THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1201 - 1250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA; Proposed 66Kv Overhead Powerline, Clanwilliam and Graafwater | AN ASSESSMENT OF THE IMPACTS ON HERITAGE OF THE PROPOSED 66Kv OVERHEAD POWERLINE BETWEEN THE TOWNS OF CLANWILLIAM AND GRAAFWATER | HIA Phase 1 | 01/06/2009 | David Halkett | ACO Associates CC | SHE Cape Environmental CC | 07/06/2018 - 08:02 |
HIA: Montana PV 3 | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Montana 3 Solar Energy Facility (Option C) as part of the Poortjie Renewable Energy Cluster near Beaufort West in the Western Cape Province | HIA Phase 1 | 18/05/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 14/06/2022 - 09:37 |
VGRWSS-II: Upgrade of Existing Scheme - Palaeontological Impact Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED UPGRADE OF THE VAAL GAMAGARA REGIONAL WATER SUPPLY SCHEME: PHASE 2 AND GROUNDWATER ABSTRACTION | Banzai Environmental (Pty) Ltd | 21/08/2019 - 10:19 | ||||
Voels Nessie C North West Province HIA | Voels Nessie C North West Province HIA | HIA Phase 1 | 01/06/2022 | Jaco van der Walt | Beyond Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 08/08/2022 - 16:48 |
Heritage Scoping Report - COZA Iron Ore Project | Heritage Scoping Report for proposed prospecting and mining activities on the Remainder of the farm Driehoekspan 453 and Portion 1 of the farm Doringpan 445, north of Postmasburg, Northern Cape Province | Heritage Scoping | 06/05/2013 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Synergistics Environmental Services | 25/06/2013 - 14:47 |
Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | HIA Letter of Exemption | 12/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Knight Piesold Consultants | 19/02/2021 - 09:08 |
Heritage Statement: MTHS Grid Interconnection | MULILO TOTAL HYDRA STORAGE PROJECT GRID INTERCONNECTION: SPECIALIST IMPACT STATEMENT | Heritage Statement | 18/02/2021 | John Gribble | 31/03/2021 - 21:03 | ||
Mooivlei Solar 3 PV PIA Report | PALAEONTOLOGICAL IMPACT ASSESSMENT - PROPOSED 330MW MOOIVLEI SOLAR 3 PHOTOVOLTAIC PROJECT WEST OF KROONSTAD, FREE STATE PROVINCE | PIA Phase 1 | 13/06/2023 | Elize Butler | Nitai Consulting | Nemai Consulting | 30/06/2023 - 15:17 |
Phase 1 A and PIA Frankfort Residential Development | Phase 1 Palaeontological and Archaeological Impact Assessment of the proposed township extension on Farm Ayr 75 at Frankfort, Free State Province. | AIA Phase 1 | 28/02/2014 | Lloyd Rossouw | SAHRA Council | NSVT Consultants | 18/09/2014 - 12:03 |
Oxford Freshmarket Development, Amanzimtoti, HIA and PIA | Phase One Heritage Impact Assessment and Palaeontological Impact Assessment for the Proposed Oxford Freshmarket Development on Portion 2453 of Umlazi Location No. 4676 in Amanzimtoti, eThekwini Municipality, KwaZulu-Natal. | HIA Phase 1 | 11/08/2023 | Phillipa Harrison | Land Matters Environmental Consulting | T and A Town Planning Consultants | 31/08/2023 - 09:17 |
HIA - Poortjies WEF | Heritage Impact Assessment for the Proposed Poortjies Wind Energy Facility on Two Farm Portions South of Pofadder, NC Province | Heritage Impact Assessment Specialist Reports | 24/11/2014 | Timothy Hart, Lita Webley, Dave Halkett, Natalie Kendrick | ACO Associates CC | Savannah Environmental (Pty) Ltd | 08/01/2015 - 10:26 |
AIA Agricultural development, Onseepkans | AIA Phase 1 report of proposed agricultural development, solar energy facility and reservoir with pipeline, Onseepkans, Northern Cape. | AIA Phase 1 | 23/11/2015 | Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC, Khâi Ma Local Municipality | 28/11/2015 - 11:26 |
Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Brookdale Assessment Centre Housing Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 28/06/2011 | eThembeni Cultural Heritage | 19/05/2017 - 14:19 | ||
CTS15_006_Residential and related infrastructure | CTS15_006_Residential and related infrastructure | 31/07/2015 | Mariagrazia Galimberti, Nicholas Wiltshire, Kyla Bluff | CTS Heritage | CEN Integrated Environmental Management Unit | 17/02/2016 - 15:29 | |
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT REPORT | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED DEVELOPMENT OF ESKOM INYANINGA 2 x 500 MVA 400/132 kV SUBSTATION, AND INYANINGA – MBEWU 400KV POWERLINE AND ASSOCIATED INFRASTRUCTURE WITHIN THE JURISDICTION OF ETHEKWINI METROPOLITAN, ILEMBE AND UTHUNGULU DISTRICT MUNICIPALITIES OF ETHEKWINI METROPOLITAN OF KWAZULU NATAL PROVINCE | AIA Phase 1 | Vhubvo Archaeo-Heritage Consultants | Nsovo Environmental Consulting | 03/08/2018 - 15:55 | ||
Battery Energy Storage System, Elandskop substation | Application for exemption from undertaking a Phase 1 HIA for the Battery Energy Storage System, Elandskop substation, Msundusi Local Municipality, KwaZulu-Natal | HIA Letter of Exemption | 12/09/2019 | Jean Beater | JLB Consulting | 1World Consultants (Pty) Ltd | 27/10/2019 - 14:48 |
Letter for HIA Exemption request: Proposed rehabilitation of Road P31/1 (R104), North West Province | Letter for HIA Exemption request: Proposed rehabilitation of Road P31/1 (R104), North West Province | HIA Letter of Exemption | 17/10/2018 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 25/10/2018 - 09:49 | |
Phase 1 Cultural Heritage Impact Assessment 2021/JvS/054 | THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMOND, DIAMOND (ALLUVIAL), DIAMOND (GENERAL) AND DIAMOND (IN KIMBERLITE) NEAR OTTOSDAL ON A PORTION OF PORTION 34 (EXCLUDING THE 4.95Ha MINING PERMIT) OF THE FARM HUMANSKRAAL 346, REGISTRATION DIVISION IO, NORTH WEST PROVINCE | HIA Phase 1 | 31/07/2021 | Johnny van Schalkwyk | 20/10/2021 - 11:17 | ||
Soyuz 6 Paleontological Desktop Assessment | Soyuz 6 Paleontological Desktop Assessment | PIA Desktop | 23/09/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | EOH Coastal and Environmental Services | 27/09/2022 - 09:45 |
ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN RESORT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN RESORT (DRIEFONTEIN FARM NO. 127) SUTHERLAND NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 01/03/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 03/09/2013 - 10:39 |
AIA Brakpoort Kliphokkies 75 MW | A Phase 1 Archaeological Impact Assessment for the Proposed 75 MW Brakfontein Photovoltaic Solar Farm, Victoria West, Northern Cape Province | AIA Phase 1 | 01/03/2012 | Celeste Booth | Albany Museum | SRK Consulting (Pty) Ltd - Pretoria | 11/06/2012 - 16:34 |
SBM PLEM Maritime Heritage Field Survey | MARITIME HERITAGE FIELD SURVEY FOR DURBAN OIL IMPORT PIPELINE | AIA Phase 1 | 12/05/2020 | Vanessa Maitland | WSP Environmental Pty Ltd - Durban | 17/02/2020 - 11:43 | |
A letter of exemption for the construction of Mafakatini Shopping Centre and Fuel Filling Station | A letter of exemption for the construction of Mafakatini Shopping Centre and Fuel Filling Station at Mafakatini area, Umngeni Local Municipality, KwaZulu - Natal | HIA Letter of Exemption | 04/02/2020 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 06/06/2021 - 07:38 |
