THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15301 - 15350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA_Rondevlei_208_IR_Schoongezicht_225_IR_Fourie_W_Mar09 | Archaeological Impact Assessment Merafe Resources-Schoongezicht Coal Mine Project on Portions 2 of the Farm Rondevlei 208 IR and a Portion of Portion 7 and a Portion of the Remaining Extent of the Farm Schoongezicht 225 IR, District Delmas | AIA Phase 1 | 13/03/2009 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | MAPID_03206 | 16/06/2012 - 14:49 | |
AIA_Bankfontein_215_IS_ptn2_Fourie_W_Mar09 | Archaeological Impact Assessment Merafe Resources - Bankfontein Coal Mine Project on Portion 2 of the Farm Bankfontein 215 IS, District Ermelo, Mpumalanga | AIA Phase 1 | 12/03/2009 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | MAPID_02885 | 16/06/2012 - 14:43 | |
9-2-252-0001-20060818-MPL | Archaeological Impact Assessment Marula Private Nature Reserve on the Farm Amsterdam 208 near Hoedspruit | AIA Phase 1 | 18/08/2006 | Jaco van der Walt | Matakoma Heritage Consultants (Pty) Ltd | MAPID_00007 | 16/06/2012 - 14:39 | |
AIA Industrial Park known as Chloorkop North, Gauteng. | Archaeological Impact Assessment Industrial Park known as Chloorkop North, Gauteng. | AIA Phase 1 | 29/03/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 17/04/2014 - 06:13 | |
Pearly Beach AIA | Archaeological Impact Assessment in terms of Section 38(8) of the NHRA for a Proposed abalone farm on Erf 385, Pearly Beach, Western Cape | AIA Phase 1 | 09/05/2019 | Jonathan Kaplan | Agency for Cultural Resources Management | 15/09/2019 - 12:56 | ||
AIA - Amalinda Downs Residential Development | ARCHAEOLOGICAL IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for a Amalinda Downs Residential Development | AIA Phase 1 | 12/03/2018 | Karen Van Ryneveld, Jenna Lavin | Cedar Tower Services | SKG Properties | 16/05/2018 - 10:15 | |
AIA_GVM_Metals_Holfontein_138_JS_Van_der_Walt_J_Dec07 | Archaeological Impact Assessment GVM Metals Limited Proposed Coal Mining on Portions of the Farm Holfontein 138 JS, Secunda, Mpumalanga Province | AIA Phase 1 | 13/12/2007 | Jaco van der Walt, Wouter Fourie | Matakoma Heritage Consultants (Pty) Ltd | MAPID_01148 | 16/06/2012 - 14:45 | |
Gestoptefontein Hill AIA | Archaeological Impact Assessment Gestoptefontein Hill, Gestoptefontein 349 IO, portion 44 | AIA Phase 1 | 04/12/2015 | Jeremy Hollmann | Assore Limited | 03/12/2015 - 12:11 | ||
AIA_Galaxy_Gold_Mine_tailings_Nel_J_Aug11 | Archaeological Impact Assessment Galaxy Gold Mine Tailings Dam Extension, Barberton, Mpumalanga Province | AIA Phase 1 | 01/08/2011 | Johan Nel | Digby Wells Environmental | 16/06/2012 - 14:45 | ||
AIA - Solis Water Pipe | Archaeological Impact Assessment for the Water Supply Pipleline for the Authorised Solis Concentrated Solar Power (CSP) Plant, Upington, Northern Cap Province | AIA Desktop | 16/04/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/05/2014 - 07:41 | |
AIA for the Village Ext 10 Residential Development. Roodekrans, Johannesburg, Gauteng Province | Archaeological Impact Assessment for the Village Ext 10 Residential Development. Roodekrans, Johannesburg, Gauteng Province | AIA Phase 1 | 08/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 12/02/2016 - 17:09 | |
AIA FOR THE UPPER MHLAHLANE WATER SUPPLY AUGMENTATION PROJECT | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE UPPER MHLAHLANE WATER SUPPLY AUGMENTATION PROJECT, OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 30/06/2013 | Neels Kruger | AGES (PTY) Ltd - Pretoria | AGES (PTY) Ltd - East London | 20/02/2014 - 10:35 | |
AIA_UG2_Expansion_Project_Huffman_TN_Nov01 | Archaeological Impact Assessment for the UG2 Expansion Project, Rustenburg Platinum Mines | AIA Phase 1 | 01/11/2001 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | 16/06/2012 - 14:50 | ||
AIA FOR THE SINQUMENI & DULATI BULK WATER SUPPLY SCHEME | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE SINQUMENI & DULATI BULK WATER SUPPLY SCHEME, EASTERN CAPE PROVINCE | AIA Phase 1 | 31/03/2013 | Neels Kruger | AGES (PTY) Ltd - Pretoria | AGES (PTY) Ltd - East London | 20/02/2014 - 11:14 | |
AIA FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | Archaeological Impact Assessment FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | AIA Phase 1 | 06/09/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 13/10/2015 - 13:42 | |
AIA_Sappi_Lomati_Multi_Fuel_Boiler_Becker_E_Oct11 | Archaeological Impact Assessment for the Sappi Lomati Power Generation: Multi Fuel Boiler, Mpumalanga | AIA Phase 1 | 01/10/2011 | Elize Becker | 16/06/2012 - 14:49 | |||
Sakata Warehouse | Archaeological Impact Assessment for the Sakata Warehouse, Gauteng | AIA Phase 1 | 20/02/2013 | Thomas Huffman | University of the Witwatersrand - Archaeological Resources Management | Sakata Seed Southern Africa Pty Ltd | 01/03/2013 - 10:05 | |
