FindReports

Advanced options
ReportRef ReportTitle ReportTypesort descending ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post date
HISTORICALHOMESTEADHaverklip265IR THE ARCHITECTURAL DOCUMENTATION OF A HISTORICAL HOMESTEAD LOCATED ON PORTION 5 OF HAVERKLIP 265 IR NEAR DELMAS, MPUMALANGA Archaeological Specialist Reports 31/01/2013 Sidney Miller Jones & Wagener Engineering and Environmental Consultants 18/07/2013 - 12:00
ARCHAEOLOGICAL IMPACT ASSESSMENT Proposed Packing Shed, Portion of Erf 1731 Kakamas South, Northern Cape ARCHAEOLOGICAL IMPACT ASSESSMENT Proposed Packing Shed, Portion of Erf 1731 Kakamas South, Northern Cape Archaeological Specialist Reports 01/05/2017 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 08/06/2017 - 09:35
AIA Greefspan Power Station II 2637 - Letter Development of PV Power Station at Greefspan near Douglas, Northern Cape Archaeological Specialist Reports 18/06/2012 David Morris McGregor Museum Van Zyl Environmental Consultants 18/06/2012 - 11:55
452HIA-Erf 30 Letamo Town, Farm Honingklip 178 Archaeological Specialist Reports 25/06/2020 Cherene de Bruyn, Polke Birkholtz PGS Heritage (Pty) Ltd 11/08/2020 - 19:43
Archaeological Assessment - FEIR Archaeological Specialist Reports 30/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/10/2016 - 10:37
Palaeontological & Archaeological Assessment Palaeontological & Archaeological Assessment: Eenzaamheid 135 portion 39 (a portion of portion 3) 3218CA&CC Velddrif Archaeological Specialist Reports 01/08/2009 Graham Avery, DM Avery Iziko: South African Museum 11/05/2016 - 08:25
Archaeoogical Impact Assessment: Mooinooi Extension 13 A report on an Archaeological Impact Assessment for the porposed Mooinooi Development on Portion 34 and the Remaining Extent of Portioin 1 of the farm Elandsdrift 467-JQ, near Mooinooi, North West Archaeological Specialist Reports 01/03/2012 Anton Pelser Archaetnos CC Maxim Planning Solutions 17/01/2013 - 11:51
AIA - Pongola AIA for the Proposed Construction of the 2.5MW Pongola Solar Energy Facility near Pongola, Kwazulu Natal Archaeological Specialist Reports 14/07/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 05/03/2015 - 11:57
IMPACT ASSESSMENT FOR THE AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND ENVIRONMENTAL IMPACT ASSESSMENT IN SUPPORT OF A MINING RIGHT HELD BY WEST COAST RESOURCES ((PTY)) LTD OVER THE NAMAQUALAND MINES, NORTHERN CAPE PROVINCE IMPACT ASSESSMENT FOR THE AMENDMENT OF AN ENVIRONMENTAL MANAGEMENT PROGRAMME AND ENVIRONMENTAL IMPACT ASSESSMENT IN SUPPORT OF A MINING RIGHT HELD BY WEST COAST RESOURCES ((PTY)) LTD OVER THE NAMAQUALAND MINES, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 19/07/2016 Timothy Hart SAHRA Council ACO Associates CC 21/12/2016 - 13:00
Archaeological Walk-Through (Karusa) An Archaeological Walk-Through For The Proposed Karusa Wind Energy Facility Situated On The Farms: De Hoop 202, Standvastigheid 210, Portion 1 Of The Farm Rheebokke Fontein 209, Portion 2 Of The Farm Rheebokke Fontein 209, Portion 3 Of The Farm Rheebokke Fontein 209 And The Remainder Of The Farm Rheebokke Fontein 209, Near Sutherland, Karoo Hoogland Local Municipality, Namakwa District Municipality, Northern Cape Province. Archaeological Specialist Reports 12/10/2015 Celeste Booth Booth Heritage Consulting Savannah Environmental (Pty) Ltd 17/12/2015 - 09:03
Archaeological Impact Assessment - Gunstfontein WEF Archaeological Impact Assessment Report for the Proposed Gunstfontein WEF near Sutherland, Karoo Hoogland Local Municipality, NC Province Archaeological Specialist Reports 21/12/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/02/2016 - 15:57
Heritage Survey of the Proposed Aquadene Housing Project, Kwa-Zulu Natal Heritage Survey of the Proposed Aquadene Housing Project, Kwa-Zulu Natal Archaeological Specialist Reports 03/07/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management John Royal Architects cc 04/11/2013 - 07:20
