Displaying 1051 - 1100 of 18817
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
AIA Tshamahansi Pipe Lines | AIA FOR THE TSHAMAHANSI CLUSTER SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | AIA Phase 1 | 10/11/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 05/12/2014 - 15:20 |
Heritage report Cullinan Township | CULTURAL HERITAGE IMPACT ASSESSMENT ON THE FARM KAFFERSKRAAL 475 JR CULLINAN | HIA Phase 1 | JA van Schalkwyk Heritage Consultant | J Paul van Wyk | 15/05/2017 - 13:55 | ||
AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA Phase 1 | 15/12/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Terra Pacis Environmental (Pty) Ltd | 25/07/2017 - 09:14 |
AIA | AIA | AIA Phase 1 | 25/07/2018 - 19:25 | ||||
Blombos cave excavation report 2007-2010 | Report on the 2007-2010 archaeological excavations at Blombos Cave, southern Cape, South Africa and update on current research with regards to the Blombos site and materials. | Archaeological Specialist Reports | 08/08/2011 | Christopher Henshilwood | 14/04/2016 - 12:06 | ||
SAS5184 - Ash Backfilling HBAR | Heritage Basic Assessment Report: Sasol Mining Sigma Colliery Ash Backfilling Project, Sasolburg, Free State Province | Heritage Statement | 17/10/2018 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 17/10/2018 - 16:50 |
PHASE 1 HIA REPORT | PHASE 1 HIA REPORT FOR TOWNSHIP ESTABLISHMENT ON PORTION 439 (A PORTION OF PORTION 49) OF THE FARM NAAUWPOORT 335JS EMAHLAHLENI LOCAL MUNICIPALITY, MPUMALANGA | HIA Phase 1 | 31/03/2021 | A Pelser Archaeological Consulting | 21/04/2021 - 15:10 | ||
KWAHLOKOHLOKO | HERITAGE IMPACT ASSESSMENT OF THE KWAHLOKOHLOKO SUB-SUPPLY AREA PHASE 2 | HIA Phase 1 | 07/07/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | JG AFRIKA | 10/10/2022 - 09:58 |
Palaeo- Upington Solar Thermal Phase 2 | Brief Palaeontological Imapct Assessment: Proposed Upington solar Thermal Plant 2 and Proposed Solar Thermal Plant 3 | PIA Desktop | 24/10/2013 | John Pether | Geological and Palaeontological Consultant | Savannah Environmental (Pty) Ltd | 31/10/2013 - 10:33 |
Leeuwbosch 1 Solar Plant Heritage Impact Report | DEVELOPMENT OF THE 9.9MW LEEUWBOSCH 1 SOLAR PV PLANT, 9.9MW LEEUWBOSCH 2 SOLAR PV PLANT AND ASSOCIATED INFRASTRUCTURE NEAR LEEUDORINGSTAD IN THE NORTH WEST PROVINCE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/05/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 18/06/2021 - 13:42 |
PIA Mmamethlake | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED MMAMETHLAKE LANDFILL SITE, FARM BULFONTEIN NO. 74-JR, DR JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA | PIA Desktop | 04/11/2013 | John E Almond | Natura Viva CC | Marinda le Roux Consulants | 13/01/2014 - 11:48 |
HIA - KleinzeeWEF | Heritage Impact Assessment Report for Kleinzee Wind Energy Facility | 04/07/2012 | Jayson Orton | ACO Associates CC | Savannah Environmental (Pty) Ltd | 09/03/2015 - 16:59 | |
Catalogue of Cape Town Buildings Progress Report | Catalogues of Cape Town Buildings Progress Report, October 1977 | Heritage Study | 24/10/1977 | John Rennie | National Monuments Council | 29/05/2015 - 10:24 | |
Gaza Gray excavation report | A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE GAZA GRAY OUTPOST OF STEINAECKER’S HORSE, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK (REPORT NO. IV) A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE GAZA GRAY OUTPOST OF STEINAECKER’S HORSE, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK (REPORT NO. IV) A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE SITE OF SARDELLI’S SHOP AT SABIEPOORT, ALSO KNOWN AS THE SITE WHERE BILL SANDERSON WAS INTERNED, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK | Archaeological Permit Report | 15/12/2015 | Anton van Vollenhoven | Archaetnos CC | 02/10/2017 - 18:47 | |
HIA Kudu Solar Facility 2 | HERITAGE SPECIALIST STUDY: Scoping and Environmental Impact Assessment (EIA) Processes for the Proposed Development of a Solar Photovoltaic Facility (Kudu Solar Facility 2) and associated infrastructure, near De Aar, Northern Cape Province | HIA Phase 1 | 23/05/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | CSIR | 04/06/2023 - 20:01 |
HIA FOR TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, NEAR KRIEL, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 03/11/2020 | Makhosazana Mngomezulu | Barzani Mining (Pty) Ltd | Barzani Mining (Pty) Ltd | 02/11/2021 - 22:33 |