AIA for Roodekrans Ext 26, Gauteng | Archaeological Impact Assessment for the Roodekrans Ext. 26 Residential Development. Roodekrans, Johannesburg, Gauteng Province | AIA Phase 1 | 25/09/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 03/02/2016 - 08:29 | |
AIA For the Proteadal Mixed Use Township, Proteadal Extension 1, Portion 216 (a Portion of Portion 214) , Paardeplaats 177 IQ, Gauteng Province | ARCHAEOLOGICAL IMPACT ASSESSMENT For the Proteadal Mixed Use Township, Proteadal Extension 1, Portion 216 (a Portion of Portion 214) , Paardeplaats 177 IQ, Gauteng Province | AIA Phase 1 | 04/10/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 04/11/2016 - 05:50 | |
AIA Zwartkop Development | Archaeological Impact Assessment For the proposed Zwartkop Industrial Development, Amandelbult, Limpopo Province | AIA Phase 1 | 05/12/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 21/01/2015 - 09:21 | |
Wolmaransstad - AIA | Archaeological Impact Assessment for the Proposed Wolmaransstad Municipality 5MW Solar Energy Facility close to the town of Wolaransstad in the North West Province | Archaeological Specialist Reports | 20/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 11/12/2013 - 16:19 | |
AIA-Wolmaransstad75MWSEF | Archaeological Impact Assessment for the Proposed Wolmaransstad 75MW Solar nergy Facility close to the town of Wolmaransstad in the North West Province | Archaeological Specialist Reports | 26/01/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 10/03/2015 - 14:03 | |
AIA Wimbrecht Hub | Archaeological Impact Assessment For the proposed Wimbrecht Agricultural hub, close to Marble Hall, Limpopo Province | AIA Phase 1 | 19/06/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Midturion Information Consultants | 22/08/2013 - 12:33 | |
AIA for the proposed widening of the N4 National Road, Section 6E, Near Waterval-Onder, Mpumalanga Province | Archaeological Impact Assessment For the proposed widening of the N4 National Road, Section 6E, Near Waterval-Onder, Mpumalanga Province | AIA Phase 1 | 22/07/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 18/11/2015 - 14:16 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED WATERKLOOF MARINA RETIREMENT VILLAGE, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED WATERKLOOF MARINA RETIREMENT VILLAGE, GAUTENG PROVINCE | AIA Phase 1 | 18/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 18/07/2016 - 11:09 | |
AIA for the proposed Venbeck Phalaborwa Filling Station, Limpopo | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED VENBECK PHALABORWA FILLING STATION LIMPOPO PROVINCE | AIA Phase 1 | 17/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 21/04/2017 - 09:25 | |
AIA Report Rietfontein Oxidation Dams | Archaeological Impact Assessment for the proposed upgrading of the Rietfontein Oxidation Ponds near Rietfontein in the Northern Cape Province | AIA Phase 1 | 12/11/2014 | Jan Engelbrecht | UBIQUE HERITAGE CONSULTANTS | Van Zyl Environmental Consultants | 12/01/2015 - 15:00 | |
AIA; Proposed Upgrades to the Public Space at Zoarvlei, Milnerton | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADES TO THE PUBLIC OPEN SPACE AT ZOARVLEI, MILNERTON, WESTERN CAPE | AIA Phase 1 | 25/01/2012 | Jayson Orton | ACO Associates CC | JZE Architects CC | 18/07/2018 - 09:11 | |
AIA Upgrade of the K101 between Brakfontein Road and Road D795 | Archaeological Impact Assessment for the proposed upgrade of the K101 between Brakfontein Road (Km 14.4) and Road D795 (Km 9.0), Gauteng Province | AIA Phase 1 | 07/07/2015 | Neels Kruger | Exigo3 Sustainability | Interdesign Landscape Architects | 09/12/2015 - 08:34 | |
Transnet Garona TFS AIA | Archaeological Impact Assessment for the proposed upgrade of Eskom Garona Substation and construction of approximately 0.5km 50kV power line from Garona to the proposed new Transnet Garona Traction Feeder Substation within the Jurisdiction of !Kheis Local Municipality in Northern Cape Province | AIA Phase 1 | 15/09/2014 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Eskom - Megawatt Park | 01/12/2014 - 14:14 | |
Archaeological Impact Assessment: Tweefontein Unit Sewer and Water Reticulation | Archaeological Impact Assessment for the Proposed Tweefontein Sewer and Water Reticulation Project, Ekangala Region Mpumalanga Province | AIA Phase 1 | 12/11/2018 | Nelius Kruger | Exigo Sustainability | 03/12/2018 - 21:11 | ||
Archaeological Impact Assessment - EIA phase | Archaeological Impact Assessment for The Proposed Tshivaso Coal-Fired Power Plant, Limpopo Province | Heritage Study | 31/07/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 13/09/2016 - 10:05 | |