Palaeontological Heritage Draft Scoping Report Loxton WEF 2 | Palaeontological Heritage: combined desktop and field-based Compliance Statement PROPOSED LOXTON WEF CLUSTER, UBUNTU LOCAL MUNICIPALITY AND THE PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. | PIA Desktop | 07/11/2022 | John E. Almond | Natura Viva CC | Loxton Wind Facility 3(Pty) Ltd | 15/11/2022 - 12:25 |
HIA for Proposed Kookfontein -Jaguar 88kV Powerline, Emfuleni and Midvaal Municipality, Gauteng | Heritage Impact Assessment for Proposed Kookfontein -Jaguar 88kV Powerline, Emfuleni and Midvaal Municipality, Gauteng | Heritage Impact Assessment Specialist Reports | 08/05/2013 | Johnny Van Schalkwyk | Envirolution Consulting (Pty) Ltd | Envirolution Consulting (Pty) Ltd | 05/11/2013 - 14:22 |
9-2-234-0002-20030401-CRC | Phase 1 Archaeological Impact Assessment for the Proposed Sewerage Line in Duiwelskloof | AIA Phase 1 | 01/04/2003 | Jaco van der Walt, M van der Ryst | 16/06/2012 - 14:38 | ||
Cultural Landscape Assessment - FBAR | Wind Garden App I(2) - Cultural Landscape Assessment | Built Environment and Cultural Landscapes | 28/07/2021 | Emmylou Bailey | Hearth Heritage | Savannah Environmental (Pty) Ltd | 29/07/2021 - 11:03 |
Welkomskraal, Venterstad | Final report on excavations and research conducted on the farm Welkomskraal, portion of Vaale Krans 122, Venterstad, Eastern Cape Province | Archaeological Permit Report | 16/03/2015 | Gerda Coetzee, Zoe Henderson | National Museum Bloemfontein - Archaeology and Anthropology | 16/03/2015 - 15:54 | |
HIA Nelsonskop Farm Township and Associated Infrastructure. | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) FOR THE PROPOSED NELSONSKOP FARM TOWNSHIP DEVELOPMENT, LIMPOPO PROVINCE | HIA Phase 1 | 26/07/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 31/07/2017 - 09:44 |
Rooipan Prospecting Heritage opinion | Heritage Opinion For the Proposed Prospecting Activities on the farm Rooipan 96 IQ, Ventersdorp, North West Province. | AIA Phase 1 | 04/06/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Zitholele Consulting | 08/06/2015 - 09:18 |
Heritage Assessment - Ilanga CSP2 | Archaeological Impact Assessment Report for the Proposed Establishment of the Ilganga CSP 2 Project, near Upington, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 18/04/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/04/2016 - 16:59 |
Phase 1 Cultural Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION OF DIAMONDS ALLUVIAL AND DIAMONDS GENERAL NEAR CHRISTIANA ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM KAFFRARIA 314HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 29/09/2017 | J.A. van Schalkwyk | 13/10/2017 - 15:43 | ||
Proposed Cemetery Extension in Petsana, Reitz | Desk Top Heritage Scoping Report Proposed Cemetery Extension in Petsana, Reitz Thabo Mofutsanyane DM, Nketoana Local Municipality, Free State | Heritage Scoping | 21/10/2021 | Len van Schalkwyk | eThembeni Cultural Heritage | ENVIROMATRIX (Pty) Ltd | 21/10/2021 - 06:16 |
Heritage report - Draft EiA | Achaeological Impact Assessment Report for the Proposed Ilanga Tower 7, Near Upington, Western Cape Province | 30/06/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 08/07/2016 - 13:59 | |
Heritage Impact Assessment Report (Jan'22) | Solaris Fields App I - HIA | Heritage Impact Assessment Specialist Reports | 11/01/2022 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/01/2022 - 12:59 |
Agricultural development on the farm Peebles, White River | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF MACADAMIA PLANTATIONS ON PORTION 1 OF THE FARM PEEBLES 31-JU WHITE RIVER, MPUMALANGA PROVINCE | AIA Phase 1 | 27/04/2019 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | MPG Environmental Consultant (Pty) Ltd | 02/07/2020 - 12:19 |
