FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort descending
PIA of Alpine Heath resort gabion installation Palaeontological Impact Assessment for the proposed Erosion Control Gabion Installation at Alpine Heath Resort on the Farm Akkerman No 5679 in the Bergville District, KZN Elize Butler 05/08/2021 - 13:36
Shishini Trading Truck Stop - Bronkhorstspruit - Phase 1 AIA PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The proposed Shishini Trading (Pty) Ltd Retail Truck Stop on a Portion of Portion 41 of the Farm Klipeiland 524 JR, Bronkhorstspruit, Gauteng AIA Phase 1 01/07/2021 Tobias Coetzee 05/08/2021 - 15:11
Palaeontological Impact Assessment: Desktop Study Shishini Trading (Pty) Ltd Retail Truck Stop - Palaeontological Impact Assessment: Desktop Study PIA Desktop 12/07/2021 Dr. Heidi Fourie 05/08/2021 - 15:15
Phase 1 AIA: PROPOSED OFFICE BUILDINGS, HOLLAND STREET, ADDO PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED OFFICE BUILDINGS ON ERF NO. 944 AND ERF NO. 945, HOLLAND STREET, ADDO, SUNDAYS RIVER LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 31/07/2021 Celeste Booth Booth Heritage Consulting Indwe Environmental Consulting 05/08/2021 - 15:51
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS Heritage Impact Assessment for the proposed Mixed Use Development on Portion of REM OF THE FARM BIGGS NO 18388 referred to as “Greytown Road Development” UMshwathi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal Heritage Impact Assessment Specialist Reports Mike Webster eThembeni Cultural Heritage 05/08/2021 - 23:51
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. 06/08/2021 Emvelo Quality and Environmental Consultant Emvelo Quality and Environmental Consultant 06/08/2021 - 11:30
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. Heritage Impact Assessment Specialist Reports 06/08/2021 06/08/2021 - 11:40
Phase 1 Heritage Impact Assessment - Matlakeng Ext 11 Matlakeng Ext 11 (Portion 2 and the Remainder of the Farm Mooifontein 480 Zastron RD); Zastron; Mohokare Local Municipality; Free State Province HIA Phase 1 05/11/2020 Free State Department of Human Settlements Leonie Marais Heri 06/08/2021 - 12:44
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE 04/06/2021 06/08/2021 - 12:53
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE HIA Phase 1 04/06/2021 06/08/2021 - 12:55
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on Portions 4 & 5 of the Farm Klipfontein 459 and Portion 1 and the RE of the FarmEnkeldoorn 605, Bothaville, Free State. AIA Desktop 09/07/2021 Tobias Coetzee 09/08/2021 - 10:12
Umsimbithi Mine Status Quo HIA Umsimbithi Mine Status Quo HIA HIA Phase 1 31/05/2021 Mabuda Mmbudziseni Moses Mulaifa Development Projects cc Umsimbithi Mining (Pty) Ltd. 10/08/2021 - 13:12
HIA Baseline Proposed Tawana Hotazel Mine BASELINE REPORT FOR THE HERITAGE IMPACT ASSESSMENT RELATED TO THE PROPOSED TAWANE HOTAZEL MINE, NORTHERN CAPE PROVINCE Heritage Scoping 08/12/2020 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Prime Resources (Pty) Ltd 10/08/2021 - 13:52
Middelburg Dam Precinct Plan PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF MIDDELBURG DAM PRECINCT PLAN, (18Ha) ON A PORTION OF PORTION 87 OF THE FARM RONDEBOSCH 403-JS, MIDDELBURG, MPUMALANGA PROVINCE HIA Phase 1 23/06/2021 Christine Van Wyk Rowe Adansonia Heritage Consultants Adansonia Heritage Consultants 10/08/2021 - 14:06
