FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDatesort descending Authors AuthoringBody CommissioningCompany Post date
The proposed reclamation of the Soweto Cluster Dumps The proposed reclamation of the Soweto Cluster Dumps, Bramfischerville, City of Johannesburg Metropolitan Municipality, Gauteng Province. Heritage Impact Assessment Specialist Reports 16/10/2019 Jennifer Kitto PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 10/01/2020 - 11:17
SECOND HIA Eskom Transnet Project SECOND HIA Eskom Transnet Project HIA Phase 1 16/10/2019 Prof. Anton van Vollenhoven 17/10/2019 - 12:34
Heritage Impact Assessment Northam Zondereinde 3 Shaft Heritage Impact Assessment for the proposed Northam Zondereinde Platinum Mine 3 Shaft, Thabazimbi Local Municipality HIA Phase 1 16/10/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Prism Environmental Management Services cc 28/10/2019 - 14:19
HIA Vergenoeg Mine 132kV line and substation A REPORT ON AN ARCHAEOLOGICAL AND BUILT ENVIRONMENT IMPACT ASSESSMENT FOR THE PROPOSED VERGENOEG MINE 132KV POWER LINE, GAUTENG PROVINCE HIA Phase 1 16/10/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Setala Environmental 16/11/2019 - 11:52
Solink-Sedibeng PV - Palaeo Field Assessment Palaeontological Field Assessment (PIA) to assess the proposed Heineken Sedibeng Solar Plant, which is located on Graceview EXT 3, Erf 244, near Vereeniging in Gauteng. PIA Phase 1 17/10/2019 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 10/12/2019 - 17:24
Solink-Sedibeng PV - Palaeo Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PV SOLAR FACILITY AT THE HEINEKEN SEDIBENG BREWERY, NEAR VEREENIGING, GAUTENG PIA Desktop 17/10/2019 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 16/11/2019 - 07:11
HIA FOR MAINTENANCE OF TRANSFORMER STRUCTURE AT MAPUNGUBWE HIA FOR MAINTENANCE OF THE BUNDLE CONDUCTOR AND TRANSFORMER STRUCTURES ALONG THE LIMPOPO RIVER, MAPUNGUBWE NATIONAL PARK AND WORLD HERITAGE SITE LIMPOPO PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 18/10/2019 Ndivhuho Eric Mathoho, Shadreck Chirikure De Beers Considated Mines 07/11/2019 - 12:07
Proposed Capacity Improvements to National Route 1, Section 16, Winburg Station to Ventersburg. PROPOSED CAPACITY IMPROVEMENTS TO NATIONAL ROUTE 1, SECTION 16, WINBURG STATION (km 89,8) and VENTERSBURG (KM 133,53). LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 19/10/2019 Len van Schalkwyk eThembeni Cultural Heritage ENVIROMATRIX (Pty) Ltd 15/01/2020 - 13:27
Lindley to Leratswana Pipeline PIA PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED RAW WATER PIPELINE BETWEEN LINDLEY AND ARLINGTON, NKETOANA LOCAL MUNICIPALITY, FREE STATE PROVINCE PIA Phase 1 20/10/2019 Elize Butler Banzai Environmental (Pty) Ltd NSVT Consultants 30/10/2019 - 09:49
HIA Magatle Filling Station HIA Magatle Filling Station, Limpopo Province HIA Phase 1 21/10/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Lokisa Environmental Consulting CC 28/10/2019 - 22:03
AIA FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM HARTSENBERGFONTEIN 332I FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE AIA Phase 1 21/10/2019 Neels Kruger Exigo3 Sustainability Coastal & Environmental Services - East London 28/02/2020 - 15:26
Park Paddocks DESKTOP HERITAGE SURVEY OF THE PROPOSED PARK PADDOCKS FARM EXPANSION HIA Phase 1 21/10/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Independent Environmental Advisor 22/11/2019 - 12:17
