THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 51 - 100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Desktop Report: Mayogi PV | Desktop Heritage Assessment for the Proposed development of the Mayogi PV Facility | Heritage Scoping | 09/05/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 09/05/2023 - 12:44 |
A Phase I Heritage Impact Assessment for Eskom's proposed construction of the Ngwedi Network Development Plan consisting of sevn 132kv power lines from the Ngwedi MTS to various substations in the Sun City area in the North-West Province | A Phase I Heritage Impact Assessment for Eskom's proposed construction of the Ngwedi Network Development Plan consisting of sevn 132kv power lines from the Ngwedi MTS to various substations in the Sun City area in the North-West Province | HIA Phase 1 | 05/01/2011 | Julius CC Pistorius | 16/06/2012 - 08:54 | ||
P1AIA-Keigate Commercial Development, Farm 1307 and Portion of RE-1-665, EL, EC | Keigate Commercial Development, Farm 1307 and Portion of Farm RE/1/665 East London, Buffalo City Metropolitan Municipality, Eastern Cape, South Africa | AIA Phase 1 | 16/06/2014 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | Control Civil Services cc | 04/08/2014 - 12:20 |
HIA Report | Heritage Assessment Report for Midrand Waste Tyre Depot | HIA Phase 1 | 17/04/2017 | 14/03/2017 - 11:42 | |||
HIA for Prospecting Right Application (KZN30/5/1/2/11349PR) | Phase 1 Archaeological and Heritage Impact Assessment for Prospecting Right Application for Lithium, Feldspar, Tin, Tantalum, Zinc, and Dimension Stone (general) on Various Farms, Situated in the Magisterial District of Port Shepstone, Kwazulu NataL Province. | Heritage Impact Assessment Specialist Reports | 19/05/2023 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Integrated Specialist Services (Pty) Ltd | 12/06/2023 - 11:00 |
An Archaeological investigation | Archaeological investigations, done at Bakkiesfontein 568 IR, (Dipaliseng Local Municipality) Greylingstad Mpumalanga | 06/11/2015 | Domonique-Marie Verkerk | 06/11/2015 - 11:06 | |||
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. | HIA Phase 1 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:37 | |
Cultural heritage assessment | Cultural heritage assessment for the proposed Derdepoort Park Extension 15 development, City of Tshwane, Gauteng Province | Heritage Impact Assessment Specialist Reports | 15/12/2015 | Johnny Van Schalkwyk | J Paul van Wyk | 15/01/2016 - 15:23 | |
AIA; Proposed Extension of a Borrow Pit, Waterkloof 1092 | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON WATERKLOOF 1092 NEAR MAMRE, WEST COAST DISTRICT MUNICIPALITY, WESTERN CAPE | AIA Phase 1 | 01/03/2013 | Madelon Tusenius | Natura Viva CC | Nadeson Consulting Services | 03/07/2018 - 12:24 |
PIA for Proposed House Middleton | Palaeontological Impact Assessment for the proposed House Middleton, 25 Llewellyn Rd, Sheffield Beach, KwaZulu Natal Province | PIA Desktop | 26/02/2022 | Marion Bamford | 18/07/2022 - 10:05 | ||
REPORT LOTUSVILLE HARRISMITH | FIRST PHASE ARCHAEOLOGICAL AND CULTURAL HERITAGE INVESTIGATION OF THE PROPOSED RESIDENTIAL DEVELOPMENTS NEAR LOTUSVILLE ALONG THE N3 AT HARRISMITH, FREE STATE | AIA Phase 1 | 01/09/2013 | Cobus Dreyer | NSVT Consultants | 10/09/2013 - 10:34 | |
HIA Report for Moakeng Housing Development | PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL DESKTOP ASSESSMENT) IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MAOKENG HOUSING DEVELOPMENT (KROONSTAD) FREE STATE PROVINCE | HIA Phase 1 | 15/01/2020 | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | Archaeological and Heritage Services Africa (Pty) Ltd | 29/01/2020 - 18:54 |