Phase 1 HIA Desktop Study Menar Capital PHASE 1 HIA HERITAGE DESKTOP STUDY MENAR CAPITAL PROSPECTING RIGHT NORTHERN CAPE PROPOSED PROSPECTING RIGHT APPLICATION FOR IRON ORE AND MANGANESE ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, LOCATED 41 KM NORTH-WEST OF KATHU WITHIN THE TSANTSABANE AND JOE MOROLONG LOCAL MUNICIPALITIES, NORTHERN CAPE PROVINCE. CaseID: 16605 (NC 30/5/1/1/2/12769 PR) HIA Phase 1 10/08/2021 Heidi Fivaz UBIQUE HERITAGE CONSULTANTS Menar Capital (Pty) Lrd 10/08/2021 - 15:04
DESKTOP PIA MENAR CAPITAL PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, NORTHERN CAPE PROVINCE PIA Desktop 10/08/2021 Elize Butler Banzai Environmental (Pty) Ltd UBIQUE HERITAGE CONSULTANTS 10/08/2021 - 15:08
HIA: Modderfontein WEF Amendment HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed part 2 amendment to the existing Environmental Authorisation for the Modderfontein WEF, near Victoria West located in both the Northern and Western Cape HIA Phase 1 27/07/2021 Jenna Lavin, Nicholas Wiltshire, Sarah Winter, John Almond CTS Heritage Terramanzi Group (Pty) Ltd 10/08/2021 - 15:28
HIA EIA Phase HERITAGE IMPACT ASSESSMENT REPORT, FOR INCLUSION IN THE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED ANKER ELANDSFONTEIN COLLIERY PROJECT, WITBANK, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. Heritage Impact Assessment Specialist Reports 17/11/2020 Cheyenne Muthukarapan PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 10/08/2021 - 15:36
HIA: Rondavel PV EGI HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Grid Connections for the Rondawel Solar Energy Facility near Kroonstad, Free State Province HIA Phase 1 29/07/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 10/08/2021 - 15:36
PIA EIA Phase PALAEONTOLOGICAL FIELD ASSESSMENT FOR THE PROPOSED ENVIRONMENTAL AUTHORISATION AND AMENDMENT PROCESSES FOR ELANDSFONTEIN COLLIERY, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. 17/11/2020 Cheyenne Muthukarapan PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 10/08/2021 - 15:41
HIA: Vrede PV EGI HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of a Grid Connection for the proposed Vrede Solar Energy Facility near Kroonstad, Free State Province HIA Phase 1 29/07/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 10/08/2021 - 15:50
Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. Non Impact Assessment Related Reports 11/08/2021 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd Magalela & Associates 11/08/2021 - 05:01
Paleontological report-Sigma Proposed restoration of power from Sigma Shaft – Vaal River line (SVR), west of Sasolburg, Free State PIA Phase 1 06/06/2021 Jacobus Francios Durand Vhubvo Archaeo-Heritage Consultants Vhubvo Archaeo-Heritage Consultants 11/08/2021 - 12:08
40727 Nalisview Cemetery (3) Phase 1 Heritage Impact Assessment: proposed extension of a new cemetery site on the farm Nalisview 1060, Bloemfontein, Free State Province. HIA Phase 1 07/05/2020 11/08/2021 - 13:36
Dalpark Shopping Centre Heritage Impact Assessment for the Proposed Dalpark Shopping Centre, Gauteng Province Heritage Impact Assessment Specialist Reports 30/06/2021 Jaco van der Walt HCAC Heritage Consultants Mills and Otten Environmental Consultants 11/08/2021 - 15:18
PIA for proposed Dalpark Retail Development Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province Palaeontological Specialist Reports 30/06/2021 Marion Bamford Prof Marion Bamford HCAC Heritage Consultants 11/08/2021 - 15:27