Bayview Social Housing Project | Bayview Social Housing Project, Chatsworth, eThekwini Municipality. Phase 1 Heritage Impact Assessment | HIA Phase 1 | 29/06/2016 | Jean Beater | ECA CONSULTING | eThekwini Municipality | 29/06/2016 - 10:52 |
Fezile Dabi Fishery Project HIA | HIA Phase 1 | Lloyd Rossouw | Enviroworks | 13/12/2017 - 16:00 | |||
Heritage Impact Assessment (HIA) for HRM | BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A PLACE OF WORSHIP FOR HOPE RESTORATION MINISTRIES PROJECT ON PORTION 31 AND 32 OF THE FARM BLUE HILLS 397 JR, GAUTENG PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 14/09/2018 | Nkosinathi Tomose | NGT ESHS Solutions | NGT ESHS Solutions | 29/01/2019 - 11:24 |
Hertzogville Photovoltaic Plant | Archaeological Impact Assessment for the proposed Hertzogville (15MW) Photovoltaic Plant on Albert and Wigt Farm No 1036 Free State Province | AIA Phase 1 | 16/04/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 06/08/2012 - 16:15 |
ABO Ujekamanzi MTS & LILO2 Heritage Impact Assessment | Proposed development of the Ujekamanzi Wind Energy Facility 2 LILO and MTS Infrastructure near Amersfoort, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 28/04/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 20/06/2023 - 16:16 |
PIA Hari PV, Northern Cape Province | Palaeontological Impact Assessment for the proposed Hari PV project on the Remaining Extent of Farm Geel Kop 456, SW of Upington, Northern Cape Province (Project No: Geelkop 4) Desktop Study (Phase 1) | PIA Desktop | 25/03/2020 | Marion Bamford | Prof Marion Bamford | Cape Environmental Assessment Practitioners | 23/07/2020 - 12:43 |
PIA: Becrux PV 1 and 3 | Palaeontological Impact Assessment for the two proposed PV facilities south of Secunda, Mpumalanga Province | PIA Phase 1 | 27/10/2021 | Marion Bamford | Savannah Environmental (Pty) Ltd | 21/01/2022 - 10:46 | |
PDA for the Dominion 1 PV project | Palaeontological Desktop Assessment for the proposed Dominion 1 solar park near Klerksdorp within the North-West Province | PIA Desktop | 20/04/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 23/11/2022 - 16:41 |
Heritage Scoping Study Biesjesfontein 218 | HERITAGE SCOPING STUDY (HS) OF DEMARACTED AREAS ON A PORTION OF PORTION 1 OF THE FARM BIESJESFONTEIN 218 FOR THE PROPOSED BIESJESFONTEIN 218 PROSPECTING PROJECT IN THE FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Scoping | 04/04/2019 | Nelius Kruger | Exigo3 Sustainability | LW Consultatns | 24/04/2019 - 10:35 |
HIA STRUMOSA URBAN AGRI | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED STRUMOSA URBAN AGRI AND WASTE EDUCATION CENTRE IN RUSTENBURG | HIA Phase 1 | 11/11/2012 | AECOM SA - Head Office | 11/12/2012 - 11:25 | ||
Phase 1 HIA Proposed Geluk Storage Dam, Reitz | Phase 1 Heritage Impact Assessment for proposed new water storage dams on farm Geluk 798, Reitz, Free State Province. | HIA Phase 1 | 31/05/2023 | Lloyd Rossouw | Paleo Field Service | NSVT Consultants | 12/08/2023 - 18:21 |
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS | Heritage Impact Assessment for the proposed Mixed Use Development on Portion of REM OF THE FARM BIGGS NO 18388 referred to as “Greytown Road Development” UMshwathi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | Mike Webster | eThembeni Cultural Heritage | 05/08/2021 - 23:51 | ||
Springhaas to Artemis Line 1 PIA | Palaeontological Impact Assessment for the proposed Overhead Powerline from Springhaas Collector Substation A to the Authorised Artemis Substation, Near Dealesville, Bloemfontein, Free State (Line 1) | PIA Phase 1 | 01/12/2022 | Marion Bamford | Prof Marion Bamford | GIBB Environmental (Pty) Ltd | 31/01/2023 - 10:31 |
Remainder portion 4 of the Farm Roodepoort HIA | PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT OF REMAINDER OF PORTION 4 OF THE FARM ROODEPOORT 504 JR BRONKHORSTSPRUIT GAUTENG PROVINCE (37.2 hectare) | Heritage Impact Assessment Specialist Reports | 24/02/2014 | Udo Kusel | African Heritage Consultants CC | LEAP - Lanscape Architect Environmental Planner | 13/03/2014 - 11:58 |
In Respect of a Lodge and Lifestyle Estate Development on Portion 8 of the Farm Vergenoeg No 177 JT, District Hazyview, Mpumalanga | In Respect of a Lodge and Lifestyle Estate Development on Portion 8 of the Farm Vergenoeg No 177 JT, District Hazyview, Mpumalanga | AIA Phase 1 | 16/06/2012 | Johnny Van Schalkwyk | National Cultural History Museum | 16/06/2012 - 08:54 | |
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:43 | |