Clocolan Raw Water Pipeline HIA | Phase 1 Heritage Impact Assessment for upgrading of a Water Treatment Works and associated infrastructure, including replacing a 550 m - long gravity feed pipeline in Clocolan, FS Province. | HIA Phase 1 | 19/02/2021 | Lloyd Rossouw | Paleo Field Services | NSVT Consultants | 16/03/2021 - 02:24 |
Phase 1 Etzostax Archaeological | Phase 1 Archaeological Impact Assessment for the Proposed Etzostax Mining Permit on a Portion of Portion 46 of the Farm Elandsfontein 309 JS, eMalahleni, Mpumalanga | AIA Phase 1 | 22/07/2022 | 06/09/2022 - 11:13 | |||
Western Cape Palaeotechnical Report | Heritage Western Cape: Interim Technical Report on Palaeontological Heritage of the Western Cape | Palaeontological Specialist Reports | John E Almond, John Pether | Heritage Western Cape | 12/11/2013 - 16:04 | ||
PIA Rietfontein Site | PALAEONTOLOGICAL FIELD ASSESSMENT FOR THE PROPOSED RIETFONTEIN HOUSING PROJECT AS PART OF THE RAPID LAND RELEASE PROGRAMME, GAUTENG PROVINCE DEPARTMENT OF HUMAN SETTLEMENTS, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY | PIA Phase 1 | 24/01/2020 | Elize Butler | PGS Heritage (Pty) Ltd | GA Environment (Pty) Ltd | 03/06/2020 - 19:29 |
HIA Kosibiya Road Upgrade | Phase 1 Heritage Impact Assessment reoprt for the Kosibiya Road Upgrade Project near Weenen, KwaZulu-Natal | HIA Phase 1 | 11/08/2014 | Stephan Gaigher | G & A Heritage | GBS Environmental Consulting | 30/10/2014 - 15:02 |
giyani aia | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Kusile Invest 133 Giyani Gold Mine Project on the demarcated portions of Un-Surveyed State Land of Greater Giyani 891 LT, Giyani, Limpopo | AIA Phase 1 | 20/04/2021 | Tobias Coetzee | Tobias Coetzee | 12/05/2021 - 17:47 | |
Ludeke Dam | DESKTOP HERITAGE SURVEY FOR THE LUDEKE DAM PIPE INSTALLATION, MBIZANA, EASTERN CAPE | Heritage Impact Assessment Specialist Reports | 01/08/2023 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 03/08/2023 - 07:41 |
Expansion_Waste Rock Dump and Pipeline at Vergenoeg Mine | Report on a Phase 1 HIA for the expansion of mining activities and the development of a waste rock dump for the Vergenoeg Mine on the remainder of the farm Kromdraai 209JR, Cullinan Magisterial District, Gauteng | HIA Phase 1 | 02/12/2013 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | APELSER ARCHAEOLOGICAL CONSULTING | 10/02/2015 - 11:37 |
Tlisitseng 1 132kV Substation and Power Line Heritage Report | TLISITSENG PROJECT - TLISITSENG 1 SUBSTATION AND POWER LINE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 29/06/2017 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 07/07/2017 - 11:46 |
Robbeneiland: Ondersoek van mop | Robbeneiland: Ondersoek van mop | 01/01/1987 | Hennie Vos | Stellenbosch Museum | 16/06/2012 - 14:33 | ||
HIA Kenhardt PV 1 | SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 75 MW SOLAR PHOTOVOLTAIC FACILITY (KENHARDT PV 1) ON THE REMAINING EXTENT OF ONDER RUGZEER FARM 168, NORTH-EAST OF KENHARDT, NORTHERN CAPE PROVINCE: EIA REPORT - HERITAGE IMPACT ASSESSMENT | HIA Phase 1 | 31/01/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Council for Scientific and Industrial Research | 16/03/2016 - 14:19 |
Palaeontological Assessment for Nkandla Extension 2 | Palaeontological Assessment (Desktop) requested in terms of Section 38 of the National Heritage Resources Act No 25/1999 for the establishment for Nkandla Extension 2 in Hartswater, Phokwane Local Municipality in the Frances Baard District of the Northern Cape Province | PIA Desktop | 28/08/2017 | Joseph Chikumbirike | Xilalelo Project Managers | Frances Baard District Municipality | 30/08/2017 - 17:05 |
