THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15601 - 15650 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA-KotuloTsatsiCSP1 | Archaeological Impact Assessment for the Proposed SolarReserve KotuloTsati CSP1 Facility, located close to Kenhardt in the Northern Cape | Archaeological Specialist Reports | 11/08/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 04/11/2015 - 08:17 | |
AIA-KotuloCSP | Archaeological Impact Assessment for the Proposed Kotulo Tsatsi CSP 3 Facility, located close to Kenhardt in the Northern Cape | Archaeological Specialist Reports | 05/02/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/03/2015 - 10:50 | |
AIA-KonkoonsiesII(final) | Final Archaeological Survey for the Proposed Konkoonsies II Solar Energy Facility, Kenhardt Magisterial District, NC Province | Archaeological Specialist Reports | 23/07/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 09/10/2015 - 08:44 | |
AIA-KomsbergMTS | Phase 1 Archaeological Impact Assessment for the proposed extension of the existing Komsberg Substation (two alternative areas) and widening of the access road, near Sutherland, NC Province | AIA Phase 1 | 24/08/2015 | Celeste Booth | Booth Heritage Consulting | Savannah Environmental (Pty) Ltd | 05/01/2016 - 12:14 | |
AIA-Kati-Kati Housing Project, Kati-Kati (near Cathcart), Eastern Cape | Phase 1 Archaeological Impact Assessment - Kati-Kati Housing Project, (Portion of) Erf 633, Kati-Kati (near Cathcart), Eastern Cape, South Africa | AIA Phase 1 | 07/03/2014 | Karen Van Ryneveld | 22/04/2014 - 14:33 | |||
AIA-IPPS wattled wood lot survey | SURVEY OF WATTLE WOODLOTS AT THE INGULA PUMPED STORAGE SCHEME | AIA Phase 1 | 01/05/2009 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Eskom Holdings SOC Limited | CTS_309761 | 06/07/2015 - 11:01 |
AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | AIA-Ikhephu Feedlot, Erf 1 Elliot, SLM, CHDM, Eastern Cape | AIA Phase 1 | 21/11/2022 | Karen Van Ryneveld | 21/11/2022 - 06:27 | |||
AIA-Hillview Housing Development | ARCHAEOLOGICAL SURVEY OF THE PROPOSED HILLVIEW HOUSING DEVELOPMENT, EMPANGENI | AIA Phase 1 | 13/11/2008 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Environmental | CTS_305262 | 03/07/2015 - 09:39 |
AIA-Hillendale August 2007 | The Archaeological Survey of Hillendale Mine | AIA Phase 1 | 24/08/2007 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exxaro Resources | CTS_305494 | 03/07/2015 - 12:38 |
AIA-hillendale august 2006 | Archaeological survey of the Hillendale Mine | AIA Phase 1 | 29/10/2006 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | CTS_304022 | 02/07/2015 - 13:55 | |
AIA-Hennenman | Archaeological Impact Assessment report for the Proposed Uitsig 5MW Solar Energy Facility close to Henneman in the Free State Province | Archaeological Specialist Reports | 26/01/2015 | 23/04/2015 - 13:19 | ||||
AIA-Helpmekaar Dam, near Tarkastad, CHDM, Eastern Cape | AIA-Helpmekaar Dam, near Tarkastad, CHDM, Eastern Cape | AIA Phase 1 | 22/12/2020 | Karen Van Ryneveld | 22/12/2020 - 11:13 | |||
AIA-Glen Ewan Private School, Queenstown, EMLM, EC | AIA-Glen Ewan Private School, Queenstown, EMLM, EC | AIA Phase 1 | 07/02/2023 | Karen Van Ryneveld | 07/02/2023 - 04:21 | |||
AIA-Empangeni southern sewer outfall | ARCHAEOLOGICAL SURVEY OF THE EMPANGENI SOUTHERN OUTFALL SEWER | AIA Phase 1 | 17/10/2008 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Environmental | CTS_305192 | 03/07/2015 - 08:48 |
