREATMENT WORKS, EASTERN CAPE | HIA Phase 1 | 19/03/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 05/06/2015 - 17:11 | |
port st Johns WWTW 2 | HERITAGE SURVEY OF THE PROPOSED PORT ST JOHNS WASTE WATER TREATMENT WORKS | HIA Phase 1 | 05/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 10/05/2017 - 08:33 | |
port st Johns WWTW 2 | HERITAGE SURVEY OF THE PROPOSED PORT ST JOHNS WASTE WATER TREATMENT WORKS | HIA Phase 1 | 05/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 10/05/2017 - 08:34 | |
PORTION 1 OF FARM 118, BARKLY WEST DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3.5 HA AREA, SOUTH-WEST OF THE GRASPAN HOMESTEAD, ON PORTION 1 OF FARM 118, LOCATED ~45 KM NORTH-EAST OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 22/02/2013 | Peter Beaumont | McGregor Museum | De Beers Consolidated Mines - Kimberley Mines | 04/04/2013 - 12:33 | |
PORTION 1 OF FARM 137, BARKLY WEST DISTRICT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3 HA AREA, ~2 KM NORTH-EAST OF THE KORTWAL HOMESTEAD, ON PORTION 1 OF FARM 137, SITUATED ~45 KM ENE OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 24/02/2013 | Peter Beaumont | McGregor Museum | De Beers Consolidated Mines - Kimberley Mines | 04/04/2013 - 12:51 | |
Portion 1 of farm Fairfield 520, Hay District | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~4 HA AREA ON PORTION 1 OF FARM FAIRFIELD 520, SITUATED ~30 KM NORTH OF CAMPBELL, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. | AIA Phase 1 | 09/03/2013 | Peter Beaumont | De Beers Consolidated Mines - Kimberley Mines | McGregor Museum | 04/04/2013 - 09:43 | |
Portion 11 of Farm 1426 Paarl NID | Portion 11 of Farm 1427 NID Graphic Material and NID Form | Heritage Scoping | 17/08/2022 | Lize Malan | 28/03/2023 - 13:12 | |||
Portion 15 of Tweefontein 360KT Phase 1 HIA | A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE PROPOSED SOLAR & WASTE WATER TREATMENT WORKS DEVELOPMENT ON PORTIONS OF PORTION 15 OF THE FARM TWEEFONTEIN 360KT NEAR STEELPOORT IN THE LIMPOPO PROVINCE - APAC022/98 | HIA Phase 1 | 01/10/2022 | Anton Pelser | APELSER ARCHAELOGICAL CONSULTING | Eco8 Environmental Planners | 14/11/2022 - 15:50 | |
Portion 191 of farm Tweefontein 915LS | PROPOSED BENDOR X129 TOWNSHIP ESTABLISHMENT ON PORTION 191 OF THE FARM TWEEFONTEIN 915 LS, POLOKWANE, CAPRICORN DISTRICT, LIMPOPO PROVINCE | Heritage Scoping | 15/06/2020 | Liesl Stegmann | AGES (PTY) Ltd - Limpopo | 24/05/2021 - 08:36 | ||
Portion 2 of Farm Roode Pan 150 PVSEF, Orania | Archaeological Specialist Reports | 31/07/2018 | Dipuo Kgotleng | Department of Environmental Affairs | Solar Capital | 26/06/2018 - 01:24 | ||
Portion 2026 of Canelands | Phase 1 Heritage Impact Assessment Report: Portion 2026 of Canelands No 1575, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 05/10/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | Tongaat Hulett Developments | 02/03/2016 - 15:46 | |
Portion 23 of Kameel Zyn Kraal 547 JR | Heritage Impact Assessment Report for The Proposed Pig Production Facility on Portion 23 Of Kameel Zyn Kraal 547 JR, Bapsfontein, Gauteng Province | HIA Phase 1 | 30/07/2020 | Alexander Antonites | Indima Agri Group | 30/07/2020 - 12:51 | ||
Portion 23 of the Farm Riet Vallei No. 851 | Heritage Scoping Report Portion 23 of the Farm Riet Vallei No. 851 R103 Inchanga, eThekweni Municipality, KwaZulu-Natal | Heritage Scoping | 20/10/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Guy Nicholson Consulting cc | 13/11/2017 - 09:03 | |
Portion 3 Yzervarkensrug 129 | Proposed new warehouse shed for the Exxaro Namakwa Sands Smelter, on Portion 3 Yzervarkensrug 129 Saldanha Bay | AIA Phase 1 | 01/01/2011 | Andrew B Smith | SRK Consulting (Pty) Ltd - Western Cape | 25/11/2015 - 15:06 | ||
Portion 3 Yzervarkensrug 129 | ARCHAEOLOGICAL REPORT Proposed new warehouse shed for the Exxaro Namakwa Sands Smelter, on Portion 3 Yzervarkensrug 129 Saldanha Bay | AIA Phase 1 | 01/01/2011 | Andrew B Smith | SRK Consulting (Pty) Ltd - Western Cape | CTS_346248 | 25/11/2015 - 15:55 | |
Portion 4, Farm Zuurwater No 62 Archaeological Specialist Study | Proposed development of a new haul road at Black Mountain Mine, near Aggeneys in the Northern Cape Province | Archaeological Specialist Reports | 18/02/2019 | Cedar Tower Services | Cedar Tower Services | 22/02/2019 - 13:21 | ||
Portion 60 and 64 Sterkspruit 33 JT | Phase 1 Archaeological Impact Assessment on portions 60 and 64 of the remainder of the farm Sterkspruit 33 JT in Lydenburg, Mpumalanga Province. | AIA Phase 1 | 12/05/2011 | Jean-Pierre Celliers | Kudzala Antiquity | Tua Conserva Environmental | 26/09/2012 - 15:59 | |
Portion 8 of Olyvenkolk 187 Green Continent PV Facility | Archaeological Impact Assessment for the proposed Green Continent Partners 75 MW Photovoltaiv Electricity Generation Facility on Portion 8 of the Farm Olyvenkolk No. 187, Kenhardt, Northern Cape | AIA Phase 1 | 01/11/2012 | Jonathan Kaplan | Agency for Cultural Resources Management | Ecoimpact | 28/01/2013 - 10:28 | |
Portion 84 Hallgate AH Phase 1 HIA | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DEVELOPMENT OF A POULTRY FARM ON PORTION 84 OF HALLGATE AGRICULTURAL HOLDINGS, LESEDI LOCAL MUNICIPALITY, SEDIBENG, GAUTENG PROVINCE | HIA Phase 1 | 30/09/2019 | J.A. van Schalkwyk | JA van Schalkwyk Heritage Consultant | Goslar Environmental | 18/02/2020 - 14:52 |