9-2-258-0005-20060401-FKE | 'n Histories-Argeologiese Ondersoek van Die Watervore by Fort Wonderboompoort, Pretoria | Archaeological Permit Report | 01/04/2006 | Anton van Vollenhoven | Fort Klapperkop Erfenisterrein | 16/06/2012 - 14:40 | ||
9-2-286-0003-20010201-ACC | 'n Ondersoek Na Kultuurerfenishulpbronne Te Kareeboskloof Wildsplaas, Noordwes Provinsie | HIA Phase 1 | 01/02/2001 | Anton van Vollenhoven | Archaetnos CC | MAPID_01680 | 16/06/2012 - 14:41 | |
9-2-255-0003-19930219-NCHM | 'n Opname van Strukture in Pelgrimsrus, Met Die Oog Op Die Verskuiwing of Sloping Daarvan Weens Die Bou van 'n Nuwe Verbypad | AIA Phase 1 | 19/02/1993 | Johnny Van Schalkwyk | National Cultural History Museum | 16/06/2012 - 14:39 | ||
PTN 26 Syferfontein | (a) PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT ON PORTION 26 OF THE FARM SYFERFONTEIN 438 IQ POTCHEFSTROOM NORTH WEST PROVINCE | AIA Phase 1 | 05/12/2016 | Udo Kusel | African Heritage Consultants CC | AB Enviro Consult CC | 05/12/2016 - 13:50 | |
Township Establishment of R56 Mixed Residential Development | (HIA) for the proposed Township Establishment of R56 Mixed Residential Development along the R56 Provincial road opposite the Ebhongeni Maximum Correctional Centre (CMAX) in Kokstad. | HIA Phase 1 | 02/10/2019 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Mshize Investments (pty)ltd | 19/10/2019 - 08:20 | |
Kwa-Mazibuko Hostels | (HIA) of the proposed demolition of the Kwa-Mazibuko Hostel Project, located on the Remainder of Portion 1 of the farm Boomplaats 200IR, and Erven 968, 969 & 970, in Katlehong, Gauteng | 31/10/2019 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Arengo 352 (Pty) Ltd | 21/10/2019 - 09:07 | ||
Greater Mthonjaneni Water Reticulation | (HIA) of the proposed Greater Mthonjaneni Water Reticulation Project within Ward 6 (Sub-Supply Area 5: Zone 3 and 4) within Mthonjaneni area. The project developer or applicant is the King Cetshwayo District Municipality. | Heritage Impact Assessment Specialist Reports | 01/12/2018 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | iSambulo Environmental Consulting | 19/10/2019 - 08:03 | |
Historical significance | - Howick landmark dating back to 1851 - Originally belonged to doctors and military hospital was on the top floor - thereafter a museam and a restuaurant | Heritage Statement | 20/05/2022 | 20/05/2022 - 13:01 | ||||
HIA Hondeklip Abalone Hatchery | .Heritage Impact Assessment For A Proposed Abalone Hatchery At Hondeklipbaai, Namakwaland Magisterial District, Western Cape | HIA Phase 1 | 15/08/2012 | Jayson Orton | ACO Associates CC | Ecosense | 28/05/2013 - 10:01 | |
Blurock Powerline Deviation | 1 Colenso/Gowrie 88kV 2.2km Powerline Deviation | Heritage Impact Assessment Specialist Reports | 16/05/2013 | Frans Prins | Eskom Holdings SOC Ltd | 04/10/2013 - 01:17 | ||
Kentani Heritage and Palaeontology walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (KENTANI), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 14:23 | |
Klipfontein Heritage and Palaeontolgy walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (KLIPFONTEIN 1), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN, KLIPFONTEIN PV PROJECT | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 16:23 | |
