FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRefsort ascending ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VUTSHINI-NKANDLA WATER SCHEME (NORTH): PHASE 1 WITHIN THE NKANDLA LOCAL MUNICIPALITY, NORTHERN KWAZULU-NATAL. HIA Letter of Exemption Len van Schalkwyk eThembeni Cultural Heritage ACER (Africa) Environmental Management Consultants 24/02/2015 - 12:55
Vunene Mining ARCHAEOLOGICAL IMPACT ASSESSMENT: Vunene Mining AIA Phase 1 Tobias Coetzee Envass Envass 04/12/2012 - 14:45
Vulindlela Pipelines CULTURAL HERITAGE IMPACT ASSESSMENT OF THE AMENDED PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. HIA Phase 1 01/09/2017 Frans Prins Kerry Seppings Environmental Management Active Heritage CC 09/01/2018 - 09:32
Vulindlela Bulk Water CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. HIA Phase 1 21/11/2016 Frans Prins Active Heritage CC Kerry Seppings Environmental Management 03/01/2017 - 18:39
Vulcania cemetery Cultural Heritage Study 20/02/2014 - 11:56
Vulcania cemetery Cultural Heritage Study 20/02/2014 - 12:18
VTM Wagon Laager Wall Maintenance: Needs assessment and technical report Maintenance of the Voortrekker Monument Wagon Laager Wall. Needs assessment and technical report. Non Impact Assessment Related Reports 29/05/2019 Johan Nel, Cecilia Kruger Die Erfenisstigting 10/06/2019 - 13:39
VTM Wagon Laager Wall Maintenance: Needs assessment and technical report Maintenance of the Voortrekker Monument Wagon Laager Wall. Needs assessment and technical report. Built Environment and Cultural Landscapes 29/05/2019 Johan Nel, Cecilia Kruger Die Erfenisstigting 11/07/2019 - 13:09
Vryheid Network Strenthenning Project Archaeological and cultural heritage phase 1 specialist report for the proposed construction of the Vryheid Network Strengthenning Project within the jurisdiction of Swellendam Local Municipality of Overberg District Municipality, Western Cape AIA Phase 1 17/08/2015 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 16/02/2016 - 09:28
VRYHEID MALL PHASE 1 HIA FOR THE PROPOSED VRYHEID MALL, KZN HIA Phase 1 27/02/2023 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management LEAP -Landscape Architectural and Environmental Planning 14/03/2023 - 16:05
Vryheid Ext 16 Ph 2 Housing Project HIA HIA for the Proposed Township Establishment of Low income Housing on REM of ERF 10000, Vryheid 12/07/2023 Gavin Anderson Umlando Bizycon Pty Ltd 18/08/2023 - 12:06
Vryheid DBAR Heritage Report Cultural Heritage Impact Assessment of the Proposed Coal Link Project, Vryheid Traction, KwaZulu-Natal. Heritage Impact Assessment Specialist Reports 21/02/2014 Frans Prins Active Heritage CC Sivest - Gauteng 14/04/2015 - 12:57
Vryheid 2x 88 kV Turn-In Power Lines HIA Report Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE VRYHEID 2X 88KV TURN-IN POWER LINES IN THE ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE HIA Phase 1 31/03/2021 J.A. van Schalkwyk 19/05/2021 - 13:58
Vryburg WWTW Heritage Specialist Report Appendix D3 Vryburg WWTW Heritage Specialist Report HIA Phase 1 01/04/2014 David Morris McGregor Museum 05/04/2016 - 16:51
Vryburg Waste Water Treatment Works Heritage & Archaeological Specialist Report AIA Phase 1 24/01/2014 David Morris McGregor Museum EndemicVision Environmental Services 12/02/2014 - 14:39
Vryburg Solar 3 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province Palaeontological Specialist Reports JF Durand 16/08/2018 - 16:26
Vryburg Solar 3 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 3) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 16:18
Vryburg Solar 2 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province JF Durand 16/08/2018 - 15:58
Vryburg Solar 2 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 2) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 15:51
Vryburg Solar 1 Palaeontological Report Palaeontological Impact Assessment for the proposed construction of three Solar Photovoltaic (PV) Facilities (i.e. Vryburg Solar 1, Vryburg Solar 2 and Vryburg Solar 3) and associated electrical infrastructure, near Vryburg, in the North-West Province 24/07/2018 JF Durand 16/08/2018 - 15:05
Vryburg Solar 1 Heritage Report Gultural Heritage Impact Assessment for the Proposed Development of a 100 MW (115(MW DC) Solar Photovoltaic Facility (Vryburg Solar 1) and Associated 132kv Transmission Line near Vryburg, North West Province. Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk J van Schalkwyk 16/08/2018 - 14:55