Heritage Impact Assessment Prieska Copper-Zinc Project – Irrigation Project Northern Cape Province Heritage Impact Assessment Prieska Copper-Zinc Project – Irrigation Project Northern Cape Province HIA Phase 1 21/10/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting ABS Africa 02/11/2020 - 13:10
Letter of Exemption Letter of Exemption from further archaeological studies HIA Letter of Exemption 22/10/2019 22/10/2019 - 16:55
Irene concentration camp memorial 2 A SECOND REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE ERECTION OF A MEMORIAL AT THE IRENE CONCENTRATION CAMP CEMETERY, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 23/10/2019 Anton van Vollenhoven Archaetnos CC Federasie van Afrikaanse Kultuurvereniginge 23/10/2019 - 07:50
Swartkrans Annual Report 2017-2019 Scientific Activities Annual Swartkrans Permit Report for Scientific Activities Between 2017 - 2019 Archaeological Permit Report 23/10/2019 Travis Pickering, Matthew V. Caruana 23/10/2019 - 14:47
Limpopo Central Hospital Phase 1 Heritage Impact Assessment Phase 1 Heritage Impact Assessment for the proposed development of the Limpopo Central Hospital on the remaining extent of Erf 6861 - Extension 30 in Polokwane in the Limpopo Province HIA Phase 1 23/10/2019 Marko Hutten PGS Heritage (Pty) Ltd 06/11/2019 - 17:39
Proposed clearing of indigenous vegetation on the Farm Bottel Fontein (15/11), Redelinghuys for the cultivation of rooibos tea HIA: Proposed clearing of indigenous vegetation on the Farm Bottel Fontein (15/11), Redelinghuys for the cultivation of rooibos tea. HIA Phase 1 25/10/2019 Jenna Lavin, Nicholas Wiltshire CTS Heritage 30/09/2020 - 16:38
Ward 7and 9 Cemetery Heritage Impact Report A REPORT ON AN ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF A CEMETERY AND ACCESS ROAD CALLED THE WARD 7&9 CEMETERY, FOR STEVE TSHWETE LOCAL MUNICIPALITY, CLOSE TO MIDDELBURG, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 27/10/2019 Daniel Viljoen, Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Archaetnos Culture & Cultural Resource Consultants 05/03/2021 - 10:12
Equiano Cable System Maritime HIA Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, landing at Melkbosstrand, Western Cape Province AIA Desktop 28/10/2019 John Gribble ACO Associates CC 01/11/2019 - 14:30
SAS5202 - Chance Finds Protocol Implementation of the Leeuspruit Risk Mitigation Measures Monitoring Plan: Chance Finds Protocol Non Impact Assessment Related Reports 28/10/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sasol Mining (Pty) Ltd 28/10/2019 - 11:48
Equiano Cable System Maritime HIA Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, landing at Melkbosstrand, Western Cape Province AIA Desktop 28/10/2019 John Gribble ACO Associates CC 01/11/2019 - 14:20
AIA ON THE FARM BEJA 39 LT FOR THE PROPOSED BEJA ORCHARDS EIA PROJECT, MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON PORTION 1, 29, 30 & 31 OF THE FARM BEJA 39 LT FOR THE PROPOSED BEJA ORCHARDS EIA PROJECT, MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 29/10/2019 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 17/01/2020 - 09:47
Ahsan Sterkfontein Caves Real Time Ground Behavior and Environmental Monitoring Heritage Impact Assessment Specialist Reports 29/10/2019 06/12/2019 - 14:54
Palaeontological Heritage Report: Desktop Study Palaeontological Heritage Report: Desktop Study Proposed mineral prospecting on the farms Spitz Kop 168, Bingap 184 and Cairnpoint 195 near Groblershoop, Hay Magisterial District, Northern Cape Province PIA Desktop 30/10/2019 John E. Almond Natura Viva CC 20/07/2021 - 15:36