AIA-East central arterial | ARCHAEOLOGICAL SURVEY OF THE PROPOSED EAST CENTRAL ARTERIAL | AIA Phase 1 | 13/10/2008 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Environmental | CTS_305186 | 03/07/2015 - 08:43 |
AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA Phase 1 | 29/08/2023 | Karen Van Ryneveld | 29/08/2023 - 10:15 | |||
AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA-Drip Irrigation and Spekboom development, Pokjesfontein, EC | AIA Phase 1 | 29/08/2023 | Karen Van Ryneveld | 29/08/2023 - 10:17 | |||
AIA-Cluster 9 Tsomo Water Treatment Works (WTW) Upgrade, CHDM, EC | AIA-Cluster 9 Tsomo Water Treatment Works (WTW) Upgrade, CHDM, EC | AIA Phase 1 | 23/03/2022 | Karen Van Ryneveld | 23/03/2022 - 11:19 | |||
AIA-Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, near Tsomo, CHDM, Eastern Cape | AIA-Cluster 9 Phase 5 and Cluster 8 Linkage, Water Supply and Access Road, near Tsomo, CHDM, Eastern Cape | AIA Phase 1 | 16/07/2022 | Karen Van Ryneveld | 16/07/2022 - 13:49 | |||
AIA-Cliffdale development_KSEMS | ARCHAEOLOGICAL SURVEY OF THE PROPOSED DEVELOPMENT IN CLIFFDALE | AIA Phase 1 | 09/10/2008 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Kerry Seppings Environmental Management | CTS_304175 | 02/07/2015 - 15:59 |
AIA-CastleWEF | AIA for the Proposed Castle Wind Energy Facility, De Aar, Northern Cape | Archaeological Specialist Reports | 30/10/2014 | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 07/05/2015 - 15:50 | ||
AIA-Burlington Citrus Development, Doorndraai 144, near Cookhouse, SBDM, EC | AIA-Burlington Citrus Development, Doorndraai 144, near Cookhouse, SBDM, EC | AIA Phase 1 | 25/05/2021 | Karen Van Ryneveld | 25/05/2021 - 11:55 | |||
AIA-Boschendal Village Development | Archaeological Assessment of Portions 7/1674 And 10/1674 Of The Boschendal Estate. | AIA Phase 1 | 01/03/2015 | Natalie Kendrick, Timothy Hart | ACO Associates CC | Boschendal (Pty) Ltd | 21/08/2017 - 11:20 | |
AIA-BloemsmondPV1 | Archaeological Impact Assessment for the Proposed AEP Bloemsmond Solar 1 PV, Keimoes, Northern Cape Province | Archaeological Specialist Reports | 21/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 09/11/2015 - 09:27 | |
AIA-Birds wood survey 1 | ARCHAEOLOGICAL SURVEY OF THE PROPOSED BIRDSWOOD PRIMARY SCHOOL | AIA Phase 1 | 13/10/2008 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Environmental | CTS_304138 | 02/07/2015 - 15:31 |
AIA-Belvoir Aggregate Quarry II, Portion 7 of Farm Maidenhead 169, Division of Queenstown, Enoch Mgijima Local Municipality, Eastern Cape | AIA Phase 1 | 14/08/2017 | Karen Van Ryneveld | isi-Xwiba Consulting cc | 14/08/2017 - 09:50 | |||
AIA-Bayview Wind Farm, near Port Elizabeth, NMBM, Eastern Cape | Phase 1 Archaeological and Cultural heritage Impact Assessment - Bayview Wind Farm, near Port Elizabeth, Nelson Mandela Metropolitan Municipality, Eastern Cape | AIA Phase 1 | 16/08/2018 | Karen Van Ryneveld | EOH Coastal & Environmental Services (CES) - Port Elizabeth | 16/08/2018 - 10:21 | ||
AIA-AggeneysSolar(final) | Final Archaeological Survey for the Proposed Aggeneys Solar Energy Facility, Namakwaland Magisterial District, NC Province | Archaeological Specialist Reports | 23/07/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 09/10/2015 - 08:41 | |