Klipfontein 2 Heritage and Palaeontology walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (KLIPFONTEIN 2), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN KLIPFONTEIN PV 2 PROJECT | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 16:46 | |
Leliehoek Heritage and Palaeontology walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (LELIEHOEK), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN, LELIEHOEK PV PROJECT | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 15:32 | |
Leliehoek Heritage and Palaeontology walkdown reports | 1) PRECONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE MAINSTREAM KENTANI SUITE PV PROJECTS (SONOBLOMO), DEALESVILLE, FREE STATE 2) PALAEONTOLOGICAL WALKDOWN, SONOBLOMO PV PROJECT | Heritage Impact Assessment Specialist Reports | 13/08/2022 | Jayson Orton, Elize Butler | ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd | SLR Consulting (South Africa) (Pty) Ltd | 01/12/2022 - 15:55 | |
Proposed Capacity Improvements to National Route 2 (N2) and National Route 3 (N3), | 1. Capacity Upgrades to the N2 (Solomon Mahlangu IC to south of Umgeni Rd I/C), including expansion of EB Cloete and Solomon Mahlangu Interchanges, and the N3 (EB Cloete to Paradise Valley) including provision of temporary access for construction below Westville and Paradise Valley viaducts. 2. CAPACITY UPGRADES TO THE N3 HAMMARSDALE TO CATO RIDGE. 3. CAPACITY UPGRADES TO THE N3 CATO RIDGE INTERCHANGE TO LYNNFIELD PARK/LION PARK INTERCHANGE. 4. CAPACITY UPGRADES TO THE N3 LYNNFIELD PARK/LION PARK TO GLADYS MANZI ROAD 5. CAPACITY UPGRADES TO THE N3 | Heritage Impact Assessment Specialist Reports | 30/08/2018 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 03/12/2018 - 01:08 | |
Heritage Statement: Padia House | 10 Lamont road, Glenwood, Durban-4001 | Heritage Statement | 12/07/2013 - 10:59 | |||||
100 10th Street, Linden, Heritage Recommendations | 100, 10th Street, Linden, Portion 2 of Erf 173, Heritage Opinion | Heritage Statement | 09/06/2014 | Stephan Gaigher | 06/08/2014 - 11:48 | |||
Phase 1 HIA Bronberg | 100ML Bronberg Reservoir and Associated Infrastructure | HIA Phase 1 | 01/03/2017 | Leonie Marais-Botes | Rand Water | 09/10/2017 - 09:22 | ||
UIA 2014 LEGACY-DAG | 102 FLORENCE NZAMA ROAD DURBAN - DURBAN ART GALLERY AND LOCAL HISTORY MUSEUM MILNE DRAIN-JOHN MILNE STREET AMAFA APPLICATION | Heritage Statement | 04/11/2013 | Rodney Choromanski | Chomanski Architects | eThekwini Metropolitan Municipality | 04/11/2013 - 14:08 | |
102 Florence Nzama St. AMAFA Report | 102 FLORENCE NZAMA ST. AMAFA REPORT DURBAN ART GALLERY LOCAL HISTORYMUSEUM | Heritage Study | 03/11/2015 | Chomanski Architects | Chomanski Architects | eThekwini Municipality - City Architects | 03/11/2015 - 11:25 | |
108-110 Vos Land - archaeological monitoring of earth moving activities on erf 687 and erf 688 Cape Town | 108-110 Vos Land - archaeological monitoring of earth moving activities on erf 687 and erf 688 Cape Town | Archaeological Monitoring | 01/01/2006 | Belinda Mutti, Mary Patrick | 16/06/2012 - 08:54 | |||
AIA_108-110_Vos_Street_Patrick_M_Nov05 | 108-110 Vos Street Historical Background and Trial Excavations at Erf 687 and 688 | AIA Phase 1 | 01/11/2005 | Mary Patrick | Cape Archaeological Survey CC | 16/06/2012 - 14:42 | ||