AIA_Tsakane_Primary_School_EXT_9_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment for the Proposed Tsakane Primary School, Tsakane Extension 9, Gauteng Province | AIA Phase 1 | 06/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02293 | 16/06/2012 - 14:50 | |
AIA Tom Burke Truck Stop | Archaeological Impact Assessment For The Proposed Tom Burke Truck Stop And Filling Station Limpopo Province | AIA Phase 1 | 12/11/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 16/11/2016 - 09:08 | |
HIA - Tiger Kloof | Archaeological Impact Assessment for the Proposed Tiger Kloof Photovoltaic Solar Energy Facility near Vryburg, North West Province | AIA Phase 1 | 11/12/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/02/2014 - 12:41 | |
AIA Thulani, Gauteng. | Archaeological Impact Assessment For the proposed Thulani Police Station and subdivision of Erf 3206, Thulani Ext 1, Soweto, Gauteng Province | AIA Phase 1 | 10/02/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | W&L Consultants | 12/02/2015 - 10:36 | |
AIA - Thabametsi | Archaeological Impact Assessment for the Proposed Thabemetsi Coal-Fired Power Station, Lephalale, Limpopo Province | AIA Phase 1 | 28/02/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 12/03/2014 - 16:46 | |
Thabazimbi Ext 69 AIA | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED THABAZIMBI EXT 69 DEVELOPMENT, LIMPOPO PROVINCE | AIA Phase 1 | 14/01/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 19/04/2017 - 08:22 | |
AIA-TewaIsithaPV2 | Archaeological Impact Assessment for the proposed Tewa Isitha Solar 2 PV Facility East Of Upington, Northern Cape Province. | Archaeological Specialist Reports | 02/12/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/12/2015 - 13:15 | |
AIA-TewaIsithaPV1 | Archaeological Impact Assessment for the proposed Tewa Isitha Solar 1 PV Facility East Of Upington, Northern Cape Province. | Archaeological Specialist Reports | 02/12/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/12/2015 - 12:51 | |
AIA_Stevebikoville_School_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment for the Proposed Stevebikoville School, Nokeng Township, Gauteng Province | AIA Phase 1 | 18/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02070 | 16/06/2012 - 14:50 | |
AIA for the proposed Springs Fresh Produce Market | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SPRINGS FRESH PRODUCE MARKET, GAUTENG PROVINCE | AIA Phase 1 | 03/02/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 11/04/2018 - 19:00 | |
Heritage report 2012 | Archaeological Impact Assessment for the Proposed Spitz Land Residential Development , Roodepoort Gauteng | Heritage Impact Assessment Specialist Reports | 22/12/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Marsh Environmental Services | 21/06/2018 - 10:49 | |
AIA-KotuloTsatsiCSP1 | Archaeological Impact Assessment for the Proposed SolarReserve KotuloTsati CSP1 Facility, located close to Kenhardt in the Northern Cape | Archaeological Specialist Reports | 11/08/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 04/11/2015 - 08:17 | |
KotuloTsatsi CSP2 - Heritage | Archaeological Impact Assessment for the Proposed SolarReserve Kotulo Tsati Energy CSP2, located close to Kenhardt in the Northern Cape Province | Archaeological Specialist Reports | 08/05/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 27/10/2015 - 11:41 | |
AIA_Simunye_Primary_School_EXT_2_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment for the Proposed Simunye Primary School, Simunye Extension 2, Gauteng Province | AIA Phase 1 | 06/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02294 | 16/06/2012 - 14:50 | |
AIA_Sikhulisiwe_Primary_School_Van_der_Walt_J_Aug08 | Archaeological Impact Assessment for the Proposed Sikhulisiwe Primary School, Ekangala - F Extension 2, Gauteng Province | AIA Phase 1 | 18/08/2008 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | MAPID_02285 | 16/06/2012 - 14:50 | |
Archaeological Impact Assessment | Archaeological Impact Assessment FOR THE PROPOSED SHELL PROTEA BOULEVARD SERVICE STATION, SOWETO, GAUTENG PROVINCE | AIA Phase 1 | 29/04/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Environmental Resources Management | 08/06/2015 - 16:13 | |
Archaeological Impact Assessment | Archaeological Impact Assessment FOR THE PROPOSED SHELL PROTEA BOULEVARD SERVICE STATION, SOWETO, GAUTENG PROVINCE | AIA Phase 1 | 29/04/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Environmental Resources Management | 09/06/2015 - 08:46 | |
Senekal 2 - AIA | Archaeological Impact Assessment for the Proposed Senekal 2 Solar Energy Facility near Mkuze, Kwazulu Natal | Archaeological Specialist Reports | 14/07/2014 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 05/08/2014 - 12:48 |