FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Heritage Management Plan - Waterloo Solar PV HERITAGE MANAGEMENT PLAN FOR THE PROTECTION OF STROMATOLITES AT THE WATERLOO SOLAR PV FACILITY ON WATERLOO 992-IN, VRYBURG MAGISTERIAL DISTRICT, NORTHWEST PROVINCE Conservation Management Plan 21/09/2018 Cecilene Muller, Jayson Orton ASHA Consulting(Pty) Ltd juwi Solar ZA C4 (Pty) Ltd. 01/10/2018 - 08:37
AIA[ASI]-Koukamma Electrification Project, Hermanuskraal, Kou-Kamma LM, Eastern Cape AIA[ASI]-Archaeological Site Inspection - Purported Grave Site: Koukamma Electrification Project, Hermanuskraal, Kou-Kamma Local Municipality, Eastern Cape Archaeological Monitoring 30/03/2016 Karen Van Ryneveld Eskom Holdings SOC Limited Royal Haskoning DHV 30/03/2016 - 09:49
Heritage Screener - Lichtenburg 2 PV_June 2018 Development of the Lichtenburg 2 PV Solar Energy Facility and Associated Infrastructure on a site near Lichtenburg, North West Province. Heritage Study 19/06/2018 CTS Heritage Savannah Environmental (Pty) Ltd 10/01/2019 - 10:04
40727 Nalisview Cemetery (2) Phase 1 Heritage Impact Assessment: proposed extension of a new cemetery on the farm Nalisview 1060, Bloemfontein, Free State Province HIA Phase 1 07/05/2020 Lloyd Rossouw 30/06/2020 - 07:05
Rehabilitation and Repair of the Bridge along Road D1321 The Proposed Rehabilitation and Repair of the Bridge along Road D1321, Midvaal Local Municipality, Gauteng Province HIA Phase 1 16/08/2021 J van Schalkwyk J van Schalkwyk 12/01/2022 - 11:19
Cornelis River Dam Phase 1 Archaeological Impact Assessment Cornelis River Dam - Ezenezeleni: Phumelela Regional Bulk Water Supply Scheme, warden, Free State, South Africa AIA Phase 1 26/07/2012 Karen Van Ryneveld Terra Works Environmental Consultants 26/07/2012 - 14:34
Phase 1 HIA: OR Tambo Memorial Phase 1 Heritage Impact Assessment Report: Proposed Developments at OR Tambo Memorial Site, Mbizana Local Municipality, Alfred Nzo District, Eastern Cape Province, South Africa HIA Phase 1 13/09/2013 Len van Schalkwyk, Elizabeth Wahl eThembeni Cultural Heritage Independent Development Trust 17/10/2013 - 10:53
Phase I PIA at Brother CISA (PTY) LTD, Newcastle, KwaZulu Natal Province A Phase I Palaeontological Impact Assessment for the development of the Brother CISA (PTY) LTD chemical plant property, Newcastle, KwaZulu Natal Province PIA Phase 1 Matthew V. Caruana Heritage Resources Management EScience Associates (Pty) Ltd 15/09/2020 - 16:51
Specialist Opinion SPECIALIST OPINION FOR THE CHANGE OF THE ALIGNMENT FOR THE PROPOSED BULK SEWER LINE ON PORTIONS OF THE FARM ZANDSPRUIT 191iq, GAUTENG PROVINCE JA VAN SCHALKWYK J A van Schalkwyk 24/01/2023 - 08:37
HIA Desktop study for the proposed development of the Victory House Centre Fuel Station and associated infrastructure. Heritage Impact Assessment: A Desktop Study. The Proposed Victory House Center Fuel Station and its Associated Infrastructures on the Remaining Extent of the Farm M’phatlele 457 KS, Portion 0 (Locatie van Mphatlele). Heritage Scoping 16/10/2023 Frans Roodt Ronell Group 19/10/2023 - 09:08
Letter of Exemption Portion 2 of farm Poundisford 2803 Exemption of Phase 1 Archaeological and Palaeontological Impact Assessment of a 5ha site on portion 2 of Farm Poundisford 2803, Bloemfontein, Free State Province*. HIA Letter of Exemption 09/12/2013 Lloyd Rossouw National Museum Bloemfontein Bloem Organic Compost, MvW Environmental Services 10/12/2013 - 15:30
Soyuz 6 draft EIR - PIA Soyuz 6 Wind Energy Facility draft EIR - Paleontological Impact Assessment Palaeontological Specialist Reports 01/02/2023 Elize Butler Banzai Environmental (Pty) Ltd Coastal & Environmental Services - East London 15/03/2023 - 14:23
Fulcrum PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED FUEL STORAGE FACILITY ON ERF 37, FULCRUM, EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 01/05/2017 Leonie Marais-Botes 20/09/2017 - 09:51
Desktop PIA Lake Umuzi South Bank Extension Palaeontological Impact Assessment: Desktop study PIA Desktop 14/05/2015 Heidi Fourie Dr Heidi Fourie 19/05/2015 - 10:28
Sendawo PV 3 Heritage Report 75MW SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY – SENDAWO SOLAR 3 Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 26/05/2016 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 10/06/2016 - 16:02
Kanku Road Heritage Impact Assessment Proposed Establishment of a Residential Development on Portions 4 and 7 of Erf 2363, Isipingo, Kanku Road, eThekwini Municipality, KwaZulu-Natal. HIA Phase 1 24/08/2016 Frans Prins Active Heritage CC Green Door Environmental 29/11/2017 - 13:38
HIA Hartebeespoort B 410 JQ HIA Desktop for the Prospecting and Related Activities on Portions of the Farm Hartebeespoort B 410 JQ, Madibeng Local Municipality, North West Province Heritage Scoping 25/03/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Ethical Exchange Sustainability Services (Pty)Ltd 03/04/2019 - 13:02
Wonderwerk Cave 2013 Report of 2013 Wonderwerk Cave Excavation Archaeological Permit Report 21/03/2022 Michael Chazan University of Toronto - Anthropology 21/03/2022 - 13:43
Henley-on Klip Landfill Closure HERITAGE IMPACT ASSESSMENT REPORT FOR THE HENLEY-ON-KLIP GENERAL LANDFILL CLOSURE APPLICATION, MIDVAAL LOCAL MUNICIPALITY, GAUTENG Heritage Impact Assessment Specialist Reports 26/11/2012 Anton Pelser A Pelser Archaeological Consulting 26/11/2012 - 11:12
SUN4642 - CMP The Sun City Resort Complex Heritage Conservation Management Plan Project 2019 - 2024 Conservation Management Plan 27/06/2019 Justin du Piesanie Digby Wells Environmental Sun International (Pty) Ltd 27/06/2019 - 10:13
PIA PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTION OF THE FARM KLIPFONTEIN 716 AND FARM CERES 626, BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE. Palaeontological Specialist Reports 18/07/2020 Elize Butler Banzai Environmental (Pty) Ltd Banzai Environmental (Pty) Ltd 10/11/2020 - 11:05
Gilmoe Mining Rights Application A HERITAGE IMPACT ASSESSMENT REPORTFOR THE GILMOE MINING RIGHTS APPLICATION ON VARIOUS FARMS AND FARM PORTIONS IN THE TAUNG DISTRICT OF THE NORTHWEST PROVINCE - APAC020/42 Heritage Scoping 01/07/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Gudani Consulting 26/05/2022 - 14:36
Leicester sand winning operations Leicester Sand Winning Opertions, Newcastle, KwaZulu-Natal HIA Phase 1 04/03/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Geoff Silk Civil & Mining Consultant cc 05/03/2014 - 10:03
Heritage Study - Mossel Bay An Annotated Survey of Buildings of Architectural, Historical and Contextual Importance in the Central Area of Mossel Bay Heritage Study 01/10/1985 Jalmar Rudner, Penny Pistorius, Melanie Attwell National Monuments Council Mossel Bay Municipality 28/01/2021 - 11:47
CULTURAL HERITAGE MANAGEMENT PLAN CULTURAL HERITAGE MANAGEMENT PLAN RELATED TO ARCHAEOLOGICAL & HISTORICAL SITES RECORDED DURING PHASE 1 HIA’S FOR THE DEVELOPMENT OF A 300MW SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED INFRASTRUCTURE ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE FOR SOVENTIX SA (rights sold to SolarAfrica Energy (Pty) Ltd, Project Hereafter referred to as Sun Central). 31/03/2023 Anton Pelser A Pelser Archaeological Consulting 12/05/2023 - 12:40
Heriatge Report R102 HIA Phase 1 18/01/2017 Frans Prins Active Heritage CC Royal Haskoning DHV 18/01/2017 - 09:11
AIA - Solis Water Pipe Archaeological Impact Assessment for the Water Supply Pipleline for the Authorised Solis Concentrated Solar Power (CSP) Plant, Upington, Northern Cap Province AIA Desktop 16/04/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 09/05/2014 - 07:41
133 Helen Joseph Rd HIA HIA Heritage Impact Assessment Specialist Reports 12/06/2023 19/06/2023 - 15:57
Enamandla PV 2 Heritage Specialist Study HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF ENAMANDLA PV 2 SOLAR FACILITY ON THE REMAINING EXTENT OF THE FARM HARTEBEEST VLEI 86, NEAR AGGENEYS, NORTHERN CAPE HIA Phase 1 10/01/2017 Lita Webley ACO Associates CC WSP Environmental Pty Ltd - Johannesburg 13/03/2017 - 10:06
Umsimbithi eMakhazeni project: HIA Heritage Impact Assessment for the proposed Umsimbithi eMakhazeni Mining Project near Belfast, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 04/12/2017 Jessica Angel PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 11/03/2018 - 21:06
IXOPO RENEWAL ENERGY PLANT, KWAZULU-NATAL A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED IXOPO RENEWAL ENERGY PLANT, KWAZULU-NATAL HIA Phase 1 23/06/2016 Prof. Anton van Vollenhoven A.C. van Vollenhoven EON Consulting 24/10/2016 - 09:23
Gamsberg Heritage Impact Assessment Report Phase 1 Heritage Impact Assessment Report for the Prospecting Rights Application: Gamsberg near Aggeneys in the Northern Cape Province HIA Phase 1 24/04/2018 Stephan Gaigher Black Mountain Mining (PTY) LTD Black Mountain Mining (PTY) LTD 16/05/2018 - 11:52
PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL DEVELOPMENT ON PORTION 6 OF THE FARM BORKUM 143LS IN SENWABARWANA, LIMPOPO PROVINCE - APAC019/53 HIA Phase 1 20/05/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Molshe Business Solutions 28/06/2019 - 12:27
HIA San Solar v.4 HERITAGE IMPACT ASSESSMENT REPORT ENVIRONMENTAL IMPACT ASSESSMENT PHASE Proposed establishment of the San Solar Energy Facility located north of Kathu on a Portion of the Farm Wincanton 472, Northern Cape Province HIA Phase 1 26/02/2013 Stephan Gaigher G & A Heritage Savannah Environmental (Pty) Ltd 27/02/2013 - 08:21
Heritage Screener Erf 1792 Heritage Screener: Proposed Development on Erf 1792 Parsons Vlei, Port Elizabeth AIA Desktop 02/12/2016 Jenna Lavin CTS Heritage 02/12/2016 - 13:34
NAM5335 - PIA Site Visit Report: Palaeontological Impact Assessment for the proposed Temo Coal road, rail link and pipeline construction west of Lephalale, Limpopo Province: PIA Phase 1 30/09/2019 Marion Bamford Digby Wells Environmental Temo Coal Mining (Pty) Ltd 30/09/2019 - 13:49
PROPOSED UPGRADE OF D1867 ROAD Proposed Upgrade of D1867 Road Situated within the Phongola Municipality, Kwazulu-Natal and Mpumalanga Provinces (Version 2) HIA Phase 1 18/07/2022 Jean Beater JLB Consulting Afzelia Environmental Consultants Pty Ltd 20/07/2022 - 14:38
13/Gibb/Melkhout Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Dieprivier, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Elizabeth Wahl, Len van Schalkwyk eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 20/05/2013 - 14:43
PROSPECTING RIGHT APPLICATION PAMDC 1 PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR PROSPECTING RIGHT APPLICATION ON SEVERAL FARMS IN THE KURUMAN MAGISTERIAL DISTRICT IN THE MUNICIPALITY NORTHERN CAPE PROVINCE. HIA Phase 1 27/11/2020 Trust Mlilo Integrated Specialist Services (Pty) Ltd Joan Construction and Projects (Pty) Ltd 18/03/2021 - 22:48
HERITAGE IMPACT ASESSMENT FOR THE PROPOSED A RADIO MAST, 132KV POWERLINE AND 400KV LOOP IN LOOP OUT (LILO) POWERLINE LOCATED NEAR DEALESVILLE IN THE TOKOLOGO LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT IN THE FREE STATE PROVINCE – ADDENDUM TO HERITAGE IMP PROPOSED CONSTRUCTION AND OPERATION OF A RADIO MAST, 132KV POWERLINE AND 400KV LOOP IN LOOP OUT (LILO) POWERLINE LOCATED NEAR DEALESVILLE IN THE TOKOLOGO LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT IN THE FREE STATE PROVINCE – ADDENDUM TO HERITAGE IMPACT ASSESSMENT. Heritage Impact Assessment Specialist Reports 17/07/2022 Jayson Orton, Elize Butler ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 12/09/2022 - 17:20
Enamandla PV 2 Heritage Specialist Study HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF ENAMANDLA PV 2 SOLAR FACILITY ON THE REMAINING EXTENT OF THE FARM HARTEBEEST VLEI 86, NEAR AGGENEYS, NORTHERN CAPE HIA Phase 1 10/01/2017 Lita Webley ACO Associates CC WSP Environmental Pty Ltd - Johannesburg 13/03/2017 - 10:07
Harmony Estate - exemption RECOMMENDED EXEMPTION FROM AN ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT ON ERVEN 4995, 4997, 5007, & 5009, HARMONY ESTATE, SPRINGBOK (NAMA KHOI MUNICIPALITY), NORTHERN CAPE PROVINCE HIA Letter of Exemption 27/06/2014 Jonathan Kaplan Agency for Cultural Resources Management Enviro Logic 24/07/2014 - 15:52
PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT REPORT PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE HIA Phase 1 18/06/2020 Frans Roodt Vhufa Hashu Heritage Consultancy CC Vhufa Hashu Heritage Consultancy CC 18/05/2021 - 12:36
HIA - Blue Hills services Cultural Heritage Assessment of Blue Hills Development, Midrand 01/04/2005 Francois P Coetzee 09/08/2023 - 13:54
AIA:PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH DISTRICT, WESTERN CAPE AIA Phase 1 01/06/2009 Timothy Hart, Lita Webley ACO Associates CC 04/09/2016 - 20:08
Bruntville MCH DESKTOP HERITAGE SURVEY OF THE PROPOSED BRUNTVILLE MIDDLE INCOME HOUSING DEVELOPMENT, MOOIRIVER, KWAZULU-NATAL Heritage Scoping 04/04/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Threshold Project Managers 05/04/2019 - 08:42
Heritage Screener: Karusa BESS Desktop Heritage Screening Assessment for the PROPOSED BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED GRID INFRASTRUCTURE AT THE KARUSA WIND ENERGY FACILITY, NORTHERN CAPE HIA Letter of Exemption 23/03/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 23/03/2022 - 08:56
HIA ARNOT-GUMENI 400KV POWERLINE A REPORT ON A HERITAGE ASSESSMENT FOR THE PROPOSED ARNOT-GUMENI 400 KV POWERLINE PROJECT, IN THE MIDDELBURG/BELFAST AREA, MPUMALANGA PROVINCE REPORT: APAC012/11 HIA Phase 1 15/10/2012 Anton Pelser A Pelser Archaeological Consulting BAAGI ENVIRONMENTAL CONSULTANCY 27/11/2012 - 13:03
Motivation for Full Phase 1 HIA Exemption for Erf 4232 of Eersterust Extension 6 MOTIVATION FOR FULL PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) EXEMPTION FOR THE ERF 4232 EERSTERUST EXTENSION 6 HOUSING DEVELOPMENT WITHIN THE GREATER TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE HIA Letter of Exemption 06/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING K2M Environmental 11/11/2020 - 14:21
HIA FOR MIXED TOWNSHIP DEVELOPMENT ON ERF 8898 Phase 1 Investigation for the Proposed Development of a Mixed-Use Township Development on Erf 8898, Portion of Erf 506, Vryburg, Naledi Local Municipality, Dr Ruth Segomotsi Mompati District Municipality, North West Province Heritage Impact Assessment Specialist Reports 01/02/2019 Francois Coetzee GKM Consulting PTY LTD GKM Consulting PTY LTD 27/05/2022 - 16:39

Pages

CSV
 
 

Search form