AIA_Buitengracht_Street_Patrick_M_Nov05 | 11 Buitengracht Street. Archaeological Monitoring: Erf 798 Cape Town | AIA Phase 1 | 01/11/2005 | Mary Patrick, Charles Arthur | Cape Archaeological Survey CC | MAPID_01959 | 16/06/2012 - 14:43 | |
AIA_Buitengracht_Street_Patrick_M_Jun05 | 11 Buitengracht Street. Historical Background and Trial Excavations at Erf 798 Cape Town | AIA Phase 1 | 01/06/2005 | Mary Patrick, J Blackenberg, Charles Arthur | Cape Archaeological Survey CC | MAPID_01970 | 16/06/2012 - 14:43 | |
113 CURRIE ROAD, MUSGRAVE, BEREA 4001 | 113 CURRIE ROAD, MUSGRAVE, BEREA 4001 APPLICATION IN TERMS OF SECTION 37(1)(A) OF THE KWAZULU-NATAL AMAFA RESEARCH INSTITUTE ACT (5/2018), FOR A PERMIT TO DEMOLISH. ALTER OR ADD TO A STRUCTURE WHICH IS, OR WHICH MAY REASONABLY BE EXPECTED TO BE OLDER THAN 60 YEARS | Heritage Impact Assessment Specialist Reports | 01/03/2022 | Somakanthen Moghambaram Govender | Artek 4 Architects (KZN) CC | Artek 4 Architects (KZN) CC | 01/03/2022 - 16:01 | |
130 Boom Street, Pietermaritzburg-Heritage Report | 130 Boom Street, Erf 2213, Pietermaritzburg-Heritage Report | Heritage Scoping | 03/11/2020 | Lindsay Napier | Lindsay Napier Architect | VNA Consulting | 04/11/2022 - 09:17 | |
Phase 1 Heritage Impact Assessment Groblershoop Powerline | 132 KV GRID CONNECTION TRANSMISSION LINE BETWEEN THE ORANGE RIVER SOLAR FACILITY 1 AND ESKOM’S HIGH VOLTAGE GROBLERSHOOP SUBSTATION, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 01/11/2022 | Lloyd Rossouw | 26/01/2023 - 11:05 | |||
Postmasburg Power Line | 132 kV Power line connection to the Humasrus Solar Thermal Energy Power plant, postmasburg. | HIA Phase 1 | 22/03/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 04/02/2013 - 10:32 | |
AIA_humansrus_132kV_power_line_Fourie_W_Mar12 | 132kV Power line connection to the Humansrus Solar Thermal Energy Powerplant, Postmasburg | AIA Phase 1 | 22/03/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 16/06/2012 - 14:46 | ||
134 Helen Joseph Road | 134 Helen Joseph Road, Bulwer, Durban, Kwazulu Natal, eThekwini Municipality | 29/11/2013 - 14:06 | ||||||
Motivation Letter | 1399_4000_Cellar Addition_SAHRA Application_20180911 | 11/09/2018 | Malherbe Rust Architects | 11/09/2018 - 18:42 | ||||
9-2-111-0105-19990428-HA | 1999 Record of St. Paul's Cemetery Rondebosch, Cape Town | BGG Phase 1 | 28/04/1999 | P Winer | Historical Archaeology | MAPID_00610 | 16/06/2012 - 14:37 | |
1st Interim report, Bulhoek, Steynsburg district | 1st Interim report on excavations conducted on the farm Bulhoek, Steynsburg district, Eastern Cape Province | Archaeological Permit Report | 25/07/2013 | Gerda Coetzee, Joanna Behrens | National Museum Bloemfontein - Archaeology and Anthropology | 25/07/2013 - 12:58 | ||
Phase 1 Heritage report | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 24/06/2014 - 12:03 | ||
Heritage phase 1 for Meletse | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 24/06/2014 - 11:40 | ||
Heritage phase 1 for Meletse | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 24/06/2014 - 11:40 | ||
Phase 1 Heritage study - Meletse | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 24/06/2014 - 11:47 | ||