Dalpark Shopping Centre Heritage Impact Assessment for the Proposed Dalpark Shopping Centre, Gauteng Province Heritage Impact Assessment Specialist Reports 30/06/2021 Jaco van der Walt HCAC Heritage Consultants Mills and Otten Environmental Consultants 11/08/2021 - 15:31
PIA for proposed Dalpark Retail Development Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province Palaeontological Specialist Reports 30/06/2021 Marion Bamford Prof Marion Bamford HCAC Heritage Consultants 11/08/2021 - 16:15
LETTER FOR HIA EXEMPTION REQUEST Leslie Community Filling Station (Pty) Ltd HIA Letter of Exemption 21/07/2021 Jaco van der Walt HCAC Heritage Consultants Texture Environmental Consultants 12/08/2021 - 09:46
ARCHAEOLOGICAL DESKTOP STUDY Archaeological Desktop Study for the Application of a Prospecting Right on Several Portions of the Farms Zandfonteinpan 472, Nederlanden 32, Rebelfort 288, Bowie 621, Schiedam 124, Jacoba 878 and Stillerustig 548, Bothaville, Free State AIA Desktop 09/07/2021 12/08/2021 - 10:04
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF A TOWNSHIP, TO BE KNOWN AS AMOROSA EXTENSION 57, ON PORTION 1 OF HOLDING 25, AMOROSA AGRICULTURAL HOLDINGS, CITY OF JOHANNESBURG METROPOLITAN MUNCIPALITY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports J.A. van Schalkwyk Greenworx Environmental (Pty) Ltd 12/08/2021 - 10:04
Phase 1 HIA Postmasburg Bulk Water Pipeline Phase 1 Heritage Impact Assessment for the proposed installation of a 710mm diameter, bulk water pipeline from the Postdene reservoir to the Greenfields residential development in Postmasburg, NC Province. HIA Phase 1 25/05/2021 Lloyd Rossouw Paleo Field Services Bigen Africa Services (Pty) Ltd. 12/08/2021 - 12:11
Phase 1 AIA: Ebika-Nqandu Road Upgrade PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF 35KM OF THE DR08344 AND DR08429 DISTRICT ROADS, BETWEEN EBIKA AND WILLOWVALE VIA NQADU IN THE MNQUMA LOCAL MUNICIPALITY AND MBHASHE LOCAL MUNICIPALITY, AMATOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 31/07/2021 Celeste Booth Booth Heritage Consulting Kimopax Pty Ltd 12/08/2021 - 12:14
EVRAZ PIA Report Paleontological Impact Assessment Report: Desktop Study PIA Desktop 13/09/2020 Heidi Fourie 12/08/2021 - 13:57
Heritage Opinion regarding the Proposed Road Realignment by the NBC Colliery Heritage Opinion regarding the Proposed Road Realignment by the NBC Colliery, near eMakhazeni (Belfast), eMakhazeni Local Municipality, Nkangala District Municipality, Mpumalanga Province. Heritage Statement 23/07/2021 Polke Birkholtz, Cherene de Bruyn PGS Heritage (Pty) Ltd 13/08/2021 - 10:00
SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE PROPOSED SONNEBLOM PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE PIA Phase 1 11/08/2021 John Almond Department of Environmental Affairs Subsolar Energy 13/08/2021 - 10:40
SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE PROPOSED SONNEBLOM PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE PIA Phase 1 11/08/2021 John Almond Department of Environmental Affairs Subsolar Energy 13/08/2021 - 10:45
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES NEW 132KV POWER LINES BETWEEN THE ON-SITE SUBSTATIONS AND THE LOCAL GRID CONNECTION FOR THE PROPOSED MATJHABENG SOLAR PV PHASE 1 AND 2 DEVELOPMENT, ODENDAALRUS REGION, FREE STATE PROVINCE. Phase 1 Cultural Heritage Impact Assessment. HIA Phase 1 02/11/2020 Johnny van Schalkwyk 13/08/2021 - 11:59
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES THE PROPOSED DEVELOPMENT OF THE MATJHABENG 400 MW SOLAR PHOTOVOLTAIC (PV) PLANT LOCATED NORTH AND SOUTH OF THE TOWN OF ODENDAALSRUS, MATJHABENG DISRICT MUNICIPALITY, FREE STATE PROVINCE. Phase 1 Cultural Heritage Impact Assessment. HIA Phase 1 16/11/2020 Johnny van Schalkwyk 13/08/2021 - 12:18