MEMORANDUM ON SITE STATUS AND HERITAGE IMPACT SUBJECT TO A SECTION 24G APPLICATION AS PART OF THE DOOR OF HOPE DEVELOPMENT PROJECT, GAUTENG PROVINCE MEMORANDUM ON SITE STATUS AND HERITAGE IMPACT SUBJECT TO A SECTION 24G APPLICATION AS PART OF THE DOOR OF HOPE DEVELOPMENT PROJECT ON A PORTION OF THE FARM HARTSENBERGFONTEIN 332I, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE Heritage Statement 31/10/2019 Neels Kruger Exigo Sustainability Coastal & Environmental Services - Grahamstown 28/02/2020 - 15:34
EDA Phase 1 A PHASE 1 HIA REPORT FOR THE ESTATE D’AFRIQUE NEW ACCESS ROAD PROJECT ON PORTIONS OF THE FARMS HARTEBEESTPOORT 482JQ & WELGEGUND 491JQ NEAR HARTEBEESTPOORT DAM, NORTHWEST PROVINCE AIA Phase 1 31/10/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 02/12/2019 - 12:54
Jan Kempdorp Cemetery Exp AIA Heritage Impact Assessment (Archaeology) for the proposed Jan Kempdorp Cemetery Extension, Phokwane Municipality, Northern Cape AIA Phase 1 31/10/2019 David Morris McGregor Museum NSVT Consultants 03/03/2020 - 12:05
Equiano Cable System Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, Landing at Melkbosstrand, Western Cape Province. Heritage Impact Assessment Specialist Reports 31/10/2019 John Gribble ACO Associates CC ACER (Africa) Environmental Management Consultants 05/11/2019 - 08:29
Heritage Screener: Loerie Estate HERITAGE SCREENING ASSESSMENT: PROPOSED LOERIE COUNTRY ESTATE MIXED USE DEVELOPMENT, EAST LONDON Heritage Scoping 31/10/2019 Jenna Lavin CTS Heritage Terreco Environmental 31/10/2019 - 12:09
Balgray PIA PALAEONTOLOGICAL PHASE 1 IMPACT ASSESSMENT FOR THE PROPOSED RE-COMMISSION OF THE OLD BALGRAY COLLIERY NEAR DUNDEE, KWAZULU NATAL Palaeontological Permit Report 31/10/2019 Elize Butler PGS Heritage (Pty) Ltd 08/09/2020 - 09:13
HIA for Upgrade of Thembinkosi Primary School in KwaZulu-Natal PROPOSED UPGRADING OF THEMBINKOSI PRIMARY SCHOOL SITUATED AT ERF 803 AND 804 IN OSIZWENI D (WARD 9) IN THE NEWCASTLE LOCAL MUNICIPALITY, AMAJUBA DISTRICT, KWAZULU-NATAL HIA Phase 1 31/10/2019 Wouter Fourie PGS Heritage (Pty) Ltd NCC Environmental Services (Pty) Ltd 06/11/2019 - 16:02
HIA for Thembinkosi Primary School upgrade heritage Impact Assessment for the proposed upgrading of Thembinkosi Primary School situated at Erf 803 And 804 in Osizweni D (Ward 9) in the Newcastle Local Municipality, Amajuba District, Kwazulu-Natal. HIA Phase 1 31/10/2019 Wouter Fourie PGS Heritage (Pty) Ltd NCC Environmental Services (Pty) Ltd 06/11/2019 - 16:05
Exemption Letter: Heritage Impact Assessment for 13 ha area demarcated for new cemetery on Farm Boemfontein 654, Bloemfontein, Free State Province Exemption Letter: Heritage Impact Assessment for 13 ha area demarcated for new cemetery on Farm Boemfontein 654, Bloemfontein, Free State Province HIA Letter of Exemption 31/10/2019 Lloyd Rossouw National Museum Bloemfontein - Archaeology and Anthropology Imbazo Trading Pty Ltd 11/03/2020 - 11:57
Kwa-Mazibuko Hostels (HIA) of the proposed demolition of the Kwa-Mazibuko Hostel Project, located on the Remainder of Portion 1 of the farm Boomplaats 200IR, and Erven 968, 969 & 970, in Katlehong, Gauteng 31/10/2019 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Arengo 352 (Pty) Ltd 21/10/2019 - 09:07
Phase 1 Cultural Heritage Impact Assessment: OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/11/2019 Johnny van Schalkwyk Heritage Consultants Milnex 189 CC 07/10/2020 - 17:26