Buffelsfontein West Archaeological Impact Assessment | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Expansion of the Samancor Mining Operation on Portion 139 and the Remaining Extent of Portion 35 of the Farm Buffelsfontein 465 JQ, North West | AIA Phase 1 | 10/07/2023 | Tobias Coetzee | Tobias Coetzee | Tobias Coetzee | 31/08/2023 - 14:29 |
Annexure D- Heritage Report | Basic Assessment for the construction of the N11 Section 13 . Mokopane | HIA Phase 1 | 09/01/2013 | Johnny Van Schalkwyk | Royal Haskoning DHV | 09/01/2013 - 11:57 | |
Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection | Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection, Hantam Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 05/12/2022 | Jenna Lavin | CTS Heritage | Nala Environmental (Pty) Ltd | 24/01/2023 - 15:22 |
AIA - Deo Gloria | AIA - Proposed Deo Gloria Bulk Water Supply Line & Reservoir | AIA Phase 1 | 06/12/2012 | Peter Nilssen | Deo Gloria Olive Estate | 24/01/2014 - 17:00 | |
Heritage amendment letter: BESS Hoekplaas PV3 | Heritage amendment letter: BESS EA amendment Hoekplaas PV3 | Heritage Statement | 27/08/2020 | ACO Associates CC | 16/09/2020 - 21:17 | ||
PHASE 1 HERITAGE IMPACT ASSESSMENT Witwater Airstrip | PHASE 1 HERITAGE IMPACT ASSESSMENT for the Proposed NTT Witwater Airfield on the Farm 948 KR near Vaalwater, Limpopo Province | AIA Phase 1 | 26/08/2023 | Tobias Coetzee | 19/10/2023 - 14:24 | ||
Umsobomvu WEF Heritage Walk Through | Heritage Impact Assessment Specialist Reports | 01/11/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - East London | 16/03/2023 - 11:13 | |
Phase 1, Upgrading of raw water abstraction point, Hopetown | Phase 1 Palaeontological and Archaeological Impact Assessment of the proposed upgrading of the existing raw water abstraction point from the Orange River outside Hopetown, Northern Cape Province | HIA Phase 1 | 29/11/2013 | Lloyd Rossouw | MDA Town and Regional Planners | MDA Town and Regional Planners | 20/03/2014 - 11:13 |
Werda HIA | PHASE 1 HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON REMAINING PORTION OF THE FARM JACOBSFONTEIN 503 (WERDA) NEAR POSTMASBURG IN THE NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 29/09/2016 | Edward Matenga | 31/01/2017 - 10:01 | ||
Heritage Report for SASA 4c-6c | Underwater Heritage Impact Assessment for Marine Prospecting Areas off the West Coast of South Africa | Heritage Impact Assessment Specialist Reports | 12/12/2017 | Vanessa Maitland | De Beers Marine (Pty) Ltd | 21/12/2017 - 15:05 | |
Phase 1 Archaeological Assessment | Report on a Phase 1 Archaeological Assessment of proposed mining areas on the farms Bruce, King, Mokaning and Parson, between Postmasburg and Kathu, Northern Cape. | AIA Phase 1 | 01/02/2005 | David Morris | 05/02/2019 - 08:01 | ||
SignificanceReport_WelgevallenfarmStellenbosch_HistoricFarmProperty | PROPOSED DECLARATlON AS A NATlONAL MONUMENT: HISTORICAL ARCHAEOLOGICAL SITE ON THE FARM WELGEVALLEN, STELLENBOSCH DISTRICT | Significance Report | 30/11/1999 | Janette Deacon | 13/09/2016 - 14:27 | ||
AIA; Century Graveyard Village of Elim | Phase 1 Archaeological Impact Assessment of a 19th Century Graveyard in the Village of Elim. | AIA Phase 1 | 01/02/2011 | Mary Patrick, Cedric Poggenpoel | Cape Archaeological Survey CC | MCiSA Property Managers (Pty) Ltd | 04/04/2018 - 15:06 |
Heritage Screener: Karusa BESS | Desktop Heritage Screening Assessment for the PROPOSED BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED GRID INFRASTRUCTURE AT THE KARUSA WIND ENERGY FACILITY, NORTHERN CAPE | HIA Letter of Exemption | 23/03/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 23/03/2022 - 08:56 |