THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15801 - 15850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
PIA of Alpine Heath resort gabion installation | Palaeontological Impact Assessment for the proposed Erosion Control Gabion Installation at Alpine Heath Resort on the Farm Akkerman No 5679 in the Bergville District, KZN | Elize Butler | 05/08/2021 - 13:36 | ||||
Shishini Trading Truck Stop - Bronkhorstspruit - Phase 1 AIA | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The proposed Shishini Trading (Pty) Ltd Retail Truck Stop on a Portion of Portion 41 of the Farm Klipeiland 524 JR, Bronkhorstspruit, Gauteng | AIA Phase 1 | 01/07/2021 | Tobias Coetzee | 05/08/2021 - 15:11 | ||
Palaeontological Impact Assessment: Desktop Study | Shishini Trading (Pty) Ltd Retail Truck Stop - Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 12/07/2021 | Dr. Heidi Fourie | 05/08/2021 - 15:15 | ||
Phase 1 AIA: PROPOSED OFFICE BUILDINGS, HOLLAND STREET, ADDO | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED OFFICE BUILDINGS ON ERF NO. 944 AND ERF NO. 945, HOLLAND STREET, ADDO, SUNDAYS RIVER LOCAL MUNICIPALITY, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 31/07/2021 | Celeste Booth | Booth Heritage Consulting | Indwe Environmental Consulting | 05/08/2021 - 15:51 |
HERITAGE IMPACT ASSESSMENT OF REM OF THE FARM BIGGS | Heritage Impact Assessment for the proposed Mixed Use Development on Portion of REM OF THE FARM BIGGS NO 18388 referred to as “Greytown Road Development” UMshwathi Local Municipality, uMgungundlovu District Municipality, KwaZulu-Natal | Heritage Impact Assessment Specialist Reports | Mike Webster | eThembeni Cultural Heritage | 05/08/2021 - 23:51 | ||
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal | The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. | 06/08/2021 | Emvelo Quality and Environmental Consultant | Emvelo Quality and Environmental Consultant | 06/08/2021 - 11:30 | ||
The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal | The Proposed Soul City/Stafford Hill Housing Development for Formalization of Semi-formal Settlement in Majorisa, within Ward 31 of Newcastle Local Municipality, Kwazulu-Natal. | Heritage Impact Assessment Specialist Reports | 06/08/2021 | 06/08/2021 - 11:40 | |||
Phase 1 Heritage Impact Assessment - Matlakeng Ext 11 | Matlakeng Ext 11 (Portion 2 and the Remainder of the Farm Mooifontein 480 Zastron RD); Zastron; Mohokare Local Municipality; Free State Province | HIA Phase 1 | 05/11/2020 | Free State Department of Human Settlements | Leonie Marais Heri | 06/08/2021 - 12:44 | |
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE | 04/06/2021 | 06/08/2021 - 12:53 | ||||
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT THE PROPOSED DEVELOPMENT OF A BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE AT THE CUPRUM SUBSTATION LOCATED WITHIN COPPERTON, NEAR THE TOWN OF PRIESKA, NORTHERN CAPE PROVINCE | HIA Phase 1 | 04/06/2021 | 06/08/2021 - 12:55 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on Portions 4 & 5 of the Farm Klipfontein 459 and Portion 1 and the RE of the FarmEnkeldoorn 605, Bothaville, Free State. | AIA Desktop | 09/07/2021 | Tobias Coetzee | 09/08/2021 - 10:12 | ||
Umsimbithi Mine Status Quo HIA | Umsimbithi Mine Status Quo HIA | HIA Phase 1 | 31/05/2021 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | Umsimbithi Mining (Pty) Ltd. | 10/08/2021 - 13:12 |
HIA Baseline Proposed Tawana Hotazel Mine | BASELINE REPORT FOR THE HERITAGE IMPACT ASSESSMENT RELATED TO THE PROPOSED TAWANE HOTAZEL MINE, NORTHERN CAPE PROVINCE | Heritage Scoping | 08/12/2020 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Prime Resources (Pty) Ltd | 10/08/2021 - 13:52 |