Vryburg Extension 29, Huhudi Extension 1 & Huhudi Re-layouts HIA REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE PROPOSED VRYBURG EXT. 29 & HUHUDI EXT.1 TOWNSHIP DEVELOPMENTS ON VARIOUS ERVEN IN THE VRYBURG/HUHUDI AREA AS WELL AS A PORTION OF THE R/E OF PORTION 8 OF THE FARM ROSENDAL 673IN VRYBURG, NORTHWEST PROVINCE HIA Phase 1 01/08/2018 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 07/10/2019 - 17:33
Vroe Werwe in die Franschoek Vallei Vroe Werwe in die Franschoek Vallei (Honours Thesis) Research Publication 01/12/1992 Jaline De Villiers CTS_369779 21/09/2016 - 16:47
Vrede Phase 1 HIA Vrede Phase 1 HIA Lloyd Rossouw Paleo Field Services 23/07/2014 - 14:03
VR003: Excavation Report May 2021 Report on excavations at the archaeological rock shelter site Varsche Rivier 003 (VR003), 2014 - 2016, conducted under HWC permits #X120417JL07 & #16062111AS0622E Archaeological Permit Report 10/05/2021 Teresa Steele, Alex Mackay, Jayson Orton 17/05/2021 - 09:33
Vosloorus Node Heritage Impact Assessment The Ekurhuleni Metropolitan Municipality identified a number of “township complexes” for focused nodal development and regeneration. The first of the projects to be implemented is the Vosloorus nodal development. The project entails development of high density residential, with a component of retail at ground floor to address the local economic development needs and backlog in the area. In accordance with Section 38 of the NHRA, an independent heritage consultant was appointed by GA Environmental to conduct a cultural heritage assessment to determine if the proposed development would have an impact on any sites, features or objects of cultural heritage significance.The cultural landscape qualities of the larger region essentially consist of two components, rural area in which the human occupation is made up of a limited pre-colonial element (Stone Age and Iron Age) as well as a much later colonial (farmer) component. The second component, although much younger, gave rise to an industrial one which is largely made up of industries, which led to large-scale township development. Impact analysis of cultural heritage resources under threat of the proposed development, are based on the present understanding of the development. As no site, features or objects of cultural significance are known to exist in the study area, there would be no impact as a result of the proposed development. HIA Phase 1 29/02/2016 Johnny Van Schalkwyk SAHRA Council JA van Schalkwyk Heritage Consultant 26/09/2016 - 17:03
Vosloorus Node Community Residential Housing Development CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF THE PROPOSED VOSLOORUS NODE PROJECT ONE, VOSLOORUS EXTENTION 9, GAUTENG PROVINCE HIA Phase 1 29/02/2016 Johnny Van Schalkwyk GA Environment (Pty) Ltd 15/03/2016 - 16:30
Vosloorus HIA HIA Phase 1 15/09/2016 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Ekurhuleni Metropolitan Municipality 15/09/2016 - 15:22
Vorna Valley X88 Proposed Vorna Valley X88 Housing Development, Midrand Region, City of Johannesburg Local Municiaplity, Gauteng Province Heritage Impact Assessment Specialist Reports 05/06/2016 Johnny Van Schalkwyk 28/06/2016 - 14:52
Voortrekker Site Report Voortrekker Monument Site Report Site Inspection Report 09/10/2015 Themba Monnye 26/11/2015 - 14:27
Voortrekker Monument Wagon Lager Technical Maintenance Interventions Assessment of the technical maintenance interventions on the structure of the 'walaer' at the Voortrekker Monument, Pretoria Site Inspection Report 06/05/2019 Mauritz Naude Voortrekker Monument 20/05/2019 - 12:43
Voorspoed Mine - Heritage LEVEL 2 HERITAGE IMPACT ASSESSMENT (SPECIALIST STUDY) REPORT: PROPOSED VOORSPOED MINE, NORTH OF KROONSTAD, FREE STATE PROVINCE HIA Phase 1 07/09/2005 Robert de Jong Cultmatrix CC Metago Environmental Engineers (Pty) Ltd 05/03/2013 - 11:29
Voorspoed Mine - building demolition Application for permit: demolition of existing historic building at old Voorspoed diamond mine, Free State HIA Phase 2 Robert de Jong Cultmatrix CC Metago Environmental Engineers (Pty) Ltd 05/03/2013 - 15:05