Archaeological and Heritage Impact Assessment Report Archaeological and Heritage Impact Assessment Report for proposed construction of Siyathemba 20MVA 88/22kV Substation and associated infrastructure within the jurisdiction of Dipaleseng Local Municipality in the Mpumalanga Province Archaeological Specialist Reports 11/05/2018 M Mabuda Nsovo Environmental Consulting Mulaifa Development Projects cc 29/10/2018 - 15:09
Bulk Sewer infrastructure at Ridgeview extensions, Vlakfontein, Balfour Recommendation for an exemption from a phase 1 AIA and Heritage Investigation on portion 28 of the farm Vlakfontein 556IR, Balfour, Mpumalanga Province for the proposed bulk sewer infrastructure at Ridgeview extensions Archaeological Specialist Reports 19/06/2018 Christine Van Wyk Rowe Adansonia Heritage Consultants Afrika Enviro & Biology 19/06/2018 - 13:03
ArchaeologicalAss-Nxuba An Archaeological Assessment and Walkthough Survey of the proposed construction of a facility substation complex, metering station and 132Kv overhead power line within the authorised development envelope of the Nxuba Wind Farm near Cookhouse, Blue Crane Local Municipality, Sarah Baartman Disctrict Municipality, EC Province Archaeological Specialist Reports 22/07/2015 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 01/09/2015 - 09:22
HIA - Rand Leases Industrial Township AIA for the Proposed Rand Leases Industrial Township, Roodepoort Gauteng Archaeological Specialist Reports 13/06/2014 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 02/07/2014 - 16:50
AIA-N10Realignment Archaeologgical Impact Assessment for the Proposed Realignment of the N10 to Facilitate Access to the Ilanga CSP Facility Site, East of Upington, NC Province Archaeological Specialist Reports 13/03/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 21/04/2015 - 15:00
Olieboomspoort raw material sourcing Report to SAHRA on Middle Stone Age lithic raw material sourcing from Olieboomspoort (Limpopo Province, South Africa) Archaeological Specialist Reports 11/09/2022 14/12/2022 - 14:58
Heritage Report Historical and Archaeological heritage environmental authorisation amendment report: Umsinde Emoyeni Wind Energy Facility, near Murraysburg Western Cape and Northern Cape Provinces Archaeological Specialist Reports 01/09/2020 John Gribble 23/09/2020 - 15:16
AIA for Mining Right Application on Dikpens 182 Portions 2 and 4 Archaeological Specialist Reports 05/08/2013 Jaco van der Walt Site Plan Consulting 16/01/2014 - 09:59
Cancellation 2020 fieldwork Statement: cancellation of the March-April 2020 fieldwork campaign at Bushman Rock Shelter and Heuningneskrans, Limpopo Province due to the COVID-19 pandemic Archaeological Specialist Reports 23/11/2020 23/11/2020 - 19:44
AIA Herbert Power Station II 2637 - Letter Development of PV Power Station at Herbert near Douglas, Northern Cape Archaeological Specialist Reports 18/06/2012 David Morris McGregor Museum Van Zyl Environmental Consultants 18/06/2012 - 11:57
Assessment of proposed stormwater dam at Verkykerskop ARCHAEOLOGICAL AND CULTURE HISTORICAL ASSESSMENT OF THE PROPOSED WATER RESERVOIR DAM AT ANNASDAL 668, VERKYKERSKOP, FREE STATE Archaeological Specialist Reports 10/03/2008 Cobus Dreyer 14/08/2013 - 15:53
KRD Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BMW, COLVILLE & ST AUGUSTINE SITES DEVELOPMENT IN KIMBERLEY IN THE FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 28/07/2020 Neels Kruger Exigo3 Sustainability Exigo3 Sustainability 11/01/2021 - 17:45
Archaeological Assessment - FEIR Archaeological Specialist Reports 30/04/2016 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/10/2016 - 10:37
ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED DISSELFONTEIN KEREN ENERGY SOLAR PLANT NEAR HOPETOWN, NORTHERN CAPE PROVINCE Portion 8 of the Farm Disselfontein No. 77 ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED DISSELFONTEIN KEREN ENERGY SOLAR PLANT NEAR HOPETOWN, NORTHERN CAPE PROVINCE Portion 8 of the Farm Disselfontein No. 77 Archaeological Specialist Reports Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 19/06/2017 - 09:48
RBM Zulti North Annual Report 2012 The Archaeological Survey of the Zulti North Mining Lease for Richards Bay Minerals, 2012 Annual Report Archaeological Specialist Reports 21/01/2013 Gavin Anderson, Louise Anderson Umlando: Archaeological Surveys & Heritage Management 12/03/2013 - 11:37
Rondevly Mining Right: Phase 1 Heritage Impact Assessment (HIA) Archaeological Specialist Reports 23/09/2019 Leonie Marais 24/09/2019 - 07:21
Report on Removal of Bird Droppings at Site 9 on Sevilla Rock Art Trail REPORT TO HERITAGE WESTERN CAPE ON THE REMOVAL OF BIRD DROPPINGS FROM ROCK PAINTINGS AT SITE 9 ON THE SEVILLA TRAIL, SEVILLA 135, CLANWILLIAM MUNICIPALITY IN TERMS OF HWC PERMIT NO. 2009-10-004 Archaeological Specialist Reports 26/10/2009 Janette Deacon CTS_361446 18/04/2016 - 09:06
Archaeological Impact Assessment Grid conection Proposed Grid Conection for the Impfou Wind Farms from Kouga area to San Souci and Chatty Substation near Port Elizabeth, Eastern Cape Province Archaeological Specialist Reports 21/08/2019 Peter Nilssen 22/04/2019 - 13:29
WATER TREATMENT PLANT,MARULENG LOCAL MUNICIPALITY ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR PROPOSED HOEDSPRUIT BULK WATER SUPPLY PROJECT WITHIN MARULENG LOCAL MUNICIPALITY IN THE LIMPOPO PROVINCE Archaeological Specialist Reports 01/10/2013 McEdward Murimbika Nzumbululo Heritage Solutions Nzumbululo Heritage Solutions 12/12/2013 - 08:53
HSR-PaulputsCSP Archaeological Specialist Input for the Scoping Phase of the EIA for the Paulputs CSP Facility, near Pofadder, NC Province Archaeological Specialist Reports 24/08/2015 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 18/11/2015 - 09:50
Assessment of proposed residential developments at Verkykerskop Archaeological and cultural historical assessment of the proposed residential developments at Verkykerskop, near Harrismith, Free State. Archaeological Specialist Reports 03/03/2008 Cobus Dreyer 24/04/2013 - 12:16
ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM SLYPKLIP 36 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM SLYPKLIP 36 FOR THE PROPOSED MAGOGUDI TYRE STORAGE FACILITIES SLYPKLIP PROJECT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports Nelius Kruger Exigo3 Sustainability Magogudi Construction Projects CC 04/11/2019 - 18:48
Assessment of Graves at Scaw Metals A report on the assessment of grave sites at Scaw Metals, Germiston, City of Ekurhuleni in the Gauteng Province Archaeological Specialist Reports 06/12/2016 17/03/2017 - 12:48
HIA for Witbank Clinker reclamation A Phase 1 Heritage Impact Assessment for the proposed Reclaiming of clinker (ash from old power stations) in Witbank, eMalahleni Local Municipality in Mpumalanga Province. Archaeological Specialist Reports 22/05/2017 Trust Mlilo Mbviseni Sustainable Environmental Initiative Mbviseni Sustainable Environmental Initiative 03/07/2017 - 10:19
AIA For the proposed Construction of Raisin drier facilities at the Orange River Wine Cellars: Kanoneiland extension Northern, Cape Province AIA For the proposed Construction of Raisin drier facilities at the Orange River Wine Cellars: Kanoneiland extension Northern, Cape Province Archaeological Specialist Reports 16/11/2015 Jan Engelbrecht UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 22/07/2016 - 11:23
Ruigtevallei-Dreunberg AIA Archaeological Survey Of The Ruigtevallei-Dreunberg 132kv Powerline, Eastern Cape For Eskom Holdings Pty (Ltd) NEAS Ref.: DEA/EIA/0000692/2011 DEA Ref.:12/12/20/2315 Archaeological Specialist Reports 22/03/2013 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Eskom - SOU 30/04/2013 - 09:26