Middelburg Dam Precinct Plan | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF MIDDELBURG DAM PRECINCT PLAN, (18Ha) ON A PORTION OF PORTION 87 OF THE FARM RONDEBOSCH 403-JS, MIDDELBURG, MPUMALANGA PROVINCE | HIA Phase 1 | 23/06/2021 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Adansonia Heritage Consultants | 10/08/2021 - 14:06 |
Phase 1 HIA Desktop Study Menar Capital | PHASE 1 HIA HERITAGE DESKTOP STUDY MENAR CAPITAL PROSPECTING RIGHT NORTHERN CAPE PROPOSED PROSPECTING RIGHT APPLICATION FOR IRON ORE AND MANGANESE ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, LOCATED 41 KM NORTH-WEST OF KATHU WITHIN THE TSANTSABANE AND JOE MOROLONG LOCAL MUNICIPALITIES, NORTHERN CAPE PROVINCE. CaseID: 16605 (NC 30/5/1/1/2/12769 PR) | HIA Phase 1 | 10/08/2021 | Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Menar Capital (Pty) Lrd | 10/08/2021 - 15:04 |
DESKTOP PIA MENAR CAPITAL | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, NORTHERN CAPE PROVINCE | PIA Desktop | 10/08/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | UBIQUE HERITAGE CONSULTANTS | 10/08/2021 - 15:08 |
HIA: Modderfontein WEF Amendment | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed part 2 amendment to the existing Environmental Authorisation for the Modderfontein WEF, near Victoria West located in both the Northern and Western Cape | HIA Phase 1 | 27/07/2021 | Jenna Lavin, Nicholas Wiltshire, Sarah Winter, John Almond | CTS Heritage | Terramanzi Group (Pty) Ltd | 10/08/2021 - 15:28 |
HIA EIA Phase | HERITAGE IMPACT ASSESSMENT REPORT, FOR INCLUSION IN THE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED ANKER ELANDSFONTEIN COLLIERY PROJECT, WITBANK, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE. | Heritage Impact Assessment Specialist Reports | 17/11/2020 | Cheyenne Muthukarapan | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 10/08/2021 - 15:36 |
HIA: Rondavel PV EGI | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Grid Connections for the Rondawel Solar Energy Facility near Kroonstad, Free State Province | HIA Phase 1 | 29/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 10/08/2021 - 15:36 |
PIA EIA Phase | PALAEONTOLOGICAL FIELD ASSESSMENT FOR THE PROPOSED ENVIRONMENTAL AUTHORISATION AND AMENDMENT PROCESSES FOR ELANDSFONTEIN COLLIERY, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE. | 17/11/2020 | Cheyenne Muthukarapan | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 10/08/2021 - 15:41 | |
HIA: Vrede PV EGI | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of a Grid Connection for the proposed Vrede Solar Energy Facility near Kroonstad, Free State Province | HIA Phase 1 | 29/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 10/08/2021 - 15:50 |
Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. | Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. | Non Impact Assessment Related Reports | 11/08/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Magalela & Associates | 11/08/2021 - 05:01 |
Paleontological report-Sigma | Proposed restoration of power from Sigma Shaft – Vaal River line (SVR), west of Sasolburg, Free State | PIA Phase 1 | 06/06/2021 | Jacobus Francios Durand | Vhubvo Archaeo-Heritage Consultants | Vhubvo Archaeo-Heritage Consultants | 11/08/2021 - 12:08 |
40727 Nalisview Cemetery (3) | Phase 1 Heritage Impact Assessment: proposed extension of a new cemetery site on the farm Nalisview 1060, Bloemfontein, Free State Province. | HIA Phase 1 | 07/05/2020 | 11/08/2021 - 13:36 | |||
Dalpark Shopping Centre | Heritage Impact Assessment for the Proposed Dalpark Shopping Centre, Gauteng Province | Heritage Impact Assessment Specialist Reports | 30/06/2021 | Jaco van der Walt | HCAC Heritage Consultants | Mills and Otten Environmental Consultants | 11/08/2021 - 15:18 |
PIA for proposed Dalpark Retail Development | Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province | Palaeontological Specialist Reports | 30/06/2021 | Marion Bamford | Prof Marion Bamford | HCAC Heritage Consultants | 11/08/2021 - 15:27 |