PIA report: Smithfield-Rouxville Zastron 33 kV powerline Paleontology Impact Assessment report for the proposed construction of a 33kV Eskom powerline from Smithfield substation to Rouxville Substation; and from Rouxville Substation to Zastron Substation, Free State Province PIA Phase 2 16/07/2021 Marion Bamford Eskom - FSOU 13/08/2021 - 14:56
Kimswa PIA _EButler 14-05-2019Fin PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) PROSPECTING RIGHT APPLICATION NEAR NEAR POSTMASBURG, REGISTRATION DIVISION; HAY, NORTHERN CAPE PROVINCE. PIA Desktop 08/05/2018 Elize Butler 13/08/2021 - 15:51
Prospecting Right application Farms 467 168 etc HAY Heritage Impact Assessment (Archaeology) for a proposed Prospecting Right application for the prospecting of Diamonds (Alluvial, General & in Kimberlite) near Postmasburg on the Remaining Extent, the Remaining Extent of Portion 1 (Strathmore), Portion 2 (portion of portion 1) and Portion 3 of Plaas 467, Remaining Extent and Portion 1 (Strathmore) of Plaas 468, Hay, Northern Cape Province HIA Phase 1 01/05/2019 David Morris 13/08/2021 - 15:54
Masibambane Application Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. Tsimba Archaeological Footprints (Pty) Ltd Sikone Consulting Engineers (Pty) Ltd 14/08/2021 - 11:28
Masibambisane Bulk Water Supply Scheme Tsimba Archaeological Footprints (Pty) Ltd Sikone Consulting Engineers (Pty) Ltd 14/08/2021 - 11:30
HIA for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park, Kgatelopele Local Municipality, Northern Cape Province. Heritage Impact Assessment for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park on the Farm Grootvlei 296, west of Barkley West in the Kgatelopele Local Municipality, Northern Cape Province. AIA Phase 1 02/09/2016 Marko Hutten Hutten Heritage Consultants AGES (PTY) Ltd - Limpopo 14/08/2021 - 14:11
Palaeontological Desktop Study – Manlenox Solar Park, Barkley West Palaeontological Desktop Study – Manlenox Solar Park, Barkley West PIA Desktop 29/06/2013 Bruce Rubidge BPI for Palaeontology Research AGES (PTY) Ltd - Limpopo 14/08/2021 - 14:13
Phase 1 AIA: Blue Rock Mining Right PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MINING RIGHT APPLICATION ON ALLOTMENT 50 OF MDLANKOMO, NEAR LIBODE, NYANDENI LOCAL MUNICIPALITY, OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 16/08/2021 Celeste Booth Booth Heritage Consulting Algoa Consulting mining Engineers CC (ACME) 16/08/2021 - 13:27
Phase 1 Revised: Dobbin Solar Energy Facility REVISED REPORT: PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED 75MW DOBBIN PHOTOVOLTAIC SOLAR FARM ON THE FARM HET FONTEIN 1/66, NEAR CRADOCK, INXUBA YETHEMBA DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. AIA Phase 1 16/08/2021 Celeste Booth Booth Heritage Consulting Global Green Environmental Consultants 16/08/2021 - 14:51
Wildebeestlaagte Vodacom Mast, North West Province Wildebeestlaagte Vodacom Mast, North West Province HIA Letter of Exemption 12/08/2021 Jaco van der Walt Beyond Heritage Tekplan Environmental 17/08/2021 - 08:53
Heritage Impact Assessment for Smithfield-Rouxville-Zastron 33kV powerline HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SMITHFIELD TO ROUXVILLE AND ROUXVILLE TO ZASTRON 33KV POWERLINE ROUTES, FREE STATE PROVINCE HIA Phase 2 06/08/2021 Edward Matenga Eskom - FSOU 17/08/2021 - 15:19

Pages

CSV
 
 

Search form