AIA-Adventure Trail within the Hala Area of the Engcobo Local Municipality, CHDM, Eastern Cape | AIA-Adventure Trail within the Hala Area of the Engcobo Local Municipality, CHDM, Eastern Cape | AIA Phase 1 | 20/02/2018 | Karen Van Ryneveld | Y.B. Mashalaba (Pty) Ltd | 20/02/2018 - 14:39 | ||
AIA- OF KAMEELHOEK 477, ADMINISTRATIVE DISTRICT OF HAY, | HERITAGE SURVEY OF THE KAMEELHOEK 477, ADMINISTRATIVE DISTRICT OF HAY, | AIA Phase 1 | 15/12/2009 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 06/07/2015 - 08:58 | ||
AIA, Witpunt, Ermelo | Report on Phase 1 Archaeological Impact Assessment on Portion 22 of the farm Witpunt 267 IT, Ermelo, Mpumalanga Province. | AIA Phase 1 | 22/01/2013 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | CTS_116756 | 04/04/2013 - 11:45 |
AIA, solar facility, Onder Rietvlei 18/3 near Aurora | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED SOLAR ENERGY FACILITY ON ONDER RIETVLEI 18/3 NEAR AURORA, PIKETBERG MAGISTERIAL DISTRICT, WESTERN CAPE | AIA Phase 1 | 24/06/2011 | Jayson Orton | ACO Associates CC | Aurecon South Africa (Pty) Ltd | CTS_503679 | 17/04/2018 - 17:52 |
AIA, Sabie Sand Nature Reserve Kirkman's Kamp | Phase 1 Archaeological Survey on the farm Toulon 383 KU located in Sabie Sand Nature Reserve, Mpumalanga Province. | AIA Phase 1 | 30/09/2016 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 12/12/2016 - 15:41 | |
AIA, Sabie Sand Nature Reserve Kirkman's Kamp | Phase 1 Archaeological Survey on the farm Toulon 383 KU located in Sabie Sand Nature Reserve, Mpumalanga Province. | AIA Phase 1 | 30/09/2016 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 12/12/2016 - 15:41 | |
AIA, portion of Farm 251 Remainder, Vanrhynsdorp. | An Archaeological Impact Assessment: Portion of Farm 251 Remainder, Vanrhynsdorp. | AIA Phase 1 | 07/07/2011 | Andrew B Smith | Site Plan Consulting | CTS_503750 | 18/04/2018 - 15:01 | |
AIA, Piet Retief | Report on Phase 1 Archaeological Impact Assessment on the Remainder of Portion 1 of Piet Retief Town and Townlands 149 HT, Mpumalanga Province. | AIA Phase 1 | 16/10/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | CTS_116792 | 05/04/2013 - 11:16 |
AIA, Perry's Farm, Hazyview | Report on Phase 1 Archaeological Impact Assessment on Portions 2, 12 and 16 of the farm Perry’s Farm 9 JU and Portion 12 and the remainder of Portion 109 of the farm De Rust 12 JU, Hazyview Mpumalanga Province. | AIA Phase 1 | 19/06/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | CTS_116776 | 04/04/2013 - 15:47 |
AIA, Maggiesdal, Nelspruit | Report on Phase 1 Archaeological Impact Assessment on Portions 7, 8, 23, 24, 46 and 69 of the farm Maggiesdal 456 JT, Nelspruit, Mpumalanga Province. | AIA Phase 1 | 08/11/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Eco8 Environmental Planners | CTS_116785 | 05/04/2013 - 08:12 |
AIA, Komatipoort | Report on Phase 1 Archaeological Impact Assessment on erven 208-219 and 244-255 of Komatipoort 182 JU, Extension 4 Komatipoort, Mpumalanga Province. | AIA Phase 1 | 02/06/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Sisonke development Planners | CTS_116784 | 05/04/2013 - 07:59 |
AIA, Kasteel, Bushbuckridge | Phase 1 Archaeological Survey on the farm Kasteel 231 KU in Bushbuckridge Municipal area, Mpumalanga Province. | AIA Phase 1 | 05/06/2014 | Jean- Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | 27/07/2015 - 15:55 | |