Dalpark Shopping Centre | Heritage Impact Assessment for the Proposed Dalpark Shopping Centre, Gauteng Province | Heritage Impact Assessment Specialist Reports | 30/06/2021 | Jaco van der Walt | HCAC Heritage Consultants | Mills and Otten Environmental Consultants | 11/08/2021 - 15:31 |
PIA for proposed Dalpark Retail Development | Palaeontological Impact Assessment for the proposed Dalpark Retail Development near Carnival City, Boksburg, Gauteng Province | Palaeontological Specialist Reports | 30/06/2021 | Marion Bamford | Prof Marion Bamford | HCAC Heritage Consultants | 11/08/2021 - 16:15 |
LETTER FOR HIA EXEMPTION REQUEST | Leslie Community Filling Station (Pty) Ltd | HIA Letter of Exemption | 21/07/2021 | Jaco van der Walt | HCAC Heritage Consultants | Texture Environmental Consultants | 12/08/2021 - 09:46 |
ARCHAEOLOGICAL DESKTOP STUDY | Archaeological Desktop Study for the Application of a Prospecting Right on Several Portions of the Farms Zandfonteinpan 472, Nederlanden 32, Rebelfort 288, Bowie 621, Schiedam 124, Jacoba 878 and Stillerustig 548, Bothaville, Free State | AIA Desktop | 09/07/2021 | 12/08/2021 - 10:04 | |||
Phase 1 Cultural Heritage Impact Assessment: | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF A TOWNSHIP, TO BE KNOWN AS AMOROSA EXTENSION 57, ON PORTION 1 OF HOLDING 25, AMOROSA AGRICULTURAL HOLDINGS, CITY OF JOHANNESBURG METROPOLITAN MUNCIPALITY, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | J.A. van Schalkwyk | Greenworx Environmental (Pty) Ltd | 12/08/2021 - 10:04 | ||
Phase 1 HIA Postmasburg Bulk Water Pipeline | Phase 1 Heritage Impact Assessment for the proposed installation of a 710mm diameter, bulk water pipeline from the Postdene reservoir to the Greenfields residential development in Postmasburg, NC Province. | HIA Phase 1 | 25/05/2021 | Lloyd Rossouw | Paleo Field Services | Bigen Africa Services (Pty) Ltd. | 12/08/2021 - 12:11 |
Phase 1 AIA: Ebika-Nqandu Road Upgrade | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF 35KM OF THE DR08344 AND DR08429 DISTRICT ROADS, BETWEEN EBIKA AND WILLOWVALE VIA NQADU IN THE MNQUMA LOCAL MUNICIPALITY AND MBHASHE LOCAL MUNICIPALITY, AMATOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 31/07/2021 | Celeste Booth | Booth Heritage Consulting | Kimopax Pty Ltd | 12/08/2021 - 12:14 |
EVRAZ PIA Report | Paleontological Impact Assessment Report: Desktop Study | PIA Desktop | 13/09/2020 | Heidi Fourie | 12/08/2021 - 13:57 | ||
Heritage Opinion regarding the Proposed Road Realignment by the NBC Colliery | Heritage Opinion regarding the Proposed Road Realignment by the NBC Colliery, near eMakhazeni (Belfast), eMakhazeni Local Municipality, Nkangala District Municipality, Mpumalanga Province. | Heritage Statement | 23/07/2021 | Polke Birkholtz, Cherene de Bruyn | PGS Heritage (Pty) Ltd | 13/08/2021 - 10:00 | |
SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE | PROPOSED SONNEBLOM PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | PIA Phase 1 | 11/08/2021 | John Almond | Department of Environmental Affairs | Subsolar Energy | 13/08/2021 - 10:40 |
SITE SENSITIVITY VERIFICATION REPORT: PALAEONTOLOGICAL HERITAGE | PROPOSED SONNEBLOM PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | PIA Phase 1 | 11/08/2021 | John Almond | Department of Environmental Affairs | Subsolar Energy | 13/08/2021 - 10:45 |
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES | NEW 132KV POWER LINES BETWEEN THE ON-SITE SUBSTATIONS AND THE LOCAL GRID CONNECTION FOR THE PROPOSED MATJHABENG SOLAR PV PHASE 1 AND 2 DEVELOPMENT, ODENDAALRUS REGION, FREE STATE PROVINCE. Phase 1 Cultural Heritage Impact Assessment. | HIA Phase 1 | 02/11/2020 | Johnny van Schalkwyk | 13/08/2021 - 11:59 | ||