PIA for SMME Training Centre and YEP on Edendale-CC, Pietermaritzburg | A Desktop Palaeontological Impact Assessment For The Proposed Development Of A Smme Training Centre And Youth Enterprise Park On Erf 1977 Edendale-Cc Located In The Msunduzi Local Municipality, Pietermaritzburg, Kwazulu-Natal Province, South Africa | PIA Desktop | 16/09/2018 | Marion Bamford | 17/09/2018 - 10:50 | ||
AIA FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON MAHINGAS 258MT, MAHINGA'S EXTENSION 259MT, TSHIKUNDU 262MT, PAGELEE 274MT AND KLUSTER 293MT FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 20/01/2021 | Neels Kruger | Exigo Sustainability | Kantey & Templer Consulting Engineers | 20/09/2021 - 10:51 |
HIA Prison Dam | Cultural Heritage Survey of the Proposed Upgrade of the Existing Prison Dam, Rustenburg Local Municipality, North West Province | HIA Phase 1 | 01/08/2012 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | SRK Consulting (Pty) Ltd - Pretoria | 10/09/2012 - 15:46 |
Phase 1 HIA Proposed Bokpoort II Solar Development | First Phase Archaeological & Heritage Assessment of the Proposed Bokpoort II 300 MW Combined 2 x 75 PV & 150 MW CSP Tower Solar Development on the Remainder of the Farm Bokpoort 390, Groblershoop, Northern Cape Province. | HIA Phase 1 | 16/09/2015 | Cobus Dreyer | 31/05/2016 - 11:16 | ||
HIA Eskom Nkambeni | PHASE 1 HIA REPORT FOR THE ESKOM NKAMBENI SUBSTATION LOCATED ON PORTION 115 OF THE FARM BURGERS HALL 21JU MBOMBELA LOCAL MUNICIPALITY, MPUMALANGA | HIA Phase 1 | 05/12/2018 | Anton Pelser | A Pelser Archaeological Consulting | EcoPartners | 05/12/2018 - 10:27 |
HIA report Sandveld 22 kV powerline re-build | HIA report Sandveld 22 kV powerline re-build | HIA Phase 1 | 01/09/2021 | Jaco van der Walt | Beyond Heritage | Environmental Impact Management Services (Pty) Ltd | 24/11/2021 - 14:21 |
CIFA comment on Final Plans for FE 9 Founders Estates | 28/10/2022 - 18:28 | ||||||
Heritage Impact Assessment Letter | Heritage Statement | Len van Schalkwyk | eThembeni Cultural Heritage | 01/09/2020 - 08:55 | |||
Phase 1 HIA Wilkoppies Extension 108 | Report on a Phase 1 HIA for the Proposed Wilkoppies Ext. 108 Township Development on Holdings 19, 20, 21, 22, 23 and 48, Wilkoppies Agricultural Holdings (Elandsheuvel 402IP) in Klerksdorp, North West Province | HIA Phase 1 | 14/11/2013 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 27/11/2013 - 16:40 |
HIA Ipelegeng | REPORT ON A PHASE 1 HIA FOR THE PROPOSED IPELEGENG EXTENSION 12 TOWNSHIP ESTABLISHMENT AT SCHWEIZER-RENEKE IN THE MAMUSA LOCAL MUNICIPALITY OF THE NORTHWEST PROVINCE | HIA Phase 1 | 10/11/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Maxim Planning Solutions | 09/07/2021 - 14:01 |
Heritage Preconstruction walkthrough Report for Sutherland WEF and associated grid connection infrastructure | PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 01/12/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 14/12/2022 - 13:26 |
PALAEONTOLOGICAL IMPACT ASSESSMENT: PROPOSED ACRUX SOLAR PV PROJECT ONE NEAR BLOEMFONTEIN, FREE STATE PROVINCE | 26/09/2023 - 16:58 | ||||||
SIB6297 - DBAR Appendix H (Heritage Impact Assessment) | Heritage Impact Assessment: Basic Assessment Process for the Closure of the Cooke Underground Operations | HIA Phase 1 | 26/10/2020 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sibanye Gold Limited | 26/10/2020 - 15:59 |
Postmasburg Prospecting Heritage Scoping | SCOPING HERITAGE IMPACT ASSESSMENT FOR PROPOSED PROSPECTING ON FARMS 53, 56, 566 AND 567, HAY MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Scoping | 17/02/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Rosenthal Environmental | 24/02/2014 - 18:49 |
Phase 1 Heritage study | A PHASE 1 HIA REPORT FOR A PROPOSED TOWNHSIP DEVELOPMENT ON THE REMAINDER OF THE FARM LEEUPOORT 283JS & PTN 79 OF BLESBOKLAAGTE 296JS, EMALAHLENI, MPUMALANGA | HIA Phase 1 | 02/06/2014 | Anton Pelser | Pr. Aracheologist/Heritage Specialist | 22/04/2015 - 11:28 | |