AIA, Karino Hydro, Karino | Report on Phase 1 Archaeological Impact Assessment on Portions 1, 3, 5 and 16 of the farm Tipperary 135 JU, Portion 4 of Portion 5 of the farm Duma 201 JU and Portion 3 of the farm Langgewacht 202 JU near Karino, Mpumalanga Province. | AIA Phase 1 | 01/09/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Enpact Environmental Consultants CC | CTS_116778 | 04/04/2013 - 15:59 |
AIA, housing on Farms 475 & 476, Elandskloof, Clanwilliam | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT: Proposed development of housing and associated infrastructure on Farms 475 & 476, Elandskloof, Clanwilliam District, Cedarberg Municipality, Western Cape. | AIA Phase 1 | 14/07/2013 | Liezl van Pletzen-Vos, Renee Rust | Pro-Active Archaeology | Eco Impact Legal Consulting Pty Ltd | CTS_503282 | 11/04/2018 - 14:11 |
AIA, extension of borrow pit, Prince Albert Townlands | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON PRINCE ALBERT TOWNLANDS, CENTRAL KAROO DISTRICT, WESTERN CAPE | AIA Phase 1 | 01/03/2013 | Madelon Tusenius | Natura Viva CC | Aurecon South Africa (Pty) Ltd | CTS_503290 | 11/04/2018 - 16:11 |
AIA, extension of borrow pit MR00374, between Laingsburg and Merweville | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON KOEËLFONTEIN 59, LAINGSBURG DISTRICT, CENTRAL KAROO, WESTERN CAPE | AIA Phase 1 | 01/06/2012 | Madelon Tusenius | Natura Viva CC | Vidamemoria Heritage Consultants | CTS_503547 | 13/04/2018 - 22:13 |
AIA, expansion of borrow pit DR02162/3.8/L/100, north-west of Piketberg | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON STINKFONTEIN A 97, PIKETBERG AREA, WEST COAST DISTRICT MUNICIPALITY, WESTERN CAPE | AIA Phase 1 | 01/03/2013 | Madelon Tusenius | Natura Viva CC | Vidamemoria Heritage Consultants | CTS_503690 | 18/04/2018 - 09:31 |
AIA, Coltshill, White River | Report on Phase 1 Archaeological Impact Assessment on Portion 147 and the Remainder of Portion 8 of the farm White River 64 JU, Coltshill Extension 2, White River, Mpumalanga Province. | AIA Phase 1 | 13/08/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Eco8 Environmental Planners | CTS_116775 | 04/04/2013 - 15:28 |
AIA, borrow pit extension accessed via MR587, Belvedere 73, Beaufort West | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT IN THE ROAD RESERVE, BELVEDERE 73, BEAUFORT WEST MUNICIPALITY, CENTRAL KAROO DISTRICT, WESTERN CAPE | AIA Phase 1 | 01/07/2015 | Madelon Tusenius | Natura Viva CC | Vidamemoria Heritage Consultants | CTS_503575 | 16/04/2018 - 09:45 |
AIA, borrow pit (DR2182/17.32/R/10/A) extension on Farm no. 581 (Keurbos), Clanwilliam | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON FARM NO. 581 (KEURBOS), CLANWILLIAM DISTRICT, WESTERN CAPE | AIA Phase 1 | 13/08/2012 | Madelon Tusenius | Natura Viva CC | Vidamemoria Heritage Consultants | CTS_503761 | 18/04/2018 - 16:49 |
AIA, borrow pit (DR02242/0.3/R/100) extension on portion 1 of Dassen Klip A 169 near Porterville | ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF A BORROW PIT ON PORTION 1 OF DASSEN KLIP A 169 NEAR PORTERVILLE, WEST COAST DISTRICT MUNICIPALITY, WESTERN CAPE | AIA Phase 1 | 01/03/2013 | Madelon Tusenius | Nadeson Consulting Services | Vidamemoria Heritage Consultants | CTS_503682 | 17/04/2018 - 18:30 |
AIA, Bateleur Estate, Nelspruit | Report on Phase 1 Archaeological Impact Assessment on the farm The Rest 454 JT in respect of Bateleur Estate located at Nelspruit, Mbombela Local Municipality, Mpumalanga Province. | AIA Phase 1 | 16/10/2012 | Jean-Pierre Celliers | Kudzala Antiquity | Eco8 Environmental Planners | CTS_116773 | 04/04/2013 - 15:13 |