Voorspoed Mine - Archaeology A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR AN EMP FOR THE VOORSPOED DIAMOND MINE NEAR KROONSTAD IN THE FREE STATE PROVINCE OF SOUTH AFRICA AIA Phase 1 01/09/2004 Julius CC Pistorius Metago Environmental Engineers (Pty) Ltd 05/03/2013 - 11:16
Voorlopige verslag van Schreuderhuis Voorlopige verslag van Schreuderhuis 01/01/1981 Hennie Vos Stellenbosch Museum 16/06/2012 - 14:33
Vondeling Lifestyle Estate Development Proposed Development of a Residential Lifestyle Estate on Portion 46 of the Farm Vondeling 285 LS, east of Louis Trichardt, in the Makhado Local Municipality, Vhembe District, Limpopo Province. AIA Phase 1 21/02/2014 Marko Hutten PGS Heritage and Grave Relocation Consultants Tekplan Environmental 03/03/2014 - 12:30
Volta PV VIA VISUAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF THE 290MW VOLTA SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED BATTERY ENERGY STORAGE SYSTEM (BESS) NEAR DEALESVILLE, FREE STATE PROVINCE Visual Impact Assessment 27/03/2023 Lourens du Plessis 20/04/2023 - 17:13
Volta PV PIA Palaeontological Impact Assessment - Basic Assessment for the proposed development of the 290 MW Volta Solar Photovoltaic (PV) Facility (i.e., Volta PV Facility) and Battery Energy Storage System (BESS) near Dealesville, Free State. Palaeontological Specialist Reports 25/03/2023 Marion Bamford 20/04/2023 - 17:08
Volta PV HIA Heritage Impact Assessment for the for the proposed 290 MW Volta Solar Photovoltaic (PV) Facility, (i.e., Volta PV Facility) and Battery Energy Storage Systems (BESS), near Dealesville, Free State. Heritage Impact Assessment Specialist Reports 01/03/2023 Jaco van der Walt Beyond Heritage 20/04/2023 - 16:58
Volta EGI VIA VISUAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT OF A 132 KV POWER LINE AND ASSOICUATED ELECTRICAL INFRASTRUCTURE NEAR DEALESVILLE, FREE STATE PROVINCE Visual Impact Assessment 27/03/2023 Lourens du Plessis 20/04/2023 - 17:15
Volta EGI PIA Palaeontological Impact Assessment: Basic Assessment or Electricity Grid Infrastructure standard, if applicable, for the proposed development of a 132 kV overhead and underground Power lines and associated EGI (i.e., Volta EGI) from the Volta PV Facility to the planned Artemis Main Transmission Substation (MTS) near Dealesville, Free State Palaeontological Specialist Reports 25/03/2023 Marion Bamford 20/04/2023 - 17:10
Volta EGI HIA Heritage Impact Assessment for the for the proposed development of 132 KV powerlines and associated Electrical Grid Infrastructure (EGI) (i.e., Volta EGI) from the Volta PV Facility to the planned Artemis Main Transmission Substation (MTS) Near Dealesville, Free State Province. Heritage Impact Assessment Specialist Reports 01/03/2023 Jaco van der Walt Beyond Heritage 20/04/2023 - 17:02
Volspruit Mine, Mokopane – Palaeontological Impact Assessment Volspruit Mine, Mokopane – Palaeontological Impact Assessment PIA Desktop 04/04/2011 Bruce Rubidge Evolutionary Studies Institute EScience Associates (Pty) Ltd 08/11/2012 - 17:46
Volspruit Mine A heritage impact assessment for the Sylvania Resources Volspruit Mine on the farms Volspruit 326 KR and Zoetveld 294KR, near Mokopane, Limpopo Province AIA Phase 1 01/09/2011 Anton van Vollenhoven Archaetnos CC EScience Associates (Pty) Ltd 08/11/2012 - 17:43
Vogelsrand HIA 11/11/2022 - 14:35
Vogelsrand 373/0 Quarry Phase 1 Heritage Impact Assessment of an existing quarry and new crusher plant site at Vogel's Rand 373/0, Ventersburg District, FS Province HIA Phase 1 01/05/2012 Lloyd Rossouw H2ON Environmental 26/07/2012 - 14:46
Voels Nessie C North West Province HIA Voels Nessie C North West Province HIA HIA Phase 1 01/06/2022 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 08/08/2022 - 16:48
Voel Nessie B North West Province Voel Nessie B North West Province HIA Phase 1 01/06/2022 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 08/08/2022 - 16:54
Voel Nessie A North West Province Voel Nessie A North West Province HIA Phase 1 01/06/2022 Jaco van der Walt Beyond Heritage SRK Consulting (Pty) Ltd - Johannesburg 08/08/2022 - 17:01
Vodacom Thohoyandou Optic Fibre Cable - Desktop Palaeontological Impact Assessment Desktop Palaeontological Impact Assessment of proposed new overhead and subsurface installation of a Vodacom optic fibre cable along provincial road reserves in and around Thohoyandou, Limpopo Province PIA Desktop 06/10/2015 Lloyd Rossouw Paleo Field Services Enviroworks 03/11/2015 - 16:34