MATJHABENG SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE SYSTEMS PROJECT: PHASE 1 AND PHASE 2 POWER LINES | THE PROPOSED DEVELOPMENT OF THE MATJHABENG 400 MW SOLAR PHOTOVOLTAIC (PV) PLANT LOCATED NORTH AND SOUTH OF THE TOWN OF ODENDAALSRUS, MATJHABENG DISRICT MUNICIPALITY, FREE STATE PROVINCE. Phase 1 Cultural Heritage Impact Assessment. | HIA Phase 1 | 16/11/2020 | Johnny van Schalkwyk | 13/08/2021 - 12:18 | ||
PIA report: Smithfield-Rouxville Zastron 33 kV powerline | Paleontology Impact Assessment report for the proposed construction of a 33kV Eskom powerline from Smithfield substation to Rouxville Substation; and from Rouxville Substation to Zastron Substation, Free State Province | PIA Phase 2 | 16/07/2021 | Marion Bamford | Eskom - FSOU | 13/08/2021 - 14:56 | |
Kimswa PIA _EButler 14-05-2019Fin | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) PROSPECTING RIGHT APPLICATION NEAR NEAR POSTMASBURG, REGISTRATION DIVISION; HAY, NORTHERN CAPE PROVINCE. | PIA Desktop | 08/05/2018 | Elize Butler | 13/08/2021 - 15:51 | ||
Prospecting Right application Farms 467 168 etc HAY | Heritage Impact Assessment (Archaeology) for a proposed Prospecting Right application for the prospecting of Diamonds (Alluvial, General & in Kimberlite) near Postmasburg on the Remaining Extent, the Remaining Extent of Portion 1 (Strathmore), Portion 2 (portion of portion 1) and Portion 3 of Plaas 467, Remaining Extent and Portion 1 (Strathmore) of Plaas 468, Hay, Northern Cape Province | HIA Phase 1 | 01/05/2019 | David Morris | 13/08/2021 - 15:54 | ||
Masibambane Application | Masibambisane Bulk Water Supply Scheme in Ward 3, 4, 5, 6, 9,10 and 11 of Maphumulo Local Municipality in ILembe District Municipality. | Tsimba Archaeological Footprints (Pty) Ltd | Sikone Consulting Engineers (Pty) Ltd | 14/08/2021 - 11:28 | |||
Masibambisane Bulk Water Supply Scheme | Tsimba Archaeological Footprints (Pty) Ltd | Sikone Consulting Engineers (Pty) Ltd | 14/08/2021 - 11:30 | ||||
HIA for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park, Kgatelopele Local Municipality, Northern Cape Province. | Heritage Impact Assessment for the Proposed Manlenox Expansion Solar Park and the Manlenox 2 Solar Park on the Farm Grootvlei 296, west of Barkley West in the Kgatelopele Local Municipality, Northern Cape Province. | AIA Phase 1 | 02/09/2016 | Marko Hutten | Hutten Heritage Consultants | AGES (PTY) Ltd - Limpopo | 14/08/2021 - 14:11 |
Palaeontological Desktop Study – Manlenox Solar Park, Barkley West | Palaeontological Desktop Study – Manlenox Solar Park, Barkley West | PIA Desktop | 29/06/2013 | Bruce Rubidge | BPI for Palaeontology Research | AGES (PTY) Ltd - Limpopo | 14/08/2021 - 14:13 |
Phase 1 AIA: Blue Rock Mining Right | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED MINING RIGHT APPLICATION ON ALLOTMENT 50 OF MDLANKOMO, NEAR LIBODE, NYANDENI LOCAL MUNICIPALITY, OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 16/08/2021 | Celeste Booth | Booth Heritage Consulting | Algoa Consulting mining Engineers CC (ACME) | 16/08/2021 - 13:27 |
Phase 1 Revised: Dobbin Solar Energy Facility | REVISED REPORT: PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED 75MW DOBBIN PHOTOVOLTAIC SOLAR FARM ON THE FARM HET FONTEIN 1/66, NEAR CRADOCK, INXUBA YETHEMBA DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 16/08/2021 | Celeste Booth | Booth Heritage Consulting | Global Green Environmental Consultants | 16/08/2021 - 14:51 |
Wildebeestlaagte Vodacom Mast, North West Province | Wildebeestlaagte Vodacom Mast, North West Province | HIA Letter of Exemption | 12/08/2021 | Jaco van der Walt | Beyond Heritage | Tekplan Environmental | 17/08/2021 - 08:53 |
Heritage Impact Assessment for Smithfield-Rouxville-Zastron 33kV powerline | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SMITHFIELD TO ROUXVILLE AND ROUXVILLE TO ZASTRON 33KV POWERLINE ROUTES, FREE STATE PROVINCE | HIA Phase 2 | 06/08/2021 | Edward Matenga | Eskom - FSOU | 17/08/2021 - 15:19 |