Heritage Impact Assessment | Heritage Impact Assessment and Palaeontological Desktop Assessment for a Mining Permit Application on a Portion of Erf 687 and a Portion of the Remainder of Erf 1526, Barkly West in the Dikgatlong Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 30/08/2021 | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | Thaya Trading Enterprise | 30/08/2021 - 18:13 |
Phase 1 Archaeological Impact Assessment of a new township development on Farm Rodenbeck 2972, Bloemfontein, FS Province. | Phase 1 Archaeological Impact Assessment of a new township development on Farm Rodenbeck 2972, Bloemfontein, FS Province. | Archaeological Specialist Reports | 28/04/2017 | Lloyd Rossouw | National Museum Bloemfontein - Archaeology and Anthropology | Mangaung Metropolitan Municipality | 21/11/2017 - 11:48 |
PIA - OrkneyPV - Mar16 | Palaeontological Impact Assessment Of The Proposed Orkney Solar Farm And Associated Infrastructure On The Remaining Extent Of Portions 7 And 21 Of The Farm Wolvehuis 114, Near Orkney, North West Province | 01/12/2015 | Elize Butler | National Museum Bloemfontein - Karoo Palaeontology Department | Savannah Environmental (Pty) Ltd | 22/08/2016 - 14:22 | |
HIA and PIA for Skeerhok PV2 | Heritage Impact Assessment Specialist Reports | 21/02/2018 - 15:39 | |||||
Phase 1 HIA for the development of a new irrigation pivot on portion 34 of the Farm Doorns No. 131 near Ritchie, NC Province. | Phase 1 HIA for the development of a new irrigation pivot on portion 34 of the Farm Doorns No. 131 near Ritchie, NC Province. | HIA Phase 1 | 27/11/2018 | Lloyd Rossouw | Paleo Field Services | 14/03/2019 - 08:49 | |
Mphambo HIA | PHASE 1 HIA’S FOR PROPOSED TOWNSHIP ESTABLISHMENTS ON A PORTION OF NATORP 227LT (MPHAMBO VILLAGE), PORTIONS OF NATORP 227LT & MCKHENIE 228LT (RIKAKA VILLAGE) AND THE REMAINING EXTENT OF ALTEIN 222LT IN THE MALAMULELE REGION OF THE COLLINS CHABANE LOCAL MUNICIPALITY IN THE LIMPOPO PROVINCE | HIA Phase 1 | 02/02/2022 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 24/02/2022 - 11:12 | |
Cullinan Development Paleontological Assessment | Cullinan Mega City Development Cullinan Extensions 2 and 5 to 12 City of Tshwane Metropolitan Municipality, Gauteng Province Farm: Portion 86 of the Farm Kafferskraal 475-JR Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 31/07/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | J Paul van Wyk | 06/06/2019 - 10:07 |
Impumelelo PIA | Palaeontological Impact Assessment for the proposed Impumelelo WEF, between Greylingstad and Secunda, Mpumalanga Province | PIA Phase 1 | 21/01/2023 | Marion Bamford | ASHA Consulting(Pty) Ltd | WSP Group Africa (Pty) Ltd | 24/02/2023 - 10:02 |
Proposed reopening of an existing borrow pit at Mothibistad near Kuruman in the Northern Cape | Request: Exemption from having to conduct an archaeological assessment, the proposed reuse of an existing borrow pit at Mothibistad near Kuruman, Northern Cape | HIA Letter of Exemption | 19/04/2014 | Enviroafrica CC | 17/04/2014 - 11:21 | ||
Kloofsig 2 Palaeo LoE | Proposed Kloofisg 2 Solar PV Energy Facility on the remainder of Farm Kalkpoort 18, Renosterberg Local Municipality near Petrusville, Northern Cape | HIA Letter of Exemption | 01/10/2016 | John Almond | Natura Viva CC | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 20/12/2016 - 09:35 |
Triple 777 Energy (Pty) Ltd- FS 10671 PR | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMM REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON PORTION 2&3 OF THE FARM ZANDFONTEIN 132, THE FARM DRAAIBANK 467 AND THE REMAINING EXENT OF THE FARM BRAKFONTEIN 147, IN THE MAGISTERIAL DISTRICT OF ZASTRON, FREE STATE | 21/04/2023 - 10:57 |