Eersterust X7 Phase 1 HIA PHASE 1 HIA REPORT FOR THE PROPOSED EERSTERUST EXTENSION 7 RESIDENTIAL, EDUCATIONAL AND ROAD DEVELOPMENT ON THE REMAINDER OF PORTION 171 & PART OF PORTION 306 OF THE FARM DERDEPOORT 326JR, CITY OF TSHWANE, GAUTENG HIA Phase 1 01/11/2019 06/04/2021 - 12:00
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/11/2019 Johnny van Schalkwyk 02/11/2020 - 08:46
HIA_Gemsbok Horn Prospect Heritage Impact Assessment of proposed prospecting drilling sites at two pans on Gemsbok Horn 242 in the Dawid Kruiper Local Municipality, Northern Cape HIA Phase 1 01/11/2019 David Morris McGregor Museum Site Plan Consulting 25/11/2019 - 10:56
PHASE 1 HIA REPORT GROOVLEI SEWER PUMP STATION & LINE PHASE 1 HIA REPORT FOR THE PROPOSED NEW GROOTVLEI SEWER PUMP STATION AND LINE LOCATED IN STRUBENVALE, SPRINGS, GAUTENG ON A PORTION OF THE FARM GROOTVLEI 124IR - APAC019/115. HIA Phase 1 01/11/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Vulcano Engineering & Environmental Consulting 21/02/2020 - 14:06
Daggafontein Sewer Pump Station PHASE 1 HIA REPORT FOR THE PROPOSED NEW DAGGAFONTEIN SEWER PUMP STATION LOCATED IN DAGGAFONTEIN, SPRINGS, GAUTENG ON A PORTION OF THE FARM DAGGAFONTEIN 125IR. APAC019/116 HIA Phase 1 01/11/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Vulcano Engineering & Environmental Consulting 21/02/2020 - 14:13
Ladysmith Erf 1 HERITAGE SURVEY OF THE PROPOSED ERF 1 LADYSMITH HOUSING DEVELOPMENT, KZN HIA Phase 1 03/11/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Mahlori Development Consultants 25/11/2019 - 10:20
erf 1 Ladysmith HERITAGE SURVEY OF THE PROPOSED ERF 1 LADYSMITH HOUSING DEVELOPMENT, KZN HIA Phase 1 03/11/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Mahlori Development Consultants 25/11/2019 - 10:32
Naudesbank Draft Heritage Report Heritage report for Nauddesbank 172 IS, Portion 09. HIA Phase 1 03/11/2019 19/11/2019 - 11:43
HIA Copper Mines Namakwaland HERITAGE IMPACT ASSESSMENT: PROPOSED REOPENING OF THREE COPPER MINES AT CONCORDIA, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2019 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 19/10/2020 - 09:18
HIA for Fairview TSF and Dump Reclamation A REPORT ON AN ARCHAEOLOGICAL AND BUILT ENVIRONMENT HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED FAIRVIEW TSF AND RECLAMATION OF HISTORIC DUMPS AT THE FAIRVIEW MINE CLOSE TO BARBERTON, MPUMALANGA PROVINCE AIA Phase 1 04/11/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Cabanga Concepts 17/12/2019 - 15:03
DAG5603 - HIA Integrated Environmental Authorisation Process for the Proposed Dagsoom Twyfelaar Coal Mining Project near Ermelo, Mpumalanga: Heritage Impact Assessment HIA Phase 1 05/11/2019 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Dagsoom Coal Mining (Pty) Ltd 22/11/2019 - 14:21
A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 05/11/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants EScience Associates (Pty) Ltd 02/12/2019 - 13:45
HIA Van Zyl PR Heritage Impact Assessment for the proposed Van Zyl's Prospecting Application, Aggeneys Area, Namaqualand Magisterial District, Northern Cape Province. HIA Phase 1 05/11/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting Greenmined Environmental 03/12/2019 - 09:14
A LETTER OF RECOMMENDATION FOR EXEMPTION A LETTER OF RECOMMENDATION FOR EXEMPTION FOR UMPHEME HOUSING SCHEME HIA Letter of Exemption 05/11/2019 Gavin Afzelia Environmental Consultants Pty Ltd 15/01/2020 - 16:16

Pages

CSV
 
 

Search form