Archaeological Scoping Report - Ilanga CSP 9 (Nov2015) Archaeological Scoping Report for the Ilanga CSP 9 facility and associated infrastructure within the Karoshoek Solar Development near Upington, NC Province Archaeological Specialist Reports 16/11/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 22/01/2016 - 15:01
Meletse Iron Ore Project - Final Amended EIAR Meletse Iron Ore Project: Heritage studies Archaeological Specialist Reports Sidney Miller, John E Almond, Prof C.J van Vuuren, Julius CC Pistorius African Heritage Consultants CC, Natura Viva CC, Department of Anthropology and Archaeology, UNISA, Dr Julius CC Pistorious Archaeologist and heritage Consultant Shangoni Management Services CTS_191857 06/02/2015 - 10:44
HIA report Gemsbok Solar PV1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED GEMSBOK SOLAR PV1 FACILITY, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Archaeological Specialist Reports 21/07/2014 Jayson Orton Department of Environmental Affairs Mulilo Renewable Project Developments (Pty) Ltd 13/01/2015 - 15:45
Heritage report Historical and Archaeological Heritage environmental authorisation amendment report: Khangela Emoyeni Wind Energy Facility near Richmond in the Northern Cape Archaeological Specialist Reports 01/09/2020 John Gribble 23/09/2020 - 15:49
Cancellation 2020 fieldwork Statement: cancellation of the March-April 2020 fieldwork campaign at Bushman Rock Shelter and Heuningneskrans, Limpopo Province, due to the COVID-19 pandemic. Archaeological Specialist Reports 23/11/2020 23/11/2020 - 19:48
ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY NORTHERN CAPE PROVINCE Archaeological Specialist Reports 01/02/2013 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 06/09/2013 - 15:53
ARCHAEOLOGICAL SCOPING Proposed housing development on Erf 745 Olyvenhoutsdrift, near Upington Northern Cape Assessment ARCHAEOLOGICAL SCOPING Proposed housing development on Erf 745 Olyvenhoutsdrift, near Upington Northern Cape Assessment Archaeological Specialist Reports Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 09/03/2017 - 11:38
Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED VOORUITZIGT MINING INFRASTRUCTURE PROJECT ON A PORTION OF PORTION 1 OF THE FARM VOORUITZIGT 81, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 29/01/2021 Neels Kruger, Dr. Heidi Fourie Exigo3 Sustainability Exigo3 Sustainability 12/01/2021 - 11:00
AIA -BloemsmondPV2 AIA for the Proposed AEP Bloemsmond PV 2 Solar Project Archaeological Specialist Reports 21/10/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 12/11/2015 - 10:12
AIA for the Botswana-South Africa Transmission Line Project (Botswana component) Archaeological Impact Assessment for the BOSA Transmission Line Project from the Isang Substation to the Tlokweng Border Post in the South Eastern and Kgatleng Distrcits of Botswana Archaeological Specialist Reports 01/09/2017 Wim Biemond Lentswe Archaeological Consultants G&A Heritage Management Consultants, Aurecon South Africa (Pty) Ltd 26/01/2018 - 09:58
ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED ROMA ENERGY DANIELSKUIL SOLAR ENERGY FARM ON ERF 753 (PORTION OF ERF 1) DANIELSKUIL, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED ROMA ENERGY DANIELSKUIL SOLAR ENERGY FARM ON ERF 753 (PORTION OF ERF 1) DANIELSKUIL, NORTHERN CAPE PROVINCE Archaeological Specialist Reports Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 20/06/2017 - 12:29
Roodekrans HIA A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT DONE FOR THE PROPOSED ROODEKRANZ DEVELOPMENT, MOGALE CITY, GAUTENG PROVINCE Archaeological Specialist Reports 08/07/2016 Anton van Vollenhoven A.C. van Vollenhoven EON Consulting 25/11/2016 - 16:30

Pages

CSV
 
 

Search form