HIA Eskom Beta to Boundary for EIA Phase | HIA Eskom Beta to Boundary for EIA Phase | HIA Phase 1 | 01/11/2014 | Anton van Vollenhoven | 08/09/2015 - 15:16 | ||
Palaeontology Plot 146 Bloemspruit | Phase 1 Palaeontological Impact Assessment of Plot 146 Bloemspruit, Bloemfontein, FS Province | PIA Phase 1 | 27/10/2016 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 23/03/2018 - 09:34 |
Heritage amendment letter: Du Plessis PV1 | Heritage amendment letter: Du Plessis PV1 | Heritage Statement | 05/08/2020 | ACO Associates CC | 23/09/2020 - 17:23 | ||
BASIC HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX 3.6MWp SOLAR PV FACILITY | A REPORT ON A BASIC HERITAGE ASSESSMENT FOR THE PROPOSED SOVENTIX 3.6MWp SOLAR PV FACILITY ON 3.8HA OF THE PROPERTY OF UNILEVER BOKSBURG ERVEN 757 & 758 BOKSBURG EAST PORTIONS 127 & 128 OF VOGELFONTEIN 84IR CITY OF EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG - APAC021/87 | HIA Phase 1 | 01/10/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Ecoleges Environmental Consultants | 04/04/2022 - 12:05 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:08 |
Palaeontological Impact Assessment for Erf 30, Letamo Esate | Development on Portion 152 of the farm Honingklip 178-IQ, Erf 30, Letamo Estate, Mogale City Municipality, Gauteng | Palaeontological Specialist Reports | 09/06/2019 | Jacobus Francois Durand | 17/07/2019 - 12:38 | ||
AIA_Vaal_River_Cape Archaeological Survey CCino_Van_der_Walt_J_May11 | Archaeological Impact Assessment: Vaal River Cape Archaeological Survey CCino, on a part of Portion 9 of the Fram Rietfontein 251 Sasolburg, Free State Province | AIA Phase 1 | 16/06/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 16/06/2012 - 14:51 | |
Impala Platinum Recommended Exemption | RECOMMENDED EXEMPTION FROM HAVING TO CONDUCT AN ARCHAEOLOGICAL IMPACT STUDY: THE PROPOSED IMPALA PLATINUM PRECIOUS METALS REFINERY EXPANSION PROJECT IN SPRINGS, GAUTENG PROVINCE | Heritage Statement | 11/03/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | 11/03/2013 - 14:27 | |
Archeological Impact Assessment Barry Marais Road Upgrade | Archeological Impact Assessment Report for Proposed Barry Marais Road Upgrade and | AIA Phase 1 | 02/09/2019 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | 19/11/2020 - 11:36 | |
Mafube Coal Mine Grave Relocation | FINAL REPORT ON THE ASSESSMENT OF NEW GRAVE SITES THAT COULD BE POTENTIALLY IMPACTED ON BY THE MAFUBE COAL MINING OPERATIONS (ANGLO-AMERICAN THERMAL COAL), SITUATED ON PORTIONS OF SPRINGBOKLAAGTE 416JS, KLEINFONTEIN 432JS & ELANDSFONTEIN 433JS NEAR MIDDELBURG, MPUMALANGA. | Burial Grounds and Graves Specialist Reports | 26/05/2017 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Mafube Coal Mining (Pty) Ltd | 06/06/2022 - 17:56 |
HIA: Aggeneys BESS | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Aggeneys PV BESS near Aggeneys in the Northern Cape | HIA Phase 1 | 01/11/2022 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 31/03/2023 - 11:00 |
Report on the 2012 and 2013 archaeological excavations at Klipdrift Complex, southern Cape, South Africa and update on current research, Klipdrift site and materials | 14/10/2019 - 08:21 | ||||||
Bakoni Platinum Watching brief | Report on Archaeological Watching Brief Bakoni Platinum. | Archaeological Specialist Reports | 10/08/2012 | Shahzaadee Karodia Khan | Digby Wells Environmental | Digby Wells Environmental | 31/05/2013 - 11:57 |
Phokeng Township Development HIA | Phase 1 Palaeontological and Archaeological Impact Assessment of the proposed Phokeng Township extension at Thabong, Matjhabeng Local Municipality, Free State Province. | Heritage Impact Assessment Specialist Reports | 06/12/2013 | Lloyd Rossouw | Phethogo Consulting | 20/05/2014 - 14:56 | |
AIA Upgrading of the Norvalspont Bulkwater Supply | ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED UPGRADING OF THE BULK WATER SUPPLY AT NORVALSPONT NEAR GARIEP DAM, NORTHERN CAPE | AIA Phase 1 | 12/09/2013 | 11/08/2014 - 08:05 | |||
Heritage Impact Assessment for Nongoma Borrow Pit 027 | Heritage Impact Assessment of DoT Borrow Pit 27 Nongoma, Northern KwaZulu-Natal | HIA Phase 1 | 24/11/2015 | Frans Prins | Active Heritage CC | Green Door Environmental | 22/03/2017 - 16:30 |
AIA-ThabaEcoLodge | AIA for the Proposed Thaba Eco Lodge 100kV PV Solar System, Klipriviersberg, Gauteng Province | Archaeological Specialist Reports | 19/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 11/11/2015 - 13:16 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |