FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA Gamma Gridline Corridor HERITAGE IMPACT ASSESSMENT: PROPOSED GAMMA GRIDLINE CORRIDOR, WESTERN AND NORTHERN CAPE Heritage Impact Assessment Specialist Reports 05/01/2023 Jayson Orton ASHA Consulting(Pty) Ltd Red Cap Hoogland 1 (Pty) Ltd 01/03/2023 - 14:34
HIA Mumbe Road Upgrade Phase 1 Heritage Impact Assessment Report Mumbe Road Upgrade Project, near Pomeroy, KwaZulu Natal Province HIA Phase 1 11/02/2014 Stephan Gaigher G & A Heritage GBS Environmental Consulting 21/02/2014 - 10:55
Putfontein 52 - 54 HIA report Putfont 20/04/2015 - 09:45
Seelo PV Cluster Charlie_Palaeontological Site Sensitivity Verification Report Seelo Charlie Solar PV_Palaeontological Site Sensitivity Verification Report PIA Desktop 17/02/2023 Elize Butler Banzai Environmental (Pty) Ltd Nemai Consulting 28/04/2023 - 12:45
New Overvaal Tunnel HIA Transnet Richards Bay Coal Line: Proposed New Overvaal Tunnel HIA Phase 1 29/05/2015 Wouter Fourie Environmental Impact Management Services (Pty) Ltd 16/11/2017 - 16:28
CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROVISION OF BULK SERVICES (WATER AND SEWAGE) - HAMMANSKRAAL WEST AREA A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROVISION OF BULK SERVICES (WATER AND SEWAGE) TO THE HAMMANSKRAAL WEST AREA, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 12/01/2018 Prof. Anton van Vollenhoven Archaetnos CC TGM Environmental Services CC 19/02/2018 - 12:28
Olympia Park Swimming Pool, Springs HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADE OF THE SWIMMING POOL PRECINCT, OLYMPIA PARK SPORTS GROUNDS, (STAND 1226 GEDULD EXTENSION 4), SPRINGS. Compiled for Ekurhuleni Metropolitan Municipality. Heritage Impact Assessment Specialist Reports 01/02/2018 William Martinson, Johann Bruwer Osmond Lange Architects + Planners, Heritage Resources Management KWP Create 08/03/2019 - 15:11
National Council of Provinces Building, Parliament Repair, Restoration & Upgrade of the NCOP Building, Erf 95165, Parliament Street, Cape Town HIA Phase 1 14/10/2014 Clive Theunissen Holm Jordaan Group (Pty) Ltd Department of Public Works 17/08/2016 - 16:25
Two Rivers Mine A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR A PROPOSED NEW TAILINGS STORAGE FACILITY AT THE TWO RIVERS PLATINUM MINE, CLOSE TO STEELPOORT, LIMPOPO PROVINCE Heritage Impact Assessment Specialist Reports 16/10/2012 Anton van Vollenhoven Archaetnos CC Ground Water Consulting Services 19/10/2012 - 15:10
2 Seam (Pty) Ltd PHASE 1 HIA REPORT FOR THE PROPOSED VLAKLAAGTE BLOCK 6 OPEN PIT AREA LOCATED ON THE FARM LOURENS 472IS NEAR KRIEL IN THE PROVINCE OF MPUMALANGA Heritage Impact Assessment Specialist Reports 01/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 2 Seam (Pty) Ltd 03/06/2019 - 10:59
Phofu SPP HIA 06/05/2022 - 12:44
HIA: FARM 951 ZONDERWATERKRAAL HERITAGE IMPACT ASSESSMENT PROPOSED CULTIVATION OF ROOIBOS TEA ON FARM 951 ZONDERWATERKRAAL, NEAR NIEUWOUDTVILLE, HANTAM MUNICIPALITY, NORTHERN CAPE HIA Phase 1 29/09/2016 Jonathan Kaplan FOOTPRINT Environmental Services 29/09/2016 - 13:54
Heritage Report TSE Distribution Substation 732 Archaeological Impact Assessment for the Proposed Establishment of the TSE Distribution Substation on Portion 8 of the Farm Damfontein 114, Near Nourpoort, Umsombomvu Local Municipality, Northern Cape Province HIA Phase 1 31/10/2012 Celeste Booth, Sholeen Shanker Albany Museum - Archaeology 08/02/2013 - 11:12
Palaeontological Impact Assessment for the proposed Geel Kop Grid Connection Infrastructure Northern Cape Province Palaeontological Impact Assessment for the proposed Geel Kop Grid Connection Infrastructure Northern Cape Province PIA Desktop 21/11/2020 Marion Bamford Prof Marion Bamford Cape Environmental Assessment Practitioners 11/01/2021 - 09:39
Brakpan Tailings Dam OVH Line & New Substation Motivation for Exemption from a full Phase I Heritage Impact Assessment - Environmental Impact Assessment for the Proposed construction of a 3.2 km long, 132kV overhead line (to be operated at 88kV) and a 88 kV substation (To be known as Brakpan Tailings dam Substation) located on Portion 77 of the farm Withok 131IR, Portion 76 of the farm Withok 131IR and Portion 5 of the farm Rooikraal 156IR, City of Ekurhuleni Metropolitan Municipality, Gauteng Province. APAC022/61 HIA Letter of Exemption 06/07/2022 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING AB Enviro Consult CC 09/07/2022 - 10:11
Prospecting Right Application on the Remaining Extent of Lehating 741 Prospecting Right Application without Bulk Sampling on the Remaining Extent of Lehating 741, near Hotazel in the Northern Cape Province HIA Phase 1 01/05/2023 Alexander Antonites Amber Earth (Pty) Ltd 02/05/2023 - 08:54
Rethabiseng-Cultural Heritage Impact Assessment Cultural heritage impact assessment for THE CONSTRUCTION OF THE PROPOSED RETHABISENG SUBSTATION AND LOOP-IN AND LOOP-OUT LINES, EKANGALA, GAUTENG PROVINCE HIA Phase 1 31/03/2016 J van Schalkwyk J van Schalkwyk 13/12/2016 - 07:31
Sibayi The proposed forestry projects by N.A. Sibayi (40ha) in respect of the same activity occurring in several locations in Doefheids Bron 145ES Portion 2 farm in Umzimkhulu local Municipality within Sisonke District of Kwazulu Natal Province HIA Phase 1 08/08/2013 Gavin Whitelaw KwaZulu-Natal Amafa and Research Institute Shasa Heritage Consultants CC 14/04/2014 - 14:46
New excavations at Border Cave Excavation of Border Cave in the 21st Century Research Publication 14/09/2018 07/03/2021 - 19:59
Heritage Impact Assessment HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED COAL MINING RIGHT APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON PORTION 1 OF THE FARM ANNYSSPRUIT 140 HT AND THE REMAINING EXTENT OF THE FARM MOOIHOEK 168 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 06/08/2023 06/06/2023 - 19:16
Heritage Impack Assessent Rockdale Ex 1 Township Development THE PROPOSED DEVELOPMENT OF A TOWNSHIP NAMED ROCKDALE NORTH EXTENSION 1, MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 15/02/2017 Johnny Van Schalkwyk J van Schalkwyk 28/02/2017 - 16:44
HIA 22kv powerline Bushbuckridge A PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF A NEW 6.656 KILOMETRE POWER LINE TO SUPPLY ALEXANDRIA IN THE BUSHBUCKRIDGE AREA MPUMALANGA PROVINCE HIA Phase 1 23/06/2014 Udo Kusel African Heritage Consultants CC Eskom - NOU 03/07/2014 - 09:27
Palaeontological Desktop Report – Thandeka Shaft, Greenside Colliery PALAEONTOLOGICAL DESKTOP STUDY THANDEKA SHAFT OF GREENSIDE COLLIERY, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE PIA Desktop 11/02/2015 18/08/2015 - 09:28
HIA for Henville x 29 Heritage Impact Assessment for the Proposed Establishment of a Residential Township, to be called Henville Extension 29, on Remaining Extent of Portion 40, Farm Rietfontein 63 I.R. in the Ekurhuleni Metropolitan Municipality, Gauteng Province. HIA Phase 1 Stephan Gaigher 16/04/2018 - 11:41
Buffalo Camp Heritage Impact Assessment Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape. HIA Phase 1 29/05/2015 David Morris McGregor Museum SRK Consulting (Pty) Ltd - Western Cape 13/10/2015 - 14:16
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:49
LoE Randfontein Exemption from Phase 1 Palaeontological Impact Assessment: Randfontein Community Library on Erven 135 and 123, Randfontein Local Municipality, Gauteng Province PIA Desktop 26/02/2017 Lloyd Rossouw Paleo Field Services METHALE ENVIRONMENTAL CONSULTING 14/06/2018 - 15:59
Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed sand Mining Permit Application on a Portion of the Farm Eureka 200 in the District of Kimberley, Northern Cape Province. PIA Desktop 02/09/2019 Marion Bamford Prof Marion Bamford Archaeological Exposures 05/09/2019 - 15:55
Establishment of Pitso 2x20MVA 132/22kV substation and +500m 132kV Loop in - Loop out Power line in Maakubu Village, Greater Tubatse Local Municipality, Sekhukhune District, Limpopo Province HIA Phase 1 29/04/2013 Julius CC Pistorius Eskom - LOU 29/04/2013 - 13:33
Popo Molefe Heritage Report for Popo Mofele HIA Phase 1 09/10/2019 Adrian Hallam //Khara Hais Municipality Spinninghead Wind Farm (Pty) Ltd 02/12/2019 - 16:12
Esizayo 132kV PIA PROPOSED 132 KV TRANSMISSION INTEGRATION PROJECT FOR THE AUTHORIZED ESIZAYO WIND ENERGY FACILITY NEAR LAINGSBURG, CENTRAL KAROO DISTRICT MUNICIPALITY, WESTERN CAPE & KAROO HOOGLAND DISTRICT MUNICIPALITY, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT PIA Phase 1 01/10/2021 John Almond Natura Viva CC WSP Group Africa (Pty) Ltd 29/08/2022 - 09:14
Phase 1 HIA Ptn 109 Witkoppen194IQ First Report on a Phase 1 HIA on Portion 109 of the farm Witkoppen 194IQ (Longland Houses), near Fourways, Monte Casino Boulevard, Gauteng. APAC013/13 HIA Phase 1 08/02/2013 Anton Pelser A Pelser Archaeological Consulting Abland (Pty) Ltd 05/07/2013 - 15:31
Richmond Road excavation report Excavation / recovery of skeletal remains: Farm Dwars River 372 KT, Richmond Road Project Heritage Impact Assessment Specialist Reports 06/05/2021 Frans Roodt 06/05/2021 - 15:18
Founders Estates Master Review Committee Final Comment FE9 21/10/2022 - 09:16
Heritage Report for deviation at 58 Edmonds Road, Glenwood, Durban Heritage report for 58 Edmonds Road, Glenwood, Durban Demonstrating how Heritage and street character are retained in addition of the driveway and other minor deviations. Glenwood, KZN, Amafa Heritage Statement 20/07/2023 Amanda Lead Lead Architects Lead Architects 20/07/2023 - 07:34
Phase 1 Investigation of the Locklore Boerdery (Pty) Ltd Cultural Heritage Impact Assessment: Phase 1 Investigation of the Locklore Boerdery (Pty) Ltd, Schweizer-Reneke, Mamusa Local Municipality, Dr Ruth Segomotsi Mompati District Municipality, North West Province Heritage Impact Assessment Specialist Reports 12/04/2017 Francois P Coetzee Francois P Coetzee Francois P Coetzee 12/04/2017 - 16:37
Archaeological Impact Assessment For Rainbow Chicken’s proposed Rooifontein expansion project at Bronkhorstspruit, Gauteng Archaeological Impact Assessment For Rainbow Chicken’s proposed Rooifontein expansion project at Bronkhorstspruit, Gauteng AIA Phase 1 26/08/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Envirolution Consulting (Pty) Ltd 01/10/2014 - 09:41
ARCHAEOLOGICAL IMPACT ASSESSMENT Proposed Packing Shed, Portion of Erf 1731 Kakamas South, Northern Cape ARCHAEOLOGICAL IMPACT ASSESSMENT Proposed Packing Shed, Portion of Erf 1731 Kakamas South, Northern Cape Archaeological Specialist Reports 01/05/2017 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 08/06/2017 - 09:35
Drostdy Street buildings: no 7: Smithy / shop c.1730 & no 9: Victorian dwelling c.1870 (Erf 6171): Evaluation of facade & recommendations Drostdy Street buildings: no 7: Smithy / shop c.1730 & no 9: Victorian dwelling c.1870 (Erf 6171): Evaluation of facade & recommendations 01/01/2005 Hennie Vos ArCape 16/06/2012 - 08:54
Big Syncline HIA Phase 1 Heritage Impact Assessment for proposed prospecting drilling in the Big Syncline area on the farm Aggeneys 56 Portion 01, Khai-ma local Municipality, NC Province HIA Phase 1 07/12/2015 Lloyd Rossouw Black Mountain Mining (PTY) LTD EndemicVision Environmental Services 08/12/2015 - 10:47
Vryburg Solar 2 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 2) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 15:51
Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Palaeontological Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Heritage Impact Assessment Specialist Reports 25/07/2021 Jayson Orton, John Almond ASHA Consulting(Pty) Ltd, Natura Viva CC 10/09/2021 - 09:57
BP/1/6025 BP/1/6025 Palaeontological Permit Report 16/06/2012 Sean Modesto 16/06/2012 - 08:54
CTS16_014 PPC Dubrody Citrus, Kirkwood Heritage Screener: PPC Dubrody Citrus, Kirkwood 25/02/2016 Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire CTS Heritage Public Process Consultants 25/02/2016 - 16:08
Palaeontological Field Assessment for the Rezoning and Subdivision of Portion 6 of Farm 743, East London Palaeontological Field Assessment for the Rezoning and Subdivision of Portion 6 of Farm 743, East London PIA Phase 1 18/03/2020 Elize Butler Imithi Services 18/03/2020 - 16:00
Heritage Screener - Angora REF (Great Karoo) Desktop Heritage Screening Assessment for the Proposed Angora Wind Farm which forms part of the Great Karoo Wind Energy Facility development near Richmond in the Northern Cape Heritage Scoping 01/09/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 15/11/2021 - 17:00
ILI2395_KOSMOSDAL_HERITAGE_STATEMENT_REPORT HERITAGE STATEMENT REPORT FOR THE KOSMOSDAL SEWER PIPE BRIDGE UPGRADE Heritage Statement 09/09/2013 Natasha Higgitt, Shahzaadee Karodia Khan Digby Wells Environmental Iliso Consulting (Pty) Ltd 10/09/2013 - 09:11
HIA Erf 8019, Cape Town Heritage Impact Assessment submitted in terms of section 38(4) of the National Heritage Resources Act Report for comment Sir Lowry Square Erf 8019, Cape Town prepared for Errol Family Fall Trust 3 August 2020 Heritage Impact Assessment Specialist Reports 04/08/2020 Vidamemoria 05/08/2020 - 14:57
Phase 1 HIA Paledi Mall Phase 4 Expansion Phase 1 HIA Paledi Mall Phase 4 Expansion HIA Phase 1 01/03/2021 Anton Pelser Bokamoso Landscape Architects and Environmental Consultants CC APELSER ARCHAEOLOGICAL CONSULTING 30/06/2021 - 08:26
Palaeontological Pre-construction walkthrough report AUTHORISED 140MW RIETRUG (DFFE Ref: 12/12/20/1782/1/AM5) AND 140MW SUTHERLAND (DFFE Ref: 12/12/20/1782/2/AM6) WIND ENERGY FACILTIES (WEFS) AND THEIR ASSOCIATED GRID CONNECTIONS (DFFE REF: 14/12/16/3/3/1/2457/AM1, 14/12/16/3/3/1/2458 & 14/12/16/3/3/1/2077/AM2) BETWEEN SUTHERLAND & MERWEVILLE, KAROO HOOGLAND MUNICIPALITY (NAMAQUA DISTRICT), NORTHERN CAPE AND LAINGSBURG MUNICIPALITY (CENTRAL KAROO DISTRICT), WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 01/12/2022 John E. Almond Natura Viva CC Natura Viva CC 08/12/2022 - 15:51

Pages

CSV
 
 

Search form