Phase 1 Heritage study | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | CTS_166894 | 24/06/2014 - 09:22 | |
Phase 1 Heritage report | 1st PHASE CULTURAL HERITAGE IMPACT ASESSEMENT FOR THE FARMS DONKERPOORT 448 KQ, RANDSTEPHNE 455 KQ AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/05/2014 | Sidney Miller | African Heritage Consultants CC | 23/06/2014 - 14:27 | ||
Phase 1 heritage | 1st PHASE CULTURAL HERITAGE IMPACT ASESSESMENT FOR THE FARMS DONKERPOORT 448 KQ REMAINING EXTENT, RANDSTEPHNE 455 KQ REMAINING EXTENT AND WATERVAL 443 KQ, THABAZIMBI, LIMPOPO PROVINCE. | HIA Phase 1 | 01/02/2014 | Sidney Miller | Shangoni Management Services | 01/04/2014 - 12:39 | ||
Phase 1 Heritage Report | 1st Phase Cultural Heritage Impact Assessment for Mezo Kitchens, for the development of a processing plant for the manufacture of melamine prefabricated kitchen cupboards on portion R/20 of the farm Uitzicht (Alias Rietvalei) 314JR, | HIA Phase 1 | 15/03/2016 | Sidney Miller | Shangoni Management Services | 27/05/2016 - 15:44 | ||
Phase 1 Heritage report for Nooitgedacht Clay Quarry | 1st Phase CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR A PROPOSED MINING LICENCE ON THE FARM NOOITGEDACHT 436 JR PORTION 25. | HIA Phase 1 | Udo Kusel | Mpumalanga Department: Economic Development | Shangoni Management Services | 03/08/2015 - 11:37 | ||
AIA_Paardefontein_282_Chicken_Kiᄑsel_U_Nov11 | 1st Phase Cultural Heritage Resources Impact Assessment for proposed extension of a Chicken Farm on Portion 22 of Paardefontein 282 JR, Roodeplaat, Gauteng | AIA Phase 1 | 11/01/2011 | Udo Kusel, Sidney Miller | African Heritage Consultants CC | 16/06/2012 - 14:48 | ||
AIA_Westwood_Poultry_Kiᄑsel_U_Feb11 | 1st Phase Cultural heritage resources impact assessment for the proposed extensions of a chicken farm on the farm Uitvlugt 709 JR, portion 10, Rust De Winter | AIA Phase 1 | 02/01/2011 | Udo Kusel | African Heritage Consultants CC | 16/06/2012 - 14:51 | ||
HIA | 1st phase H.I.A. of a 35 ha study area on portion 18 of the farm Dufield 35 IR, Lichtenburg district, North-western Province. | Heritage Statement | Sidney Miller | 02/09/2021 - 13:48 | ||||
SWEP Phase 2 Alternative report | 1st phase H.I.A. of a proposed extension and upgrading at Sishen Mine, also known as phase two of the Sishen Western Expansion Project that is | PIA Desktop | 01/06/2021 | Sidney Miller | Sidney Miller | 02/09/2021 - 14:10 | ||
SWEP Phase 2 heritage report | 1st phase H.I.A. of a proposed extension and upgrading at Sishen Mine, also known as phase two of the Sishen Western Expansion Project that is located on portions of Gamagara and Doornvlei, Northern Cape | HIA Phase 1 | 02/11/2020 | Sidney Miller | 02/09/2021 - 13:47 | |||
SWEP Phase 2 heritage report | 1st phase H.I.A. of a proposed extension and upgrading at Sishen Mine, also known as phase two of the Sishen Western Expansion Project that is located on portions of Gamagara and Doornvlei, Northern Cape. (Amendment 1 on request from SAHRA APM unit letter dated 27th September 2021). | HIA Phase 1 | 02/11/2020 | Sidney Miller | Sidney Miller | 02/09/2021 - 14:07 | ||
Sishen Expansion Project | 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT For Sishen Mine | HIA Phase 1 | 01/08/2022 | Siegwalt Udo Kusel | Sidney Miller | 13/10/2022 - 09:51 |